odisha oistrict:keonjhar block: ghasipura batch: -- batch i... · 2018-01-31 · 'evs goatrv...
TRANSCRIPT
Block: GhasiPuraBatch: l/ 2009-10
odisha oistrict:KeonjharIWMP-lV,Ghasjjura-
Approvcd Project Cost(Rs.in lakns): --^"-i"n
Ev ben.l itu rel Rs.in lakhs)nteclsummary or proJect
SJ.NO, worh sub category Details of achievements
1 NRIVI WORKS :Unit (ha / nos / Rmt l Quantity
(Dfand Development lProductiveUse)
0
3400
(e) Wasteland developed 0
(it) Sorl & tlorsture Conservation 0
0
0
(d) Field bundl^g 222
ti Earlhen Canal 0
0 )Vegetative and EngineeringStructure
(a) Checks & pl!9s 0
(b) Gabion struclure 0
(c) Gully pluss29
e) Gabian stfucture 0
(0 Earlhen bund 0
(g) Olhe(G.C StrLrdure)
Water Harvesling Struclure (New
Created)160
lb) Checl dams 0
lc) Nallah Bunds 0
(d Perco!ation lanks(e) Ground Water recharge 14
(0 Othe.s(Canal) 5
(s)Masonry Drcp Slrucl're 13
(h)Divercion Drain
(") Water H-ruestin9 Structure lOtdreiuvenated)
27
0
(c) Nallah Bunds 0
(d) Percolalion lanks 0
(e) Ground Water fecharge 0
2Production system & micro -
enterprisesPoultry nos 7480
Duckery 2322
Kitchenqarden nos 13r2
HrYreldinovanetv paddv 28
Fruittree Dlanlalion 400
Fishery 20
I\rnikits r0
SmallDettvbusine!s 32
Aqric(']lture lmplements 221
3 Livellhood activaties Po!llrv SHG(nos) 2A
'evs
Goatrv SHG(nos) 5SDices& Paoad SHG(nos) 12
Drudgery(WomenFriendly FarmEouioments)
SHG(nos) 12
4 Oihers lndividualB!sinessSummary
Total rain water haruest,nq sLructufes created 160Total tain waier haNestinq shuciures renovated 27
Additronal area brouaht under orotective irrioation 95Numbels ol farmers benefitedDirect emploVment created 55452
Signaturd"-.><6\9
i,.,. llL:t'P .\h.:-tr'Signature
P.D, WatershedsPIA
(1 (tr#'Signature
APD(Livelihoods)
6 "9^) \^
't it'Stt'e: Odisha District- Khurda Block, Khurda
Project lD/ Name of the Cluster: IWMELKblda- Batch-l/2009/10
Approved Project cost (Rs. In Lakh) -628.20 Actual Expenditure (Rs. ln lakh)- 514.75341
Summary of project activities implemented:
SI No Work / Activity Work Sub CategoryDetails of ach evementsUnit Quantitv
'l NRM Works
(DLand Development
( Productive use)(a) Afforestation ha 0
(b) Hodiculture ha
(c) Agriculture 0(d) Pasture 0
(e) Wasteland Developed 0
(f)..
(s)..
Soil & Moisture (a) Trench m 0
(b) Field Bunds m 0
(c) Terrace ha 0
(d).
tVegetative and EngineeringStructure
(a) Check & Plugs nos 0
(b) Gabion structure nos 0
(c)
Water harvesting Structure(New created)
(a) Farm Ponds Nos 34
(b) Check dams nos 4
(c) Nallah Bunds nos 16
(d) Percolation tanks nos 3
(e) Ground water rechargestructure nos 0
(f) Diversion Weir nos 2
(g) Drop Structure nos I
Water Harvesting Structure(Old rejuvenated) (a) Farm ponds nos 5'1
(b) Check dams nos 4(c) Nallah Bunds nos 11
(d) Percolatron tanks nos(e) Ground water rechargestructure nos 0
(f)Chanel nos 4(g) Diversion Weir nos 7
(h) RMS nos 2
2Production Sysytem & Micro-enterprises 1. Beekeeping nos
2. Vegetable minikit nos 7203. Farmer Kit nos 584. Patato Cultivation ha '15
5. Paddy Cultivation ha 806.Green Gram Cultivation ha 20T.Horse Gram Cultivation 10S.Mushroom nos '10
9.Banaraj chicks nos 8900l0.Pisciculture nos 18
11. Pump set nos12. Travis nos 9
3 Livelihood activities '1. SHG Assisted SHG (nos) 1762. Assetless Person nos '15
4 Others nosSummarv:
Total Rain water harvesting structures created nos 37Total Rain water harvesting structufes rejuvenaGd nos 74Additional area brought under protective irrigation na '120.60
Number of tamers benefited nos 3390Direct employment created Mandays 71262
, APD (
Signature
--aoP5ttvP.D., Watersheds
\4-
Signqture Signaturq
.WZ4urv $,>1r) (E{nd & War'€f)' / ApD llrveiiioool
rwl-
Sl-'e: odisha District- gurdg- Block- Begunia t "li
Project lD/ Name of the Cluster: l!vl\4P-ll, Begunia Batch-l/2009/'1 0
Approved POect cost (Rs. In Lakh) -525.36 Actual Expenditure (Rs. In lakh)- 421.40151
Summary of project activities implemented:
sl No Work / Activity Work Sub CategoryDetails of achievements
Unit Quantitv,l NRM Works
0 Land Development( Productive use)
(a) Afforestation na 0
(b) Horticulture 5.50
(c) Agriculture ha 0
(d) Pasture ha 0
(e) Wasteland Developed ha 0
(f). .
(s).
Soil & lvloistureConservation
(a) Trench m 0
(b) Field Bunds m 0
(c) Terrace na 0
(d).
l
Vegetative andEnoineerino Structure
(a) Check & Plugsnos 0
(b) Gabion structure nos 0
(c,t
Water harvestingStructure (New created)
(a) Farm Ponds Nos 8
(b) Check dams nos 5(c) Nallah Bunds nos 2
(d) Percolalion tanks nos 't0
(e) Ground water rechargestruclure
nos 7
(0 TanU Pond nos
(g) Chudde nos 6
(h) lrrigation Drain nos
Water HarvestingStructure (Oldrejuvenated)
(a) Farm ponds nos 0
(b) Check dams
(c) Nallah Bunds
nos 2
nos(d) Percotation Tanks nos 7rs./ uruuno water rechargeslructure
(0 TanU Pond
14
nos 9(g) lrrigation Drain nos 7
2 Production Sysytern &Micro-enterprises 1. Green Gram Cultivation
:-=-----=_---z. Deeo Heplacement:-::-:-::-r. r.tsctcullure
ha
nos 900nos lc
a. banaraj Chicks nos 134085. Vegetable kits nos 5006.Sprayer nos 837. Pump Set nos 79u.sented Rice na 26LSun Flower ha 2'lU. lravis I -" 14Livelihood activities 1. SHG Assisted SHG (nos) 160z. Assefless person
nos 54 Othersnos
Summary:
|larvesltn(
=-:-::--:---------I orel R.rn w'l^. l,^^,^^r:--structures created nos 44
_.. -,_.-, ,,sr rerrrrg pUucrures re tvFnrta.lqooitionat.area brought under proGcrG irEliili-,,lumber of farmers benefitedH
nos 30
152.69
nos 1601
Mandays 48429
tySignature
rpaq*=.iinPo t r- i',)e't irrl,ooi
Signature
. l^:
----,,{u{21;t\l-)P.D., Watersheds
Signature
rY1
St-'e: Odisha DistricF Khurda Block- Jatni ^"\'Project lD/ Name ofthe Cluster: lwL4P-lll, Jatni Batch-l/2009/10
Approved Project cost (Rs. ln Lakh) -639.12 Actual Expenditure (Rs. In lakh)- 522.38602
Summary of project activities implemented:
Sl No Work / Activity Work Sub CategoryDetails of achievements
Unit Quantitv1 NRM Works
(DLand Development( Productive use)
(a) Afforestation ha 0
(b) Horticulture ha 0
(c) Agriculture ha 0
(d) Pasture ha 0
(e) Wasteland Developed ha 0
(0
(s).
iiSoil & MoistureConservation
(a) Trench m 0
(b) Field Bunds m 0
(c) Terrace na 0
(d)..vegetanve andEnqineerinq Structure
(a) Check & Plugsnos 0
(b) Gabion structure nos 0
(c)
Waler harvestingStructure (New created)
(a) Farm Ponds Nos
(b) Check dams nos 18(c) Nallah Bunds nos 0
(d) Percolatjon tanks nos 3
(e) Ground water rechargeslruclure nos
(0 Drainage Chanel nos 11
(g)Construction of Guard Wall nos 4
(h) Dug Well nos I
(v)Water HarvestingStructure (Oldreiuvenaled)
(a) Farm ponds nos
(b) Check dams nos 0
(c) Nallah Bunds nos 0
(d) Percolation tanks nos 0(e) Ground water rechargestructure nos 0
(0..
2Production Sysytem &Micro-enterprises l.Vermi Compost nos 8
2. Vegetable minikit nos 10403. Jhudanga Cultivation ha4. Potato Cultivation 405. Vegetable Cultivation ha 306.Green Gram Cultivalion na 102T.Pisciculture nos 348. Pump set nos 799. Sprayer nos . 52l0.Banaraj Chicks nos 88961 l.Farmer Kits nos /c12.Travis nos'13. Scented Rice na 1.6
J Livelihood activities 1. SHG Assisted nos 742. Assetless Person nos 34
4 Others nosSummary:
Total Rain water harvesting structures created nos 28
Total Rain water harvestin structures rejuvenated nos 55Additlonal area brought under protective irriga on ha 280.95Number of farmers benefited nos' 3764Direct employment created Mandays 92456
Signature
(Lq(a-YIA
5"I-
Signature
\p$ff:rrrAPD (Livelihood)
Signature
,-a,ftP4t\tt'P.D., Watersheds
Signalure
.l 'z /4)I 7 \'/
/^/ e' 'ysrcnl enocREss REPoRT oF BATcH-l/2009-10 PRoJEcrs UNDER
. WATERSHED DEVETOPMENT COMPONENT
State r ODISHA Disrrict : KORAPUT
Project lD / Name of the cluster : IWMP+ PoTTANGI
Approved Project Cost (Rs in Lakhs) i720.00 lakhs
of Project Activities implemented :
\bk
Block: POTTANGI
Batch - l/2009-10
Actual Expenditure
(in lakhs)
PMKSY.
:575.40263lakhs
Summawork Sub CateSory DetailAchievements
Sl No Work / ActivityUnit Quantity
1 RM works:(a)Afforestation HA
(i)Land DeveloPment(Productive Use)
{bl Horticulture HA
(c)Agriculture HA
(dlPasture na
(e) Wasteland DeveloPed HA
(f)
(c)
(ii)Soil & MoistureConservation
{a) C.C.T (Contineous Counter
Trench) m
(b) Staggard Trench HA
(c) Field Bund 77
(d)Graded Bund HA 90
{e) Terrace Rmt 2271
{iii)Vegetative & Engineering
Structure
(a) checks & Plugs Nos 72
{b)Loose Boulder Nos
(c)Gabion Sturcture Nos
(d) Masonary Gulley Control
Structure Nos 42
(iv)Water Harvesting
Structure (New Created)
(a)Farm ponds NO5 23
(b) Check Dams NOS 19
(c)Nallah Bunds Nos 9
{d} Percolation Tanks NOS
(e) Ground Water Recharge
Structures NOS 6
lfl Field Channel Rmt
(ct
(v)
Water HarvestjngStruct!re (Old
Rejuvenated)
(a) Farm ponds Nos
(b)Check Dams Nos
{c)Nallah Bunds Nos
(dl Percolation Tanks Nos
(e) Ground Water Recharge
Structures Nos
(f)
\b?-
unit (sHG/lndiv.) 23
Production SYstem
Micro EnterPrises
unit (SHG/lndiv )12
\22. Bee KeePing
3. Vegetable cultivation HA
4. Ginger Cultivation na
5. Potato / Maize HA 22
HA 19.2
Group/lndividual 72
71
Livelihood Activities f otAssetless
1. Goatary
2. Vegetable CultivatioJl Group/lndividual
3..Ginger Cultivation Group/lndividual 1
, <6'(^h.l Rr<inpss Gro!p/lndividual 3
ro!p/lndividual5
roup/lndividual
other I
-T
.finr Structures Created I Nos
!.^,o.rino <tn'.trrres Reiuvenateo Nos 0
HA46
hr^,,dhr,'n.tpr Protpctive lrriSation
Nos 1245
Directed EmPloYment Created MandaYs 108680
\ 4\7
Signature
,Y*Signat
PIA
Signature
\@-mo r\"S{i'
5ignature
r. C.l'Gunffic-watershed, KoraPutwatershed, KoraPut
.t soli l.nrt-Fr!3tlo'l UII' !
.l.{' wai3$5, Patan."
signature
(DDsC), KoraPut
./1l/:.,'
t
State I
rb\r\\.tr\pHyslcAL PROGRESS REPORT OF BATCH-l/2009-10 PROJECTS UNDER
PMKSY- WATERSHED DEVETOPMENT COMPONENT
Proiect lD / Name of the Cluster I ly!!:ILIASMANTPUR
Approved Project Cost (Rs. in Lakhs) :720.00lakhs
Summary of Project Activities implemented :
Block: DASMANTPUR
Batch - l/2009 10
Actual Expenditure
(in lakhs) | 624.90228 lakhs
ODISHA District : KORAPUT
5l No Work / Activity Work Sub CategorY DetailAchievementsUnit quantity
1 NRM Works:
(i)Land Development
{Productive lJse}
(a)Afforestation HA
(b) Horticulture HA
(c)Agriculture HA
{d)Pasture HA
(e) Wasteland DeveloPed HA
(f)
{c,
(ii)Soil& MoistureConservation
(a) C.C.T (Contineous Counter
Tren€h) Rmt 3500
(b) Staggard Trench HA 3
(c) Field Bund Ha L4
ld)Graded Bund Ha
(e)Terrace Rmt
(iii)Vegetative & Englneering
Structure
(a) checks & Plugs Nos
(b) Loose Boulder Nos 377
(c)Gabion Sturcture Nos
(d) Mechanical Filter StriP Rmt 780
(iv)Water Harvesting
Structure (New Created)
{a) Farm ponds Nos 34
(b)check Dams Nos
(c) Nallah Bunds Nos
{d) Percolation Tanks Nos 9
(e) Ground Water Recharge
Structures No5 5
(f) Field channel Rmt 4774
(c Masonary Guard wall Rmt 300
Water Harvesting
Structure (Old
Rejuvenated)
(a Farm ponds Nos
Check Dams Nos
(c Nallah Eunds Nos
lo Percolation Tanks Nos
(e
St
Ground Water Recharge
uctureS Nos
tf)
tg,
it6
2Production System
Micro Enterprises
1. Goatary unit (5HG/lndiv.l 20
2. Bee Keeping unit (SHG/lndiv.)
3. Vegetable Cultivation T|A
4. Seasonal gusiness Group/lndividual 47
5. Seed Replacement lndividual 120C
6. Tomato / Coriander Leaf na
3Livelihood Activities f or
Assetless
1, Goatary croup/lndividual 14
2. Polltry Group/lndividual 6
3. Vesetable Cultivation Group/lndividual 82
4. Seasonal /Haat Business Group/lndividual 32
5 Group/lndividual
6 Group/lndividual
Other 1
2
Summary :
Total Rain Water Harvesting Structures Created Nos
Total Rain water Harvesting structures Rejuvenated Nos 0
Additional Area brought under Protective lrrigation HA
No. of Fatmers benefited Nos 642
Directed Employment Created Mandays L10920
Signature Signature
-1${k}* !#,,PrA - APD (L &'W)
watelshed, KoJaPut
Signature
, ---\ -.'-$-*<lnpo trv,*rih-tdli' '
Watershed, Koraput
Signature
r&\I_Proiect Dlf€cto4
(DDSC), Koraput
/
'9
\-\\' ,61 t-,
PHYsrcAT PROGRESS REPORToF BErcHlT-ot1o PRoJEcrs UNDER PMKsY- wATERSHED
DEVELOPMENT COMPONENT
5tate: ODISHA District KORAPUI
lWf,4P lll,Boip_arrgudaD / Name oc the Cluner Batch /2009 10
d Prolecr co5t (Rs in takhs)(in lakhs)
^f Pr.ie.t a.tivities imol
Sl NoDetailAchievements
Unit Quantity
1240
(b) Horticu t'rre 241.5
0
0
(e) wasteland D€veloPed 0
(f) 0
(cJ 0
(i,)soil & Moisture
G) c c T (contrneou! cqunter rrench) 0
(b) Staggard rrench 0
(c)Field Bunding 335
(d)Graded Bundins
(e)reff.ce
(,Li)vegetatlve & Engineering
(d)checlt & Plugs 97
(b)Loose Boulder 76
(c)Gabion sturcture 0
0
(iv)Water Harue(ing
structure (New Created)
Nos | 116
(b)Checl Dams Nos 0
(c) Na lah Bunds No5 l0{d) Percolatlon Tanks 75
(e) Ground Water Recharge Str!ctures 3
(f)Field channel 0
0
(") Structure (Old
Nos 2
{b)check Dams 0
(c)Nallah BLrnds 0
(d) Percolation Tanks 8
(elGround Water Recharge Struci! es 0
(f) 0
0
Production System &
l.Mushroom Cultivation (BY group) 10
2.compostins)l nclude ve|.t!9!!9:!Igl 0
3.lntegrated Nutrent managemenl 100
4.lntegrated Pest manaSement o
5.Onion Cultivation 1332
6.Vegitable seeds Distrlbutron Nos 840
7.SRl Paddy Cultivat on 100
Y\6a
SjCnature
h.A,'--c\4'l \ )
APO {1'.&W}
'gt. sor conscn,slp HfEIJhed'
KoraPut
ct,|n+n \riab. sladDt9jttst
!-,SsWatershed, Koraput
8 Yam SuckerDemnostrationr252
9.Back Yard Plantation t8410.K.8 Pump d stribut on 46ll.Vegitable Cultivation
12.Ma z Cultivation15
13 Patato Cu tivation28
3Livelihood Activities for
I\4ushroom Cultivation Group (Nos) 40Vegetable Cultivation (Molore Pump) Gro!p (Nos) 1lTailoring Group (Nos) 2
9alon G.oup (Nos) 2
Rosin Sainted stick makeing Group (Nos) 10
Brash Band Group (Nos) 5
Reshon Shop Group (Nos) 8
Bambo Works Group (Nos)
Carpenter Group (NotCycle mart Group (Nos)
Mobile mart Group (Nos)
Mason croup (Nos)
Goatary Gro!p (Nos) 4L
Tea Hotel
Blacksmit Group {Not 2
Panshop Group (Nos)
poIIary Group (Nos) 2
Farmers Tool Gro'rp (Nos) 10Other
0
0
0Summary:
Total Rain Water harvest ng Svuctures Cr€ated 1.tt U
Tora Rdh \^/orer Hdrve<fing <tructu p. Reju!endtoo
Additional Area brought under Protective rrigation HA .90
No. of Farme 5 benefrted qbl
Directed Employmenr Cr€ated ra,ra€0
Proje.it Diiecldr,Waler5hed, Koraput
pHystcAr PRoGRESS REPORT OF BATCH-l/2009'10 PROJECTS UNDER
PMKSY- WATERSHED DEVETOPMENT COMPONENT
f"
State: ODISHA DiStTiCt : (ORAPUT
Project lD / Name oc the Cluster : IWMP-lV, LAMTAPUT
Approved Proiect cost (Rs. in Lakhs) : 720 0o lakhs
ol Project Activities implemented :
(in lakhs) : 587.40528lakhs
Block : LAMTAPUT
Batchl/2009-10
ActualExpenditure
mWork Sub Category Oetail Achievements
Sl No work / ActivityUnit Quantity
I \RM Works :
(i)Land Development(Productive Use)
{a) Afforestation HalKm 99/30
(b)Horticulture HA
c)Aqricukure HA
(d) Pasture HA
(e) Wasteland DeveloPed na 29.58
(f)
lg,
{ii)Soil& Moisture
Conservation
(a) C.C.T {Contineous Counter
Trench) Rmt 300
(b)Staggard Trench HA
(c) Field Bund HA 68.5
{d)Graded Bund
(elTerrace
(iii)Vegetative & Engineering
Structure
(a)checks & Plugs Nos 244
(b)Loose Boulder Nos 505
(c) Gabion Sturcture Nos
(dl Mechanical Filter StriP Rmt 562
{iv)Water Harvesting
structure (New created)
(a)Farm ponds Nos 18
(b)Check Dams Nos 18
[c) Nallah Bunds Nos 2
(d) Percolation Tanks Nos 30
{e) Ground water Recharge
Structures Nos 54
(f) Field channel Rmt 2497
(g) Rins Well NOS
(h) Rock Fill Dam Nos 1
(v)
Water Harvestjng
Structure (Old
Rejuvenated)
(a)Farm ponds Nos
b) Check Dams Nos 2
(c) Nallah Bunds Nos
(d) Percolation Tanks Nos
(e) Ground Water Recharge
Structures Nos
(f)
'1rb
P}
Production system &Micao Enterprises
KB PUMP Nos 36
Onion Seeds distribution Nos 351
Sprayer Nos
Vesetable Seeds Distribution Nos 479
Patato Cultivation HA 64
Seasonal /Petty Busrness No5 50
Vegetable Cultivation HA
Goatary Group {Nos) 14
3Livelihood Activities for
Arsetlers
Vegatable Cultivation Group/lndiv. 63
Potato cultivation Group (Nos) 40
cashew Seeds Business Group/lndiv. 21
Vegatable VendinB Group (Nos)
Other 1
2
Summatv:
Total Raln water Harvesting Structures Created Nos t22
Total Rain Water HarvestinB Structures Rejuvenated Nos 2
Additional Area brought under Protective lrrigation HA 60
No- of Farmers benefited Nos 385
Directed EmDlovment created Mandays 80514
Signature SignatureSignaturereSignatu
ffit hedt1
Watarshed, Koraput watershed, Koraput
or"r"oo,rffiSl?J(DDSC), Koraput
rryyf'l
/ px"ttcat pnocREss REpoRT oF BATcH-r/2009-10 pRoJEcrs uNDERWATERSHED DEVELOPMENT COMPONENT
srate: oDtsHA Djstrtct : KoRAPUT
Project lD / Name oF the Cluster :lWMp,V
Approved Project Cosr (Rs. in Lakhs) :720.00
Summarv oI
t ,ch+PMKSY-
Block : SEMII-IGUDA
Batch t/2009 10
Actual Expenditure(in lakhs) 634.32706
ojed Actavities imSl No Work / Activity Work Sub Category Detai Achievements
Unit Quantity1 NRM Works :
{4Land Development
iProductive Use)
(a ) Afforestatio n
(b) Horticulture na
{c)Agriculture na
Ld) Pasture na
le) Wasteland Developed Ha
(f)
tcl
(iDSoil & MoistureConservation
(a) C.C.T (Contineous CounterTrench) m
(bJ Staggard Trench HA
(c)Field Bund na 288.25(dJGraded Bund
(eJTerrace
{iji)Vegetative & Engineering
Structure
(a) Checks & Plugs Nos 4(b) Loose Bouider Nos 544(c)Gabion Sturcture Nos
(d)stylo grass Ha
(iv)Water Harvesting
Structure (New Created)
(a) Farrn ponds Nos 101(b)Check Dams Nos 1(c) Nallah Bunds Nos 5(d) Percolation Tanks Nos(e) Ground Water RechargeStructures Nos
(f)Field Channel RMT 300(g)Masonary gully control Nos L2
tv,Water Harvesting
5tructure (Old
Rejuvenated)
(a)Farm ponds Nos 2(b) Check Dams Nos Nos(c)Nallah Bunds Nos Nos(d)Percolation Tanks Nos No5(el Ground Water RechargeStructures Nos Nos(f)
r8l
\b- I
2Produation System
Mlcro Enterprises
l,vegetable seed Nos 12
2 vermibed Nos 12
3 papaya seedllnB Nos 6
4.veeetable cultivation Ha 126
5,Lnatua proouI|on Group (Nos) 1
6.Banrajchiks Group (Nos) 4
/. FrsnerY /ouckerY Group (Nos) 1
S.Fruit gradenins Group (Nos) 1
9.Pisiculture Group (Nos) 1
l0.Tailoring Group (Nos) 2
11.K.8 pump Indiv. 24
Livelihood Activities forAssetlesg
lVegetable Vendoring Group/lndiv r82
2Banaraj Chicks Group/lndrv 1t
3 Bio Organic Group/lndiv 2
4. Goatary Group/lndiv 112
5. Tailoring Group/lndiv 8
5. Carpentry Group/lndiv 2
6.Pisiculture Group/lndiv 4
7. Blacksmith Group/lndiv 2
8. Mushroom Group/lndrv 1
9.Poultry Group/lndiv 2
l0.Grossary Group/lndiv 77
11. Hotel Business Group/lndrv 3
12.Fishery/duckery Group/lndiv 3
13. Mobile repairing Group/lndrv 1
Other 7
2
Summ€ry :
Total Rain Water Harvesting Structures Created Nos 102
Total Rain Water Harvesting Structures Rejuvenated Nos 2
Additional Area brought under Protective lrrigation lla 105
No. of Farmers benefited Nos 517
Directed Employment Created MandaVs 104832
Signature SKature
4_cs",+N o,oTJ-i]')Semiliguda Watershed,Koraput
Signature
N t --(.-\ !a!\-*\\fAPD (tlveti+6!il) \ ' '
Watershedr Koraput
Signature
'96'r(Project Director, Waiershed
(DDsC), Koraput
/ B(j), , i District:Malkangiri
,t itl name or ctusl lwMPll20og-10
./rcved Project cost (R.. geg.OOO
Oln Lakh):
.!bBlock: Korukonda at'
Batch : l/ 2009-10 'j'ActualExpenditlre 32g.go5g(Rs In LaKn):
!1.
lo.Work / Activity Work Sub Category DetaitE of Achievements
Unit Quantiry,| NRM Work:
(DLand DeveloPment(Productive Use)
(a) Afforestatron Ha
(b) Horticulture Ha 72
(c) Aoriculture HA
(d) Pasiure Ha
(e) Wasteiand DeveloPed (Land
devglopment)HA 90.157
(0.
(ir)Soil & MoistureConservation
(a) Trench
(b) Field Bunds Ha 120.7
(c) Terrace M
(d) .na
,iiDVegetative andEnoineerino Structure
(a) Checks & Plugs
(b) Gabion Structure Nos
{c) LBCD/LBS Nos 169
{d) Brush wood check dam Nos 217
,iv)
Water HarvestingStructure (NewCreated)
(a) Farm Ponds Nos 38
(b) Check Dams Nos 10
(c) Nallah Bunds Nos(d) Percolation Tanks Nos 7
(e) Ground water recharge structure No3
(O WHS Nos 7
(g) Community Tank Nos 3
(h) Water Body Nos at
(i) Earthen Structure Nos
0) Run off management structure NoS
(k) Dug out sunken Pond Nos
(l) Divertion bund Nos 3
Water HarvestingStructure (OldRenovated)
(a) Farm Ponds Nos. 7
(b) Check Dams Nos.(c) Nallah Bunds Nos-
{d) Percolation lanks Nos.(e) Ground water recharge structure Nos.(O WHS Nos. I
lion Systom &enleronses 1 K.B pump NoS. 41 '.,
2 Spraver Machine NoS. 50-3 Back yard plantation Nos. 1414. Banarai Chicks Nos. 485. Compost pit Nos. 136. Fish food Nos. 607. Banana cultivation Nos. 1508. Veremtcompost Nos.9. Mushroom Nos. 3510. Vegetable cuttivation Nos. 18311. Green gram cultivation Nos. 37
3 Livelihood Activitieg lfiqatery SHG (Nos.)2Paddy busrness SHG (Nos.)qbq€nt stick busrness SHG (Nos.)4.Ground rut cultivation SHG {Nos.) 45.Veg. cultuvation SHG (Nos.) 26.Tent house SHG (Nos.)T.Seasonal business SHG (Nos.)8.Brick making business SHG (Nos.)9.Fairy market Nos. 13l0.Stationary shop Nos. 1
11.Tea & tifin stall Nos.l2.Tailering Nos. 5'l3.Carpenter Nos.l4.Mession Nos.'l5.Blacksmith Nos.l6.Poultry vendino Nos. 4l T.Grossory shoo Nos. 718 Bettel shop Nos. 419.Veo vendino Nos.20.Barber shoo Nos. 1
2'l.Fisherv Nos. 'l
Other NosSummarv:Total reinwaterharvesting structure6crealeo
Nos 97
Total rainwaterharvesting structurereiuvenated
Nos tt
Additional areabrought underorotective irrioation
na 106
Number of farmersbenefited Nos 2042
Direct employment Mandays
\t*lq<i't-Sign4tlie of PIA
\h2-"rnSignaturodfAPD (Land E Water)
Signaturo APO Sigrdlufi(Livolihoods) Wate6h
.o
Malkangiri
I"u9At' I
O\L I
District: Malkangiri
twMPlU2009l0
Block:
Batch
Mathili
: l/ 2009-10roiect lD / Name of Cluster:
Approved Project cost (Rs. ln Lakh): 495 000
ummarv ot Proiect Activities lmpleflcllC!!
397.00Expenditure
e:, Odisha
st. No. work / Activity work Sub Category Details of Achievements
NRM Work: Unit Quantirv
(i)Land Development(Productive Use)
(a) Afforestation 10
lb) Horticulture na 29
{c) Aqraculture na(d) Pasture Ha
(e) Wasteland Developed (Land
development)l-lA
(f) .
(iDSoil & MoistureConservation
(a) Trench
lb) Field Bundinq 214
{c) Terrace M
ld) Diversion Bund na 25(e) Land Development na '112.4
(iiDVegetative and EngineeringSiructure
(a) Checks & Plugs
(b) Gabion Structure Nos{C) LBCD & LBS 344(d) BWCD Nos 62{e) ECD NoS 6(fl Duqwell NoS 2
(iv) Water Harvesting Structure(New Created)
(a) Farm Ponds Nos 98
(b) Check Dams Nos(c) Nallah Bunds Nos(d) Percolation Tanks Nos(e) Ground water rechargestructure
Nos
(0.
Water Harvesting Structure(Old Rejuvenated)
(a) Farm Ponds Nos. 3
{b) Check Dams Nos.(c) Nallah Bunds Nos.(d) Percolation Tanks Nos.{e) Ground water recharqe structuretfl.
2Production System & Micro-enterprises
1. Sesame Cultivation na JC
2. Vermin Compost Nos 18
3. Sri Cultivation na 23
4. Pisciculture Nos 3B5. Veoelable Cultivation 266. Duckery Farmtnq NoS 687. Backyard l,4anqo Plantation Nos 79048. Orqanic ComDost Pit Nos 4639. Yam Suckers Nos 116010. Backvard Banana Cultivation NOS 59801 1. Zinqer Cultivation Ha 412. Green Gram 1113. Onion Cultivation Ha 1
3 Livelihood dctivities 1. Goatery Farminq SHG 42. Goatery Farmanq '16
3. NTFP Business SHG 84. NTFP Business crG 165. Veqetable Cultivation ctG 46. Grocery Shop Nos 127. Tea & Betel ShoD Nos '10
8. Ferry Business NOS9. Cvcle Mart ReDair Shoo Nos 410. Poultrv Cuttinq Shop NoS 2
Other Nos
Summarv:Total reinwater harvestingstructures created
Nos 98
Total rainwater harvestingstructure renuvenated
Nos 3
Addjtional area broughtunder Drotective irriqation
Ha 54
Number of tarmersbenefited
Nos 1600
Direct employment created lvlandays 105325
4u1'.17 r'
Signature& water) APD
(Livelihoods)Watersheds.Malkangiri.
..JishaA\A
./ect lD / Name of Cluste lWMP1lu2009-10
District: Malkangiri Block: Malkangiri
Batch:l/2009-10Actua Expend turelRs. In Lakh)
t^a,r'
268.31008Approvcd Project cost (Rs.
I
288.000
_.t
State: District:KeoniharProlect roll.tame oi-lulter: lw rt-rr'nn;aaon- 2009,10
548,0000052t7 r\U
xppruveo rrolect cost(Rs.in lakhs):
Summ:Expenotture(Rs.an lakhs):ry or prolecl activities imDtem€
Sl.No. Work sub Category I Derails ot achievcmenls
NRIU WORKS: U nlt (ha / nos / R;t/Cubic meter) QLantrly
(r) ueveropmenl (ProducltveUse) (a) Afforestation
s4 83
00
Sotl & voi.trr"a;;;;;r* rq/ vvds'erano oeve oped00
a 144.6(gfgrace0
0(e) Eadhen Canal
!!braoeo Dund
(a) Checks & ptuss(n) Vesetat;veind Ei sl;;;ri;s 8
2
0
138
a;;;i;;i- 0
(rv) warer Harvesrins sGi;iiElfi;;qeated)
38
9)0
(e) crouna WaGr recrrZrge63
73(D Orhers(piversio;t;-
(v) water Harvesrine SrruiiiEldii_ rejuvenared)
2
0
0toi Lneck dams(c) Nallah Bunds
{d) Percolarion lanG0
:"J,:,',:,'.1'ttGfuei*-*0
02
Prodr.:clion system &iE6-_ enlerpises 0uckerv nos 3900
8Fisheries
Seed replacement25
VerminComoostino !9:]!9riculture tmpiements
39
Kitchen qarden tools105
Intercroppjno34359
Travis 8 CaiiractorPoultry(BanraD
1600
17'75
nmattdpeltybusinessSprayer
rybridbyck 4Aveqelablemrnrkrts
770
2. Vermin Compost Nos 603 Sri Cultivatron HA 2504. Saru cultivation Nos 305 Vegetable Cultivatron Ha 806 Onion Cultivation HA 247. GroundnutCultivation NoS 208. Potato cultivation Nos 0L Yam Suckers Nos10. Backyard Banana Cultivation Nos 7761 1. Zinger Cultivation HA 412 Maize cultivation Ha 5013 Sprayer Nos 3014 kantapalla Nos 1315 K.B. Pump Nos 5016 Green gram & Black gramCultivation na 65
3 Livelihood Activities '1. Goatery Farming SHG 12
2. Goatery Farmino 183. NTFP Business SHG 54. NTFP Business5 Veqetable Cultivahon SHG6. Veqetable cultivation crG 34. Grocery ShoD Nos 1
5. Tea & Betel Shoo6. Ferry Business7. Pisciculture 4
4 Other petty business Nos 144
Summarv:Total reinwaterharvesting structurescreated
Nos 79
Total rainwaterharvesting structureretuvenateo
Nos 2
Additional areabrought underorotective irioation
na 45
Number of farmersbenefited Nos 704
Direct employment Mandays 120000
,}el
,,nn*ffi'l ,r"no*Water)
SignatureAPD Sj(Livelihoods) Watersheds.
7,.5)
Districti-MavurbahnJ
.iiBlock:- Sulrapada''l-i
Proiect lD/l.lame of the Cluster:- IwMP- l- SuIapada Balch - l(2009- I 0)
r ,rproved Project Cost (Rs in Lakh) -66o'r0 Actual E\pcndilurc (Rs '
n Lakh:) - , C.b e\
Summarv of Proiect Activities lmohment€d:
-.!L[qI
work/Aciivitv I wo't S'u crNRM Works
Detrils of Achicvcmenls.Unit Ouantit
(r, Soil and Moistur€Consen ation
(a) Afforestarion na 550
(b) Pasturc ha 450(it Soil and Morsturc
Conscn'ation(d) Count€r Bunding Cubic meter 250
(ii') Vegetatire and EngirceringStructure
(c) Checks & Plugs Nos
('v) Water Han csting Structure(Nc$ Created)
(a) Farm Pond Nos ln(bi Chect Dam Nos(d) Pcrcolation Tanks Nos 2A
(c) Ground watcrrecharqe structure
Nos
(O LBCD Nos llt(\') Water Haf\ esting Stnrcture
(Old rejul'enated)(a) Farm Pond Nos 57
(b) Check Dam Nos t4(d) Percolation Tanhs Nos 5
(c) Grcund Wate rrccharsc stiucture
Nos 21
2 Production S] stem & MicroEntemnse
I Ground Nu( Nos 63
2 Coaten Nos3.Vee. Cultivation Nos 180
4 Pisiculture Nos 403 Li\ elihood Actir itics L Drudee SHGNos) 24
2 Fishen SHGNos) ]]03. Goaten SHG(Nos) l-5(,r
Summa : 4. Sabai Business SHCNos) 555 Ves CulEr ation SHC(Nos) 2306.Seasional Business SHG(Nos) t0l
Sunman:Total Rain$ater Han€stingStruch.re creatcd
Nos 201
Total RainNater Han'estingStructure reiur€nal€d.
Nos t00
Additional Arca brought underDrotective irrisation
Ha. 350
Number of farmers benefittcd Nos 5500Drcc! EmDlo\ment created Mandavs t 28571
l\ t ^\ lrrlr{:^,I.f-Sighaturc tu 'SignaturcPIA
Watershed
,fi33;"J#;?1"
"ffisAPI>I,H
IT]
St\o work/ActivirvI NRM tv;;; "'^"'"'". wor(5ub catetorv DetailsofA(hievement
r,"r ' u"rl li'Jl"o u*,** ", i o i"r u,ur,"" .n*r, i f,l'l -o*-''t'tv l
Structure
I (b) Gu y ptues cmt i a,, i -:.: -- lothol) . !* 2sI v) W.ter HarvesrrnS Strucrure (a) Farm pond ruo, -, 54(N"vt C,pdted
f *,'- -, {ol Lnech uam Nos 3
(e) 6round Water Noslel \rround water Nos 2RF.h;ror <r. ,-r,,.-
- (F) Orher Nos 6'(u) -
warer Ha rvest ng strucrure ' '" r"'i"i'r'r,-n -"0 'ilI i:t
(O d Reluvented)
T "^fl.:::y w,,:.
I '* I ,. Rechdrge \l,Lr.ture
rroour on\V,ter&\4i,ro I CrouldNJt No. lOlnterprise
:l Lrvelihood Activities r n. ,.t"..,, 1 ",^" .;Lrvelihood Activities 1 Drudgery I N., ZlReduction
!Iotal Rainw.ter Harvest ng Nos lrqe -Nos 146>lrucMe LreatedTorat Ratnwater Harvesting - -N; nStructure reiuvenatedAdd tionalArea brought under Ha.
Statc Odish.r District Mdyurbahnj Block lladds,r h
Project tDlNam€ of the CtusteFlWMrr it, Badas.hr B,rtch t(2009 10)
Approved Project Cost (trt In Lakh) 816 00 Actuat Expendrture (Rs in Lakh)
@'663.16+
3
protect'r'e rrr sarionNumber of farmers benefirted
i orreci emptoym-"nt cre.tua i
768 48
: 1217
I158961
NO!
Mandays
J'ai\nSignoturc
,$
",$ffi$lu
rate:- Odisha
Project lD/Nrme of the Cluster:- IWMP-ll/./Kuliana
Approved Project Cost (Rs rn Lakh):-66o 6D Actual
Summarv of Proiect Activities ImDlemented:
BlocktKuhana
Batch-l(2009- l0)
Expcndilurc (Rs in Lakh):- 58:3.q8l
ProjeclAPI\LH
,,M"",APD.I, & W
Sl No Work-/Activitv Work Sub CrtesorY Details of Achievements.
I NRM Works Unit Quanril]'(i0 Soil and Moisture
Cons€n atiol(d) Othcrs ha 21 00
(',') Vegclatile and EngineeringStructurc
(c) Earrhen Ch.'cks Cubic meter t0:r00.00
('r) Watcr Hanesting Structurc(Ne$ Created)
(a) Firm Pond Nos 2t)
(b) Check DaIn Nos )(0 Otlcr( Dug \\ell) Nos 2.1I
2 Production S\ stem & MicroEnlcmnse
l.GroundNut Nos 200
2.Ducken Nos 50
3.Ves. Culti\ ation Nos t204 Aqri. lmDlements Nos 55
3 Livelihood Actrvitres L Dmdecn SHC'(Nos) l22. Fishen' SHG(Nos) t403. Goatan' SHCNoS) 69
Summan: 4. Poulh SHCCNos) 20
Jotal Rain$atcr Ha^ estrngStructurc cr€alcd
Nos )94
Total RainNater HaricshgStructure reiulenatcd.
Nos Nrl
Additional Arca brought underDrotectivc imqation
Hi. 292
Number of farmc.s benefitted Nos +5.12
Dircct EmDlovment creatcd Mandals I63636
stmDerailr of Achievemenr,
1 NRM Work Unit Quantity(t) Land Development
(Productlve Use) {b) Horticulture Ha.Agriculture Ha. 302.5
d Pusture Ha.Westland Development Ha. 6.O7
{ l Soil& MoistureConservation
Trench MField 3unds M
(c na.d) Nursery Nos./Ha. 210OOlO.O4
(|||) Vegetative and EngineeringStructure
a Checks & Plugs Cmtb Gabion Structurc cmt
(tv) Water Harvesting Structure(New Created)
a Farm Ponds Nos. r20lo Check Dams Nos,
Nallah Eunds Nos.(d) Percolatron Tanks Nos.(e) Ground Water Re€harge
StructuresNos.
0 Ring Well Nos.
G) WHS Nos. 1h Water Body Nos, 2
(v) Water Harvesting Structure(Old Rejwenated)
a Farm Pond Nos.b Nos,cl Nallah Bunds Nos.d) Percolation Tanks Nos.(e) Ground Water Recharge
StructuresNos.
2 Production System & MicroEnterprise
a Poultry No. of Beneficiary 2298b) Fish No. of Beneficiary 772c K.V.Pump No. of Beneficiarv 19d) Potato Seeds No. of Beneficiarv 570
Seeds No. of Beneticiarv 110
0 VermiCompost No. of Beneficiary 1003 Livelihood Activities a Agriculture sHG No5. 30
b Gotery SHG Nos. 644 Others a Indivldual (Business Purpose) Nos. 215ummary:Total Rainwater Harvesting Structure cteated NosTotal Rainwater Hawestint StrucIure rejuvenated, Nos 0AdditionalArea brought underprotective irrigatjon Ha. 792Number of farmels benefitted Nos 7485Direct Employment created Mandays 57509
/ State- Odisha District MavurbahnjProject tD/Name of the ClusterlwMp tV, lashipur Batch-r(2009-10)Approved Project Cost (Rs in Lakh),600.00 Actual Expenditure iRs in Lakh)
ElockJashipur
t]ts . 5 83
-h*d*"R\"MZ,^-t"'ttgngaufe
APD.L & W,,.)-/..ft"
P.DWote.shed
r)6
sLate odisha District Mayurtrhanr
Prolect lD / Namc of Clusteri NMP-vsrJKRUL|
Approved proiect cost (Rs in lakh): 660 Actual
Block: sukrull
Batchi l/ 2009'10
expenditure (Rs in lakh ): 5j\. G\B
sl. wort / l*ivitv ; work sub categow , Detaits ot achievements
worK / Acr'rvrrt!!_o.. , -1,-, -. . unit qu9!!!Y .ot **" I-l]i-^^, i,' otr.,"iEi.n- h"(i) t and DevPlopment \d'hrrv
r {Productive useli'IouuLt'v' wr' jb)Horticulture na ?'a
/-\ ^ -'i-!,lr, rra lfra IIc)Agriculture l" I
,n\D'.tr rrF nalutrdlvr!l'l(e) Wasteland naIl\e' lraJrvrs - : l
|oevelopcu
ItttIrsJ. .
,!mI [e).. i- Ii tr-rr,^1ch ,fl j I(rr) Sorl & Moisture td' irE'
Conservatlon IConservatlon :
\b)lreld Bund!'(bltlelo Durru) :",1t1r""t- ha
. _l; ,i I
tiiij -v"c"t"tt"."d -- [a) Cnecks & plugs I nos l
i ngineeringJtructure1b)Gabionstructure no5'; ' c,JM,lLl L6s I1..-
lrvl watei Harvesting i(a) Farm ponds I nos 'i tro
Structure (New(!edted)
;ihl'h.'k dams nos'(blcheck oamst-,-\ ^l.llrh A,'n.
5
3.l Nallah Bunds nos.
ld )eercola tionl9$1--191- G-)fiffi"r"; ----Gs
re,fn!*s*!rr-*"*ao.u i. i
(v) Water HarvestingStructirre (Oldreluvenated)
1a) Farm ponds
(b) Check d.rrns
(c) Nalla h Bunds
no5.
no5.
nor.
02 Production systemr |,r r o-L nIerpfl5e5
{e)Ground waterrechaage structure
(f )... ...... ... Ii.
"oro- "uaator,o"&
743
5500
2438
32
03
APD
Asst, Sc* ConcoNCion OffcerC.,u.|| PIA lUtlaP V, Sukruii
Signat
atersheds
/ Physical activities details under the schemeSJ"=oa',sna -re IWM P-ll2009-10(Batch-t),Bock-papadahandi
Block :- PapadahandiApproved Project Cost (Rs. ln Lakh) :- Rs. 660.00000
District :- Nabarangpur
1*
{"Actual Ex nditure (Rs. ln Lakh) :- Rs. 572.70523
Summary of Project Activities lmplemented :
VvCl;\ :,i.-t!..l Lcii
tiI t''
Illi,ttrl
;
$
j ie) wosiclarrd Developed/.\
^+ L
^ ,. (q r: e c if..,,)
(il) Soil & Moisture Conservation
(b)Field Burrds M.(c)ountour Runding Ha. 378(d)Diversiorr Bond Rmt.(e)Open Well Ha.(f)Others(Specify) Ha.
(i ii) Vegetative and Engineering Structure
(a)Agro Forestry Ha.(b)Earthen Checks Cum. 5496(c)Gully Plugs Cum. 533(d)Others(Specify) i'ios 65
(iv) Water Harvesting Structure (New created)
(a)Farm Ponds Nos. 150(b)Check Dams Nos. L7(c)Nalla Bunds Nos.
(d)Percolation Tanks Nos.(e)Ground Water recharge structure Nos. 6(f)Others(specify) Nos. 60(a)Farm Ponds Nos.(b)Check Dams Nos.
i.i t/..lii (..i j\Cillir'.t ,iLi'r: i
II
I i - l.:: -;;,r,"q51U11On
tr ; ,rii',.-
J
',.'y'ater Harvesting S:rxture (Old Renovete
I
i
,....llorlvilttel d, tvll,\aur e
)r -ii.,- ,..1,
iiI/lravisI 11\r7^-o*^" I r a,,t.i..^'',
^ F
l(h)Poultry [:armingi--_'.- -- -..-* - -. .- ,
r r!O5. !
I
1
--,iI
-t
I
I
i
I
I
l!U5,
Nos.
2o-2,,t
-'.'
laan
1500
[8"'I"'Y j t'Jcis. I ZrrOS i
lKg.lIJit- t.t l -- - -l
d)(c)Nalla Bunds
Nos.lurrErLutalfton I anKs
-
(e)Grou nd W"t"i t".t,.["E*.t,rr"Nos.
Nos.I r rvrr tersIJPeclIy,drJuppty oT yam Seeds I
ll19l:ineorrrai'.ffi-i Nos.
12000
60000
i
.
Livelihood activities
(l)Onion Seeds
(m)Patato S""dr-(n)Sheepery
i ,..l-*r-I Nos.
11.35
6.t6
3196
(a)Grant (lndivisuat)Nos. t20
I Nos. t52(A)
l
(B) Tot"lrainm Nos. 185(c) &ql Nos(D) i_ Ha.
Nos.778
(E) 3745Mandays 17260
APD(l-ivelihoods)
.(
Kg.
,-,/,/ STATE:- ODTSHA
,#oiect lD / Name of Cluster:- tWMp-,- Approved Project Cost(Rs in Lakh):- 621,.962 .
' :L ; ;. ;,,- i,_-; ;l_iolcc'. .]ctr.,,tiia. tmpls
Sl rvoiwo
!g1{Qgvplopment (pr
!(ii) lsoit & Moistrrre Con:e^.ration
lt
l(iiit
DISTRICT:. NABARANGPUR BLoCK:-JHARIGAM
Actual expenditure(Rs in Lakh):_551.37g64
l( c) Agrrculturerlil)f'd\iLll1:l
j'tJa ,, ,,',1- ir -
l(a) rron.h
l(b) Fteld Bonds'1"
l m l ooo t
l_- _- --.- -,,-..--.---.,j
I m I b2e80.00_ i
Batch: I /2009-70
i r,u i
i ltil :
l-l
I lt..
380.40 I
+.tr) i
.. ..-:---- -' i
.16 nr\ i
'\hb
lv*eot.tiu" ancl Enqineeiineitir.ti,r; - - -
-=-t--
- i'
T-- ;o- i - __q_
i:;Lj
work sub categor Details of achievementsUnit I euantityod uctive use) (a) Afforestationha 150.08ha I sosa
(c )Drop Structure(d)LBCD
-
(e)Brushwooa cnect aarn_-(f)Live fenci/slNl:la Rrn l, c.
i (r
no
no
no
20
38
1.02
rmtrmt
80
L26rmt 46.7rmt 24
(iv), tilter 6( OU[tet no
no3warer narvestlng 5tructure(New created) (a) Farm Pond
204I uam no L7
no 1.(d)Percolation Tank no 0
ll no 2Ir, vvdre] Harvesltng Stfucture
-
(g)G rou nd wate ruEchlEE strr.trEno 3
(v) !9no
97water ha rvesting Structure(Old rejuvenated) (a) Farm Pond0
lurr-ilELK LJdII no 0I Lrtrdildil DunqS
(d)Percolation Tankno 0no 0
(e)Grou nd Water recharge Structure no 0
Horticultrireb
rrrrs. r vuoru vvoil
lil A c.^f^'^-+-.,r.rr rot vrvr !J!r y
r. I Nt-ll-k D.,".J^
l{lr^r^}^-
l.Fishery Based Farming SYstem no 4g \.1 Production svstem & Micro enterprises
2.Adoption of Proven TechnologY no 251 ''.508Duckery Eased Farmine Svstem no
; -.'. egeraoie Lulitvatron
'- 1 1ye5tQ( k l)evelOPlIerll
iO.eoultrV Aased Farming SYstem
Z A..kf td H"-t-rlt,""
l2 Sheeoaiv
,c
,ti
-r;:r;r Stall
t-11 lC(en i.rliltle
i lra \1.C tJC
^lz.
ii" f"r,,
.j-, r, ,
SHG NO
c!C Nl^
i
I
I
-1.-f
I
-.U
i11.Drum Party/'l rl't i'c
I
)4l(l
l-1It
3 Maize Cultivation SHG NO
SHG No
6
4.Grocerv Shop 0
1! se!*l6.Rope Making
SHG No 0
SHG No 4
17. Masson SHG No 0
1R Rlark Smith SHG NO 0
19.PoterY SHG No 0
)Ummary. I -lJotal rain water harvesting structures Created
.
ZJota[jin water harvesting stru:tures rejuvenated ,
3.Additional area brought under protective lrrigation I
no 204
no 0
ha 2L.2
no 974
mandays 169000
rqtr.APD(Livelihoods) P.D,
no
no
noiu/: t\|..
Physical activities deteils under the scheme IWMP-lll/zOO9-lo(Batch-l),Bock-Umerkote \"b
lq I I "_! "lr r oject _cosi ( n11lnfgl,h ) __:: ir.lactual Expenditure (Rs. tn Lakh) :- Rs.
L- Summary of Project Activities lmplemented :
ogi. i2000557.752q
vvUi i\ iuu LuLC6vr ,- I UCtiili5 ui HLi lruvcrliCilr
I
I !!ni+ I r)!!:ntit\/
I Ha i rrg I| ,,- i' ! - M {l:r' f loUr.l UtV!tlr.r!/i.t(.
,i, 1, .. i,;:t.,1:,i-r -i iir, I
l(a) lrench _ _L___ rvt:
@Countour BundingMoisture Conservation
Vegetative and Engineering Structure
Water Harvesting Structure (New created)
(d)Diversion Bond(e)Open Wel!(f)Others(Specify)(a)Agro Forestry(b)Earthen Checks(c)Gully Plugs
(d)Others(Specify)
(b)Check Dams
(e)Ground Water recharge structure(f) loose bolder strucyture(g)Others(Drop structu re)
b)Check Dams(c)Nalla Bunds
(d)Percolation Tanks(v) Water Harvesting Structure (Old Renoveted)
I
!Lirlu vLJciuurrrcr. ,f ruL,u,!jvL uji_,
I r1,r. !
i u,.!
:
(ii)
(iii)
- f;. 650Rmt.
Ha.
Ha.
Ha.
Cum. 77125Cum. 11055Nos. 0
(iv)
[a)Farm Ponds Nos. 62Nos. 29
(c)Nalla Bunds Nos.(d)Percolation Tanks Nos. 40
Nos. 227LCum. 206L6Nos. 145
(a)Farm Ponds Nos.
Nos.
Nos.
Nos.
(e)Ground Water recharge structure
(b)Raising of Misc. Seedlings Distribution Nos.(c)Distribution of Veg. mini kit & Onion Nos. of kit 1200(d)Mineral Mixture Nos.
(f )Travis ---
l't,Nos.
I ir-., ,
i,I
l'---------l| 1ar:, I
I
I
I
I
. !-__
i\l o <,
U r/Jr ruvpL, r ,.o.. .+ t_i
3 Livelihood activities (a)Grant (lndivisual) Nos. 80(b)sHG Nos. 714
Summary :
(A) o,tal rain water harvesiing structures created Nos. 131(B) Total rain water harvesting structures renoveted Nos. 0(c) Additional area brought under protective irrigation Ha. 720(D) Number of farmers benifited. Nos. 3745(E) Direct employment created Mandays 29859
.4"^PDG{&water)
APD(Livelihoods)
i
I
I
i
I.tI
I
I
I
I
i
I
I
I
I
ihlPolri'tr., rrrmins
/i'\Dicrirrrirrrrr:
1l-t
t'r)tp.- Odi<ha
I R pprorred erofect Cost (Rs. tn Lakh) :- ni. izs.sgsga ----lDL"ri,'r l\laharansnrrr
Isloc! :- fosagumtrnrta
,V
P3/lRctual f*penaiture tnr !l3!ll-._ :- Rs. 622 .61-202
[.r n,il Prg,iect Aciivities I mplementetl :
Work/Activitvi\14 lA/^-1.-
Vegetative and Engineering Structure
Work Sub Categorv
L: . _1-.. .
llrirr,r',",,i.,,,oj_ -_ll.llc..-r...
i (e l\n/a-.tel a nrJ Deve loneCi (f )Ar; ro l:c.li-r:;.. r.v
tlelrr.l:llrr/iUuvLt
Details of AchievementI:Ir''a I at,rrn+i+.. i
,lI
Hp.
l.l r
(i)t.F.s
(b)Field Buncs(c)Terrace
(d)Diversion Bond(e)Open Welt(f)Others(Specify)<ontou r B""dirC(a)Agro Fore
a)Farm Ponds
(c)Nalla Bunds
(e)Groundwm(iv) Water Harvesting Structure (New created)
--.r " -,,.)t..^mrn. 1Drr.-lrrriirrn rrco\
i;ij
I
I
i.., ,: i'llr-ristr:re Crlrsprrratior
L25
:UHa. 96M.M.Ha.
Rmt. 1.2574Ha. 16
( iii)
Ha. 111Ha. 3.5
lyrLvvJE E,tJtuer
-
Nos. 5
Nos. 30Cum. 89Nos. t22
IyrLrtELn udtll) Nos. 13Nos.
Nos. 9Nos. 2
tr rvL. rEt )[arPELt ! y,
-
lri-------_t_-__ _ ilht;i' i l(a)rarm e'o
i I (b)Checx Darnsri-i I (c)Naila Buncts':1r.
,l:,l.r,,ilii:;.iiq;.1:.'-.;.;!1--6i,,e(C,iiiiei-roVetec)|(d)percolatior,T,_
Noi :4|
nr^. I t\r
;
lttttlI : lLiu
I ^,^- -i---__=-=;-.--*-l
lNos,lTii /cl )Veoef ;, i rio l-)amn
1 (e)Papay;,7 Uruntstlck
I :r Il,lr\t (v Jilr'i
I irtgr. I Zr.ro0
(c)Nalla Buncls
--
(d)Percolation T"rrlF-,a.^,.'trf-r ,--*t .:.._,_ :,.Cil0rS€ iirt:C:Ui_C
Nc.,.
Nos.
Nos.
glgelterrl( h )othe rs-B rics rvt- ti n!_-IrlGr:*+ /t^.tt.,i-.-
-
lVtls. i '1
Nos.
Nos.244
1-J lLivelihoodactivities rervr sr rr lrt tvlvt)udl I
(b)sHG
-
Nos. _
_ _l!el. __Nos.
276
(c)ClG 68
49
)
(B) Total rain water trarvestinlitructure Nos. 746(c) AdditionaI area Urougt tffi Nos. 46(D)
srltrtEfl
-
Direct emptoymeHa. 743
(E) Nos. 7432Mandays 7643
APD(Land & Water) APD(Livetihoods)
\\ ,//
,Nn"dttf
p hys ica I activiti es detai I s u nder the scheme {UlflYlP.VEoOe'4OFatoh'U SoqkdeiotBl
roject Cost (Rs. ln laltt_inditure (Rs. ln Lakh;
District :- NabarangPurState :- Odisha
Details of Achievement
proved
tual Exp
- Rs. 661.80
- Rs. 565.24084
Work Sub Category
hers(SpeciNos.
Nos.
(b)Earthen Checks
c)Gully Plu
(d )Others(SpecifY)L.Compost Pit
(a)Farm Ponds
-aI
Work/AclivitY
I--'--,;". 1l Project Actrvities lmplemented
Soil & Moisture Conservatiorr
3.Counter Boundin(a)Brushwooq {!4:
Vegetative and Engineeri69 Structure
Water Harvesting Structure (New created)
b)Check Dams
(c)Nalla Bunds
d)Percolation Tanks
(e)Ground Water recharge structure
(f)Others(SpecifY)
l.Guard Wall(a)Farm Por,$(b)Check Dq11:
(c)Nalla BundsWater Harvesting Structure (Old Renoveted)
d)Percolation Tanks
ia )[ield-Bunds- _--
rrq.1--- -- -.*--.: -----i| '..- |
-- iiill- -,-:-.- - .*li1:_--.-r
a.
1-$s7 Srnall Earthen Structuiit
30
30
Ha. 27
Nos 1000(iii)
Nos 45
Nos 95
Nos. 300
Nos 300
Nos. 180
(iv)
Nos. 30
Rmt. 4900
Nos. 5
Nos. 73
Rmt. 500
Rmt. s00
Nos. 0
(v)
Nos. 0
Nos. 0
Nos. 0
e)Ground Water recharge structure Nos. 0(f)Othe rs(Specify)
0(a)Supply of Yam Seeds Kg. 23000UIr\.rrstng oT tvl tsc.5eedlIngs Distribution(L)L/tstr tLutrorr of Veg. nrini krt & Onion
Nos. I zoooNos. of kit I r roo
{nT\y/
(f)Travis
r\l Ui.
Nos
l\los
l\lC:;.
li'._ _
Nos
__ uo_qon
500iA')
r f-il_l
l:'r
150
I
-iI
III
I
iI
I
III
I
I
i
I
e)Vetina
I
i.i\lJ i-'ullliJ, i t-iS
i
6. paddyNos. 100
T.Mango Seedling -__S.Patato Seeds
Nos. 3250
Kg. 50009)Onion Seeds Ha. 1L.35
3 Livelihood activitiesKr- ro SHG
RF To CIG
RF TO l,,rdrr'drrl
Nos. 25
Nos. L00
Nos. 50
(A)
(B)
(c)(p)(E)
SummarV :
Total rain water h ri ctrr
Total rain water harvesting structures renovetedAalalltlonal ere: hrnr rohi rrnda. ^r^+^^+i.,^ ;--;-^t:
Nos. 210Nos. 0
P rBd
Number of farmers benifited
-
Direct emolovmpnt crp:tod
Ha. 190Nos. 5412
Mandays 22540
Y{ zAPD(Lanr
*{flrz'J & Water) APD(Livelihoods)
i
I,Il,rltt:l
I
i
'-r'h''t'"'r'\
l/r \h t, -
rJi l1,l\t-r-'\
l.ii.p:nnlr. c;or.lqi' i- -
It Water Dovire' r /- \j'arlii
'_ r' ,. -.r t ---l',f i r
I
l4 lpfn2;y;1;1
)u
I
It
Phvsical Proeress Report of Batch-1, IWMP-l / 2009-10District:- Nuapada
rl';
.y'ect lD / Name of Cluster:- Cluster-l-x6o'oved oroiect cost (Rs in lakh):- 468lbp,oved project cost (Rs in lakh):- 468.72 ,
'6rrn,flrtu of proiect implemented:-
Block:- Nuapada
Batch:-lActual expenditure( Rs. ln lakh):-
m o 4to.4L242
Sl No. Work / Activity Work sub Category Details of achievements
L NRM Works: Unit Quantity(t) Land Devlopment ( Productive
Use)
(a ) Afforestation Ha. 22.16
(b) Horticulture Ha. 26.9
(il) Soil & Moisture Conservation . (a) Countour Bunding M 7.4
(b)Others (Field Bunds) M 13
(C) Others (Countour
Trenchine)M 300
(il r) Vegetative and EngineeringStructure
(a) Earthen Checks Nos. 1.2
(b) Loose Boulder
Structu re
Nos. 280
(tv) Water Harvesting Structure (
New created)
(a) Farm Ponds Nos. 27
(b) Check dams Nos. 7(c)Percolation tanks Nos. 1,O4
(d)Ground WaterRecharge Structure
Nos. 2t
(v) Water Harvesting Structure (
Old rejuvenated)(a) Farm Ponds Nos. L2
(b) Percolation Tank Nos. 192 Production System & Micro-
Enterp rises
(a) Mixed Crop
(Gr"cundnut withMaize)
Nos of SHG/FtG 27 Group
{h! Onron lr!os or SHG/Ftc lg Q16r-r3
c ) Greengram Nos of SHG/FtG 6G(d)Veg. Kit Nos of
SHG/lndividual2L Group /1,35
lndividual
(e) Potato Nos ofSHG/lndividual
27 Group / L57
lndividual3 Livelihood activities (a) Poultry Nos of SHG/CIG 42 Groups /127
lndividuals(b) Goatary Nos of SHG/ClG/
lndividual20 Groups/ 40
lndivid ua ls
( c ) Duckery Nos ofSHG/lndividual
2Groupsl 64
lnd ivid uals(d) Pisciculture Nos of SHG/Clc/
lndividual21. Groups/ 13
lndividuals
'{)r)
I
4 Total rainlrAdditinn el
/drcr ildrveSUng structures createdrater harverting:rar 1...^,,^L+ ..- l^.-ts
Nos. 159Nos. 31
Number of farmers benefitedent created
Ha. 50Nos. 990lVlandays 21_,000
t
11L
, i PlA. ,.j,,l\1,r,1,i.,
Signature
APD (tand & Water) P.q,HSdI&Nuapada
afs\\hf€itor
.\x\11
//ce: odisha/_hroject lD/Name of Cluster: iWU P- ll
District; Nu B loc k:Kom na
B"t.t'vroor{oAioroved Proiect Cost (NRM, PSME & LH)(Rs in lakh): 390.96 Actuat Expenditure: ( tn Lakh ) 3 71.10
Summ;rly of Project activities implemented:Sl.No Work/Activity Work Sub Category Details of achievements
1 NRM Works: Unit Quantity
r)
Land Developme nt(Prod uctive Use) (a)Afforestation Ha 31
(b) Hortaculture Ha 24O Agricu lture Ha 0(D)Pastu re Ha 0(E)Waste la nd deve loped(f) Affo restatio n Ha 21(g)Horticulture Ha 74
(il) Soil & Moisture Co nservation (a) Trench (Stagga rd ) Ha 4(b) Fie ld bu nds M 135O Terrace Ha 0(d) Conto ur bunds Ha 69
lr)Vegetative & Engineeringstructure (a) Checks & Plugs Nos 0
(b) LBS M 273O G a bion Structure Nos 0
1D)Gully Plugs M 2540
(tv)Water harvesting
Structure(New) (a)farmpond Nos 54(b) check dam Nos 2
@ na llah bunds Nos 1(d)percolation Tanks Nos 34(e)G round Water Recharge
Structu re Nos 0(f) wHS Nos 94(g) RNls 33
(v)Water harvesting StructureIQei' 11p621"61
f.Jos 0(b) cnect< clam Nos U
O na lla h bunds Nos 0(d)percolation Tanks Nos 0(e)G rou nd Water Recharge
Structure Nos 5(f)Dug Well Nos 2
2Production system &Micro Enterprise l Poultry Nos 606
2 Fishery Nos 223 Onion Nos 6594-Garlice Nos 365-Vegetable Cultivation Nos 109
3 Livellhood Activities 1- sHG(Nos) 15
4
2
MembersBenefited 747 4
Nos 0
'fotal Rain water harvestinB structures created
fouf noin water hdrvesting structures rejuvenated
AdOitional dred brought under prote(tive irrigation
Numbers of farme rs benefited
Dircct emPloYment created
Nos 217
Nos 1
Ha 91.4
Nos 1432
mandays 13 6894
. q0lr
,\b'*SiSnature
PIAPIA, WMPCIIJSTER{I
KOMNA
$qrVLfl
/te,-oaisna District:-Nuapada
/e r oiectl D/Name of the Cluster-IWMP-ll I
/ A@roved project cost(Rs.in lakh) 564.\2
Block:-KomnaBatch:l/2009-10Actual Expenditure
Summarv of proiect activities im emented Rs.in lakh') 254.44
Sl.No Work/Activity Work Sub Category Details acl ivementI NRM Works Unit Quantity
I
Land development(productive useJ [al Afforestation Ha
[b] Horticulture Ha 33.75
Ic)Agriculture Ha
Id)Pasture Ha
[e)Wasteland developed Ha 10.2
[0 Avenue Plantation Km 5
ie) Ha
il
Soil& MoistureConservation [a)Trench m 20
[b)Field bund Ha 97
Ic)Terrace Ha
tdlIe)
llrVegitative andEngineering structure [a)Checks & Plugs Nos L39
[b) Gabion structure Nos 10
[c) Drop spillway 1.46
iv
Water HarvestingStructure INewcreated) [a) FarmPond Nos 13
[b)Check Dam Nos
[c) Nallah Bunds Nos 5
[dJPercolation Tank Nos 103
[e) Ground Water rechargestructure Nos 22
t0
V
Water HarvestingStructure (Oldrejuvenated) a) FarmPond Nos
[b)Check Dam Nos
[c) Nallah Bunds Nos
[d)Percolation Tank Nos
[e) Ground Water rechargestructure Nos 20
2
Production system µ-enterprises Vegetable Cultivation Ha 11.5
Ground nut Ha 9.4Cutton Cultivation Ha B,B
fp
Su
\r!4 6'\<Signature
PIA APD
Signature
[Land & Water).sifu#-\\"i'.p1ffiu,gnagtor.
^, a te-r's-hed, N u apada
Summer Cultivation Ha 13
Ground nut & Maize Ha 32.5
{) onion (14+23) Ha a13/
Greengram (Mung) Ha B.B5
Kiranashop Nos 4 nos
Panipuri Shop Nos 1 nos
3 Livelihood activities Fish Cultivation
Nos [SHG)
7
Duckery 4
Mudport Making )JSurf making 3
Mobile Reparing
Nos (indivisule)
2
Vegetabal Cultivation 2B
Kirana Store 9
Panipuri Shop 2
Cycle Reparing 3
Mobile Reparing 2
Poultry (Chiks ) Nos (SHG,FCIG) 15
Taillering Shop 3
Tiffen Hotel 2
Pisciculture Nos (SHG,FCIG) 22
Poultry Shop Nos (SHG) 1
Asarbati Making Nos 2
Musroom cultivation Nos [SHG,FCIG) 4
Gotary Nos [SHG)4
Rice Bussness 1.
Paperplate Making Nos [SHG) 1.
4 Others Nos
mmaTotal rainwater harvest ng stru{ule qeelsq Nos 1,43
Total rainwater harves ng structure rejuvented 20
Additional area brought under protectlye rr4ggtiell- Ha 80.6
Number of farmers benefited Nos 1791
Direct employment created Mandays 37044
l\ rrl,{ ., Odisha District: Nuapada Block: Khariar r-l -
:
7 ioject ID / Name of Cluster: - IV, Khariar Batch:- I /2009- I 0
fApproved Project Cost (NRM. PSME& LH) (Rs in lakh)- 2,63,41.77 0/- Actual Expenditure: 2,63,47,7701-Il( Summarr of Proiect activities imnlemented:
st N. Work/Activitv Work Sub Cateqory Details of achievementsI NIIM Works: Unit QuantityI 2 3 1
(i) Land Development(Productive Use)
(a) Afforestation IIa. 7
(b) llorticulture I Ia. 19.5
O Agriculture Ha. 3
(D)Pasture Ha. 5
(E)Waste land developed 0
(f) Afforeslation 0
(g)Horticulture fla. 0
( ii) Soil & Moisture Conservation (a) Trench (Staggard) 3.6
(b) Field bunds Ha. 48
O Graded bund Ha. l6
(d) Contour bunds Ha. 13.15
( iii) Vegetative & Engineering structure (a) Checks & Plugs Nos 212
(b) LBS Nos 1124
@ Gabion Structure 0
(D)Gully Plugs 0
(IV) Water harvesting Structure(New) (a) farmpond Nos l3(b) check dam Nos 6
O nallah bunds Nos 8
(d)percolation Tanks Nos 58
(e)Cround Water RechargeStructure Nos 0
(0 wHS Nos l5(g) RMS Nos 7
(v) Water harvesting Structure(Reiuvenated) (a) fhnnpond Nos l0
(b) check daar Nos 0
O nallah bunds Nos 0
(d)percolation Tanks Nos 8
(e)Ground Water RechargeStructure
Nos 5
lsL(f)Dug Well Nos 0
Production systern &Micro Enterprise
l- Poultry Nos fi;
2-Fishery Nos 35
3-Onion Nos 56
4-Garlice Nos 0
5-Vegetable Cultivation Nos 62
-t l-ivel ihood Activities I SHG(Nos) t5
2-Members
Benefited325
4 others Nos 0
Summary
Total Rain water harvesting structures created Nos 116
Total Rain water harvesting structures renovated Nos 26
Additional area brought under protective irrigation Ha 86.2
Numbers of farmers benefited Nos 636
Direct employment created mandays 10542
Signature
APD (Land & Water)
C:uE P.I A Wrtarobcil,r
District: NUAPADA Block: Sinapali
Batch:l/2009-10
Actual expenditure (Rs. in lakh):3s8.08
t'llD/ Name ofcluster: V
.pproved project cost (Rs.in tkh):.
1mary of Droiect activities implemented:
Sl.No. works/ Actitivity Work 5ub Category Details of AchievementsNRM Works: Unit Quantity
1Land Oevelopment (Productiveuse)
(a). Total Afforestation ha2.00
(b)Total Horticulture ha 2.00
O Total Additional Agriculture ha
(d)Total Pasture ha
(e)created on wastelands ha
(f) Others . ha
(g) Others . ha
2 Soil & Moisture Conservation 1 Staggered trenching ha
2 Countour Bunding ha 66.42
3 Graded Bunding ha
4 Bench Terracing ha
5 Others ha !28.10
3Vegetative and EngineeringStructure 1 Earthen Checks Cubic meter
2 Brushwood Checks Rmt
3 Gully plugs Cubic meter
4 Loose bolder Cubic meter 99.405 Gabion structure Cubic meter
6 Others nos 1.00
4Water Harvesting Structure (Newcreated) l Farm ponds nos
12.00
1.4.2 Check dams nos
1 .4.3 Nallah Bunds nos
1.4.4 Percolation tanks nos 79.00'1 .4.5 Ground Water recttarge nos 27.OO
1.4.6 Others nos 34.00
5Water Harvesting Structure(Renovated) 1 Farm ponds nos
2 Check dams nos
3 Nallah Bunds nos
4 Percolation tanks 6.005 Ground Water recharge nos
6 Others nos
6Production system µ-enterprises 1.Poultry
1.002. No. of activities nos 113.00
3 No. of Beneficiaries nos 98.00
1.004 Fisheriesnos * .00
5.No. of activities
6. No. of Beneficiaries nos 39.00
5.6 Others
1 No. of activities nos 9.00
2 No. of Beneficiaries nos 82.00
1. No. of activities nos7.007
Livelihood activities for the asset-
less persons
2.No. of Beneficiaries nos 394.00
SummarY;nos.
Total rainwater harvestlnB w
Total rainwater h
Additional area brought under projective irrigation
Nrr rmhcr of farmers benefited
nos.
ha
nos.
MandaysDirect emPloymen!sreaigg
\*
Singature
APD(Land & Water)
APD(
Asst, F'r t Direci,\A,/i;f.,icha "i.t
,$w#*Prolect iir*;iir
Y,fr'ielshe :1, Fi1 I 111;, lrr
. Odisha
ni ctutt"r - IWMP-lll
Approved Project Cost (ln Lakh)'564.94961
District - RaYagada
Actual Expenditure (ln Lakh) 541.36242
Block - KASHIPUR
Batch - l/ 2009-10(%
\))
Summerv of oroiect activities implemented
Work / ActivitY Work Sub-categoryDetails of Achivement
Sl. No.
U nit Quantity
1 2 4 5
*T01 NRM WorKs:
Land DeveloPment(Productive use)
il(i)
(b) Horticulture Ha. L47
(c) Agriculture Ha.
(d) Pasture Ha.
(e) Wasteland Development Ha.
(f) Cashew Plantation Ha.
(ii) Soil & Moisture Conservation (a)Trench Mt. 42321
(b) Field bund Ha. 45
(c) Countour Bu nding Ha. 27.5
(iii) Vegetative & Engineering
Structure(a) Checks & plugs N os.
(b) Gabion structure N os.
(c) Loose Boulder structure Nos. 242
(d) Masonary guardwall Mtr.
(e) Masonary drop structures Nos.
(f) Sto ne Bu nd ing Mt 1000
(iv) Water Harvesting Structure(Newly created)
(a) Farm ponds Nos. 60
(b) check dam N os.
(c) Nala Bands N os.
(d) Perculation Tanks Nos. 4
(e) Ground Water Rechar8e structure N os. 25
(f) Dugwell Nos. 10
(g)lrrigation Canal Mtr. 43
(v) Water Harvesting Structure(Old rejuvenated)
(a) Farm ponds N os.
(b) check dam Nos.
(c) Nala Bands Nos.
(d) Perculation Ta nks Nos.
(e) Ground Water Recharge structure Nos.
02 Production System & Micro
Enterprise
Papaya & Drumstick Seed ling N os. 1000
Vegetable mini-kit Distribution Nos. 978
Maize de mo nstration Ha. 100
Sunflower demonstration Ha. JO
Bana raj chiks distribution Nos. 3500
Kandul/Harhar Demonstration Ha.
Pine-Apple seedlings distribution Nos.
Mango seedlings distribution N os.
custod Apple seedling distribution Nos.
Fishe ries Unit 24
Pou ltry N os. 10
Goatery Nos. 10
Livelihood activities I r'r
ElcFl!
u rse ry N os.03
o u ltry N os. 19
oatery Nos. 29
eaf plate making Nos.
isiculture Nos.
easonal Business Nos.
)etty shoP N os.
;ewing machine No s.
)addy mill lnos'
)addy business
vesetable Cultivation
N os.
N os. 1-6
Potato cultivation I
Rooe making I
veeetable trading I
Sunflower
Drudsery Programmee
N os. t2
No s.
No s.
Nos.
Nos. I 8
il[iilln*.t", Harvesting structures created
r"i.rnffi ,'r*"*Harvestingstructuresre juvenated
[l-aan.*r.t".brouchtu@
-
fi"r -lN os.
Ha. 310
N os. 385
Number ot iarme15 ucrrErrLr
Direct emPloYment createdMandays 72a348
T
, ,/ri'{/ ./r{\'iwn'
,t. ,D,,, -.'
'l! ate'::':u' ' -'
^* ti]"3I1*""0
State - Odisha
l,lame of Cluster - IWMP-tV
Approved Project Cost (tn Lakh)-720.OO Actual Expenditure (tn Lakh)
)/l\Block - K.Singpur
Batch - t/ 2009-10
540.00
District - Rayagada ab$
51. No.
I
Work / Activity Work Sub-category Details of Achivement
Unit Quantity2
4 501 NRM Works:
Land Development(Productive use)
(i)(a) Afforestion Ha.
(b) Horticulture Ha.
(c) Agriculture Ha.
(d) Pasture Ha.
(e) Wasteland Development Ha.
(f) Cashew Plantation Ha.(ii) Soil & Moisture Cons"rvation- (a) Trench Ha.
(b) Field bund Ha. 420(c) Terrace Ha.
(iii) Vegetative & Engineering
Structure(a) Checks & plugs Nos.
(b) Gabion structure Nos.
c) Loose Eoulder structure Nos. 21,5
(d) N4asonary guardwall \4tr. 400(e) Masonary drop structures
(f) Multi-purpose meetins Dlace
\,Jos.25
Nos. 1(iv) Water Harvesting Structure(Newly Created)
l(a) rarm ponds
l(b) check dam
-
(c) Nala Bands
(d) Perculation Tanks
(e) Ground Water Recharge structure
-
(f) Dugwell
(g) Masonary canal
{os. 74
Nos. 3
Nos.
Nos. 31
Nos. 2
Nos.
Mtr. 3s0(v)
o2
Water Harvesting Strr.trre-(Old rejuvenated)
(a) Farm ponds
(b) check dam
(c) Nala Bands
Nos.
Nos.
Nos.(d) Perculation Tanks Nos.
{e) Ground Water Recharge structure Nos. 2Production System & MicroEnterprise
Veg Seeds Mini Kid Distribution Nos. 1260Ivlaize Cultivation Demonstreri6h Ha. '139
Yaam Distribution Qnt 15
Sunfl ower Demonstration Ha. 130
Onion Seeds Distribution Ha. ^2CMustard Seeds Distribution Ha. 2
Floricultures Ha. 0.8
Tomato Cultivation Ha. 6.4
Pisi culture N os. 1
Banaraj Chicks Nos. 6000
Vermin bed Distribution Nos. 17
Duckary Distribution Nos. 2035
Buck Distribution Nos.
03 Livelihood activities Vegetable Cultivation Nos. l9
Sunflower Cultivation Nos. llCotton Cultivation N os. l8
Arhar and Tamarind seasonal business Nos. 62
Gotary Farming Nos. ll6Tailoring Nos. I
Petty Business N os. t7
Dry Fish Business Nos. I
Drudgery Programmee Nos. 8
Summary
Total Rainwater Harvesting Structures created Nos. 74
Total Rainwater Harvesting Structures rejuvenated Nos. 2
Additional area brought under pro tective irrigation Ha. 415
Number of farmers benefited Nos. 482
Direct employment created Mandays 195438
1
i ), -sfrpg5e\ 'l
1
APD (Land & Uuater)
: ,,
S .\r'VSignature
PD, wat6rsheds
,,S6-oAPD (Livelihood)
t
i;'r,2-N"_.-,-Signature
/ 3(l)
Siaie uols!-la
C)Lre;."1 lD / l',,iame oi CiusIe. l',ivi*tr-r
t-,pprayec prcjecl Ccgt iRS. irtLar.it:. aiOC.0I,; ^Cir;ai expe.;:j,llj:3 ,i! l": LEI-.:rj- z:i. :'1
.fap
r-ii! i lair.It ni l^nrc'.rFm+a!(
II
L.tnii i
T
!
\rudlrLiLv
(i) Land Development (Prociuciive use) a) Afforestation ia 19
b) Horticulture tiia. 64
(c) Agriculture Ha
(d) Pasture Ha
(e) Wasteland developed Ha.
( ii) Soil & Moisiure Conservation (a) Trench Ha.
(b) Field Bunds Ha.(c) Tenace(d)Stone Bundinq Ha. 185
(iii) Vegetative and EngineeringStructure
(a) Checks & Plugs cum 3750
(b) Gabion Structure
(c) Loose Bulder cum 1746(d) Stone Guard Wall Nos.
(e) Earthen wall Nos.
1iv) Water Harvesting Structure (Newcreated)
(a) Farm Ponds Nos. IJ
(b) Checl<dams Nos.
c) Nallah Bunds (R.M.S) Nos. 17
(d) Percolation tanks Nos. 2(e) Grourrd Water recharge Nos(f) Gravity Flow Nos o
(S) M I Channel Nos. 48(v) Water Harvesting Structure (Old
rejuvenated)(a) Farm Ponds Nos.
(b) Checkdams Nos. 12
(c) Nallah Bunds Nos.
(d) Percolation tanks Nos.(e) Ground Water recharge Nos. e
tisLi iu. JAjoVrt
yrvt t\ ,
I
Prcducrion sysiem & mrcro-^ -.1 - rf, -1..,-. ".cr !rs, Pr rssJ
Lrveill-rood activities
5 Banna Cultrvation
l-,tuQzety
Seasonai business
>nb (r\os.) 8
I\US 2
U4 Others
Summary:
Total rainwater harvesting structures Nos. 92
Total rain water harvesting structures rejuvenated Nos. 15
Additional area brought under protecti.,,e lnigation U^I tq. rc/. lu
Number of farmers benefited Nos. 736
Direct employment created Mandays 70851
&*"il.dfi-rE)ebpturse cr oi
P.D., vgscl#€,ffiPattPardlakhimuidt
ii Goair''' i1.
1^\ aP\n
Sie',€ U'JrSh3 -)i)-
[.teta i rs ci acnieve!'nerls
(r) Land Developi'neni (Frociuctive use) (a) Afforestation ia(b) Hortir;ulture bt(c) Agrrculture Ha
(d) Pasture Ha
(e) Wasteland developed Ha 3.66
(ii) Soil & Moisture Conserveticn (a) Trench Ha 4A Q
(b) Field Bunds Ha 104.75(c) Tenace(d)Stone Bunding Ha 15 29(e) Vent. Plantaino Ha. 20(f) Dia Phaqam Wall Ha 0.91
q) Guard Wall Ha 69.77
( iii) Vegetative and EngineeringStructure
(a) Checks & Plugs Nos.
(b) Gabion Structure
(c) Loose Bulder cum 2807
(d) Stone Guard Wall Nos. e
1(e) Earthen wall Nos.
(iv) Water Harvesting Structure (Newcreated)
(a) Farm Ponds Nos. 30(b) Checkdams Nos 32
(c) Nallah Bunds Nos. 20
(d) Percolation tanks Nos. E
(e) Ground Water recharge Nos.
(f) Ml Water pit Nos. 11
(q) M tChannel Nos. 66(i) Diversion Channel & Gravity Nos. 28
(v) Water Harvesting Structure (Old
rejuvenated)(a) Farm Ponds Nos.
(b) Checkdams Nos. 1
(c) Nallatr Bunds Nos.
(d) Percolation tanks Nos.
(e) Ground Water recharge Nos. 1
l;,.i' :. i -,'. r z
rlrl
i
1l' \).il
Prociuciicn systenr & micro-onrernriccc
Livelihood activities
2 Turmei'ic culiiva'rion
l't .5r1n1lov,/er culltvatror i .1/ |
*----L -----::=---iI i1., i
- - i ,.- -0,iJUi
cultivation
Cuiiivaiiorr
SHG (Nos )
-t r- inr- -. \or rL, tr!us.,
P.D.Wbe6fsMs,oetfutttParalekhcmua4t
f,flr* NW \ssi(n-atM# nff&] prq.dgftffi,
PIA A.P.D. 1t-ano & u$1e1trOOe.O{4p*oosl
't ? oiaio cultr vatioi-r
SHG (Nos.)
SHG (llos IHill Broom Making
Turmeric Cultivation SllG (Nos.)
Water Pump for Agriculture SHG (Nos )
SHG (Nos.)
Total rainwater harvesting structures
Total rain water harvesting structures rejuvenated
Additional area brought under protective inigation
Number of farmers benefited
Direct employment created
\t\
trt()r r\, l,lu> / I
\
L7t\ /n
)Lcrts vul>lld t's)u/vt,t-.
,rc)e.t iL' , l.iarr,e oi Ciuster l//ilF-lrl,-.PP. Jruv r. rrve. v'-.
vvork I rrciiviiy VVOi-K SUfr UaIeQor r
I lr,if I Ctr ranf ilir
0i---/rr
NRM W*1*ffi a) Afiorestaiio_n_
b) Hcrticulture
iaHa
AAA
(c) Agriculture Ha
(d) Pasture Ha
(e) Wasteland developed Ha
( ii) Soil & Moisture Consei-vation (a) Trench M
(b) Field Bunds M 240(c) Tenace(d)Stone Bunding Ha. 4',:
(e) Stone Pitching & Guardwall Ha. 2
( iii) Vegetative and EngineeringStructure
(a) Checks & Plugs Nos.
(b) Gabion Structure
(c) Loose Bulder cum 128
(d) MlCanal Nos. 5
(e) Diversion Bond Nos. 11
(iv) Water Harvesting Structure (New
created)(a) Farm Ponds Nos. 87
(b) Check Dam Nos.
(c) Nallah Bunds Nos.
(c) Percolation tanks Nos.
(d) Ground Water Reehage Nos. 28
'e)Gravitv Flow Nos. 4
(0 Dugwell Nos I
(q) Compost Pit Nos. 4
(v) Water Harvesting Structure (Old
rejuvenated)(a) Farm Ponds Nos.
(b) Checkdams Nos.
(c) Nallah Bunds Nos.
(d) Percolaiion tanks Nos
(e) Ground Water recharge Nos.
\,\i\
\
Producl'on svstan & microentsrpils:s 8 Trssueculture
i5 Li,' ".n"T.Ptsoculiuie i t( j.
'1 1.Xerox Machine ReDa:r
Livelihcod aCivities
btal rain waler harvesting strucrures rejuvenated
area brought under protective inigation
Number of fai'mers benefited
*,rMatFo,drs*i&ti Galopatt
Paralekhcmundt
ii S,,,,i't,,..1, rxr, '.,alr3
li Tu:,ne.,c ari tattJi
rye afi)laitr r./Ut5tta
Prc,reci lil i I'lame cf C[]ster IVVI\4P-i v'
.appi'oved pro]ecl cosi (Rs 1n r-akhl 72C
Summarv of Proiect Activities implemenied ;
Batch li20uv-'tt
Aciuai expenciiir-rre (Rs in Lar<hr 54'J 82
cr Ar^ Wnrk / Actirriiv \416.lz Qr rh azlqn^.\,
1-' naa-.---.^at--^ioi -.lrvtEJrolrvrr
i^.,| [.retart5'ei dLtirsvelrreiil.>I
use)i eiJ-ZJ
(b) Horticulture Ha 91 05
(c) Agriculture Ha. 25.4i(d) Pasture na
(e) Wasteland developed lla 12.75(ii) Soil & Moisture Conservation (a) Trench M
(b) Field Bunds Ha. - 94.66(c) Terracr:(d)Stone Bundinq L.l a 114 49
(iii) Vegetative and EngineeringStructure
(a) Checks & Plugs Nos
(b) Gabion Structure
(c) Loose Bulder cum 4376Guard Wall Nos. 19
(iv) Water Harvesting Structure (New
created)(a) Farm Ponds Nos. lo(b) Checkdams Nos 19(c) Nallah Bunds Nos.
(d) Percolation tanks Nos. 22(e) Ground Water recharge Nos. 2(fl WHS Nos, I(S) M lChannel Nos. 52(i) Gravity flow Nos. '10
(v) Water Harvesting Structure (Old
rejuvenated)(a) Farm Ponds Nos. 4(b) Checkdams Nos. 1
(c) Nallah Bunds Nos.
(d) Percolation tanks Nos.
(e) Ground Water recharge Nos.
01 I'JRM Works :
t
_tI
rrl;-- M""h!9r9P9[
13.Cold drinks
14.Shoe ot'r:.t19!:
SHG (Nos )
ilect emPtoyment created
.lpotaliqllyaigl 300
a -v
" s "t4l!'
t'ul!Yg!g'
5 SRi
6 lviix
7 .prSCiCr:tt-t-lre
g.Oniorl crriiivartor t
il
.a
Production sYstem & micro-
enterPrises
14
60
_frt dt'-,q-2lu'?totclgpv11"ot.
,,turruur"-#ffi poildsffi;;B*prem'mu '"#ni*itr'ffff"
.-..--1--t!iiI
i.ios.
i\u>.
irios -
State Od isha
rg (a)District - Boudh
IWMP.I
312.00
^"to tl)Proie^!D/ Name of Cluster
Apf,ri .1C project cost (Rs. ln lakh) :
Block : Harabhanga
Batch: l/ 2009-10
Actual expenditure (Rs. ln lakh): 276.71
Sl. No. Work/ Activity Work 5ub Category Details of achievement
01 NRM works : Unit Quantity
tilLand Development
{Prod uctive use)
(a) Afforestation Ha 0
(b) Horticu ltu re Ha 0
O Agricu lutu re Ha 0
(d) Pasture Ha 0
(e) Wasterla nd developed Ha 0
(f) ..... 0
0
(ii)Soil & Moistu re
Conservation
(a ) Tre nch m 0
(b) Field Bu nds m 19
O Terrace ha 0
td ).... 0
(iii)Vegetative and
Engineering structu re
(a)Checks & plugs nos. 5
{b) Gabion structure n os. 0
o.... 2
(iv)Water Harvesting
structure (New Created)
(a) Farm ponds n os. 11
(b) check Dams nos. 4
O Nallah Bu nds n os.
(d) Percolation Tanks n os, 13
(e) Ground Water recha rge
structurenos. 1-6
(f)... 0
(v)
Water Harvesting
structure (old
rejuvenated)
(a) Farm ponds n05.
(b) check dams n os.
O Na llah Bu nds n os.
(d) Percolation tanks no5.
(e) Ground water recharge
structure5
(f)....
o2Production system &
micro enterprises
1. Pou ltry Activity
Beneficia ries
2. Fisheries Activity 1
Beneficiaries 10
3. Mung Cu ltivation Activity 60
Beneficia ries 300
4. Others Activity 32
Beneficia ries L782
03 I ivelihood activities
1. SHG (nos.) 42
410
2. clG/JLG (No)
160
04
Others
Summary:r^*-r "-;-,.,.+.. f'e^/p<tino stfl ratures cfeated n os. 51
nos. 5r.,trl rainwater harvestinP, structures reiuvenated
Add,ti";.1 "*. b.*ght under protective irrigation ha 99.80
n os. 784iillr.-, ^+ r"'-..< hpnpfited
ni.^-+ --^l^wmant .rpatPd Mandays 78916
SignaturePIA
Signature
APD (Land & water) ,,r'*rr"r,&
ztdalluteAPD (Livelihoods)
state odisha District - Boudh Block - Boudh
Proiei:t ,' Name of Cluster IWMP-ll Batch: U 2009'10
Approved proiect cost (Rs. ln lakh) : 648 Actual exPenditure (Rs. ln lakh):572.31
Sl. No. Work/ Activity Work Sub category Details of achievement
01 NRM works : Unit Quantity
(i)Land Development
(Prod uctive use)
(a)Afforestation Ha 2
(b) H orticulture Ha 0
O Agriculuture Ha 0
(d) Pastu re Ha 4
(e) Wasterland developed Ha 0
t 2L7.49
(e) ......
(ii) Soil & Moisture Conservation
(a) Trench m
(b) Field Bu nds m 46
@ Terrace ha
(d)
(iii)Vegetative and Engineering
structure
(a) Checks & plugs n os. 27
(b) Ga bion structure nos.
o... 2
(iv)Water Harvesting structure
(New created)
(a) Farm ponds n os. 22
(b) Check Dams nos. 55
O Nallah Bu nds no5.
(d) Percolation Tanks nos.
(e) Ground Water recha rge
structurenos. 19
(f)... 8
(r)Water Ha rvesting structure
(old rejuvenated)
(a) Fa rm ponds n os. 1
(b) check da ms n os. 28
O Nalla h Bunds nos.
(d) Percolation tan ks n os.
(e) Ground water recharge
structure(f)....
o2Production system & micro
enterPrises
1. Poultry Activity 34
Beneficia ries 180
2. Fisheries Actlvity 29
Beneficia ries 145
3. Mung Cu ltivation Activity 100
Beneficiaries 500
4. Others Activity 21,8
Beneficiaries 1.090
O-v rt
)......
03 Livelih ood activities
1. SHG (nos. ) 49
659
2. CIG/JLG (No) 72
360
04 Others
Summary:Total rainwater harvesting structures created n os. 131Total rainwater harvesting structures rejuvenated n os. 29
Additional area brought under protective irrigation ha tL3.7tNumber of farmers benefited n os. It69Direct employment created Ma ndays 1230L4
Signature
PIA
SignatureAPD (Land & Water) ,.,1k!:,
vsffiture
eet'(tivelihoods)
/5 u)w
state : odisha Dist: Nayagarh Block : Nayagarh
Pr 'ect lD / Name of Cluster : IWMP-1, Nayagarh Batch'.1 I 2009-1"0
Approved project cost 642.00 Lakhs Actual expenditure 51'4.1,6 Lakhs
Summarv of proiect activities implemented:
sl.
NoWork / Activity Work Sub CategorY Details of Achievements
L NRM Works. Unit Qu a ntity
(i)Land Development(Productive use)
(e) Afforestation ha
(b) Horticulture ha 7.6
(c) Agriculture ha
(d) Pasture ha
(e) Wastelanddevelopment
ha
(f)
(e)
(ii)Soil & MoistureConservation
(a)Trench rmt 650 rmt
(b) Field Bunds m
(c) Terrace ha
(d).
(iii) Vegetative and
Engineering Structure
(a) Checks & Plugs nos. tl
(b) Gabion structure nos.
O L.B.S nos. 29
(iv)
Water Harvesting
Structure (New
created)
(a) Farm Ponds nos. 43
(b) Check Dams nos. 26
(c) Nalla Bunds nos. 1.
(d) Percolation Tanks nos. 30
(e) Ground waterrecharge structure
n05, 25
(f) Ring well for kitchen
ga rde ntlE. 14
\r
a
A.
(u)
Water Ha rvestingStructure (Old
rej uve nated )
(a) Farm Ponds no. 7
(b) Check Dams nos.
(c) Nallah Bunds n os.
(d) Percolation Tanks n os.
(e) Ground water n os.
jf) Village Tank/Pond no5. 9
2Production system &m icro-enterprises 1-Vegeta ble cu ltivation FIG (nos.) 5B
2-Moong Cultivation FIG (nos.) 74
3-Pisci Culture FIG (nos.) 4
4-Pou ltry FIG (nos.) I5-Onion cultivation FIG (nos.) 10
6-Potato cu ltivation FIG (nos.) 1,
7-Black smith FIG (nos.) 1
8-Potor FIG (nos.) t9-Pampad Making FIG (nos.) 1,
10-Brinja I cu ltivation FIG (nos.) 1,2
3 Livelihood activities 1-Pou ltry SHG (nos.) 9
2-Vegeta ble cu ltivationSHG (nos.) 62
FIG (nos.) 10
3-Wheat flour Making SHG (nos.) 7
4-G oa ta ry CIG (nos.) 2
5-M ixture(snacks) Making SHG (nos.) 2
6-Agarbati Making SHG (nos.) 5
7-Mushroom Cultivation SHG (nos.) 344 Others nos.
tt \\qaV"-
r/rA7%;
s?e"*Wb 1
APD (Land&Water) APD (Livelihood)
Summary:Total rainwater harvesting structures created
Total rainwater harvesting structuresrejuvenated
Additional area brought under protective
irrigation
Number of farmers benefited
1,06,531Di rect em ployment created
..,r'
w:il+'rSignatu re
p,watersheds
I
nos. 125
n05. 10
ha 186.3 1
nos. 794
ma ndays
tL a)
Pirysical Prog, css Report of tlatclr-I I zAiig-LAUriiier Wareisired Developnrcnt Coruponent IPMKSY]
jrai,' : Jijisha l)i:;tricl : Surrdargarlr Block : Rajgangpur
,'i'(.! '.L lu i li-iile trf Clr.rl,tlr : ii.iJqarr(.)l)ur Batch: I/2009-10
i\r)l,,JVi,:o proji:ci cr,.si il{:;. lrr l.ikir): 0,)/1.00 Ar.tuirl Expenditure (Rs. In Lakh) : 547.00480
iu i t i r fi ii ry of i.;roject .rcti vi ties i ilt plcrtrcntecl :
ci Details of51 .: -r. t r^r,-.-t- -,.L ^-E^*^-.- i 1vturk / ectlvity Work Sub Category:-i I .' ssv vsEeYvr I I __rrL- I achievementsl,0. ii',ii{r'r iryi;rks: i Unit I Quantity
ill tii ri;nd Di:'relolirlri:rtt i("r) Al{orcsralion I hu
i rrr\r-. uyvr nr. . i I .-','. i y""l':':L;nd Di,'relol.)nrr:r)t ;(a) Alforcsralion I f,u
I,ltt, (procJucr.ive usc)
| (b) Horuic;utture I !l I 1 I0
I l(c) Asriculture I hu Iir"l--l
i I (d) Pasture I ha I B0l-.1.------ll/^r vrr-^u,.t.,,,^ c\z,,.arr,n,rrl i i
r i\e/-.. i i i1il--i----.---'Soil &lvrtiisture l(a)Trench I m | |-]--::-l--l,LonSerV.jLiolli(b)Fielcjtjunds/CourrtourBundinglhu|463.45
l)' l---- I - r
i (c) icrracc I na Iri'-'li-l
Ns>d
, (ProcJuctive usc)
| (b; ttoruic;utture i nu I r r o,l"l-lI l(c)
Asricutrure I f. I
i..t------tl(e) Wastelarid DcveloPcd i Ii 1--- - i-/,\(r/
I\'/ I iI: ' i- - I --' i, -.i I\9iil l-l--.---,ii. 'Soil &lvrtiisture l(a)Trench I m I rl\"/ "-"e" | "' I I
l/-nncair,:l,nrr lr.-r--,^r-r ra. - -t-^)-^'..--, -.-.-;..-r,--- --l-;: I 1.. ". I
nos. i 10 l
linos. i 530 l
-l-rI]--L- I
nos. I
I
rE,ii,eeri^s strurcture lioj 1uulrua, I not i s30 il;^; I -I-
, l(c) . I I rr --1 --l----l 1iv iWater iiarvestirrg Slructure | (a) Farm PondS I nos. I
iii'l.uu Cr,.rated) t
ioi 3,..x Daps I no, Iii:. i !-
.:Ii(d) . r ir;r,ii ivcgeii:trvc arru i1a; Crrec,.,; & Plugs linjection Pil"l I nos. i tO
I
!(c) Naiiari Burtds I not. ;
nos.
(d) Percolation lanks j nos.
(e) Ground Water Recharge Structure I nos.
(a) Farnr Porrds I nos. I tvVater ii;rvestii i91 Structure(Oltl [it; uvcricitcd ) (b) Chcclr Dams i not. i
(i.) riraiicit-r Uurrds j ,.ror. j
(9) Pergolaiiol rarrks _ ll:. [__ -_-r'----'- l---- ---(e) Ground Wa[er Rechargc Structure I n_ot._l___
113
roJO
P.iqe 1 cl 2
,N2
Prociucrioii System &M icrc--cnrerprises Ieotato
DemonsLratlon
j Pyra Crop IFic:ld Pca]
Muslard Dcrr ronsLrali<;
iicd Crarrr [/\rlrur] Dcrr
u-; Li uei i i;cor! Activities
trLilt:r:
iU:: i{nary:i-ol.,t R.:in v/;li.ot- ii.rrvcsLinq structurcs crealed i nor.ittt..i Reirr fiJiLtrr- ltar-vesting sr-rLlcturcs rc.luvcnu[t:d nos.
(r. r
,,iLll:,r.ior ;al Jr i:., l-.rrrri;gl rL under protecLive irrig;iIion,riuir iber o[ far rrrers benefited
148.30
Man-days 2,45,88Li)irrct employrnent created
-^'^-)\{YYAssistanr Engirreer
Sc.,rr Conservet ion PanposhCririr Plli, iwivlP-l
[{a;gaiii;pur
(Land & Water)hk
(Livelihoods)
.J//.//\.---------
-/Project Director
Watersheds, Sundarga rh
Page 2 of 2
rld Pca I Dcrnonstra!i"r_
rr r sLra li<trr
l),"rr I Dct rt0tlstralion
rrrl Dcrrrc-instration
:rnonstraliorr
ration
ha
ha
23,70
4t7.50
ha 15.00
ha 169.17
ha 166.67
ha
ha
26.40
z).zznstration
nonstration
cL
I Breed Buck
ha 1,7.32
ha 27.76
nos. 57
nos. B
tion nos. 45
I"o SHG nos. 136
113
_ll
IAJ-- oo,rnu
A-)/' I
Block- Gurundia
Batch : 1/ 2009-10
axb
District- Sundargarh
ime of the Cluster- IWMP-II, Gurundia
{pproved Project Cost(Rs. In Lakh): 612.00000 Actual Expenditure(Rs in Lakh): 532.2043L
Summary of Project activities implimented
SL Work / Activity Work Sub CategoryDetails of Achievements
Unit Quantity1 NRM Works :
(i) Land Development(Productive use)
(a) Afforestation ha 36.7(b) Hortieulture ha tt.4@ Additional Agriculture ha 0(d) Pasture ha 0(e) waseteland developed ha 0
(ii) Soil & MoistureConservation
(a) Staggered trenchinq m 11416.5(b) Field Bundins m 600@ Terrace ha 0(d) Others (Diversion Bund) m 1000
(iii) Vegetative andEngineering Structure
(a) Earthen Check & pluqs Nos 493(b) Gabion structure Nos 0@ Loose boulder Nos 1250
(iv)Water HarvestingStructure (New
created)
(a) Farm ponds nos 54(b) Check dams nos 22@ Nallah Bunds nos 24(d) Percolation Tank nos L54(e) Ground Water rechargestructure nos 15
(f) Others nos
(v)Water Harvesting
Structure (Renovated)
(a) Farm ponds nos L4(b) Check dams nos 0@ Nallah Bunds nos 2(d) Percolation Tank nos 5(e) Ground Water rechargestructure nos B
(f) Others nos
Production systemand micro enterprises
Seed Replacement Pkt 5l-lybrid Maize Cultivation No 100HWPaddy Seeds No 319lyb. Paddy Seeds pkt 390HDPE Pipes No 130Veg. Seeds un its 933Zinger Kq 1500Diqsel Pump Set No 25Pigs Nos 87Fish Fingerlinqs No no'aNutritional Garden No 9500Supply of Sprayers No laBanaraja Chicks Nos 2900K.B.Pumps No 6
Supply of Bucks No 30Duckery Nos 1700Nutritionql Garden (K.Lime) No 2000Pyra cropinq Ha. 100Pisciculture (Application of lime) No 10Potato Cultivatiion Ha. 68.05
3 Livelihood activitiesSHG Nos 74CIG/FIG nos 12Very poor Individual Nos 43
4 Others
. a9\
Summary:Total rain water harvesting structures createdTotal rain water harvesting structures renovatedAdditional area brought under protective irrigationNumber of farmers benefitedDirect employment created
4d,-Signatufu
PIA
/\
*-a*\*'Signature
APD (Land & Water)
NosNosHa
NosMandays
APD (Livelihoods) P.D., WatershedsSundargarh
269292927296
15838
F
Ma^?n..**
JTATE- ODISHA
. Proiect lD/ Name of the Cluster,Approved project cost (Rs in lakh)
/6(')
DISTRICT -SUNDARGARH
lwMP- t
625.44
aFl a\BI.ocK. TEPHRIPARA
Batch -1l 2009-10
Acutal Expenditure : 555.32596
SI
No.Work / Activity Work 5ub- Category
Deta ils of achievement
Unit Quantityt NRM Works:
(r)Land Development( Productive use ) (a ) Afforestation ha
8.2s
(b) Horticulture ha 44.2s(c) Agidulture ha 0(d)Pasture ha 18.5(e) Wastela nd developed ha 8.67(f)......
(e)...............
( il)Soil and MoistureConservation (a) Trench ha
2.00
(b) Field Bunds ha 36.00( c) Terrace ha 0(d)............ 0
( ilr)Vegetative and Engineering
Structure (a) Checks and Plugs nos29 &37
(b) Gabion Structure nos 0( c) Loose bolder structure Nos 207
(tv) Water Harvesting Structure (
New created ) ( a) Farm Pond nos64
(b) Check Dam nos 1,1,
(c) Nallah Bunds no5 3
(d) Percolation Ta nk no5 124( e)Ground Water Recharge
Structure no571.7
(f) 22
(v) Water Harvesting Structure (
Old rejuvenated )
( a) Farm Pond
nosL2
(b) Check Dam nos(c) Na llah Bunds nos 1
(d ) Pwercoation Tanks nos 1,
( e)Ground Water Recharge
Structure nos15
(f)............ 3
2Production system & Micro -enterprise 1. Activity
22
2. Beneficiary 92 303
4
3Livelihoodactivities forassetless person
1 SHG ( nos)103
2. Activity nos L7
3.Beneficiary nos 2149
Is.\b
,
lt
WAPD(Land&Water) APD (Livelihood)
\?
Signature
PD , Watersheds
4 Others no5 o
0Summary:
0
Total rainwate r harbestingstructures created nos
341-
Total rainwater ha rbestingstructures rejuvenated nos
32
Additioanl area broughtunder protective irrigation ha
559
Numbers of farmersbenefitted nos L672
Direct employment created mandays t7347
4LL<'L- y' \)
-.t--- -..\\-\-
l^. tdte: Odisha
I oject lD/ Name of Cluster: lWMp-tv
/ Approved project cost (Rs.in lakh ) : 658.0956r Summarv of proiect activities implemented :
r#9 a.\a
District:Sundargarh Block:KutraBatch: I /2009-10
Actual expenditure (Rs. tn lakhs ): 610.1445
I SL. No Work / Activity Work 5nb Category Details of achivements
I NRM Works : Unit Quantity(i) Land Development
(Productive use )
(a)Afforestation
ha 50(b)Horticulture ha 50(c)Agriculture ha 56(d) Pasture ha 165(e)Wasteland ha
f)............. ha(e).............. ha
(ii)
Soil & Moisture Conservation (a)Trench m 5900(b)Field Bunds m 27000c)Terrace ha
(d)Contour Bunds m 66000(iii) Vegetative and Engineering
Structure (a) Checks & Plugs n os. 50(b)Gabion Structure no5.c)L.B.S n os. 1,42
ld) Eearthen Check Bund nos. L40(iv) Water Harvesting Structure
(New
created
(a) Farm ponds nos. 78
b) check dams n os.(c )Nallah Bunds nos. 24d) Percolation Tanks nos. 109
(e) Ground water recharge
structure n os. 57f) w.H.s nos. 55
(v) Water Harvesting Structure(ord
rejuvenated ) (a) Farm ponds nos. 15b)Check dams nos. 10c )Nallah Bunds
(d) Percolation Tanks/(e) Ground water rechargestructure n os. 60(f)..............
Production system & micro-enterprises l.Arhar ha 15
2.Grount Nuts ha L2
3.Black Gram ha 114. Brinjal ha 6
5. Ladisfinger ha 10
\ 6.Tomato ha 1,2,, T.Sunflower ha 158.Capsicum ha 1,L
9.Vermicompost nos. 29L0.Mango Graft ha 10011. Bana na Sucker ha 1512. Patato Seeds ha 1213. Spreyar Machine no5. 3514.Pyara Cropping ha 2615. Pump Set nos. 1016.Ch ilti ha 817. O n ion ha 818.Potato ha 40
3 Livelihood activities l.Pisciculture SHG(nos.) 5J2.Goatry SHG(nos.) 343.Poultry SHG(nos.) 674.Veg. Cultivatlon SHG(nos.) 545.Agriculture SHG(nos.) 15
4 Others n os.
Summary:Iotalrain water ha rvesting structures:reated nos. 323
Total rain water harvesting structuresrejuvenated no5. 85
Additional area brought under protective irrigation ha. 75
Number of farmers benefited nos. L752
Direct employment created mandays 15 6285
/-a'tl
I
Signatu
)\ure
,z\natsig
'1\ia;r'15rgnature
2\7---
PIA APD (Land & Water )
bk(APD Livelihood )
re
P.O Watersheds,
Sundargarh
/
t7 (?) qfi< ala
iS'rte: Odisha District: Kalahandi Block: Th. Rampur
Batch: I / 2009-10Project lD / Name of Cluster: IWMP - I I 2OO9-LO
Approved project cost (Rs. in lakh):720.00Actual Expenditure (Rs. in lakh):527.043
Details of achievements
d ) Pastu re
F ield Bunds
(a) Checks & PlEnsineerins Structu re
b) Gabion Structu re
c) Others (Guardwal
a) Farm pondsStructure (New
c) Nallah Bu nds
d) Percolation Tanks
(e) Ground waterrecha rge structure
a) Farm pondsStructu re (Old
Check dams
c) Nallah Bu nds
d) Percolation Tanks
2. Veeetable
Sl. No Work / Activity I Work Sub Category
01 NRM Works: Unit Quantity
(i)
Land Development(Productive use) (a) Afforestation ha 289.50
(b) Ho rticu ltu re ha 109.50
(c) Asriculture ha
ha 5.00[e, wasrerano
development ha
(f) ha
(ii)
Soil & MoistureConservation (a)Trench ha
ha 116.00
(c) Terrace ha(d) Others (Stone &Contour Bunding ha 61.50
(iii) nos. 20.00
nos. 230.00
n os. 2.00
(iv) n os. 4.00
(b) Check dams n os. 22.O0
nos.
n o5. 14.00
n os.
(f) Others n os.
(iv) n os.
no5. 2.00
n os.
n o5.(e) Ground water
recha rge structure nos.
lOthers n os.
o2
Prod uction system &
m icro-e nterp rises L. Arhar 80.00256.00
3. Patato 63.00
a2\
\{
APD (Land & Water)
_.4ffi,Signature
P.D, Watersheds
Livelihood activities
Total rainwater harvesting structures created
Number of fa rmers benefited
7,16,788.O0
L" ,ib7
Block: Th. Rampur
Batch: I / 2009-10Project lD / Name of Cluster: IWMP - ll / 2OO}-LO
Approved project cost (Rs. in lakh): 756.00
PHYSICAL PROGRESS REPORT
District: Kalahandi
Actual Expenditure (Rs. in lakhl: 647.372
Sl. No Work / Activity Work Sub Category Details of achievements01 NRM Works: Unit Quantity
I
Land Development(Productive use) (a) Afforestation ha 22.70
{b) Horticulture ha 31.00(c) Agriculture ha 1.00(d) Pastu re ha 3.00[el vvd5tetano
development ha 5.00(f) ha
(e) ha
(ii)Soil & MoistureConservation (a)Trench ha zt.oo
(b) Field Bunds ha 247.79(c) Te rrace ha 53.00(d) Others (Stone Bundinr ha 727.0O
(iii)Vegetatrve &
Engineering Structu re (a) Checks & Plues nos. 2,230.00(b) Gabion Structure nos. 2.00(c) Others (LBCD) nos. 15.00
(iv)
vvdtel nd, ve5LtItB
Structure (New
created ) (a) Farm ponds n os.
(b) Ch eck dams n os. 1.00(c) Nallah Bu nds n os.
(d) Percolation Tanks n os. 17.00(e) Ground waterrecha rge structu re nos.
(f) Others (ea rthen canal n o5. 3.00
(iv)
Water Ha rvesting
Structu re (Old
rejuvented) (a) Farm ponds nos.
(b) Check dams n o5. 2.00(c) Nallah Bunds n o5.
(d) Percolation Tanks nos.[e, urouno warerrecharge structu re nos.
(f) Others (MCD) nos. 2.00
o2
Prod uctron system &.
micro-enterp rises 1. Arha r 727.OO
2. Vegetable 220.005
Livelihood activities
a."\
APD (Land & Water)
otal rainwater harvesting structures created
Number of fa rm ers benefited
'{icl":{"{!
P.D, Watersheds
. )te: odisha District: Kalahandi
Project lD / Name of Cluster: IWMP - lll / 2009-10
Approved project cost (Rs. in lakh):420.00Actual Expenditure (Rs.
-rtrl
Block: Lanjigarh
Batch: I / 2009-10
in lakh): 388.901
PHYSICAL PROGRESS REPORT
Details of achievements
NRM Works:
a) Afforestation
a) TrenchField Bunds
a) Checks & Plu
) Gabion Structurec) Others (Guardwa
d) Others (Ca na
a) Farm pondsStructu re (New
Check dams
c) Nallah Bu nds
d) Percolation Ta nks
(e) Ground water
a) Farm pondsStructure (old
c) Nallah Bunds
d) Percolation Tanks
micro-enterprises
Sl. No Work / Activity Work Sub Category
01 Unit Quantity
(i)
La nd Development(Prod uctive use) ha 30.25
(b) Horticulture ha 41.00(c) Aericulture ha
(d) Pasture ha 17.50le) wasteranodevelopment ha
(f) ha
(e) ha
(ii)
Soil & Moisture
Con5ervation ha
ha 362.80
(c) Terrace ha
(d) ha
(iii)vegetative &
Ensineerins Structure n os. 11.00
nos. 90.00
n os. 53.00
n o5. 6.00
tiv) n os. 1.00
n os.
n os.
n os. 67.O0
n os.
(f) Others (MCD n os. 22.OO
(iv) n os.
(b) Check dams nos.
n os.
n os. 1.00
[e) brouno warer
recharge structu re n os.
(fl Others (RSS) n os. 5.00
oz 1. Maize 180.00
2. Arhar 80.00
af
,-HH
Livelihood activities
Summary
Total rainwater harvesting structures creatednos.
68.00
TdEfTamWeter ha rvesti ng structures
reiuvenated nos.1.00
Additi6'naT a retbrought u nde r Protectrve
irrisation ha59.00
Number of farmers benefited nos. 207.00
Direct employement created mandays 94,032.00
SiMtlre' Sifnature
.,2 \ 17fu'l_ pxysrcal pRoeRrss nspoRr I
ate: Odisha District: Kalahandi Block: M. Rampur
Batch: l/ 2009-10Project lD / Name of Cluster: IWMP - lV / 2009-10Approved project cost (Rs. in lakh):378.00
Actual Expenditure (Rs. in lakh):329.979
Details of achievements
Productive use
Field Eunds
c) Terrace
d)Others (Guardwall
e) Others (Can a I
Structu re (New
b) Check dams
c) Nallah Bu nds
d) Percolation Ta nks(e) Ground water
Structure (Old
b) Ch eck dams
c) Nallah Bu nds
d) Pe rcolation Tanks
Others {RSS
m icro-e nte rp rises
Sl. No Work / Activitv Work Sub Catesorv01 NRM Works: Unit Quantity
(i) (a) Afforestatio n ha(b) Horticu ltu re ha 9.00(c) Agriculture ha(d) Pasture ha[el wasrerano
development ha
(f) ha
(e) ha
(ii)Soil & Moisture
Con servation (a)Trench ha
ha 343.70
ha
(d) ha
(iii)veSetatrve &
Ensineerins Structu re (a) Checks & Plues nos. 15.00(b) Gabion Structu re no5. 250.00(c) others (LBCD) n os. 62.00
n os. 8.0013.00
(iv) (a) Farm ponds nos. 3.00nos. 1.00
n os. 23.00
n os. 24.O0
n o5.
(f) Others (MCD) nos.
(iv) (a) Farm ponds n os.
n os.
nos.
n os.(el L, rOUnO Water
recharge structure nos.
n os.
o2 1. Arhar 722.00
lF
'bw2
\
Ir[Ll_l'$r,[,n]
-/'u-":''{'<n\--:-)ie:/.{4lf
t ''r
si6natureP.D, WatershedsAPD (tand & Water)
2. Vegetable 168.00
3
4
03 Livelihood activities 1 SHG (nos.) 78.00
2
04 Others nos.
5ummary
Total rainwater harvesting structures createdno5. 28.00
lotal rarnwater narvestlng structuresreiuvenated no s.
Additional area brought under Protectiveirrigation ha 16.3 3
Number of farmers benefited nos. 153.00
Direct employement created mandays 84,672.OO
LL%F-r'*Signature
--4.,
1{/ ttn 9
state:OdishaProject lD / Name of
Approved Project cost
Paikmal
I 2009 70
Rs.59122698lakh
PHYSICAL PROGRESs
District: Bargarh Block:(- Batcn I
f,,...' a"oendiiureRs.690.0lal'h
Surnrna.rn/irips imDlemented
Details of achievements
Unit QuantltY
work sub cateSorvSI NO
NRM Works:land DeveloPment
lha 30
(,) BA2 na 0
3 HA6
(d) PastureHA 0
Soit a Voistrt" Conseruation
Wasteland develoPeo5 0
(f) .........
(ii)
350.00
57000
3 Ha I oouO terrace
0
5
2
(iii)
Vegetative and
Engineering Structure 0) Gabion structureI no5, 52
zdl Gullv Dlugs
8
Water Harvesting
StructLlre (New Created)(iv)a)Farm Ponds
nos- 1071 3
b)thech dams2 5no5.3
.1\ Par.olation tanks5
4
no5. 10e)Ground Water
IN WHS "* | 1126
nos I riv
1
Water Harvestlng
Structure (Old Reiuvenated)no5.b)check dams
O Nallah Bunds2
(d) Percolalron rank s- NO3
NO 2(e)Ground Waterrp.hrrpp <truCtUre
NO 125 0wHs
NO 3412
Produclion System &1. Goatery
3282.Vegetable Cultivation
3.Small Busrness
4. NurserY1
5.Tailorlng
"o 6.Shee pr y
t L velihood activities LGortery sHG (,ior ) 158
2.Vegetable Cultivation SHGnos. 110
3.5n rJll Business SHGnos. 22
SHGnos. 2
5.Tent House SHGnos. 3
6.women farm toul! sHGnos. 8
4 Others
SummarYT^rar -inv,.ter hirvostins structure created 302
nos. t5T^r.r .ainu'arar h:rvcstins slructure reiuvenated227.45
Additional area brought under protective irrigiionNr,,-h". .f fnrn\. rs benefited 1570
94244Direct emplovment created
;"^.,r6.r(tt_+9 '%,{ ff\'
r ,?-b
;#,hfFEfin'il
Y. ..' \k ignafure 5lg
APD(Land&Water) APD(LivelihoodlP.D. ersne0s
' :.r-)
Pro,ed lo/ Name ol cluslerrwMP rapproved proie.tco5t Rt 7I9 4lakh
PHYSICAL PROGRESS
Oistri.t: Bargarh Block: Padampur
B3lchr/2009'10
Actual exp€ndirlre Rs 613 s1092larh
l;.+
;T*K(s/
or D.oled activitjes imPlenentlqworkf!q!!E-
{02
3 ll7 69
(e)wsteland develoPed5
59
iiil L2
15
29
233
3
5
)1
13
svuclure (Old R€juvenated)
1
2
3
3
169
16
3
12
5
Total rainwai€r haryesting svucrure c
I rainwater hatuestns nrocture
iiilii"an,"" rro,ct't uno", prore.rive n saro 220.r9
Number ol lameG b€netited
o^.r "-ptov."nr "*t"a
123665
\el+fal"\" ur\
)ab
t'State; Odisha
Project lD / Name
approved prolecr
PHYSICAL PROG RESS
Districtt Bargarh Block: lharbandh
Batch-l/ 2009'10of Cluster:lWMPj.]!costl (Rs.618 0 Lakh Actual expenditlrre (Rs 540 82808 !akh
of ororect activrties implernente
Details of achievements
I^ii Ouantltv
SI
NRM Works:
Worl Sub CategorY
Ha 2
(rl
Land DeveloPment
lProductive uselHA 0
b) Horticulture2 0
@ Agriculture HA3 0
(d)Pasture HA
0(e)wasteland develoPed HA
5 00
{ii)m
50rl & lvlolsture Lor'5e105200
3na 0.00
4HA 637
5
nos. 0liii)
Vegetative and
Engineering Structurenos, 0
I2
hl Gahinn strLrcturenos. 82
water Ha rvesting
StructLtre {New Created)nos, 91
lnos,
2
3(.) Nrllah Bunds
dl Per.o!ation tanks
nos. I o5
(e)Ground Water
recharge structure(f) RMS
126
lWat"r. H"-esting) lsiructure (Old Rejuvenated) (a) Farrn ponds
nos. 48
1 (b) Check dams no5. 0
2 O Nallah Bunds no5. 0
3 (d) PercolaLion tinks NO 0
4
(e)Ground Water
recharge structufeNO
0
5 (0....... NO 0
2
Production System &
rnicro-enterprises 1. GoaterVNO 152
2.Vegetable Cultivatiojl 188
3.Small BLrsiness
4. Duckery 13
5.Mango 2
6.Sheepry 18
Livelihood activities LGoaterY SHG (nos ) l
2.Vegetable cultivation 5HGnos. 146
3,Small Busrness SHGnos. 5
.. 1
-. '-*rl,{,,,,,..,,,,, i*?Ll, .,,,."."
l\ II il$..,,.,t r.tlrAPDlLand&Water)
, ,,,iy'{^ -.rY\$r-,o\
Sign+ureP.D-Watersheds
Vqar
) 4.Grain Bank SHGnos. a
5.Ricc proccssrng SHCnos. 6
6.Women larm too s SHGnos. 6
Others 0
Summary'ordl dr'rwaler harvesling stru' l" a crPJl'J 111
TotaL rainwater harvesting structurc rejuvenated 48
Additional area brought under protectrve lrrrgalron 185.56
Number of farmers benefited t4l9
Direct employment created mandays 45040
Signa
APD(Livelihood)
gvPHYSICAL PROGRESS
) ^ist-Barrarh Block'Bii€Pur,6te-odisha
#.i".i t7""-" "
*. .lusterrwMPily- Batch-r/200s-10
/ Approved cost (Rs In Lakh'fl4 40 Actual Expn Rs in lakh) 557_24574
activities i tedSummary ol project actlvrtles lmpremenDetails of achievements
Sl No Unit Quantfy
1
(i)Land DeveloPment
(Productive usel0
{blHorticulture Ha lHa
(clABnculture HA 0
(d)Pasture HA o
le) Wasteland devel9!9! 0
tfl... 0
(8)....... 0
(ii) Soil & Moisture Conservation(a)lrench 0
(b)Field Eunds 0
@Tarrace 0
(d) Graded bundins 5
(e) Field Bunding ha
(iii)Vegetative & enginee.ing
structure
{alchecks & Pluss l
lb)Gabion Structure 0
o..... 0
(iv)water haruesting Structure
(New createdl
(a)Farm ponds 35
lb)Check dams (WHS) 13I
(c)Nallah Bunds 0
{d)P€rcolation tanks 24
(e)Ground water recharge
structure (RMS)166
1t... 0
(v) Water harvesting Structure (old
(a)Farm ponds 3
(b)Chect dams (WHS) 11
(c)Nallah Sunds 0
(dlPercolation tanks 0
(e)Ground Water re€harge
structure (RMs)o
{ft....... 0
Itrtrucllon rystem & micro
lnlarpnses 1-mango plantation 40
2-Goatery no {beneficiary) 2833 Weaving no (beneficiary) 1854-Veg.Cuhrvatron no (beneficiary) 4165'patato Cultivation no (beneficiary) 25
6-Ves.business no (beneficiary) 9
7 Puffed Rrce no (beneficiary) 5
8-petty business no (beneficrary) I9-Sheeperv no lbeneficrarv) 6410-Ves. Vendins no (beneficiarv)
11-Eettle shoD no {beneficiary)12-Veq. (its & imDlements arv) 93
13-poultery arv)
14-Rice Processing no (benefic arv) 22
15-Mason no (benefic 2
16-Saloon no (benefac arY) 3
17-black Smith arv)
18-Stationary arv) t219-Sweet Mason no (benefic ary)
20-Caroentrv no (benefic ary) 2
21-kabadi no (benefic arv)
arv) 3
23-Smallhotel arv) 2
24 Patato Business no (benefic ary)
25-Turmuric business no (benefic arv)
26-Moter cycle repairing a rv)
27'Rice Business fio (benefic ary)
28-Poultrv chicks arv) 34
29-Fishery no (benefrc arv) 2
30-Broom business no {beneficiarY)
31-Tailorins no {beneficiary)
3 tivilihood activities 1-Farm implements SHG (Nos) L4
2-Goatery SHG (Nos) 7
3-Rice orocessinq SHG (Nos) 6
4-Ves.Cultivation sHG (Nos) 93
SHG {Nos) 35
6 Sheeperv 5HG Nos)
4 Others
Summary
Total rainwater harvesting structures created 356
Total rainwater harvesting structures rejuvenated 14
additional area brought under protective irrigation ha 249
Number of farmer benefited 2303
Dired emPloymenl created. 20308
\-r9a1.r-. dtt' Wa^t' ,gs Signatu
r t') -lt-2-
Wv{ Sign
APD (Land & water) APD (Livilihood) ;r*Af'"
o-7 ,(.o-.
SummarY
Project lD/ Name of cluster:Approved Proje.t Cost(Rs. In lakh):
of P.oject activ;ties imPlemented:
toisinghnru/MLt_516.00000476.36698nditure (Rs. In lakh):
5No ;dtt" ----I rotar
5, Work 5ub cateSory Detnils o
1 Unit
Land Dev€lopment (Productiv€ Use)
(b)Ho(icult'rre
(c)Agri(ulture
(d)P.5ture
1e) wasteland development
(rl
1l Soil & Moisture Conservation
b)tield Bunds
(d)
vetctrtivc and EnBineerint Structure (d)Chcck5 & PIug!
(b)Gabin structure
O gully plug
i,)Watar Harvestint Structurc {New 11
(b)check dams
(c)Nallah Bunds
t,-(d)Per.olation td'rks 124
(-.)Ground wJter recharse str!Lture larlJ
(f)others/RMS l1
/^a-'
{b) (her(.Jar)]s 0 ,r.
(c)Ni lrir lllnd! 0 no
id) fer.r lrriorL raol5 / n no
lel Crcurd water rechargf 1.1 no!
r. couttry ' Sno,
; ,r.. Astreries ?0 'ro5
3 Vegeiable Catron 20 nos
4........
1. Vegeiable Calron sHc (4
2 Small Business 8 un i
\\ dler liar!e!llnil
-l
I Produ( tion sy!1rnr &nrrr:ro enrerpn5es
I'I'l
Livelihood aclrvrlieso,l
246 nos
4()l I t
4lI. s
66t
c
l20t acr
Total rainwater harvesring structures created
Tolal rainwarcr harvesring structr,rei reluvenatea
Additional area brought under prot,"ctive irigaiion
N!mber of farnrers beneiited
Drrc.t eorployment cr€ated
SignatureAPD {Land & \Jater) P O \,,,'
7a.5
]bt
Summary of Project activities implemanted:
b)
c)
f)
Distrlct:
Project lD/ N.mc oi ClustcrlApproved Project Cost{Rs. rn lakh):
Actualexpe.dit!re {Rs. In lskh)l
Odi5hag,rlansir
rwgll!720.00000
614.18955
Sl No
5l No Work sub Cat€gory Derails o
t Unit
1l tand Development (Productive Use) t5
2
(c)ABricult!rre
(e) Waste and development
(il Soil & Moisture Con5er!Jtion
d)Stragsered trench
Vegetalive and Engineering Structure (a)checl, & Pluss
@ BUlly plug
(lr'l Water Harvesting Stru.ture (New Cre 62
(b)check dam, 0
(c)Nallah Bunds
(d)Percolat on taflKs
(e)Ground Wal€r recharge110
(f)Others/RM5
Sier,SPh
(w.tersh..ls)
Signature
APD (Land & water) PD
l,:i r. n i,l;r l!,
r r,i.
(clN,,rll.h Eundi i ',,,.(d) f'c.. o la t io I tonk
_,i_ l-:--
]E(e) c,ound wnt.rrccar.luee slructure I rr. !
5{t)(orher)wHs I ," '2
Pro.Ju.tion system & 1. Others
5 ].'nenrlrc,it
{r t"- _1O.!l) (Mrnrb)rt
0
3 Livclihood aclivlties 5rlC { f!!5 J
2
Others
o
Iolal rainwdrer harvestrng Srr Jclurps Crealed 510Total rainwater harvesting structures rejuvenated
39Additional area brought
irrgation hac- t.l5Number of Farmers benifited 1452
Di.ect employment created 2850
utiYebip lnv
APD (Livelihoodsl
.) orb
)ll
Stat.:
Proiect lD/ Name ot
Cost{Rs. In lskh}lActlal expenditurc (Rs.
In lakh):
Summary of Project activitie5 implemented:Odisha
BJlycjI--
'tYli]l-540.00000
443.13622
rl
l5l
!1ry91
Work 5ub Category
Unit Quantity
Land oevelopm.nr {P.oduc!v
.l j,\:.st.ran.i J€ver.rnlent
50il & Moleturc conrc^irtion
veBet.tive and EnSin.erinB
water Harv$rinC 5|.ucl!re
t)n u,,, r, t!.i'. ,. h.,sr,!ulru t rlr I
{")Waler Hatuethng sttuctuf€
lr)Grou.d watef rccharge nruciure l
2Prod!crion syst€m & micro-
1 Agr nlple.rent5,3!.r,veg .ult'!arion,Fcnil'ser,K3pd'ip,Maneo errft,6.rli.,G,ou1dn!i.n o.,poratoseed.sp dytr vernrbed vet. ((
I K io'n *,ater rn'n3 puinp
stor€,p! scs.fJtl pr.rpr.,r.i.tw.rr(b!tiness,paddy&..e ir!r r.)s,*..:. a,'
bu5ires,,paddV,ri.e,puff rcablsiness,s31oo.,sp.€,veevend.€ I
siBia!4
rolei ra rnwaler ha rue!t,nE nru.tute.reared
lotsl'arnwaler hafves!rng nruct!r€ renovated
Acditronal ar": b.ouShi und,pr protect'v€
Nuflrber oi irrne15 benliitedDi.ectemplovme created
d) Prorecr lD/ N.'nc or Clu5ter:fi Approved Proi€ct cost(Rs In l.kh):rl actuJl .{pc.dnure (Rs In Irkh):
5!rnnrnry of Proj€ct activities implemcnted
504.00000413,49493
991!rl:grqri!!r!!!. .;
2 lProduclion tyslem & mrcro'cnterprjees
I Aer 'nt ".{,n$,4r.k.v.lj.! tr!.t on,Fertilrs.r,K0 p!mp,MnnUoqr.tt,G.rlic Grouf dn!t,o.ion pclatoseed,itr.ter,!e,m b€c,ret Krr
J;;l a""*,v l
--t
-----r
'.'---;_l
a
Itr]i
---]-,,, il)l
Land Developm.6t (Pfoductive U*)
1€l wrste Jni dev.ropdr rl
rveeerarivc nnd tnBineerinS Strucrure
water Harverting 5tructur€ {New Created)
.,)Gro!.d wat.J re.ha.6e !ti!.r1,.
l,!Jlcr Naruerr'ne 5trudu,c {RenovJtcd)
(b)Check dams
qj||lh 8,",r'__
l.)GroJrd !r'ar.''.,.rirr!e.,1i!.rJ,.
Tota rrnrw.nfr [xvcn .g 5rrdct!rc crcrt.d
T.i,J .rinw,jl. t .r.!r( .r, ,1,!ch,r r..ov.rtd
dd r,on. aie. !rolqFt ffder Drorec|vr
t!.r€ Pr 1! r.t I rr-..d tr,.:,,.. !lr!!.e:; ,!oilr& j :. tr!n r.5:,:!,r!Lrfa
pa4y,broom,daijy,lirh
b!s nc!\,prcd\,,ri..,pLf ,.;..b!s nrj5 5n,oo.,5pic€ vlB ve.d,.8
i
i
_r4l14109
iri t.Nr'ir!i..iit rtr: .r r. rti.l-
N!nrb.roll.:nre,r... I r.d
3 ?-(3Q)
. .- , ".,;irr.:r '" "r"'
: "'r'1r..:r..':,.1: jlf i: :':1.' lrl:ritl:::-r::: l:t::' '" "r . . -.. :'l'l:''l'""'.
.
' a^!b
'r.,' . ;'
'.r,J!.r.tjaa1l:;!91l:1 t!1!lllr,:!:ral&t.fltaljj
tl |1ir !1/uri./,'i.i:,lt; r,r:trt 3tb C..r.8o.y
I )'v! rl5
1. ) f.la lan S|NJ!1.1)Per{ o .rti.n lant!
i .1c,.)!rd,!it.' rrth.rse
ili, i ;r.rir'r,rrir:
irlLi: r, /ila;:l lr.
n..r-i, !rpond lu,pl !i,, Liithl r,,a !lig4;
ll.lails of achievamont5
ED?
. | _:.. ..
, I '.i,:,'' 'r"" i,'\l ' l
l'.'! ii rr' .:. ' '
I ll,..r rl'I i ,)j i firj ijrr.r)d!'ir'',:"i,,,a,.i,,!,.,,,.1,i i
li:,.1"r,,.r , I l, ,l alrtr.i(: & ir1!u5
l.',,, r,,'.| ,,lCJti,nn 5t!cturc' ' i,rr.rs -
clirtrri- -- ]
-, - l
'''.,''- l, !_l:-,-
t:
!jtg.v
1t!l:C
- l.;'l',d;';;:t;;
')7
.'
1
ll
,Ui, .t r|tllJ!,n{rfi .,,, ,ted
.\ rI..,,.o&.iltrx
I r,.! rrr(r.\t:rrN
l:l'rrlirLr,. ., _ _,.. ..:_'1!ll|,.bf ::lt:::
. i l)\,(;i: .!!t ig
,, ifi I ooi: .. r.! r, lr,rrll,l
: O0rlertI v,iiLlrble (!llrvatLfin
I t . wlnvrner l . wlnvrn8-.-" i v.';.".- ..'r*"'L,'I i -, .i- Lrhoopa Kalhr rnirk ra
r lri sln.ii llus r,!5\
,. ; ,.--,-. ilLlllltqt]I l lrilo,r)Br, n ce crores!irl_ lr _-- '' _ i
, l!,|:tft,_--__ -- .: -,.-._,-*._
_.l ltilrl!a!11{1i,r)r:!l!-:!.qg!1s'-l:!
I ' l:u ti.rdr papdd mnkiq't J;
,l!]1f.
1bi 28
2,1't
ili.:r: t!a.s'Ohp!r
:i rli.i r.r., ,aa .tnpan.ms)
:
_11 i:.r.r::?i:;.rr
-a29,,i4
-1
J
'* i ". l-"ni'';, 1
-- r ,lta
{t,"{' 1':..l:.' ',,1:;'ii
,.:.
a{n?'!:.apo{ilfrrdrJ P !. r&Bh<r!
i:ir
i:!:
PHYSICAL
tate-Ocr,sh:lt)
r-rj.ct lD/Name ofthe ciuster:-j)proved project costIRs. in lakh) :-
ctuai expenditurefRs. in lakh) :-
fproiect activiti
, (5)PROGRESS REPORT,BATCH-I / 2OO9 - lO,
IWMP.I,CHAKAPAD.District-Kandhamal Block-Chakapad
ilo a$t
/IWMP.I672.00547.95entedurIlrnirrv or pr otecL acLtvlLle5 tlnotell
;1.
{oWork/ Activity work Sub Category Details of achievenrents
I NRM Works : Unit OuantityLand Development (Productiveuse) fal Afforesrtarion ha 0
fb) Horticulture ha
fc)Aariculture na 0(dl Pasrure ha 0
(el Wasteland developed ha 0
rn. 0
fel .... 0
Soil & Moisture conservation lal Trench m ()
(c)Terrace ha
fdl Graded Bund ha. 5f13.0
Vegetative and EngineeringStructure [a) Checks & Pluss nos.
0
(bl Gabion structure nos.
Ic ) Loose BolderStructure nos. t1
fd) ofhers nos, u5
vJWater Harvesting StructureINew createdl [a) Farm ponds nos. /I
(bl Check dams nos. I (:,
fc lNallha Bunds nos. 0
fdl Percolation tanks no5.(e) Ground waterrecharge structure nos. 0
(f) others nos. )T
)
Water Harvesting Structure I0ld rejuvenated) fal Farm ponds nos,
[b) Check dams nos. 2
[c lNallha Bunds nos, {i
(dl Pe.colatjon tanks nos.(e) Ground waterrechar-ge structure no5, 0
ffl others nos, J]
2
Production system & micro-enterprises
(a)Poultry nos,
No. of Beneficiarv nos. 95
Iblothers nos.Dockery nos. 4
No. of Beneficiary nos, 30Fisheries nos, I
Nc,. of Beneficiary nos. 6Gotary Farm nos, J
Nu. of BeneficiarV nos, '2u
Livestock Dev- nos, 25No. of Beneficiary no5. t7I
Paddy Cultivation nos, IlNo. of Beneficiary nos. B{J
Petty Business nos. ltNo. of Beneficiary nos. 35
Tailoring no5. t1.No. of Beneficiary nos, 7:.)
Veg-cultivation nos. 1.26
No. of Beneflclary nos. 9111
3 Livelihood activities No. of LH Activity : SHG [nos)Fisheries SHG fnosl 1
No. of Beneficiarv &EtE [nosl l.iGoatery SHG Inos] 19
No. ofBeneficiarv g6 fnosl 2{t.iLeaf pleat Making SHG [nosl 72
No. of Beneficiary ffi fnosl 8 0,1.
Patato Cultivation SHC [nos] 4
No. of Beneficiarv Sm [nos] .J tr
Petty Business SHG [nos] 56No. ofBeneficiarV 16 [nos] 5 9.1
Poultry SHG [nosl .l
No. ofBeneficiary Sfi6 fnosl 4tlRice Mill SHG [nos] 4
No. oF Beneficiarv Sl[ (nos) 45Vegetable cultivation SHC fnoslNu. of Benefrcrarv S [nos] 305
4 Others nos. 0
0Summaryl (l
Total rainwater harvesting structures created nos.Tolal rainwater harvesting strucl :ures reluvenateo nos. 36Additional area brought under p otective irrigation ha. 13 8.2 5Number of farmers benefited nos. 217 9Direct employment created mandays 2147 A
. a,o]
, -n"&T.nhLlf;:U' 'r Y,-/.gu
A.S.C.O.rcum- P.I.A
Chdkopdd^5*SY(?\'^'
A.P.D(Land &Water)
Kandhamal Kandhamal
',"i.
BLOOK DAII]NGAA]JI
aaTcH 120(,9.1c
ACTUAL EXPEND TURE 1RS. N L,1XH)j !63.t2,120
&,otsTRtcT:
CLUSTER iWMP,II
(Rs lN LAKH)r 469.3500
I ,',.,-1 1.5 wa5rerands Deveroped
>l;3
r.2 l sraggered rrenchins
I
1.2 t.A tand Oevelopm€.r
;L36AEarthenStru.rure
1.1.6 A Tubew€l Parform
l3 6 Armp OrwelrPJ u m
-
1.41 6round Water recharge nructur€
1463Su,p|t5
155 Ground Water .echarg€ nrrdu.e
a
I5 6.A r! rp Or5urpru!1.56Blmp.OfPai Chuan I
1,
,"i\
qIII1
1
i1
REPAIR N6 PO NI {CYCLE
5 12 No or 8€n€ficaries
5.2 2 No ot Beneficaries
9 3 2No..fBe^efi.arias
9 a 2 No ol Beiefraries
5 5 2 No ol Senefi.ar es
i)
.: - --1 - :--" -"1 - -.
^l(r
ffi*tt+'='-#ffi:l##"i*--:]
9I!$!-aL tlt_4fgg:t''ud'14,-UA1fBi!j-ELs--AA&NEgASL
]!.ii]]'itl:i/.i|rl.i,i.]i...|;i:lhi30|]0'i.
t\
>{'{c!
]lr :"- :l(Ji |!1'!'l lv^.at
.- - ---"1-" 'Lt.
.-;r i- "_'--if.__i1,::i' i:'' -l- - -_'.
=,::ij-r--f--i - -*+r1!::':-,- - - ------ ;;;f.r ;i- --
\6,'' ap
District: Kandhamal
Project lD/Name ofClusture: IWMP- lll
Approved project cost (Rs. In lakh):672.00
Block: Khajuripada
Batch: l/2009-10
Actual Expdt. (Rs. In Lakh):478.31218
Summarv of proiect astivities implemented
Sl.No. Work Sub-categoryDetails of achievement
Unit Quantity/Amt. in lakh
1 NRM Works(i) Land Development (productive usE) (a)Afforstation ha. 1.52 1.43000
(b)Honiculture 1.03918(c)Agriculture(d)Pasture
le) Wasteland developed
{f)Oth-Hill Broom Plantation onha 0.6 0.42300
tiit Soil & Moisture Conservation (a) Trench(b)Field Sunds ha 10.62 5.34469(c)Terrace
(d)Graded Bund ha 484.48 720.88244
(iiil Vegetative and Engineering Strudure (a)Checks & Plugs
{a) i. Earthen Check um 1638 3.16418(aj ii. Gt'lly Pluss Cum 621 o.62187(b) Gabion Structure Cum L0 0.09814(c) LBs Cum 308 2.34249(d) 5ub Surface Dyke No2 o.84713{e) t!4asonry Guard Wall No8 3.90920(f) Masonry Surplus No4 5.O2tO4(g) Drop Structure No1 0.09544(h) Diversion Tank No6 0.35158(i) Azola Culture Tank No 3 1.61000{j) Earthen Canal No. 1 L.91768(k) Humepipe Culvert No1 2.84039(llWell Platform & Chandini No1 0.s3305
(iv)Water Harvesting Structur€ (Newcreatedl
(a)Farm Ponds No 37 83.13162
{b} check Dams No8 13.ss922(c)Nallah Sunds
(d) Percolation Tanks NO 11 34.43391{e) Ground water recharge structure(fl Silt retention structure No1 2.90401G)Artisan Weil No1 0.102s5(h) PaniChuan No 35 24.13391
lv)Water Harvesting Structue (Oldrenovated) (a) Farm Ponds NO 13 30.90136
(b) Check Dams No5 21.03513{c) Nallah Bunds(d) Percolation Tanks
1"1 ,
/ I wtrL/adn,,l.
Work Sub-categoryDetails ofachievement
Unit Quantity/Amt. in Lakh
2
!:11 unu warer recharge structure
3.O4667(f) PaniChuan No4
Production systen & micro-enterprises L Poultry No9 1.66064
No8 7372a03. KB Pump No3 o.035704. Life fencinB/Manqo planrirn Nos 2.86850
No.9 6.279526. Chandua No4 o.0787s
No9 o.437768. Cycle repairing Nol 0.05000I, vetserdote Lutttvation No 91 34.1932110. Mason Equipment !9-1 I o.osoooar, o CK ryranng No4 0.6500012. Colourfish cuhivation No1 0.07000aJ, r5encesllck makinp No5 0.9260014. Duckery No 15 3.5205015. coatery No 38 13.65122
No1 0.750001. sHG (Nos.) 117
34.7921aOthers FIG (Nos.J 34
Summary:otal rainwater hatuF<ri^' dn--:------------ l-ts
rotar rarnwater hatue<fin No 93 162.86s34qdditional erFA hr^,,chr,,.,.t: No. 22 54.98316
\umber of farmers benefitF.t
-
Jlrect e m Dlovment .rF:re.t
-
He. 101.8
No.2405No. 48452
€-\^1, u-Ki\\]-Signature"
APD (l-and & Waterl
Signature
&& Soil CB|rlery61i6n Qffigj;
Ehajuripadld*"";;
APD (tivelihood) P.D.Watersheds
\1:
\5\
PHYSICAL
State-Odisha
Project ID/Name ofthe cluster:-Approved pro.iect cost(Rs. jn lakhJ :_
Actualexpenditure[Rs. in lakh) :-
PROGRESS REPORT,BATC H-r / zoos _7o,IWMP-IV,Tikabali.
District-Kandhamal Block-Tikabali
/rwMP-rv61,2.00
535.519uIr ma qI!roject acrivities jmpl€ menteo
st.No Work/ Activity" Work Sub Category Details of
achievementsI NRM Works I Unit Quantitv
ti)Land Development(Productive use) l[4) Afforesttation ha 0
fbl Horticulrure ha 0fclAgriculture na 0fd) Pasture ha 0[e) Wasteland developed ha 0fn 0(gl ..... 0
rii) Soil & Moisture conservation (al Trench m 0(b) Field Bunds ha. 126.8[c]Terrace ha 0[dl Graded Bund ha. 107 2.0
riii)Vegetative and EngineeringStructure fal Checks & Pluos nos.
2
(b) Gabion structure nos, 0GLLoose Bolder Struft ure nos. B6fd) others nos. 32
[ivJWater Harvesting StructureINew created) [aJ Farm ponds nos.
fb) Check dams nos. 25fc lNallha Bunds nos. 0[d) Perco]ation tanks nos. 3(e) Ground water rechargestructure nos. 0
(fl others
fal Farm ponds
nos. 52
(vlWater Harvesting Structure (OId reiuvenated)
no5, 4
I -1.
' ,\( -,/
S$NX\i?v./\-^ \ . ,
APD (Land & Water)Kandhamal, Phulban
\
P*r\iltfAPDlf,velrhobd)r I
-qr*--Project ImplementingAgenry
IwMP-lV, Tikabali
tc"i/\'\(ffca-Project Director Wltblsheds
Kardharnal Phulbani
check dams nos, 7
fc lNallha Bunds nos. 0
fdl Percolation tanks nos. 0
(eJ Ground water rechargestrucrure nos. 0
ffl others nos. 18
2
Production system & micro-enterprises
(alPoultry nos, 70
No. of Beneficiary nos. 454
fb)orhers nos. 247
No. of Beneficiary nos, 7446
3 Livelihood activities No. of LH Activitv :-160SHG(nosl 113
No. of Beneficiarv:-1499 nos. 1499
4 Others nos, 0
0
Summary: 0
Total rainwater harvesting stn ctures created nos. 97
Total rainwater haIVesting structures reiuvenated nos, 23
Additional area brought under protective irrigation ha.
Number of farmers benefited nos, 3920
Direct emDlovment created mandays 32747*Actualexpenditure(PIA Level + WC Level)
\1t
District: KandnamaLBlock:-Earilr.saich: illliig :lJ
Aclualeilenrliiur€ {lri r lalth ), L Jr rr': c u,ter:' rw)lly-', L !(j,r iR{ in Lakn l
iecr activities lmPlemented:
I
oi pitjetl ,Dl!!: oi ir.4\r, 'l ,-lll.:
!!!-r-, -! ,: '-'
r - i,ri- '..'_5.,;".r;.;* I
---
--lid) P3!]!tr*
:. -
----L, I l,l_ ir,ri; C - rEi 'atror''
{eJ vvasrerclv ue!" -r"-{f).
,ai lrevr u' .
lb) Field Bundrng2.5
1i3.5
p*.' - " l:;E,nc;rinq
iol erduEu ev,," r(6)
(a) Checks and Plugs
{b) Gablan sLrudufe: a?1
il I
ffi. '--'-:i_j- -'- '
I
il).
5
J) L)fyrng ya'u1l,-t
| )t ,---
l-- , f\.',;tla,"e"i "s5d;; (No"
I 'lt;:arc"oi-
\r) rrrrpruvslr'e'i! ' 1
(a) Farm Ponds
(b) Check dams
tt,l_-
i-L *-I . i';;;r'",;a ;a s*a;l ll rqrr,itl9{]-
--
"- + ---:.- ) ------ll
LU
Ground Waler recharge st'udure.253
{a) Fa.m Ponds
(b) Check dams
9#ilii#;* =-_-(e) Grcund Water recharge struclufe
10(f) wHS
i . -_) .,-.
(t
Detals ot Livctrhgod acrrviry
!iia iiLr.,)
i
,l
-___ iF -4 94 i
-€1q1-9.293rt. I
lr .\?r
r".,..i i, rr ,.irr.rllir$ Ageiy.-'., i,rla;ro & Wateri APi' i
- Cr rtr. 1. d.Lrion4. Kr.ali Si tch5 Veg. Cull vai on6 Ma,z€ Cuttivarioo7 Bar'rana C!tttvetion
'T0 Goal fa.n n
: C16 FIG a ]LG
2. Bl1nana CurttvaiionBrli.ks nrakrng
4 Bnnlalcultivaiion5 Fedilizer ELrsiness
6. Hill Brcom seedli7 lloney Bee8 Khal Busrness
10 Pac,dy B{rsiness
'12. Pcl::io Cultrvallorl
1,1 Tunxeric .utt !aiiorl15 Ve! Cuilivatioo
1 (// ..{\'-\ a+
gb"k, Srn"|'apad"Batch:ll 2009-10Odish a District:Keonihar --,.
tWtvtP-t,S"nraP5ilq!'| ;::"d
P'!fj4 C*t(Rt l" l"kh+Actual E x pe nd it u rel8!.jlE!!:]l--l
-i16iect activiiies imPlementeo
Q!antrlYSl.No.
Work sub CategorY Details of achl
Unit (ha / nos / Rmt /
Cubic meter) t
Work/ ActivitY
NR[4 WORKS :1
Ina 45
161 5(r)
aand DeveloPment (Productrve (a) AfforestaUon
na
Aolrculture ha 0
(d) Paslure0
r]a 2(e) Wasteland develope(0(a) trecncn(rD Soil & I\,4oLslure uonservar|orl 0(b) Field bunds m
{c) Terrace.l\ Fiol.l hr'n.lin.' I na 235
0
ha 0l0 Earlhen Canal\cl.^dcro.l Trpnch na 24
0(rLL)
VEC-utive and EngineeringStructure
a) checks & Plugs
/k\ al-hi^^ ctnr.nrre nos 0
nos 92c) Gully plugs(d) Loose boldef nos 21
(e) Gabian structure Cubic meter 0
1 Earthen bund 0
1ts) Other (Diversion nos
nos 2(iv)
WEGiIZmesting Structure (New
Created)(a) Farm Ponds
n0s s
nosc) Nallah Bunds,-{\ oor.nl.li^n trhks n". I 36
nos 27(e) Groi-ind Waterra.har.le slruclure
nos(f) Others(Constrtrction ot
Canal)
nos 0(vl
Water Harvesling Skucture (Old
reiuvenaied)(a) Farm ponds
0{b) Check damslc) Nallah Bunds 0
nos 24
0(e) Grcund Waterfecharoe slruclure
Drying Yard 292Production system & mlcro _
enierprises
-Qntl 40.5
Bao I-eftllzernosQntl 211 95
Q ntL 5ArharseedVermincompost 5
Ban nos
Travis1l7
nosrolpserPisciculture ha.Tissueculture@anEiif nos 1811rlorsegram
1Veterinary Kil1lmprovement oiWEii nos
HybriU Brinjat&Green-Chillv
2
ha 2053
Lrvelihood activities Cultivation SHG(nos) 8023
iHG(nos)ur uu9ery{vvomenFriendly FarmEauiDmentsl
SHG(nos) 10
I SHC/n^c\1
iSmalJTenlhouseDetergent Making lRice processin! SHG(nos)4 Others Sm€llbustness 24
Summqry
Tolal rain l^aler harvestino srrrrct rre< "..-r-aTolal ra.n waler harvestino stn,.t,r.as ran^..,-^
Addil;onal area brouqhl under Drotectlve rfnd,ri^n 35
nos 522Direct emptoyment cie-Gl mafdavs 56400
1,7
\
f-'c\.':20^(l \e 'orgnature
PIA APD(Land & Wate4
C"(,|fi"r'r Signature
APD(Livelihoods)
Signature
P.O, Watersheds
"Cr6'
State: Odisha District:Keonjhar/ Block :Telkoi
Project D/Name of cluster: IWMP-ll,Telkoi Batch: l/ 2009-10
Approved Project Cost(Rs.in lakhs): ...-. 696.00000
Actual Expenditure(Rs.in lakhs): 556.75729
Summary of project activities implemented
Sl No. Work sub Category Dctails of achlevements
NRM WORKS :Unit (ha / nos / Rmt /
Cubic meter)Quantrty
(D LanoUse)
Development (Productive 8
(b) Ho'liculture 27
cl Aoriculture ha 0(d) Pasture 0(e) Wasleland developed na
(iDSo | & Moisture Conservation
(a) trecnch 0
(b) Field bunds 0
(c) Terace 0
(d) Field bunding 209.403
(e) Contour trench 177
(f) Eadhen Canal I
(lI) Structure (a) Checks & plugs 0
(b) Gabion structure 0
(c) Gully pluqs 0(d) Loose bolder(e) Gablan struclure Cubic meler u
(0 Eanhen bund T
(g) Other (Diversion Bund)
(iv) Water Harvesling Struclure (NewCreated)
(a) Farm ponds 1B
(b) Check dams nos U
(c) Nallah Bunds 0
(d) Percolation lanks
(e) Ground Water recha.ger63
(D Olhers(Orop Struclure)1
tv,Water Harvesting Slructure (Old
reluv_6nated) a) Farm ponds0
b) Check dams0
(c) Nallah Bunds0
(d) Percolaiion tanks0
(e) Ground Water rechargeU
2 Prod!ction system & micro -enlerPnses
Distribution of AgricultureEquipments
nos 732Crop diversrtication
41
na 18 76
^ rcn ruNlH nos 23
Hvbrid maiTa.,ntn/.1i hatsackyard vegitabJe
cultavalion140
WatermFlon cr,rln/'ri nos
nosComposting 1in-tuding
vermj- compostinq)1
Hybrid Brinjal & creenchillv12.444101
Breeding B!ck (Livestockamprovement)
3 LivetinoodlirivitiE lsclculture nosnos 344VeoilabJe crrlriv,ti- nos 506vvdrcrr eton c!tttvalton SHG(nos) 3
F rrirKtnq SHG(ros)Sericulture qHG(nos)Small business nos 78
./
t)'lY,;tvit7
SidnaturePIA
f #zv\\j $':'-;r1IAUAA'\' \l 11 /M1 I
Si\nalure ilgnatureAPd(tand&Water) APD(Livelihoods)
a;
l( r'.'u,,,i.t :) i:l'
SignatureP.D, Watersheds
Distribution of AgriculiureEquipments. SHG(nos)
OthersDrudgery(Women
Friendly FarrnEquipments) SHG(nos)
8
Summary
r^rir nin u,,lar harveslino structules cfeated n0s
nos0
Total rain water harvesting s!qq!I9!19!9!3!99
Additional area brougllt under protective irrigahon91
Numbers of farmers benetited 1032
Direct emplovment createcl manoays 12119
54
\]'''>;.ftSignature g. {
(,, ('f'>--I )9 t \r
./SignatureAPD{Livelihoods)
- l r_znn
rrgnatureP.D, Watersheds
APD(Land & Water).
Lrvehhood aclivi;;
Tl re sne ra wEZiiroraroUuJtrvaIon
P,.,.pser
123eoarery SHG(nos) 6
u_!!Ig.ySHG(nos) 5!!G(nosei i!sPr edr rrlj SHc(nos
_cd,prd(ernaKtnq Stlc(nos 10
7
Oihers
VegelaoreculiEiGiDruOgery(Women
Friendly FarmEquipments)
SHG(nos) 10
i qlvr' g
rn0rv/duatBustness'17
$!!!arv 33
ffi nos
trect emptovminGEliiirnandays 74A67
itare - odisha
l{ame of Cluster, tWMp-l
Approved Project cost ltn Lakh)_564.Oo Actual Expenditure (tn
tA(r)District, Rayagada
n}\'1\ t
I ock - gissamcuttack
Eatch,l/ 2009 10
Lakh) -514.69493
r)r0
S'rmmerv of prolect a o
SI. No. Details ofAchlvement
Unit Quantitv1
01
(t(Productive use)
(b)Horticulture
(cJAgricuhure Ha.
(d)Pasture Ha.
{e) Wasteland D€velopment 60(f)Cashew Plantation 20
{ii) Soil & Moisture Conservation {a)Trench Ha, 9.96(b)Field bund 76
{c)Terrace(iii) Vegetative & Engineering
Structure(a)Checks & plugs 8
(blGabion structure
{c) Loose Boulderstru€ture Nos, 70
(d) Masonary guardwall Mtr. 470
(e) Masonary drop structures 4T
(f)Multi-pu.pose me€ting place 1
(iv) Watef Harvesting Structure(Newly Createdi
lal 18
(b) check dam I(c)Nala Bands
(d) Perculation Tanks 46
(e) Ground Water Recharge structure 58
(f)Dugwell 7
{g)Masonarycanal Mtr. 400
tv, Water Harvesting Structure(old rejuvenated)
{a)rarm ponds 1
(b)che(k dam Nos,
(c)Nala Eands
(d) Perculation Tanks
(e)Ground Water Recharge skucture I02 Production System & Micro
EnterprisePapaya & Drumstick Seedling distribution 20664
Vegetable minFkrt Distlibution 7701.
Maire demonstration to5
&b1
Ha..2201
:l? 50
*5000
| :li(lU
JJ,,,! rr (h 'Ll tr burron
(.ndul/Hirh.r Demon!traLLon
)tnc App. \ced rngs drstrrbLrtron
\/ "np. se.dlints distributron
Htr
Live ihood act v I .s0l
. L'\ro,lAooLe eced InI drrttrbufion300
R,.:r:i Duckllna b rds drstribution
Nos 21r000
33 70
Goatery
Goat rearrng
Grocery snoP
Leaf plate mak ng
Nos I 2
40
NOS 1
Nos'14
NOS. T
Sea!onal Buslness
pettv shop
Sewing mach ne
Nos. 11
3
1Paddy mlll
1
Vcgelab e Cultrva! on NOS
Hill Broonr making 10
l
9
Drudgery Prollramm€e NO9.
Summary
Total Rainwater Harve!t ng Struct!res created
Tota Rainwater Harve5lrng Structures rejuvcnated
Additlonal area brought undcr protective irr gatlon
Number of farmers bcnct ted
Dlrect emp oyment crcrted
Nos
Mandays
5rl
1
3 /I'
413
16U44ri
. V,,&frK.
i$ai; ,' jjl;l4:f,|,- ei-....:r..:,!'r.1
;;.r,;-*rir,5icl*uiFAPD (Land & Water) APD (Ll
',"",u[,(oN'PD, Waiirshcd5
1
d).j ,disha District: Rayagada
, oject lDlName of Cluster :IWMP-ll,RayagadaApproved project cost (Rs.in lakh):559.20000
Block:Rayagada
Batch: | /2009 10
Actual expenditure (Rs. In lakh):505.84808Summarv of
5t. Nowork Sub category Details of achievements
1 NRM Works: Unit quantity
(i)
Land Development(Productive use) (a)Afforestation ha
(b)hortucLrlture ha
{ c)Asriculture ha
(d) Pasture ha
{e)wasteland devioped ha
(f)Nursery seedling nos. 10000nos(g)Nilagiri plant(distributron) ha 15ha
(iD Soil & moisture Conservation (a)Trench m(b) Field Eunds 70482rmt(c)Stone terracing m 8457rmt(d)LBCD nos. 54nos(e)Gully control structure no5, 257nos(f)Masonry GCS
(g)Masonry guardwall rft 1537rft(h)lrrigation canal rft 7130rft
{iiil
Vegetative and Engineering
Structure a)Checks & Plugs nos.(b)Gabion structure nos.
(c/-.
(iv)
Water Harvesting Structure(New created) (a) Farm ponds no5. 14nos
(b)check dams no5. l5nos(c) Nallah bunds no5.
(d)Percolation tanks no5.
(e) cround water recharge
structuae no5.
{f)......water Harvest|nt 5tructure(Old rejuvenated ) {a} Farm oonds nos.
{b)check dams nos,
c) Nallah bunds nos.(d)Percolation tanks n05.(e, Glound water recnar8e
Srructure
(f)......
2
Producion Syslem & mtcro-enlerpnseS l.vegetable minikit no5, 1279nos
2.yam seeds no5. 5000ks
3.sunflower seeds n05. 0ks
4,AmarDali manso seeds 1890nos
5.Sanaraichicks nos. 6166nos
6.cotton seeds n()5. 130nos
T,Arhar seeds nos. 40nos
S.Micronutrient kits nos, 50nos
3 Livelihood activities 1.Veg Cull 28nos
2.Seasonal Business 55nos
3.Gotary nos, 15nos
4.Cotton Cult. nos. 30nos
5.Broom Business no5. 20nos
6 Talnrind no5. 25nos
7.Drudgery distribution no5. 8nos
Others nos.
Summary:
Total rainwater harvesting structures created
Total rainwater harvesting structures rejuvenated
Additional area brought under protective irrigation ha
Number of farmels benefited nos.
Direct emplovment created manoays 177437
s4t t1)0r '