of prefab cat ii &ews housing for delhi development...

43
DELHI DEVELOPMENT AUTHORITY FORM IA For Environmental Clearance Of Prefab CAT II &EWS Housing For Delhi Development Authority At Pocket 5, Sector – 14, Dwarka, Delhi SUBMITTED TO:SEIAA, Govt. Of NCT Delhi Delhi Pollution Control Committee ,IVth Floor ISBT Building Kashmiri Gate ,Delhi SUBMITTED BY: DELHI DEVELOPMENT AUTHORITY VIKAS MINAR, ITO, NEW DELHI 110002 EIA Consultant: DrA.K.Gupta of Shri Environmental Technology Institute, Delhi

Upload: vanduong

Post on 23-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

DELHI DEVELOPMENT AUTHORITY

FORM IA

For

Environmental Clearance Of

Prefab CAT II &EWS Housing For

Delhi Development Authority

At Pocket 5, Sector – 14, Dwarka, Delhi

SUBMITTED TO:SEIAA, Govt. Of NCT Delhi

Delhi Pollution Control Committee ,IVth Floor ISBT Building

Kashmiri Gate ,Delhi

SUBMITTED BY:

DELHI DEVELOPMENT AUTHORITY VIKAS MINAR, ITO, NEW DELHI – 110002

EIA Consultant:

DrA.K.Gupta of Shri Environmental Technology Institute, Delhi

Page 2: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

FORM- IA

Land use

The proposed project site earmarked for development of CAT II &EWS Housing is located

at Pocket 5, Sector 14, Dwarka, New Delhi. Hence no land use change is anticipated as per

MPD

Project Site Location

The proposed project site is located at Pocket 5, Sector 14, Dwarka, Now under the

jurisdiction of Delhi Development Authority (DDA).

2 KM Radius

Page 3: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

5 Km

Page 4: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

10 KM Radius

Project Site

The proposed development has been planned in an area of 43100 SQM.

1.2. List out all the major project requirements in terms of the land area, built up area,

water consumption, power requirement, connectivity, community facilities, parking needs

etc.

Land area and Built-up area:

The site is almosteve in topography and possesses in the area of 43100 SQM. The Housing

Complex will be constructed as per the defined building by-laws of the Delhi Development

Authority The proposed Housing Complex will have total built-up area of 153313.81 SQ M

and the area statement for the proposed CAT II& EWS Housing Complex is as follows

Page 5: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Description Area in (SQM)

Gross total Site Area 43100

CAT II FAR 200%

Max Permissible Ground

[email protected]%

13828.20

Proposed Ground Coverage @20.23% 8400.99

Permissible F.A.R. 83052.24 (200%).

Proposed Floor Area. ( cat-II) 51564.06

Proposed floor Area ,community needs

(SHOPS) 1318.73

Proposed part of EWS area under F A R 30140.34

TOTAL AREA under F A R 83023.03 sqm ( 199.93%)

Nos. of CAT-II Dwelling Units 632

Nos. of Blocks 6 Nos.

N0.of Floors (S+15)( S+14)

EWS

Proposed F.A.R. area (as given earlier ) 30140.34

Built-up Area under Community

permissible

502.69

Total Floor Area (EWS) incl under FAR 42598.08

Nos. of EWS Dwelling Units 1008

Nos. of Block 4

No of Floors (S+14)

Total Stilt Area (cat-II & EWS) 5945.87

No of Basements and area 2, 9915.115+9915.115=19830.23

SQM

Total built-up Area (CAT II& EWS

+STILT + Basements )

153313.81 SQM

Total Area under F A R 83023.03

Built up area not under F A R 70290.78

Total Nos. of Dwelling Units

(3BHK,2BHK & EWS )

1640 Nos.

Proposed Green Area @25.60 % 10631 SQM

Water perculating soft green area 5435 SQM

No of trees proposed 550 ( min reqd 520)

Proposed Vehicular Road Area 19100

Parking

Parking Required 1257 ECS

First & Second basement 585 ECS

Stilt 182 ECS

Open surface 501 ECS

Parking Proposed 1268 ECS

Page 6: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Water Consumption:

During the construction stage, water will be sourced primarily through tankers arranged by

the contractor and partly through bore wells only if D J B permits for the same. It is

estimated that water demand during the construction phase may vary from 10 to 15 KLD for

drinking purpose and toilets as the project is prefab based and prefab structure will be casted

in the casting yard.

During the project operational stage, water will be supplied by DJB and partly Ground

water only if DJB permits for the same (estimated to be 954.4 KLD, balance 227.2 KLD

shall be from STP). This would be supplied by DJB through command tanks. Each command

tank has its own command area / ground water will be used if DJB permits for this. The

water demand estimated for the proposed Housing Complex is shown in table below.

Table2: Water Requirement Details

S.No. Item Description Number of

inhabitants/

Population

Per Capita

water

Requirement

(L/D)

Total water

Requirement

(KLD)

A. Flushing Water 1640X5=8200 45 369

B Domestic Water (EWS) 1008X5=5040 90 453.6

C Domestic Water (Others) 632X5=3160 180 568.8

A+B Total Water Demand 1391.4

D Horticulture for

[email protected]/ SQM

11.4

Grand Total (A+B+C+D) 1402.8

Quantity of Sewage

disposal/day @80% of total

domestic demand

1113.12

Treated water available

@80% of sewage

generation

890.4

Requirement of Treated Waste Water From STP

(Flushing and Horticulture)

380.4

Page 7: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Treated water Extra to be used for sector road side green areas & plantation, Sector greens & Other DDA projects etc

510

Waste water:

During the Construction stage, For construction work total anticipated labour to be

employed will be 260 & labor camps will be made for site, Details of labor camp including all

facilities.

There will be temporary houses for the labors.

There will be temporary canteen facilities for construction labors.

All construction labors will be provided with Personal Protective Equipments like helmets, gum-boot, and hand gloves, etc.

There will be separate first aid box in project site office as well as in contractor site office.

There will be standby ambulance facility for whole construction schedule to deal with any emergency situations.

There will be tie-up with local nursing home for health screening purposes of the construction labors.

• Toilet with septic tank facilities/mobile toilets will be provided for construction labours during the whole construction period.

• Fuel for food cooking will be provided

• For recreation Common Room with TV and indoor games will be provided

During the operation stage, It has been estimated that approx. 1113.2 KLD of sewage will

be generated from the project. The entire sewage will be treated in STP of 1200 kld,. 890.4

KLD of water requirement will be met through recycling of STP treated water

The Developer will provide sewage treatment plant of following capacities base on FAB &

MBBR/SAFF process for treatment of sewage &sullage water The treated effluent shall be

of a quality suitable for flushing & horticulture for external areas.

Page 8: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

SCHEMETIC DIAGRAM FOR PROPOSED STP

Parameters Inlet Water Characteristics Outlet water Characteristics

pH 7.5-8.5 6.0-8.0

BOD 5 day, 21OC 200-250 mg/l Less than 10 mg/l

Suspended Solids 200-400 mg/l Less than 5 mg/l

COD 500-600 mg/l Less than 30 mg/l

Oil & Grease 20 mg/l Less than 2 mg/l

Temperature Ambient

Power Requirement:

The total connected load as per BRPL is calculated to be around say, 16840 KW and

after considering diversity etc. the transformer rating shall be 11000 KVA for this Housing

Complex.

Power will be supplied by BRPL

The emergency purposes backup is provided with DG Sets of Total capacity of 1500 KvA

within which ,water supply pump backup is proposed by using DG set (1*125 KvA.)

HSD (low Sulphur variety) will be used for DG set .

Page 9: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Connectivity:

The Project site is located at Pocket 5, Sector 14, Dwarka having a Latitude 28O 36‟ 24.57” N

and longitude 77O 01‟48.30 ” E., adjacent to Delhi Metro (blue line).The site is within

Dwarka, which is one of the best planned new township of Delhi and is located in the South

West part of the State. Connected well with AIR, RAIL and ROAD to all major towns of

India

Community Facilities:

In order to fulfill the daily basic needs of resident population as well as step in population,

convenient shopping and community room-facility are planned for both categories.

For CAT II and EWS the community needs specifies the Senior Citizen Rm, Recreation

crèches & reading rm. is total of 529.05 SQ M. which is free from FAR.

Along with the community use, approx 1200 sqm area has been proposed for convenient

shopping etc. as per DDA requirement.

Parking needs:

For the Housing Complex ample parking space will be provided as per norms. For the EWS

category 213 ECS @ 0.5 ECS/100 sqm of floor area have been provided as open surface

parking. 1031 For CAT II @ 2 ECS/100 sqm of floor area have been provided under the stilt

area and basement.

1.3. What are the likely impacts of the proposed activity on the existing facilities adjacent to

the proposed site? (Such as open spaces, community facilities, details of the existing land

use, disturbance to the local ecology).

Impact on Land use pattern

The project will be established on designated area. And there will be no displacement or

resettlement of people from the acquired land. The land is not a forestland and no tree will be

uprooted. Therefore, the predicted impacts on the land use pattern of site will be

insignificant.

Impact on ecological setting

The impact due to construction activities on the ecology of the area will be confined to the

construction site itself. There will be negligible impact on the ecology (flora & fauna) during

the construction phase. As there is no forest in and around the proposed site, no impact is

anticipated on the fauna. However, no adverse impact is anticipated on the ecology due to the

proposed Housing complex.

Page 10: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

No significant air pollutants air emissions will be discharged from the project. Therefore,

there will be insignificant impacts on the flora and fauna due to the operation of the project.

There will be very little SP M, SO2 and NOX emission from the proposed Housing activity.

The entire project influenced area will be developed as per the Master Plan Delhi

Development Authority, thus no induced development is foreseen due to the proposed

project. Also the proposed development shall be carried out as per the defined building by-

laws; hence no impacts are envisaged due to proposed development.

Moreover, proposed project will be provide value addition to the existing infrastructure

facilities such as improve public transportation system, telecommunications, power lines,

better roads security etc.

Further, during the construction as well as operation stage of the project, will generate direct

and indirect employment opportunities for a large section of society. The employment will

have positive impact thereby increasing the quality of life.

1.4. Will there be any significant land disturbance resulting in erosion, subsidence &

instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc

may be given).

Soil Type:

In order to understand the existing scenario of soil quality in the study area of project site,

Soil sample were collected from project site based on the collected Soil Map for the area,

Existing Land use of the Area, sources of pollution etc. Samples were taken from one

location based on the above said criteria. The baseline concentrations of important

parameters like organic matter, nitrogen content and phosphate etc. indicate that soil in the

study area has good productivity potential and sandy silt in texture.

Table 3: Physio-Chemical Characteristics of Soil

S. No. Parameter Unit Project Site

1 pH at 25°C - 7.97

2 Organic Matter % 0.684

3 Sodium Content % by mass 0.39

4 Potassium Content % by mass 0.24

5 Calcium Content % by mass 0.583

6 Magnesium Content % by mass 0.31

7 Conductivity (1:3)at 25˚C % by mass 1750

8 Phosphate (as P 04) % by mass 0.045

9 Nitrogen Content % by mass 0.69

10 Sand % by mass 2.67

11 Silt % by mass 57.76

12 Clay % by mass 16.57

Page 11: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Slope Analysis: The project area possesses fairy plain terrain with drainage slope towards South-Eastern side

of the project site.

Total Station Survey was carried out not only for project site but also surrounding area.

Erosion / Subsidence:

Proper greening & paving of area will not cause any soil erosion problem and subsidence.

Seismicity:

The area under study falls in Zone-IV according to the Indian standard Seismic Zoning Map.

Suitable seismic coefficients in horizontal and vertical directions respectively, have to be

adopted while designing the structures.

1.5. Will the proposal involve alteration of natural drainage systems? (Give details on a

contour map showing the natural drainage near the proposed project site)

The proposed project activities will not cause any alteration of natural drainage system.

1.6. What are the quantities of earthwork involved in the construction activity-cutting, filling

reclamation etc. (Give details of the quantities of earthwork involved, transport of fill

materials from outside the site etc.)

During construction phase, some excavation is envisaged in order to provide foundations and

basement. This excavated soil (app. 79320.9 m3) will be properly stacked within the site

under tarpaulin cover; and will be reused for backfilling purpose, road construction etc. The

top-soil will be preserved separately and will be used for landscaping purpose only. Hence no

immediate adverse impacts on the land environment are envisaged.

1.7. Give details regarding water supply, waste handling etc during the construction period.

Water Supply

During the construction stage, water will be sourced primarily through tankers arranged by

the contractor and partly through bore wells only if D J B permits for the same.

Waste Generation / Handling

Soil excavated will be reused for backfilling and the fertile top soil will be reused for

horticultural purpose. Spillage of oil from the machinery or cement residual from concrete

mixer plants will be properly collected and disposed off. For construction laborers, proper

sanitary facilities & wash areas will be constructed and good hygienic conditions will be

maintained.

Page 12: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

1.8. Will the low lying areas & wetlands get altered? (Provide details of how low lying and

Wet lands are getting modified from the proposed activity)

No Low lying and wetlands areas are present in and around the project site.

1.9. Whether construction debris & waste during construction cause health hazard? (Give

quantities of various types of wastes generated during construction including the construction

labour and the means of disposal)

Construction and pre-operational cleaning of the proposed facility would generate limited

amounts of some waste solvents and flushing materials. A licensed contractor would remove

these materials for appropriate off-site disposal as discussed below The hazardous / non

hazardous waste shall be subjected to proper segregation, reuse / recycle, disposal and proper

documentation.

Solid waste and debris that cannot be recycled, reused, or salvaged would be stored in on site

dumpsters or similar containers for disposal. Potentially hazardous wastes would be

separated from normal waste including segregation of storage. All waste from the project site

would be removed in accordance with applicable regulatory requirements.

During construction, all chemical materials would be evaluated during the material receiving

process. Materials that are hazardous would be stored in identified storage areas that include

containment measures. Personal would be rained on the proper use, handling, protective

equipment, storage, and disposal of hazardous materials. A health and Safety Plan would be

developed and implemented to insure that the potential for exposure of construction workers,

workers on near by sites, and others in the area is minimized. The health and safety plan

would define worker safety training, monitoring procedures, and personal protective

measures. The construction phase would require use of various petroleum and chemical

products, including medium- weight oil, thinners, solvents, paint, gasoline and diesel.

The hazardous Waste is stored in leak proof container (s) and able to drain / remove liquids,

and the containers are duly marked with “Hazardous Waste “in red colouran with date of

beginning of storage on each containers. These Hazardous Waste containers are stored on

pucca floor in an isolated covered area in the unit in such a manner that it does not in any

way contaminate the environment or the ground water due to air/rain/ seepage/ leakage etc.

That storage facility is having appropriate containment system. Care will be taken

precautions to prevent any accidental ignition or reaction of ignitable or reactive waste.

The construction debris generated from the construction project will be common place in

nature and will not cause any health hazard to associate and nearby population. The

construction debris will be used for land leveling / backfilling and landscaping according to

its composition.. Waste concrete will be reused as aggregate in construction process. Total

construction waste general is estimated as following: -

Table 4: Details of Wastes Generated during Construction Phase

Particular Approx. Qt.(in MT)

Soil, Sand, Concrete & Gravel 15-20

Page 13: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Metals 3-5

Bitumen 1-3

Source: as per CPHEED manual of Municipal Solid Waste Management and TIFAC Report

Abstract on Construction Industry.

Approx. 260 labours will be used during the construction period. Proper sanitary facilities

will be provided to construction laborers through moveable Sulabh Souchalaya and treatment

will be done using septic tank. Wash areas will be constructed and good hygienic conditions

will be maintained.

2. WATER ENVIRONMENT

2.1. Give the total quantity of water requirement for the proposed project with the breakup of

requirements for various uses. How will the water requirement met? State the sources &

quantities and furnish a water balance statement.

Please refer to Clause no. 1.2 of Form IA for CAT-II &,EWS Housing Complex project

regarding details of water quantity, sources and wastewater generation. Kindly refer as given

below for water balance diagram of proposed project.

Water Storage:

Storage will be provided for one day‟s requirement. In order to ascertain the quantity of

water consumed, the supply will be through the water meter installed in the supply line. The

water main will be fed into Fire Fighting storage tanks with total capacity and from these

compartments the water will be allowed to overflow into Raw water Tanks, from the Raw

Water Tank, water will fed through a Water Treatment Plant and will be pumped into Treated

Domestic Water Tank. All the underground water tanks will be with adjacent pump room,

which will be located about 600 mm below tanks in order to ensure a positive suction to all

pumps. Half of the water storage will be done in overhead tanks in the proposed project.

1 No. of underground tank of 200 KL for proposed flushing water tank and 2 Nos. of 300 KL

for proposed domestic water tanks will be provided. All the buildings shall have bulk

overhead storage equivalent to half day consumption

The liquid effluent of 1113.12 KLD will be treated in 1200KLD STP

2.2. What is the capacity (dependable flow or yield) of the proposed source of water?

Daily water demand for the Housing Complex has been calculated to be about 1402.8 KLD (

including STP treated recycled water of 890.4KLD). Water demand will be met from DJB

and partly through bore wells only if D J B permits for the same.

2.3 What is the quality of water required, in case, the supply is not from a municipal source?

(Provide physical, chemical, biological characteristics with class of water quality):

Water will be supplied by DJB and partly Ground water only if DJB permits for the same.

Page 14: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Status of water quality in project-influenced area has been shown below in Table 5:

Table: Water Quality in Project Influenced Area

S. No. Parameter Bore well near Project site (Dwarka)

1 Colour (in hazen unit) 02

2 Odour Unobjectionable

3 pH 7.2

4 Total. Hardness, mg/l 248

5 Chlorides, mg/l 17

6 Fluorides, mg/ 0.4

7 TDS, mg/l 570

8 Calcium, mg/l 51

9 Magnesium, mg/l 26

10 Sulphate mg/l 9.5

11 Nitrate, mg/l 0.5

12 Total. Alkalinity, mg/l 183

13 Arsenic, mg/l <0.005

14 Iron, mg/l 0.11

15 Zinc, mg/l 0.21

16 Total Coliform, 3

17 E- Coli Absent

2.4. How much of the water requirement can be met from the recycling of treated

wastewater? (Give the details of quantities, sources and usage):

80%

Freshwater

Required 1022.4 KLD

INI

Initial Water

Requirement

1402.8 KLD

Flushing

369

KLD

Horticult

ure

11.4KLD

Treated

Effluent

890.4

KLD

(~510 KLD) Treated

water Extra to be used for sector road side green areas & plantation, Sector greens & Other DDA

projects etc

Domestic

1022.4

KLD

1113.12

KLD

Page 15: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Please refer Clause No. 1.2 & 2.1 of Form IA for Dwarka Housing project regarding details

of water quantities, sources and usage).

2.5. Will there be diversion of water from other users? (Please assess the impacts of the

project on other existing uses and quantities of consumption):

There will not be any substantial effect on water demand of this region due to proposed

project activity development will be as per the master plan and the peripheral services at the

sector level are already approved by DJB / MCD

2.6. What is the incremental pollution load from wastewater generated from the proposed

activity? (Give details of the quantities and composition of wastewater generated from the

proposed activity):

The liquid effluent of 1113.12KLD will be treated in STP of 1200KLD capacity .

Table 6 below shows the expected characteristics of wastewater.

Table 6: Characteristics of Domestic Wastewater

Parameter Expected Wastewater

Characteristics

Treated Wastewater

Characteristics

pH 7.5-8.5 6.0-8.0

BOD 5 day, 21OC 200-250 mg/l Less than 10 mg/l

Suspended Solids 200-400 mg/l Less than 5 mg/l

COD 500-600 mg/l Less than 30 mg/l

Oil & Grease 20 mg/l Less than 2 mg/l

Temperature Ambient

2.7. Give details of the water requirements met from water harvesting? Furnish details of the

facilities created.

Water Harvesting will be done as per design enclosed for recharging the ground water level.

Page 16: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

The entire site is provided with planned underground drainage system with final disposal to a

natural drainage system of the area providing protection of the site from flooding,

water logging and preventing soil erosion.

1. Rainwater from the entire complex is proposed to be harvested from Roof and from

surface and landscape areas.

a) Rainwater harvested from surface areas, roads and driveways and landscape will be

first filtered in filter chambers having gravel and coarse sand as filter media .The RW

will be connected to twelve recharge wells constructed as per the specifications of the

central ground water board.

2. Rainfall data (Refer Sheet 1 of 2)

RAIN WATER HARVESTING CALCULATION FOR THE CAT II & EWS

HOUSING DWARKA, NEW DELHI

Run Off Calculation

(Q = 10 x C x I x A) cum/hr

Total runoff for roof area, Q1

Q1 = 10 x 0.90 x 35 x 0.840099

= 264.631185 cum / hr

Total runoff for Green area, Q2

Q2 = 10 x 0.10 x 35 x 1.9060

= 31.71 cum / hr

.

Total runoff for paved/Road area, Q3

Q3 = 10 x 0.80 x 35 x1.9100

= 534.8 cum / hr

Page 17: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Total Run Off to be recharged = Q1 + Q2 + Q3

= 836.631185 cum / hr.

Total Run Off to be harvested for 15 Minutes, i.e. 209.1577 cum

Volume of 1No. Harvesting pit of size 3.0M diameter and 3.5 M water depth

=24.75 cum / hr

.

No. of Pits =8.39

Total No. of Harvesting pits required =8 Nos.

Page 18: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

storm water from terraces and other open areas will be collected through rainwater down take

pipes and connected to nearest deep drain with 100-200 mmdia pipes. The rain water will be

collected by catch manholes with minimum depth of 600 mm and slope of 1:350 towards

main drain with 300 mmdia PVC pipes and PCC cover. Open drains with perforated RCC

cover will be places at every 3 m interval. The channels will lead to approx. 13 nos. rain

water harvesting pits, located at different locations around the premises. The size of rain

water harvesting pits is 5x53m with desilting chamber 1.5x3m with 5 m effective depth. The

pits will be laid with 500 mm thick layer of 1.5-2.0 mm average dia coarse sand, over 500

mm thick layer of 5-10 mm dia gravels, which, in turn will be laid on 500 mm thick layer of

10-30 mmdia loose boulders. A perforated PVC pipe, laid inside bore; will transfer the

excess rain water to sandy layer. Casing will be provided with cleansed pea gravel of 3-6 mm

average dia. The run-off from roads and parking area is provided with oil & grease trap

system.

For collecting storm water, storm water drainage network has been provided during the

design stage as per the guidelines defined in Master Plan of Delhi City. In the project design,

it shall be ensured that no mixing of the storm water with waste effluent takes place. All the

storm water will be diverted to rain water – harvesting pits proposed in the complex. Roof

rain water harvesting potential for the proposed project site is 264.63m3/hr. The excess rain

water is disposed to the municipal storm water line as per the site condition. Diagram of

typical rainy well is shown below:

2.8. What would be the impact of the land use changes occurring due to the proposed project

on the runoff characteristics (quantitative as well as qualitative) of the area in the post

construction phase on a long term basis? Would it aggravate the problems of flooding or

water logging in any way?

No adverse impacts are envisaged due to proposed project on the runoff characteristics of the

area as adequate arrangements will be made to trap & treat the rainwater and suitable storm

water drainage system will be provided.

During the post-construction phase, runoff from the project shall not be allowed to stand or

enter into the roadside or nearby drain. Adequate measures (as discussed in Clause 2.7) shall

be take to collect such runoff and either shall be reused or stored in recharging pits suitable

garlanding drain as per the existing contours of the pot will be developed.

2.9. What are the impacts of the proposal on the ground water? (Will there be tapping of

ground water; give the details of ground water table, recharging capacity, and approvals

obtained from competent authority, if any):

As detailed out in Clauses 2.2, 2.3 and 2.5.

2.10. What precautions/measures are taken to prevent the run-off from construction activities

polluting land & aquifers? (Give details of quantities and the measures taken to avoid the

adverse impacts)

Page 19: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

The best way of minimizing sediment loss from a construction site is to control the erosion in

the first place. Sediment control measures that capture eroded soil (for example, hay bales

and silt fences) are frequently limited in their effectiveness.

Erosion will be controlled by the following steps.

Clean 'run-on' water will be diverted from upslope around the disturbed area. Care

will be taken to ensure that such diversion of storm water above the disturbed area

does not itself cause flooding, erosion or scour.

Vehicle will be restricted to access to one stable entry and exit point.

Preserving grassed areas and retains the maximum cover of natural vegetation by

minimizing the amount of land disturbed by shaping. Mulch or revegetate disturbed

areas as soon as possible.

It will be ensured that stockpiles of sand, gravel, soil and similar materials are

located so that material:

- does not spill on to the road or pavement

- is not placed in drainage lines, depressions or watercourses

- cannot be washed into roadways, drainage lines, depressions or watercourses.

Accidental spills of soil or other materials on the roadway or gutter will be removed

daily.

Excess materials and water from cleaning tools and equipment down storm water

drains will be avoided.

Minimize on-site vehicle activity during wet weather or when the site is muddy.

Sediment control measures

Sediment control structures aim to capture sediment or other pollutants washed from the land

surface, thereby stopping them getting into receiving waters. As previously mentioned, it is

far better to prevent erosion in the first place than to rely on sediment control.

However, construction activities inevitably involve some land disturbance. Sediment control

measures are therefore an essential part of construction site management.

Sediment can be controlled by sediment basins, sediment traps or sediment filters.

Sediment basins and/or the smaller sediment traps are excavations with a barrier or bank that

may be constructed from a broad range of materials, including earth, gabions and rock, lined

with geotextile material . Sediment basins and traps are generally used to treat channelised

flow, generally by a combination of settling and filtration.

It is imperative that sediment controls, whether basin, traps or filters ,be regularly ,inspected

and maintained to ensure effective operation.

Page 20: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

During the construction phase, runoff from the construction site shall not be allowed to stand

or enter into the roadside or nearby drain. Adequate measures shall be taken to collect such

run off and either shall be reused (if possible) or disposed at the designed construction waste

disposal location. Suitable garlanding drain as per the existing contours of the plot will be

developed.

2.11. How is the storm water from within the site managed?(State the provisions made to

avoid flooding of the area, details of the drainage facilities provided along with a site layout

indication contour levels):

As detailed out in Clause 2.7.

2.12. Will the deployment of construction labourers particularly in the peak period lead to

Unsanitary conditions around the project site (Justify with proper collection explanation):

Proper sanitary facilities like common bath place, temporary toilets etc. will be provided to

laborers and treatment will be done using septic tank.

2.13. What on-site facilities are provided for the, treatment & safe disposal of sewage? (Give

details of the quantities of wastewater generation, treatment capacities with technology &

facilities for recycling and disposal)

Domestic Wastewater Disposal:

The liquid effluent of 1113.12 KLD will be treated in 1200 KLD STP .

2.14. Give details of dual plumbing system if treated waste used is used for flushing of toilets

or any other use.

All the buildings shall have domestic and flushing water OH tanks separate, and separate

down take stacks, the flushing water line shall supply to the WC flushing cisterns only,

where as the domestic water shall be supplied through a separate down take system to all

other outlet points.

3. VEGETATION

3.1. Is there any threat of the project to the biodiversity? (Give a description of the local

ecosystem with it‟s unique features, if any):

There are no major wild life sanctuaries/parks within 10 km radius of the project site. Neither

any rare or endangered species have been recorded in the project influence area. There is no

notified natural/ Reserve forest area in the North West District. The Delhi NCR region falls

under a transition zone between the North Western Thorn Scrub Forest(IM1303) ecoregion

and Upper Gangetic Plains moist deciduous forests (IM0166) ecoregion, as delineated by

World Wildlife Fund for Nature (WWF). This transition zone bears characteristics of both

the ecoregions, and varies gradually from east to west. The study area represents the thorn

Page 21: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

scrub forests in north western region of the Indian subcontinent. Many ecologists consider

this thorn scrub to represent a degraded state of tropical dry forests (Champion and

Seth,1968; Puri et al. 1989).

Babool (Acacia spp.), Eucalyptus (Eucalyptus hybrid), Shahtoot (Morus alba), Neem

(Azadirachtaindica), Seemal (BombaxCeibs),Aswath (Ficusbengaensis), Bel

(Aeglemarmelos) Amaltash (Cassia fistua), Sahjan (Moringaoleifera), Peepal (FicusreCAT-

IIiosa), Gulmohar (Delonixregia) are among the common dominant tree species found in the

study area.

Other than the large trees, some shrubs could also be located in the study area,dominated by

Thevetianerifolia, Langerostomiaspeciosa, Lantana camara etc. Lower no flowering plant

forms and cryptogamous vegetation are absent during the time of study. Climbers and lionels

were fewer in number.

The ecology of the study area is not very rich in diversity or high in endemism which may be

primarily accounted for the scattered distribution of poor quality and quantity of fodder. The

major mammalian fauna of the project influenced area involve common languor, Rhesus

macaques (macaquamulata) mongoose (Herpestrisedwardii) etc. Avifauna is primarily

represented by Common crow (Corvusspendens), House sparrow (Passer domesticus), bue

rock pigion(Columba livia), Rose ring paraqeet (Piteculacramerii),spotted doves

(Streptopeliachinensis) and finches. Common peacock (Pavocristatus), are known to be

present in the area. Small reptiles; primariysquamateslikeizards,chameleons, poisionous&

non-poisionous snakes are also found in the study area.

Amphibians and fishes are primarily restricted to the water logged and marshy areas. This

might account for their significant absence in the project influenced area. However the study

area represents densely distributed human habitation. Lack of suitable habitat and proper

food & fodder has lead away most of the faunal variety away from human habitations.

No endangered or endemic species (as notified in IUCN Red Data Book) are located within

the study area. No migratory birds breed in the study area. No Tiger reserve/ elephant reserve

/ turtle breeding place is located within 15 km radius of the study area.

3.2. Will the construction involve extensive clearing or modification of vegetation? (Provide

a detailed account of the trees & vegetation affected by the project):

The proposed site is an open land which has been earmarked under Residential Landuse in

Master Plan of Delhi.

3.3. What are the measures proposed to be taken to minimize the likely impacts on important

site features (Give details of proposal for tree plantation, landscaping, creation of water

bodies etc along with a layout plan to an appropriate scale):

There will not be any kind of impact of this project on site features. The Green Belt for the

proposed project has been planned in an area of 9060 SQM to provide a clean, healthy and

Page 22: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

beautiful green environment for the people to live in and work in. Within the proposed

project site green bet area has been designed to achieve a blend between modern building and

various species of plants shrubs to create a clean, healthy and aesthetic environment that

provides a visual retreat and relaxation to the occupants of these buildings. A combination of

evergreen trees and deciduous species is used I these complexes. Some of the species are as

follows: -

Table 7: Generally Used Pant Species for landscaping

A) Evergreen Species

Scientific Name Common name

1) Alstoniascholaris Devil‟s tree

2) Callistemon sp. Bottle brush

3) Micheliachampaca Sita Ashok

4) Pumeria aba Champa

5) Roystoearegia Royal Bottle plant

6) Washngtoniafilifera Petticoat palm

B) Deciduous Species

1) Bauchiniavaregata Kachnar

2) Cassia fistula Amaltas

3) Cassia nodosa Pink cassia

4) Erythrinablackii Tota

5) Schleicheratrijuga Kusum

6) Tabebuiarosa Pink tabebuia

The planting arrangement should be based on optimal use of available land and quantum of

irrigation water and treated wastewater. It is recommended that tree plantation (large size

species) should be undertaken at the time of preparation of the site so that they would grow

to considerable size by the time of commissioning of the proposed project.

Kindly refer for landscaping plan of proposed CAT II & EWS Housing Complex.

4. FAUNA

4.1. Is there likely to be any displacement of fauna- both terrestrial and aquatic or creation of

barriers for their movement? Provide the details.

The proposed site is an open land and devoid of forestation, so in existing conditions, this

pace is not the habitat for local fauna. There will not be any type of displacement or any

other effect on the local fauna due to proposed project activities.

4.2. Any direct or indirect impacts on the avifauna of the area? Provide details.

Within the proposed project site, proper landscaping has been panned to provide a clean,

healthy and beautiful green environment for the people to live in and work in. Common

native variety of trees and ornamental flowering species will be planted in the green space.

Page 23: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Landscaping can have direct positive impact on the local avifauna, as this will provide shelter

to local birds.

4.3. Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on

fauna:

These measures are applicable for this project.

5. AIR ENVIRONMENT

5.1. Will the project increase atmospheric concentration of gases & result in heat islands?

(Give details of background air quality levels with predicted values based on dispersion

models taking into account the increased traffic generation as a result of the proposed

constructions):

Increased traffic generation 1268 no. of vehicles due to project is not going to cause

significant increase in atmospheric concentration of gases and will not result in heat island

formation.

5.2. What are the impacts on generation of dust, smoke, odorous fumes or other hazardous

gases? Give details in relation to all the meteorological parameters.

Air Pollution Dispersion Relationship with Meteorology

The measurements of wind speed and direction, temperature, humidity, rainfall and solar

radiation are important parameters used in the study of air quality monitoring results and to

further understand the chemical reactions that occur in the atmosphere. Meteorological

monitoring is used to protect air pollution events such as inversions, high pollutant

concentration days and to simulate and predict air quality using computer models.

Wind Speed and Direction

The region has a semi-arid climate with extreme seasons, hot summers, and heavy rainfall in

the monsoon months and very cold winters. The mean monthly temperature ranges from

14.3OC in January (minimum 3

OC) to 34.5

OC in June (Maximum 47

OC). The annual mean

temperature is 25.3OC (WMO 1971)

Dust storms occur frequently during the summer months, leading to a build-up of particulate

matter in the atmosphere.

The monsoon period is favorable from the pollution point of view due to the frequent

washout of pollutants along with rain. Mixing height is an important parameter that

influences the dilution of pollutants. It varies diurnally as well as seasonally.

During the construction and operation phase of proposed project, air pollution causing agents

can be vehicular movement and occasional use of DG sets.

Page 24: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Stacks for DG Sets will be provided with proper height as per CPCB Guidelines and

emissions from DG sets will meet the stipulated norms as per NAAQM.

5.3. Will the proposal create shortage of parking space for vehicles? Furnish details of the

present level of transport infrastructure and measures proposed for improvement including

the traffic management at the entry & exit to the project site.

For the Housing Complex ample parking space in the open area has been provided. With the

consideration of surface parking, provision for parking will be provided for 213ECS FOR

EWS and 1031 ECS for CAT-II in open area at ground surface 2 level basements.

.

5.4. Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian

pathways, footpaths etc., with areas under each category.

The total area is dedicated to roads, i.e. proposed vehicular road Area is 19100SQM. In the

project provision, wide service road is made for the smooth traffic movement. Internal roads

with suitable width have also been provided. Adequate CAT-II arrangement has been

provided covering al corners.

5.5. Will there be significant increase in traffic noise & vibrations? Give details of the

sources and the measures proposed for mitigation of the above.

The prime sources of noise levels during the construction phase are the construction

machinery and the vehicular noise. The effect of noise would be significant during day time,

the residential area located in the near vicinity of the construction site may increase in the

day time as well as night time ambient noise levels.

Mitigation Measures

The main stationary noise producing sources such as generators should be provided with

noise shield around them.

For protection of construction workers, earplugs should be provided to those working very

close to the noise generating machinery.

(a) Suitable damping the air compressor noise

(b) Silencers/mufflers in the air compressor and DG sets should be provided

(c) Regular preventive maintenance of pumps and other rotating equipments

will reduce the noise levels.

During the operation stage, there would be a minor increase in ambient noise levels in and

around the site due to Housing activities there will be quiet large no of population.

Mitigating Measures

Development of Greenbelt around the CAT II& EWS Residential complex can bring a

considerable reduction in noise levels;

Page 25: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

During night & day time use of horns should be restricted

The noise generation levels will be confined within the surrounding area of construction site

and unlikely to affect the area 100 m away form the site. Construction period is only for

about two years, hence there will be short term, localized and reversible impact on ambient

noise levels during the construction activity.

Acoustic barriers should be placed near construction sites.

The maximum noise levels near the construction site should be limited to 75dB (A) Leq (5

min.) in industrial areas and to 65 dB (A) Leq (5 min.) in other areas.

There should be fencing around the construction site to prevent people coming near the

site.

Materials need not be stockpiled and unused equipment to be placed between noisy

operating equipments and other areas.

Constructing temporary earth bund around the site using soil etc, this normally is hauled

away from the construction site.

It is envisaged that there shall be maximum movement of CAT-IIht motor vehicles and 2-

wheelers inside the Residential Complex, hence this will have insignificant rise in noise

level. Moreover, this will be further minimized by plantation on the sides of internal roads,

on the open spaces inside and around the periphery of whole Residential Complex. Proper

maintenance of the internal roads will be carried out and informatory signboards shall be

provided to encourage vehicle owners to maintain their vehicle, not to bow horns and follow

the emission standards fixed by Government Authorities.

5.6. What will be the impact of DG sets & other equipment on noise levels & vibration in &

ambient air quality around the project site? Provide details.

Stacks for DG sets will be provided with proper height as per CPCB Guidelines and

emissions from DG sets will meet the stipulated norms as per NAAQM. Noise emission from

DG sets will meet the noise levels as per CPCB Guidelines.

6. AESTHETICS

6.1. Will the proposed constructions in any way result in the obstruction of a view, scenic

amenity or landscapes? Are these considerations taken into account by the proponents?

The land allocate for proposed project has been earmarked for the development of Housing

Complex, hence no such adverse impacts are envisaged.

Page 26: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

6.2. Will there be any adverse impacts from new constructions on the existing structures?

What are the considerations taken into account?

The development in the entire project influenced area is as per the approved master plan of

Delhi and will be as per the provisions of Delhi Development Authority. Hence no adverse

impacts are anticipated from new constructions on the existing structures in this area.

6.3. Whether there are any local considerations of urban form & urban design influencing the

design criteria? They may be explicitly spelt out.

There are no local considerations of urban forms & urban design influencing the design

criteria. The proposed site falls under the area of approved Master Plan of Delhi. The housing

Complex project will be constructed within the designated as per the defined building by-

laws of Delhi Development Authority.

6.4. Are there any anthropological or archaeological sites or artifacts nearby? State if any

other significant features in the vicinity of the proposed site have been considered.

Within the project influence area, there are no significant archeological properties. Since all

the activities whether during the construction or operation stage, will be carried out in the

project premises, hence no impacts on any type of archeological monuments are envisaged.

7. SOCIO-ECONOMIC ASPECTS

7.1. Will the proposal result in any changes to the demographic structure of local population?

Provide the details.

Establishment of any residential project leads to socio-economic changes. Influx of

population leads to change in economic status of the community. The peak labour force will

be about 260 during the construction period.

Employment potential

For the proposed activity, the proposed activity is required to employ over 260 persons and

number of manpower, is also required to increase indirectly in various other activities during

the construction phases. Thus increasing the employment opportunities for local population.

Other activities also help the local population in terms of employment.

Significant number of permanent employees shall also be required during the operation phase

of the mall. Some of the areas, which directly offer the job potential, are, parking attendants,

sanitation workers, venders and hawkers.

Economy of the region

Page 27: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

The increasing facilities in the transportation help to improve the economy of the area. Many

people are involved in various unit related activities directly or indirectly and help to improve

the general economic base of the region as a whole.

The operation of the project shall provide value addition to the existing infrastructure, as due

to development of the Housing Complex, facilities such as public transport, water supply,

telecommunications, power lines, road maintenance etc. shall be upgraded in and around the

project premises.

The operation of project and other allied facilities, will improve the employment

opportunities. During construction about 260 total skilled, unskilled and professional work

force including temporary and permanent employees will be required per day. This work

force will be hired locally in order to generate the employment to the local people. While

during the project operation stage for the purposes of day-to-day maintenance works about

40 persons will be employed.

Due to operation of proposed project, there will be enhancement in pubic health and safety.

All fire and safety measures suggested by Government Authorities will be taken and regular

mock drills will be conducted at the project site. Regular health check up will be carried for

persons working near DG sets and security guards.

Infrastructure Services in the Region:

Schools

The study area has adequate facility of education; there are several primary and secondary

schools located in the area. The educational facilities are provided in stages i.e. junior basic

school, senior basic school, higher secondary school, degree colleges, Polytechnic. Pre-

primary and primary educations are mainly the responsibility of local bodies. Middle,

secondary and senior secondary education is primarily looked after by Directorate of

educationNirmalBharetiya School -0.25 Km, National Law University -1 Km, Presidium

School -1.1 Km , Guru Gobind Singh Indraprasta University -1.5 KmEiglewings School of

Language Studies -1.15 Km

Tele-Communication

Three Telephone exchange is provided at District level, Telecommunication facility in the

study area is adequate; electronic telephone exchange is working in the study area, and

mobile facility is also available. Delhi is connected with one of the best telecommunication

networks in India.

Roads and Transportation System

The project area is having high road density. It is connected by a network of state level and

internal roads to the entire region. There are more roads which link Punjab, HARYANA, UP,

RAJASTHAN, i.e. GT Road, NH-8 connecting Delhi To Jaipur ,Outer Ring road, Ring

Road etc within 10 km distance

Post-Office

Postal facility is available at town.

Page 28: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Banks The study Area is having branches and ATMs of al major nationalized as well as privatized

banks. In addition to leading international banks, almost all nationalized and private sector

banks have branches in Delhi many with ATM centers. Financial Institutions are equally well

represented, as is the insurance sector with every nationalized company operating a branch

here.

Hospital The Health & Family Welfare Department of Govt. of Delhi.caters to health needs of this

region and also has to share the burden of migratory as well as floating population from

neighboring districts .

Medical facilities abound with multi-speciality hospitals, nursing homes and other health-

care centers all over Delhi . Catering to the citizens` health needs are: Artemis Hospital -8

Km ,VPS Rockland Hospital -2.2 Km ,Maharaja Agrasen Hospital 6 Km , Ayushmann

Hospital -2.2 Km

7.3. Will the project cause adverse effects on local communities, disturbance to sacred sites

or other cultural values? What are the safeguards proposed?

The CAT-II & EWS Housing Complex project will be constructed within the designated site

as per the defined building by-laws of Delhi Development Authority. There is no sacred site

or cultural heritage site in nearby vicinity of proposed project; hence no adverse impacts are

envisaged.

8. BUILDING MATERIALS

8.1. May involve the use of building materials with high-embodied energy. Are the

construction materials produced with energy efficient processes? (Give details of energy

conservation measures in the selection of building materials and their energy efficiency)

The major materials required for construction of the proposed project will be steel, cement,

bricks, metal, flooring tiles/stones, sanitary and hardware items, electrical fittings, water, etc.

PREFAB CONSTRUCTION TECHNOLOGY:

The construction is proposed to be in pre fab concrete structure. The technology adopted

shall be „3S‟ system.

The System is with Precast hollow core R.C.C column, once erected and plumbed, Precast

concrete beams are placed over with poring concrete in the hollow column and sealing

column-beam joint. After the portal is ready, precast slabs are placed over beams with a

further 40mm reinforced concrete screeding over them.

The walling system shall be with autoclaved aerated concrete blocks, which are having

higher thermal resistance than concrete.

Page 29: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

ECOLOGICAL BENEFITS:

The columns, beams and slabs are all precast in factory or temporary fabrication yard, which

helps in

- Use of optimum quantity of water

- Use of optimum quantity of material ( say, cement & steel)

- Use of only steel shuttering for precast components - no requirement of wood, ply or

other formwork.

- Very less requirement of water at construction site.

- Less carbon emission at site

- Almost no shuttering is required.

- Much less noise and air pollution at site.

- Faster construction method reduces the project duration.

- Less number of work force requirement at site

- Minimise the construction waste.

The walling material is autoclaved aerated concrete blocks which has again lot of benefits

like

- AAC blocks are made of cement, sand and fly ash, which reduces the natural clay

consumption from fertile land, as in case of conventional bricks.

- Requires much less energy than the requirement in clay bricks.

- Optimum use of water

- Less volume of material requirement to cover constructed volume, considering 1 cum

of material in concrete covers 1.1 cum of constructed volume, in brick it covers

approx 1.5 cum, where as AAC covers approx 3.5 cum of volume.

- Low thermal conductivity.

- Because of larger block size, it requires less time, less water and jointing materials.

-

The Precast column beam and slab technology as explained above has been executed in

various housing projects in Maharashtra, Karnataka, and Andhra Pradesh. Some photographs

of the executed buildings are being submitted for perusal.

Table given below shows estimated quantities of construction material required for the

proposed Residential project.

Table 8: Estimated Quantities of Construction Material Required for Proposed Project

Construction Material Qty. Construction Material in MT

Cement 19500

Sand 38900

Aggregate 58400

Steel 3800

All the items to be used in the proposed project will be as per the national building code

specification. If the building materials with high-embodied energy are locally available, it

will be used in construction.

Page 30: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

8.2. Transport and handling of materials during construction may result in pollution, noise &

public nuisance. What measures are taken to minimize the impacts?

Mitigation Measures for Air Pollution during Construction Stage

To minimize such impact following measures shall be taken:

All the loose material either stacked or transported shall be provided with suitable covering

such as tarpaulin, etc. Water sprinkling shall be done at the location where dust generation is

anticipated. To minimize the occupational health hazard, proper personal protective gears i.e.

mask shall be provided to the workers who are engaged in dust generation activity.

Mitigation Measures for Noise Pollution during Construction Stage

During the construction stage, expected noise levels shall be in the range of 80-85 dB(A)

which will decrease with increase in distance as per the Inverse Square Law. Administrative

as well as engineering control of noise will be implemented. Isolation of noise generation

sources and temporal differentiation of noise generating activities will ensure minimum noise

at receiver‟s end. To prevent any occupational hazard, ear muff / ear plug shall be given to

the workers working around or operating plant and machinery emitting high noise levels. Use

of such plant or machinery shall not be allowed during night hour. Careful planning of

machinery operation and scheduling of operation shall be done to minimize such impact.

8.3. Are recycled materials used in roads and structures? State the extent of savings

achieved?

It will be prefab structure as per the design in the casting yard and shall be installed at the site

as per the DDA specification.

The walling material is autoclaved aerated concrete blocks which has again lot of benefits

like

- AAC blocks are made of cement, sand and fly ash, which reduces the natural clay

consumption from fertile land, as in case of conventional bricks.

- Requires much less energy than the requirement in clay bricks.

- Optimum use of water

- Less volume of material requirement to cover constructed volume, considering 1 cum

of material in concrete covers 1.1 cum of constructed volume, in brick it covers

approx 1.5 cum, where as AAC covers approx 3.5 cum of volume.

- Low thermal conductivity.

- Because of larger block size, it requires less time, less water and jointing materials.

Wherever possible Fly Ash will use as filling material

8.4. Give details of the methods of collection, segregation & disposal of the garbage

generated during the operation phases of the project.

As per the manual or municipal solid waste prescribe my Central Pubic Health and

Environmental Engineering Organization (CPHEEO), the quantity of solid waste generated

Page 31: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

varies between 0.3 – 0.6-kg/capita/ day. The solid waste will comprise biodegradable waste

e.g. domestic waste, food waste, horticultural waste etc. and recyclable waste, like plastic,

paper, tin, glass etc. For estimating the quantum of waste following assumption are taken into

consideration:

Table 9; Estimated Quantities of Solid Waste Generated during Operational Phase

Description Population Per capita Solid

Waste generation

(Kg/capita/day)

Total Solid Waste (Kg/Day)

Residents

8200

0.6

4920

Construction Phase

During the construction, considerable amount of construction waste such as earth, debris,

malba, etc will be generated. However the construction waste here shall be approx 30% less

than the regular construction sites as the entire structural work shall be done with pre fab

technology which will have almost no in-situ casting and no shuttering work.

Construction debris will be managed either within project site or they will be sent to

low lying areas owned by M/s Delhi Govt.

Operation Phase

During the operation only domestic waste is expected to be generated. It has been

estimated that approx.4920 kg/day of solid waste will be generated from the proposed

complex during commissioning of the project.

For Cat[II & EWS Housing Complex; There will be a Garbage collection point in

each tower, vertically connecting garbage rooms at all floors, segregating organic

and inorganic waste in separate bags will be implemented.

For EWS Housing Complex; Door to Door collection system, segregating organic

and inorganic waste in separate bags will be implemented

Disposal will be taken in separate centralized collection facility which shall be

provided at suitable distance in the complex.

This waste will be transferred to Municipal authority for final disposal.

Biodegradable/ compost able waste shall be composted by Municipal authorities

and non recyclable and non biodegradable shall be buried at waste management

sites of MCD two numbers are marked in Zonal plan of the Dwarka

A site of about 60 ha for solid waste has been earmarked near Narela – Bawana

industrial area phase– II.

Page 32: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

9. ENERGY CONSERVATION

9.1. Give details of the power requirements, source of supply, backup source etc. What is the

energy consumption assumed per square foot of built-up area? How have you tried to

minimize energy consumption?

Power Requirement:

The total connected load as per BRPL is calculated to be around say, 16840 KW and

after considering diversity etc. the transformer rating shall be 11000 KVA for this Housing

Complex.

Power will be supplied by BRPL

The emergency purposes backup is provided with DG Sets of Total capacity of 1500 KvA

within which ,water supply pump backup is proposed by using DG set (1*125 KvA.)

HSD (low Sulphur variety) will be used for DG set.

Energy Consumption Assumed Per Square Foot of Built-UP Area:

Energy consumption per square meter of built-up area is approx. 35 WATT approximately.

CAT-II buildings, Energy saver shall be installed to save energy up to 20% in common area

Energy Conservation Measures & Management Plan:

In the Operational Phase, appropriate energy conservation measures & management plan will

be adopted in order to minimize the consumptions of non- renewable fuel. The following

measurs are suggested to be adopt

Page 33: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

• Provision of window openings on recessed faces helps in reducing the heat gain in units.

•Arrangement of staggering balconies & louvers help in cutting of glare and heat gain.

•Natural low level at west corner of site has been used to advantage by placing the service

areas there.

•Photovoltaic cells based devices will be used in housing complex for common area

lighting as per DDA policy

•Overall glazing area has been maintained at around 25% of the Façade area.

• Use of CFL in common areas.

• DG sets shall be PLC controlled to optimize their usage based on the actual loadrequirements.

• Use of fly ash made bricks and cement will be used in common area i.e. pathway &pavement area for whole Group Housing complex.

S.N. Material U-Value

(BTU/ft2/°F

W/M2/°C

1 Walls (4‟‟ ,9” Prefab) - 1.36/1.00

2 Normal glass 1.1 6.25

4 Internal ceiling/floor unexposed 0.41 2.33

5 Slab exposed to run and insulated with black brick corba 0.12 0.68

Compact fluorescent lamps will be used in place of incandescent and halogen lamps in al

common areas.

The water supply pumping system shall be provided with variable speed drive to conserve

energy at part load.

lighting and switching shall be designed by keeping in mind day light integration.

Roof insulation shall be planned to conserve energy.

Capacitor banks shall be panned for improving the power factor of the power supply.

After testing the viability, solar energy can also be used to meet electricity requirements as it

would reduce dependence on non-renewable sources of energy and make environment

cleaner.

These measures will effectively cut down the electricity/ diesel consumption.

9.2. What type of, and capacity of, power back-up to you plan to provide?

Please refer to Clause 9.1.

9.3. What are the characteristics of the glass you plan to use? Provide specifications of its

characteristics related to both short wave and long wave radiation?

No, ordinary glass is being used. The building materials is N-6 for maximum house, the

windows are recessed or with projection to solar passive.

9.4. What passive solar architectural features are being used in the building? Illustrate the

applications made in the proposed project.

Page 34: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Building design and envelope has been optimized through section of appropriate wall and

roof construction and through adoption of solar passive measures after studying the sun path

analysis to provide shading devices for windows and roof, which would reduce energy

demand. Sunshades will be used around windows in order to protect from direct sunCAT-

IIht. Use of recessed windows, which can be recessed 600 to 700 mm from the external wall,

will reduce the load due to solar radiation by 30% and it will effectively reduce the heat load

of the building envelope.

9.5. Does the layout of streets & buildings maximize the potential for solar energy devices?

Have you considered the use of street Lighting, emergency -Lighting and solar hot water

systems for use in the building complex? Substantiate with details.

This CAT II & EWS housing is having Electrical load of approx 31.0 KW for street Lighting

as against total connected load of approx 16840 KW.

Solar panels may be installed for street lighting , subject to policy decisions of DDA .

9.6. Is shading effectively used to reduce cooling/heating loads? What principles have been

used to maximize the shading of Walls on the East and the West and the Roof? How much

energy saving has been effected?

The East – west walls are mostly blank wall with minimum window fenestration. Otherwise ,

2 mt wide balcony projection along the longer sides of the building blocks creates a solar

passive envelope.

Passive solar architectural measures have been adopted to provide shading devices for

windows and roof, which would effectively reduce heating up of building envelope. Sun

shades will be used around widows in order to protect from direct sun light

9.7. Do the structures use energy-efficient space conditioning, -Lighting and mechanical

systems? Provide technical details. Provide details of the transformers and motor efficiencies,

Lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC

free chillers? Provide specifications.

Lighting –Following parameters has been adopted

-Installation of energy saver Lamps

-Use of Day light switches

Lighting design has been done as per draft- Energy conservation building code

Transformers are Low loss and high efficiency type. Equipped with harmonic

filters to suppress wave form distortion

Variable speed pumping system (Secondary loop) is proposed for energy

conservation

No AC system

Page 35: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

9.8. What are the likely effects of the building activity in altering the micro-climates?

Provide a self-assessment on the likely impacts of the proposed construction on creation of

heat island & inversion effects?

The proposed project is the construction of Residential Complex due to which there will not

be any significant effects on the surrounding environment of proposed project, hence no heat

island effect is envisaged. The proposed project is a Housing Complex, which is intended to

use only for residential purpose and will be constructed within the designated site as per the

defined building by laws of Delhi Development Authority. Increased traffic generation and

occasional use of DG sets use due to project is not going to cause significant increase in

atmospheric concentration of gases and will not result in heat island formation.

The ratio between the hard surface and green surface (grass, shrubs and trees) on the

Plot shall be less than 0.4. The front Plaza is also interspersed with green areas and

flower beds. Therefore, there is neither creation of Heat Islands nor any inversion

effects

9.9. What are the thermal characteristics of the building envelope? (a) roof; (b) external

walls; and (c) fenestration? Give details of the material used and the U-values or the R values

of the individual components.

The construction is proposed to be in prefab concrete structure. The technology adopted shall

be „3S‟ system

The System is with Pre cast hollow core R.C.C column, once erected and plumbed, Precast

concrete beams are placed over with poring concrete in the hollow column and sealing

column-beam joint. After the portal is ready, precast slabs are placed over beams with a

further 40mm reinforced concrete screening over them.

The walling system shall be with autoclaved aerated concrete blocks, which are having

higher thermal resistance than concrete.

ECOLOGICAL BENEFITS:

The columns, beams and slabs are all precast in factory or temporary fabrication yard, which

helps in

- Use of optimum quantity of water

- Use of optimum quantity of material ( say, cement & steel)

- Use of only steel shuttering for precast components - no requirement of wood, ply or

other formwork.

- Very less requirement of water at construction site.

- Less carbon emission at site

- Almost no shuttering is required.

- Much less noise and air pollution at site.

- Faster construction method reduces the project duration.

- Less number of work force requirement at site

- Minimize the construction waste.

Page 36: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

9.10. What precautions & safety measures are proposed against fire hazards? Furnish details

of emergency plans.

As the proposed project envisages setting up and operation of a residential complex, no

major emergency situation is anticipated except a fire hazard. Keeping in view, the scale of

operations and the number of people present at any point of time, there shall be adequate

arrangement to fight any potential fire hazard.

The project proposes to install adequate number of fire fighting equipment along with a full

fledgedfire fighting system to take care of any potential emergency.

Fire Fighting System

Fire fighting will be as per the provisions of the National Building Code (SP 7:983, Part IV,

2005). A static water tank of 250 KL has been proposed with each U.G reservoir for fire

fighting, the EFH have been placed on the main fire ring at every 45 mts as per building

code.

The complete proposal of fire fighting system has already been approved from the CFO –

Delhi Fire Service.

Fire Hydrant System

The FHCs are located at each floor of the buildings connected to the Fire main ring and wet

risers. The buildings above 45 mt of height, and the basements shall be equipped with

automatic sprinkler system as per codal provisions.

Ventilation and Smoke Extraction

The basements are completely designed with mechanical ventilation system with both fresh

air inlet and exhaust system. The Fire escape staircases, lift wells are pressurized as per NBC

norms.

Fire Safety

The entire fire protection system, detection system and the mechanical ventilation and

pressurization systems shall be carried out as per approval/NOC from Delhi Fire Service.

Police station and Police post, Hospitals and Fire stations are located within the District level

as per MPD 2021 provision.

9.11. If you are using glass as wall material provides details and specifications including

emissivity and thermal characteristics.

Not Applicable

Page 37: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

9.12. What is the rate of air infiltration into the building? Provide details of how you are

mitigating the effects of infiltration.

Not Applicable

9.13. To what extent the non-conventional energy technologies are utilized in the overall

energy consumption? Provide details of the renewable energy technologies used.

After testing the viability, solar energy may also be used to meet electricity requirements.

10. Environment Management Plan

The Environment Management Plan would consist of all mitigation measures for each item

wise activity to be undertaken during the construction, operation and the entire life cycle to

minimize adverse environmental impacts as a result of the activities of the project. It would

also delineate the environmental monitoring plan for compliance of various environmental

regulations. It will state the steps to be taken in case of emergency such as accidents at the

site including fire.

Kindly refer : for environmental management and monitoring plan.

ENVIRONMENTAL MANAGEMENT AND MONITORING PLAN

(A) ENVIRONMENTAL MANAGEMENT PLAN:

The table is given below describes the generic measures that need to be undertaken during

project construction and operation stage.

ENVIRONMENTAL MANAGEMENTPLAN

S. No. Potential

Impact

Action Parameters for

Monitoring

Timing

1. Construction Phase

1. Air Emissions All equipments are operated

within specified design

parameters

Random checks of

equipment

logs/manuals

Construction

activities

Vehicle trip to be minimized to

the extent possible

Vehicle logs Site Clearance

and construction

activities

Page 38: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Any dry, dusty materials stored

in sealed containers or

prevented from bowing.

Absence of stockpiles

or open containers of

dusty materials.

Construction

activities

Compaction of soil during

various construction activities

Construction logs Construction

activities

Ambient air quality within the

premises of the proposed unit

to be monitored.

The ambient air quality

will conform to the

standards for PM2.5,

PM10, SO2 and NOX,

CO

As per DPCC

requirement

2. Noise List of all noise generating

machinery onsite along with

age to be prepared. Equipment

to be maintained in good

working order.

Equipment logs, noise

reading

During

construction

phase.

Night working is to be

minimized.

Working hour records Construction

activities

Generation of vehicular noise Maintenance records of

vehicles

During

construction

phase

Implement good working

practices (equipment selection

and sitting) to minimize noise

and reduce its-impacts on

human heath (ear muffs, safe

distances, and enclosures).

Site working practices

records, noise reading

During

construction

phase

No machinery running when

not required

Acoustic mufflers / enclosures

to be provided in large engines

Mufflers / enclosures in

place.

Prior to use of

equipment

S.

No.

Potential

Impact

Action Parameters for

Monitoring

Timing

2. Noise Noise to be monitored in

ambient air within the plant

premises.

Noise reading As per DPCC

requirement or on

quarterly basis

whichever is

earlier. The noise level will not exceed

the permissible limit both

during day and night times.

All equipments operated

within specified design

parameters.

Random checks of

equipment logs/

manuals

During

construction

phase

Vehicles trips to be minimized

to the extent possible

Vehicle logs During

construction

phase

Page 39: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

3. Wastewater

Discharge

No untreated discharge to be

made to surface water,

groundwater or soil.

No discharge hoses in

vicinity of

watercourses

During

construction

phase

The discharge point should be

selected properly and sampling

and analysis should be

undertaken prior to discharge

Discharge norms for

effluents as given in

consent to operate by

DPCC

During

construction

phase

Take care in disposal of

wastewater generated such that

soil and groundwater resources

are protected

4. Soil Erosion Minimize area extent of site

clearance, by staying within

the defined boundaries

Site boundaries not

extended / breached as

per plan document.

During

construction

phase

Protect topsoil stockpile where

possible at edge of site.

Effective cover in

place.

During

construction

phase

5. Waste

Management

Implement waste management

plan that identifies and

characterizes every waste

arising associated with

proposed activities and which

identifies the procedures for

collection, handling & disposal

of each waste arising.

Comprehensive Waste

management Plan in

place and available for

inspection on-site.

Compliance with MSW

Rules, 1998

Prior to site

clearance.

6. Non-routine

events and

accidental

releases

Plan to be drawn up,

considering likely emergencies

and steps required to

prevent/limit consequences.

Mock drills and records

of the same

During

construction

phase

7. Environment

Management

Cell/Unit

The Environmental

Management Cell/Unit is to be

set up to ensure

implementation and

monitoring of environmental

safeguards.

A formal letter from

the management

indicating formation of

Environment

Management Cell

During

construction

phase

II. Operational Phase

8. Wastewater

Discharge

No untreated discharge to be

made to surface water,

groundwater or soil

No discharge hoses in

vicinity of

watercourses.

During operation

phase

Take care in disposal of

wastewater generated such that

soil and ground water

Discharge norms for

effluents

During operation

phase

9. Emergency

preparedness,

such as fire

fighting

Fire protection and safety

measures to take care of fire

hazards, to be assessed and

steps taken for their

Mock drill records, on

site emergency pan,

evacuation plan

During operation

phase

Page 40: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

prevention.

(B) ENVIRONMENTAL MONITORING PLAN

The environmental monitoring programme is a vital process in the Management Plan for any

construction project. This helps in signaling the potential problems that would result from the

proposed project and will allow for prompt implementation of effective corrective measures.

The environmental monitoring will be required during construction & operational phases.

Water Quality and Public Health

Since water contamination leads to various water related disease, the project authorities shall

establish a procedure for water quality surveillance and ensure safe water for the consumers.

Detailed epidemiological study related water born disease shall be carried out and the data

shall be compiled for every year in the project area. This data would help the authority in

finding out the trends for incidence of water related diseases prevalent in the area, which

would help them to take suitable remedial measures for reducing or eradicating the

occurrence of these diseases in future.

Water quality parameters shall be monitored before and after the completion of the project.

Monitoring shall be carried out on quarterly basis to cover seasonal variations. Water quality

shall be analyzed by applying the standard techniques. The parameters recommended for

monitoring are as follows:

MONITORING PROGRAMME DURING CONSTRUCTION STAGE

S. No. Parameter

1 pH

2 Total. Hardness

3 Chlorides

4 Fluorides

5 TDS

6 Calcium

7 Magnesium

8 Sulphate

9 Nitrate

10 Total. Alkalinity

11 Arsenic

12 Iron

13 Zinc

14 Total Coliform,

15 E- Coli

Ambient Air Quality

Monitoring

1 Parameters to

be monitored

Particulate

Matter

(PM2.5)

Particulate

Matter

(PM10)

Sulphur

Dioxide

(SO2)

Oxides of

Nitrogen

(NOX)

Carbon

Monoxide

(CO)

Page 41: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

2 Sampling

Methodology

The air

quality

monitoring

will be

monitored as

per

DPCC/CPCB

guidelines

3 No. of

Locations

One location

in vertical to

downwind

direction to

be

monitored.

4 Frequency of

Measurements

Once a week

5 Compliance The

monitoring

results will

be compared

with

National

Ambient Air-

Quality

Standards.

Noise Quality Monitoring

1 Parameters to

be monitored

Equivalent

noise levels

averaging for

24 hours

2 Sampling

Methodology

The noise

levels will be

recorded

using a

portable

hand held

noise level

meter.

3 No. of

Locations

One

locations at

boundary

4 Frequency of

Measurements

Once a week

5 Compliance The

monitoring

Page 42: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

Water and Waste Water Quality Monitoring

Water and Wastewater sample shall be analyzed to meet

the drinking water standard and municipal sewer

discharge standards respectively.

Water and Waste Water Quality

Monitoring during Construction phase

Water Quality Monitoring:

1 Parameters to be

monitored

As per IS 10500:1991

and amendments as

enacted

2 No. of locations One locations each at

intake and after

treatment

3 Frequency of

Measurements

At least once in a

season

4 Compliance The monitoring results

will be compared with

the preferable and

permissible limits of IS

10500:1991

Wastewater Quality Monitoring:

For construction work total anticipated labour to be

employed will be around 260. All labour will come

from nearby area and will for day time only. No labor

camps exists for site, however moveable toilets will be

provided for labours during the whole construction

period.

Water and Waste Water Quality

Monitoring during Operation phase

Water Quality Monitoring:

Water will be Municipal supply, supplied from DJB. If Delhi Jal Board permits for

ground water use, water quality will be monitored as given below

1 Parameters to be monitored As per IS 10500:1991 and amendments

as enacted

2 No. of locations One locations each at intake and after

treatment

3 Frequency of Measurements At least once in a season

4 Compliance The monitoring results will be

compared with the preferable and

permissible limits of IS 10500:1991

results will

be compared

with the

National

Ambient

Noise

Quality

Standards.

Page 43: Of Prefab CAT II &EWS Housing For Delhi Development Authorityenvironmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/... · Prefab CAT II &EWS Housing For Delhi Development Authority

EMP Budget

Revised EMP budget during construction,

S.

No.

Item Amount

1 Air pollution ,suppression of dust,air

monitoring

5 lacs

2 Water pollution Provision for Sewage

Treatment Plant

700 lacs

3 Provision of Storm Water Drainage

System

Included in project cost*

4 Provision of solid Waste Managemen,t 10 lacs

5 Health and Safety measures and other

,safety facilities toilet s to construction

workers

10lacs

6 Environmental quality Monitoring and six

monthly report submission

5lacs

7 Green Area Development 10 lacs

Total 740 lacs

EMP budget during operation,

S. No. Item Amount per year, Rs. In lacs

1 Provision for Rain Water Harvesting 0.5

3 Provision of Storm Water Drainage

System

0.5

4 Provision for Green Area Development 5.0

5 Provision of Waste Management 10.0

6 Health Environment and Safety measures

and maintenance of STP

2.0

7 Environmental Monitoring 1.0

Total 19