of the scheme ‘pradhan mantri kaushal vikas yojana 2.0...

33
UT Administration of Dadra & Nagar Haveli UT of D& NH Skill Development Mission Govt. Industrial Training Institute, Silvassa Request for Proposal for Empanelment of Industry as Training Provider for implementation of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0DNH Notice No. PMKVY/ITI/DNH/NEW JOB ROLES/2018/257 Dated: 09/09/2019 UT Level Skill Development Mission acts as an apex body for monitoring, co- ordinating and convergence related to Skill Development & Entrepreneurship Activities to leverage employability. UT Level Skill Development Mission (UTLSDM) is the Project Implementation Agency for PMKVY 2.0 in UT Administration of Dadra & Nagar Haveli. Empanelment of TPs is one of the significant aspects for the smooth and seamless implementation of the scheme. UTLSDM through this advertisement invites any partnership Firm/ Private Limited Company/ Public Limited Company etc and having skill training facility and are willing to impart short term skill development training programme and placement in accordance with prescribed norms of PMKVY 2.0 guidelines are eligible to apply. Interested parties can send their details in form of area of interest, preparedness, infrastructure availability and their experience in this area and submit the same in sealed envelope as specified from 26.8.2019 to 16.09.2019 16:00 hrs to the UT Level Skill Development Mission, at above mentioned address. Any selection would be based on strength of experience, availability of infrastructure and preparedness. You can download the Bid document from website: www.dnh.nic.in from 26 /08/2019 to 16/09/2019 up to 16:00 hrs. Sr. Items Details No. 1 Online download from 26/08/2019 up to 16/09/2019 15:00 hrs. website: http://dnh.nic.in/tenders-dadra-nagar- haveli.aspx 2 Last date and time of submission By 31/08/2019 up to 17:00 hrs through of queries for clarification email 3 Response to Bidder’s queries by By 03/09/2019 email 4 Last date & time of submission 16/09/2019 upto 16:00 hrs at chamber of the Principal, Govt. I.T.I., Amli, Silvassa- 396230 5 EoI Bid-opening 16/09/2019 at 16:00 hrs. Sd/- Director Higher & Technical Education UT. of Dadra & Nagar Haveli

Upload: others

Post on 23-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

UT Administration of

Dadra & Nagar Haveli

UT of D& NH Skill Development Mission

Govt. Industrial Training Institute, Silvassa

Request for Proposal for Empanelment of Industry as Training Provider for implementation

of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0’ DNH

Notice No. PMKVY/ITI/DNH/NEW JOB ROLES/2018/257 Dated: 09/09/2019

UT Level Skill Development Mission acts as an apex body for monitoring, co-

ordinating and convergence related to Skill Development & Entrepreneurship Activities to leverage employability. UT Level Skill Development Mission (UTLSDM) is the Project Implementation Agency for PMKVY 2.0 in UT Administration of Dadra & Nagar Haveli. Empanelment of TPs is one of the significant aspects for the smooth and seamless implementation of the scheme.

UTLSDM through this advertisement invites any partnership Firm/ Private Limited

Company/ Public Limited Company etc and having skill training facility and are willing to

impart short term skill development training programme and placement in accordance with

prescribed norms of PMKVY 2.0 guidelines are eligible to apply. Interested parties can send

their details in form of area of interest, preparedness, infrastructure availability and their

experience in this area and submit the same in sealed envelope as specified from 26.8.2019

to 16.09.2019 16:00 hrs to the UT Level Skill Development Mission, at above mentioned

address. Any selection would be based on strength of experience, availability of

infrastructure and preparedness. You can download the Bid document from website:

www.dnh.nic.in from 26 /08/2019 to 16/09/2019 up to 16:00 hrs.

Sr. Items Details

No.

1 Online download from 26/08/2019 up to 16/09/2019 15:00 hrs.

website:

http://dnh.nic.in/tenders-dadra-nagar-haveli.aspx

2 Last date and time of submission By 31/08/2019 up to 17:00 hrs through

of queries for clarification email

3 Response to Bidder’s queries by By 03/09/2019

email

4 Last date & time of submission 16/09/2019 upto 16:00 hrs at chamber of the

Principal, Govt. I.T.I., Amli, Silvassa-

396230

5 EoI Bid-opening 16/09/2019 at 16:00 hrs.

Sd/- Director

Higher & Technical Education

UT. of Dadra & Nagar Haveli

Page 2: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

REQUEST FOR PROPOSAL

FOR

EMPANELMENT OF INDUSTRIES (Manufacturing or Service industry)

OPERATING IN DADRA & NAGAR HAVELI

AS TRAINING PROVIDER UNDER STATE COMPONENT OF PRADHAN MANTRI KAUSHAL VIKAS YOJNA (PMKVY 2.0)

Last date for submission of proposal: 16 September, 2019 Time: 16:00 hrs.

Issued by: UT LEVEL Skill Development Mission – DNH Government Industrial Training Institute, Amli, Silvassa Dadra & Nagar Haveli 396230

Page 3: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

Disclaimer

All information contained in this document, subsequently provided/ clarified are in good

interest and faith. This is not an agreement and is not an offer or invitation to enter into an

agreement of any kind with any party. UTLSDM - DNH reserves the right to cancel this

document, and/or invite afresh proposals with or without amendments to this document

without liability or any obligation for such document, and without assigning any reason.

UTLSDM - DNH reserves the right to take final decision regarding award of contract.

Submission of proposal under RFP mode doesn’t guarantee allocation of target under PMKVY

(2016-20). This RFP doesn’t encourage creation of any new training infrastructure specifically

for imparting training under PMKVY.

Under no circumstances will the UTLSDM - DNH be held responsible or liable in any way for

any claims, damages, losses, expenses, costs or liabilities whatsoever (including, without

limitation, any direct or indirect damages for loss of profits, business interruption or loss of

information) resulting or arising directly or indirectly by application or non – application to

this RFP.

UTLSDM - DNH reserves the right not to proceed with the RFP or invite afresh with or without

amendments at any stage without assigning any reasons thereof, or to alter the timeline

reflected in this document or to change the process or procedure to be applied. It also

reserves the right to decline to discuss the proposal further with any party submitting a

proposal in response to this RFP. Information provided at this stage is merely indicative.

1

Page 4: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

Content 1. BACKGROUND: ..................................................................................................................................... 3 I. PRADHAN MANTRI KAUSHAL VIKAS YOJANA (PMKVY 2.0) ................................................................... 3 II. OBJECTIVE: ........................................................................................................................................... 3 2. ELIGIBILITY CRITERIA ............................................................................................................................ 4 3. OTHER INSTRUCTION TO APPLICANTS .................................................................................................. 4 4. SUBMISSION OF PROPOSALS ................................................................................................................ 5 5. RIGHT TO TERMINATION/CANCELLATION/REVISION/AMENDMENT .................................................... 5 6. LIST OF DOCUMENTS TO BE SUBMITTED .............................................................................................. 6 ANNEXURE A: FORWARDING LETTER ................................................................................................................. 7 ANNEXURE B: POWER OF ATTORNEY ................................................................................................................. 9 ANNEXURE C: FINANCIAL TURNOVER ...............................................................................................................10 ANNEXURE D: DETAILS OF EXISTING TRAINING CENTRES ..................................................................................11 ANNEXURE E: DETAILS OF PROPOSED TRAINING CENTRES ...............................................................................11 7. LIST OF JOB ROLES …………………………………………………………………………………………………………………….………13

2

Page 5: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

1. Background:

I. Pradhan Mantri Kaushal Vikas Yojana (PMKVY 2.0)

Pradhan Mantri Kaushal Vikas Yojana (hereafter referred as PMKVY) 2016-2020 is a flagship scheme of Ministry of Skill Development and Entrepreneurships (hereafter referred as MSDE) was launched on 15 July, 2015, on the occasion of World Youth Skills Day by Honorable Prime Minister, Shri Narendra Modi. PMKVY is implemented by National Skills Development Corporation (NSDC) under the guidance of the Ministry of Skill Development and Entrepreneurship (MSDE) with an outlay of Rs 12000 crore to train 1 crore youth of the country with an objective to enable and mobilize a large number of youth (unemployed youth or, school/ college dropouts) to take up industry designed quality skill training, become employable and earns their livelihood from increased productivity with existing workforce. PMKVY scheme is being implemented by the state governments along with central government through two components – CSSM and CSCM in National Skills Qualifications Framework (NSQF) aligned Job Roles.

The PMKVY 2.0 scheme is being implemented under two components:

I. Centrally Sponsored State Managed (CSSM): 25% of the funds of PMKVY 2.0 shall be allocated to the States and total physical target allocated to Dadra and Nagar Haveli for skilling is 4000 youths from 2016-20

II. Centrally Sponsored Centrally Managed (CSCM): 75% of the PMKVY 2.0 funds shall be available to MSDE for skilling through National Skill Development Corporation (NSDC).

Being a Project Implementation Agency for promotion of skill development,

entrepreneurship & innovation in the state, UTLSDM - DNH has been entrusted to execute

this scheme in Dadra and Nagar Haveli. In this reference, UTLSDM DNH invites the RFP from

interested and eligible training providers for submission of proposal for empanelment to

undertake project under CSSM component of PMKVY 2.0. The eligible empanelled training

provider shall implement PMKVY 2.0 training in identified/proposed sector and job roles

across Dadra & Nagar Haveli.

II. Objective:

UTLSDM - DNH has the mandate to implement the Pradhan Mantri Kaushal Vikas Yojana (PMKVY 2.0) scheme’s state managed component by empanelling training providers.

UTLSDM - DNH being a state level nodal agency for implementing state component of PMKVY

2.0, and is expected that with respect to the key indicators and processes, to ensure

achievement of overall PMKVY 2.0 goals and objectives. Empanelment of Training Provider is

one of the significant aspects for the smooth and seamless implementation of the Scheme.

In view of the above, UTLSDM - DNH by way of this RFP, invites proposal from interested training providers for engaging an independent TP herein referred to as ‘Applicant’ for implementation of PMKVY 2.0 in the State.

3

Page 6: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

2. Eligibility Criteria

a) Industries (either in manufacturing or in service sector) having average annual turnover of Rs. 50 crore or more in last three completed financial years for job roles related to their concerned sector.

b) Preference will be given to industries having existing training centres duly recommended by respective Sector Skill Councils.

c) Sub-contracting, sub-letting, franchisee arrangement or consortium of any kind is NOT allowed for any Organization.

d) The existing and proposed training centre/s shall be within industry premises or industrial area.

3. Other Instruction to Applicants

a. All documents to be submitted duly signed and sealed authority signatory of industry. b. The applicant shall have to pay nonrefundable processing fees Rs. 10,000/- (Ten

Thousand Rupees only) in form of Demand Draft in separate envelop along with RFP

document. The DD shall be in favor of “UT Level Skill Development Mission DNH”

(UTLSDM - DNH) payable at Dadra and Nagar Haveli. Application without submission of

proposal processing fees Rs. 10,000/- in the form of demand draft shall be liable to

reject.

c. General power of attorney/Board of Directors resolution/ Deed of Authority contract and all correspondences/documents thereof. Format for General Power of Attorney as per Annexure B

d. Applicants shall have to submit a refundable Earnest Money Deposit (EMD) of Rs. 1,00,000/-(One lakh Only) . EMD to be paid in the form of a Demand Draft/FDR in the favor of ‘Principal, Govt. ITI Silvassa, payable at Silvassa, UT of Dadra and Nagar Haveli drawn on any nationalized bank and must accompany with covering letter in a separate cover other than the proposal cover. Proposals that are not accompanied by the above Earnest Money Deposit (EMD) Demand draft in a separate cover shall not be considered.

e. Applicant is expected to examine all instructions, forms, terms and specifications in the

RFP documents. Failure to furnish all information required by the documents or submits a RFP not substantially responsive to the bidding documents in every respect may result

in the rejection of the application.

f. The training centre set up shall be in accordance with PMKVY 2.0 guidelines (as amended from time to time)

g. Funding pattern will be as per PMKVY 2.0 guidelines (as amended from time to time). h. The Applicant shall have to follow PMKVY 2.0 guidelines/any circular issued by UTLSDM

- DNH pertaining to CSSM component (as amended from time to time) for Training delivery, Assessment & Certification, Placement, Tracking, Payouts etc.

i. Applicant is advised to refer to the PMKVY guidelines available on PMKVY website:

www.pmkvyofficial.orgList of Documents to be submitted. i. The shortlisted agency should furnish a Performance Security Deposit (PSD) of Rs. 5 lakhs, in the form of a Bank Guarantee (BG) at the time of signing of MoU for empanelment or Earnest Money Deposit (EMD) can be adjusted against Performance Security Deposit (PSD). The PSD shall remain valid for a period of two years from the date of signing of MoU or issuance of BG.

Note: Submission of proposal and paying of proposal processing fees under RFP mode doesn’t guarantee allocation of target under PMKVY (2016-20). UTLSDM DNH shall in no case be responsible or liable for those costs, regardless of the conduct or outcome of the proposal process.

4

Page 7: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

4. Submission of proposals I. The tentative schedule for the process is highlighted in the table below:

Sr. Key Activities

Dates

No.

1 Release of notification for request of proposals 26 -08-2019

2 Last date for submission of queries 31 -08-2019 till 4:00 PM 3 All queries related to RFP to be sent at [email protected]

4 Last date for submission of proposals by prospective TPs 16-09-2019 upto 4:00 PM

II. Contact Details of Gujarat Skill Development Mission-

Sr. Items

Details

No

Name of the

UT Level Skill Development Mission

1.

Address: UT LEVEL Skill Development Mission – DNH Government Industrial Training Institute, Amli, Silvassa Dadra & Nagar Haveli 396230

Organization

Contact

1. Name: Saloni Rai 2. E-mail:[email protected]

Person

Tel: 9718263089

5. Right to Termination/Cancellation/Revision/Amendment

Notwithstanding anything contained in this document, UTLSDM - DNH, reserves the right to cancel/terminate the process without assigning any reason thereof at any time prior to signing of the agreement and UTLSDM - DNH shall have no liability for

above‐mentioned actions. Further, UTLSDM - DNH reserves its right to revise or amend this document any time for any reason by issuance of addendum.

UTLSDM - DNH may at its sole discretion and at any time during the evaluation of RFP, disqualify any applicant, if the applicant has made misleading or false representations in the forms, statements and attachments submitted in proof of the eligibility requirements. UTLSDM - DNH shall have all the rights to disqualify the application during the evaluation of RFP if:

a) RFP without processing fee b) RFP without required documents

c) Use of modified formats for submission

5

Page 8: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

6. List of Documents to be submitted

Sr. Description Supporting Document/s

No.

1 Name of Industry

2 Registration number Copy of Registration/Incorporation Certificate and

Memorandum and Articles of Association 3 Date of registration

4 Place of registration

5 PAN CARD Copy of the PAN Card

6 Registered address Proof of address (For e.g. Electricity Bill)

7 Corporate head-office address

8 Website URL-

9 Name & contact details of the Name:

authorized signatory Designation:

Mobile No.:

Email ID:

10 Name & contact details of primary Name:

point of contact:

Designation:

Mobile No.:

Email ID:

11 Average turnover of last three C.A. Certificate for Annual Turnover as per completed financial years Annexure C along with audited reports

12 Do you have existing training (Yes/No) If yes, provide details in Annexure D centre(s) which you want to convert along with centre's latest photographs to PMKVY Centre?

13 Details for new centres proposed to Provide details in Annexure E be established in PMKVY

6

Page 9: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

Annexure A: Forwarding Letter

{Strictly on applicant’s letterhead}

Date:

To, The Director, UT LEVEL Skill Development Mission – DNH Government Industrial Training Institute, Amli, Silvassa Dadra & Nagar Haveli 396230 Dear Sir,

Sub: RFP published by UTLSDM - DNH for empanelment of industries operating in Dadra and Nagar Haveli as Training Provider under State Component of Pradhan Mantri Kaushal Vikas Yojana (PMKVY 2.0) in Dadra and Nagar Haveli.

Please find enclosed proposal in respect of the empanelment to undertake the project under Centrally Sponsored and State Managed Component of Pradhan Mantri Kaushal Vikas Yojana (PMKVY 2.0) in Dadra and Nagar Haveli, in response to the Request for Proposal (RFP) Document issued by UT Level Skill Development Mission (UTLSDM) DNH.

We hereby confirm that:

1. The proposal is being submitted by (name of the agency who is the applicant) is in accordance with the conditions stipulated in the RFP.

2. We have examined the RFP in detail and have understood the terms and

conditions stipulated in the document issued by UTLSDM - DNH and in any subsequent communication sent by UTLSDM - DNH. We agree and undertake to abide by all these terms and conditions. Our proposal is consistent with all the requirements of submission as stated in the RFP or in any of the subsequent communications from UTLSDM - DNH.

3. The information submitted in our proposal is complete, is strictly as per the

requirements as stipulated in the RFP, and is correct to the best of our knowledge and understanding.

4. We would be solely responsible for any errors or omissions in our proposal. We

acknowledge that UTLSDM - DNH will be relying on the information provided in the proposal and the documents accompanying such proposal for empanelment of the applicant for the aforesaid programme, and we certify that all information provided in the application is true and correct; nothing has been omitted which renders such information misleading; and all documents accompanying such proposal are true copies of their respective originals.

5. We acknowledge the right of UTLSDM - DNH to reject our proposal without

assigning any reason there of or otherwise and hereby waive, to the fullest extent permitted by applicable law, our right to challenge the same on any account whatsoever.

7

Page 10: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

6. We satisfy the legal requirements and meet all the eligibility criteria as laid down in the RFP.

7. This proposal is unconditional and we hereby undertake to abide by the terms

and conditions of the RFP.

8. We have not directly or indirectly or through an agent engaged or indulged in any corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice.

9. We have enclosed the processing fee in the form of demand draft as stipulated

in RFP in separate cover. The details are as under.

Item Amount in Demand Draft No. Date Drawee Bank INR

Processing Rs. 10000/-

Charges

In witness thereof, we submit our proposal for the RFP published by GSDM

For and on behalf of:

Signature:

Name:

Designation

(Company seal)

(Authorized signatory)

8

Page 11: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

Annexure B: Power of Attorney (Required only if the Signatory to the Bid is not directly authorized by the Company Board, or Partners. Otherwise the Board Resolution/Partners Resolution would suffice)

Date:

To, The Director,

UT LEVEL Skill Development Mission – DNH Government Industrial Training Institute, Amli, Silvassa Dadra & Nagar Haveli 396230

Dear Sir,

Sub: RFP published by UTLSDM - DNH for empanelment of Industries operating in Dadra and Nagar Haveli as training provider under state component of Pradhan Mantri Kaushal Vikas Yojana (PMKVY 2.0)

<Applicant’s name> hereby authorizes <Designated Representative’s name> to act as a

representative of <Applicant’s name> for the following activities vide its Board Resolution

(and Power of Attorney if applicable)1 attached herewith.

To attend all meetings conducted by UTLSDM - DNH (PIA) and shall discuss, negotiate, finalize and sign any Proposal or agreement and contract with AMC related to EoI.

Yours faithfully, <Signature and Name of appropriate authority of the Proposer >

<Signature and name of the Designated Representative of the Proposer for acceptance of this Power of Attorney>

For

<Name of Proposer >

Encl: Board resolution for Authorized signatory

1In case the Signatory to the bid is not directly authorized through a Board/Partners Resolution of the firm, then the Power of Attorney vesting relevant powers to the Signatory should be attached. The purpose is to trace the authorization to a Board/Partner’s Resolution.

9

Page 12: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

Annexure C: Financial Turnover

The applicant should give declaration by charter accountant on their letter head duly signed and sealed in following format.

To whomsoever it may concern

On the basis of audited financial statements, I/ we hereby certify that (Name of Industry) having registered office at (Office address) has an average annual turnover of Rupees

______ (Rs. In Crore) in the last three completed financial years. The details of annual turnover are mentioned below:

Sr. No. FinancialYear AnnualTurnover (INR) 1

2

3

Note: Audited financial statements for the last three financial years should be submitted by the Applicant.

(Chartered Accountant):

Signature

Name

RegistrationNo.

Contact No.

Seal:

Date:

Place:

10

Page 13: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

Annexure D: Details of existing training centres proposed to be converted to PMKVY Centres

Whether Centre Address/ is recommended Location of

Number of by concerned

existing training

Name of Job Sector Skill

Sr.

candidates that centre proposed Name of Sector Role/ Course/ Council (SSC) (If

No can be trained to be converted Trade Yes, provide per annum to PMKVY recommendation

Centre certificate/ letter of SSC)

Annexure E: Details of new centres proposed to be established in PMKVY

Address/

Whether space is Name of Number of already available

Sr. Location of proposed Job candidates that with industry to Name of Sector

No proposed Role/ Course/ can be trained start this Centre

training centre Trade per annum (Yes/ No)

11

Page 14: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

SUMMARY OF JOB ROLES OF NSDC

Sr. No.

Sectors

Sr. No. in List of Job roles of NSDC

1

Aerospace & Aviation 1 to 11

2

Agriculture 12-39

3

Apparel, Made-Ups &

Home Furnishing

40-67

4

Automotive 68-78

5

Beauty & Wellness

79-81

6 Banking, Financial Services and Insurance

82

7 Capital Goods 83-89

8 Construction 90-100

9 Domestic worker 101-104

9 Electronics & Hardware 105-120

10 Food Processing 121-150

11 Furniture & Fittings 151-158

12 Gems & Jewellery 159-166

13 Green Jobs 167-174

14 Handicrafts & Carpets 175-185

15 Healthcare 186

16 Hydrocarbons 187-198

17 Infrastructure Equipment 199-208

18 Iron & Steel 209-217

19 IT-ITES 218-224

Page 15: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

20 Leather 225-237

21 Life Sciences 238-243

22 Logistics 244-253

23 Management and

Entrepreneurship & Professional

254-258

24 Media & Entertainment 259-266

25 Mining 267-275

26 Paints & Coatings 276-281

27 Plumbing 282-284

28 Power 285-296

30 Retail 297-302

31 Rubber 303-311

32 Sports 312-313

33 Telecom 314-327

34 Textiles & Handlooms 328-350

35 Tourism & Hospitality 351-360

36 People with disability 361-375

37 Management & Entrepreneurship & Professional

376

38 Handicrafts & carpets 377

39 Beauty & Wellness 378-384

12

Page 16: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

LIST OF JOB ROLES Job roles under CSSM Component of PMKVY 2.0 for training in F.Y 2019-20 for the U.T of Dadra and Nagar Haveli

S No

Sector Name of the QP QPRef.ID NSQF

Level

CCN

Catego

r y

Contain

s

Elective

s/

Options

Elective/

Option

Name

Versio

n

No.

Theory

(hours)

for

Compul

so ry

NOSs

Practic

al

(hours)

for

Compul

s ory

NOSs

Total

Hours

for

Compu

ls ory

NOSs

Optio

n 1

Theor

y

Optio

n 1

Practic

a l

Optio

n 2

Theor

y

Optio

n 2

Practi

c al

Man

d

ator

y

OJT

Reco

m

mend

e d

OJT

NSQC

Approv

al

Status

Curric

u lum

Availa

b ility

Partici

p ant

Handb

o ok

Availa

bi lity

Finali

z ed

for

CSS

M

Comments (CSSM) Availabil

it y

status

on

SDMS

Total

Duration

including

Options

Optiona

l Hrs.

Duratio

n

1 Aerospace &

Aviation

Airline High Lift Truck

Operator

AAS/Q0102 3 1 1.0 126 162 288 17th

Meeting

Yes Yes Yes No 288 0

2 Aerospace

& Aviation

Airline Cargo Assistant

AAS/Q0103 3 1 Option O1:Airsid

e Vehicle

Operator

1.0 87 105 192 19 29 17th

Meeting

Yes Yes Yes Rationalized-

Option/Elective to

be finalized or

make it

multiskilled

Yes 240 48

3 Aerospace

& Aviation

Airline

Baggage

Handler

AAS/Q0104 3 1 Option O1:Airsid

e Vehicle

Operator

1.0 85 107 192 19 29 17th

Meeting

Yes Yes Yes Rationalized-

Option/Elective to

be finalized or

make it

multiskilled

Yes 240 48

4 Aerospace &

Aviation

Airline Customer

Service Executive

AAS/Q0301 4 2 1.0 106 134 240 17th

Meeting

Yes Yes Yes Yes 240 0

5 Aerospace &

Aviation

Airline Security

Executive

AAS/Q0601 3 2 1.0 130 110 240 17th

Meeting

Yes Yes Yes Yes 240 0

6 Aerospace &

Aviation

Flight Dispatcher AAS/Q0603 4 1 1.0 261 315 576 17th

Meeting

Yes Yes Yes Training Duration

more than 550 hours

No 576 0

7 Aerospace

& Aviation

Airline Flight

Load Controller

AAS/Q0604 5 1 Option 1.0 106 134 240 19 29 17th

Meeting

Yes Yes Yes Rationalized-

Option/Elective to

be finalized or

make it

multiskilled

No 288 48

8 Aerospace

& Aviation

Aircraft

Powerplant

Technician

AAS/Q2001 4 1 Option O1:Aerospa

c e Welder

2.0 157 227 384 81 111 21st

Meeting

Yes Yes Yes Rationalized-

Option/Elective to

be finalized or

make it

multiskilled

No 576 192

9 Aerospace &

Aviation

Airline Reservation

Agent

AAS/Q0302 4 1 1.0 108 132 240 20th

Meeting

Yes Yes Yes Yes 240 0

10 Aerospace &

Aviation

Airline Ramp Executive

AAS/Q0602 4 1 1.0 106 134 240 20th

Meeting

Yes Yes Yes No 240 0

11 Aerospace &

Aviation

Airline Cabin Crew AAS/Q0605 4 1 1.0 224 256 480 21st

Meeting

Yes Yes Yes No 480 0

12 Agriculture Agriculture Extension

Service Provider

AGR/Q7601 4 2 1.0 60 140 200 7th

Meeting

Yes Yes Yes No 200 0

13 Agriculture Animal Health Worker

AGR/Q4804 3 1 1.0 120 180 300 7th

Meeting

Yes Yes Yes Yes 300 0

14 Agriculture Aqua Culture Worker AGR/Q4904 3 1 1.0 80 120 200 19th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

15 Agriculture Artificial Insemination

Technician

AGR/Q4803 3 1 1.0 150 250 400 7th

Meeting

Yes Yes Yes Yes 400 0

16 Agriculture Bamboo Grower AGR/Q6101 4 2 1.0 80 120 200 7th

Meeting

Yes Yes Yes Yes 200 0

17 Agriculture Beekeeper AGR/Q5301 4 3 1.0 60 140 200 7th

Meeting

Yes Yes Yes Yes 200 0

18 Agriculture Broiler Poultry Farm

Worker

AGR/Q4302 3 2 1.0 95 115 210 7th

Meeting

Yes Yes Yes Yes 210 0

19 Agriculture Dairy

Farmer/Entrepreneur

AGR/Q4101 4 1 1.0 80 120 200 6th

Meeting

Yes Yes Yes Yes 200 0

20 Agriculture Layer Farm Worker AGR/Q4307 3 2 1.0 80 120 200 19th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

Page 17: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

21 Agriculture Fisheries Extension

Associate

AGR/Q5107 3 1 1.0 56 144 200 21st

Meeting

Yes Yes Yes No 200 0

22 Agriculture Floriculturist - Open

cultivation

AGR/Q0701 4 2 1.0 80 120 200 7th

Meeting

Yes Yes Yes Yes 200 0

23 Agriculture Floriculturist -

Protected cultivation

AGR/Q0702 4 2 1.0 85 115 200 7th

Meeting

Yes Yes Yes Yes 200 0

24 Agriculture Gardener AGR/Q0801 4 2 1.0 130 170 300 7th

Meeting

Yes Yes Yes Yes 300 0

25 Agriculture Greenhouse Operator

AGR/Q1003 3 1 1.0 90 110 200 19th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

26 Agriculture Hatchery Incharge-

Poultry

AGR/Q4401 5 2 1.0 75 125 200 6th

Meeting

Yes Yes Yes Yes 200 0

27 Agriculture Micro irrigation

Technician

AGR/Q1002 4 1 1.0 80 120 200 7th

Meeting

Yes Yes Yes Yes 200 0

28 Agriculture Mushroom Grower

(small

entrepreneur)

AGR/Q7803 4 2 1.0 75 125 200 19th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

29 Agriculture Organic Grower AGR/Q1201 4 2 1.0 80 120 200 19th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

30 Agriculture Ornamental fish

technician

AGR/Q4910 4 1 1.0 100 100 200 21st

Meeting

Yes Yes Yes No 200 0

31 Agriculture Paddy Farmer AGR/Q0101 4 2 1.0 70 130 200 7th

Meeting

Yes Yes Yes Yes 200 0

32 Agriculture Quality Seed Grower AGR/Q7101 4 2 1.0 90 110 200 7th

Meeting

Yes Yes Yes Yes 200 0

33 Agriculture Seed Processing

Worker

AGR/Q7102 3 2 1.0 75 125 200 7th

Meeting

Yes Yes Yes Yes 200 0

34 Agriculture Hatchery Operator AGR/Q4402 3 2 1.0 80 120 200 19th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

35 Agriculture Small poultry farmer AGR/Q4306 4 2 1.0 100 140 240 19th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 240 0

36 Agriculture Sugarcane Cultivator AGR/Q0203 4 2 1.0 70 130 200 7th

Meeting

Yes Yes Yes Yes 200 0

37 Agriculture Tractor operator AGR/Q1101 4 1 1.0 88 112 200 7th

Meeting

Yes Yes Yes Yes 200 0

38 Agriculture Soil & Water Testing

Lab Analyst

AGR/Q8103 5 1 1.0 70 170 240 17th

Meeting

Yes Yes Yes No 240 0

39 Agriculture Agri Service Input

Dealer

AGR/Q7804 5 2 1.0 100 200 300 22nd

Meeting

Yes Yes Yes No 300 0

40 Apparel, Made-

Ups & Home

Furnishing

Assistant

Fashion

Designer

AMH/Q1210 4 1 1.0 150 350 500 11th

Meeting

Yes Yes Yes Yes 500 0

41 Apparel, Made-

Ups & Home

Furnishing

Cutting Supervisor AMH/Q0610 5 2 1.0 90 210 300 11th

Meeting

Yes Yes Yes No 300 0

42 Apparel, Made-

Ups & Home

Furnishing

Embroidary Machine

Operator (Zigzag

Machine)

AMH/Q0801 4 1 1.0 80 190 270 8th

Meeting

Yes Yes Yes No 270 0

43 Apparel, Made-

Ups & Home

Furnishing

Export Assistant AMH/Q1601 4 2 1.0 90 180 270 7th

Meeting

Yes Yes Yes Yes 270 0

44 Apparel, Made-

Ups & Home

Furnishing

Export Executive AMH/Q1602 5 2 1.0 90 180 270 7th

Meeting

Yes Yes Yes Yes 270 0

Page 18: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

45 Apparel, Made-

Ups & Home

Furnishing

Fabric Cutter -

Apparel, Made-Ups

& Home

Furnishing

AMH/Q1510 4 1 1.0 90 210 300 11th

Meeting

Yes Yes Yes No 300 0

46 Apparel, Made-

Ups & Home

Furnishing

Fashion Designer AMH/Q1201 5 1 1.0 210 510 720 8th

Meeting

Yes Yes Yes Training Duration

more than 550

hours

Yes 720 0

47 Apparel, Made-

Ups & Home

Furnishing

Finisher AMH/Q2255 4 1 1.0 90 210 300 11th

Meeting

Yes Yes Yes No 300 0

48 Apparel, Made-

Ups & Home

Furnishing

Framer-Computerized

Embroidery Machine

AMH/Q1301 4 1 1.0 60 140 200 8th

Meeting

Yes Yes Yes No 200 0

49 Apparel, Made-

Ups & Home

Furnishing

Hand Embroiderer AMH/Q1001 4 1 1.0 60 140 200 7th

Meeting

Yes Yes Yes Yes 200 0

50 Apparel, Made-

Ups & Home

Furnishing

Hand Embroiderer

(Addawala)

AMH/Q1010 3 1 1.0 60 140 200 11th

Meeting

Yes Yes Yes Yes 200 0

51 Apparel, Made-

Ups & Home

Furnishing

Inline Checker AMH/Q0102 3 1 1.0 85 185 270 8th

Meeting

Yes Yes Yes Yes 270 0

52 Apparel, Made-

Ups & Home

Furnishing

Layerman AMH/Q0201 3 1 1.0 35 85 120 7th

Meeting

Yes Yes Yes No 120 0

53 Apparel, Made-

Ups & Home

Furnishing

Line Supervisor

Stitching

AMH/Q0601 5 1 1.0 210 510 720 11th

Meeting

Yes Yes Yes Training Duration

more than 550

hours

No 720 0

54 Apparel, Made-

Ups & Home

Furnishing

Machine

Maintenance

Mechanic (Sewing

Machine)

AMH/Q1901 5 1 1.0 160 380 540 8th

Meeting

Yes Yes Yes No 540 0

55 Apparel, Made-

Ups & Home

Furnishing

Measurement Checker

AMH/Q0103 4 1 1.0 80 190 270 8th

Meeting

Yes Yes Yes Yes 270 0

56 Apparel, Made-

Ups & Home

Furnishing

Merchandiser -

Made- ups & Home

Furnishing

AMH/Q0911 5 1 1.0 160 380 540 11th

Meeting

Yes Yes Yes No 540 0

57 Apparel, Made-

Ups & Home

Furnishing

Packer AMH/Q1407 3 1 1.0 60 120 180 11th

Meeting

Yes Yes Yes Yes 180 0

58 Apparel, Made-

Ups & Home

Furnishing

Pressman AMH/Q0401 4 1 1.0 85 185 270 8th

Meeting

Yes Yes Yes Yes 270 0

59 Apparel, Made-

Ups & Home

Furnishing

Production

Supervisor (Sewing)

AMH/Q2101 5 1 1.0 210 510 720 7th

Meeting

Yes Yes Yes Training Duration

more than 550

hours

Yes 720 0

60 Apparel, Made-

Ups & Home

Furnishing

Q C Executive-

Sewing Line

AMH/Q1401 5 1 1.0 210 510 720 7th

Meeting

Yes Yes Yes Training Duration

more than 550

hours

No 720 0

61 Apparel, Made-

Ups & Home

Furnishing

Sampling Coordinator AMH/Q1801 5 1 1.0 110 250 360 8th

Meeting

Yes Yes Yes No 360 0

62 Apparel, Made-

Ups & Home

Furnishing

Sampling Tailor AMH/Q0701 4 1 1.0 210 510 720 8th

Meeting

Yes Yes Yes Training Duration

more than 550

hours

No 720 0

63 Apparel, Made-

Ups & Home

Furnishing

Self Employed Tailor AMH/Q1947 4 1 1.0 80 260 340 13th

Meeting

Yes Yes Yes Yes 340 0

64 Apparel, Made-

Ups & Home

Furnishing

Sewing Machine

Operator

AMH/Q0301 4 1 1.0 80 190 270 7th

Meeting

Yes Yes Yes Yes 270 0

65 Apparel, Made-

Ups & Home

Furnishing

Sewing

Machine

Operator- Knits

AMH/Q0305 4 1 1.0 90 210 300 11th

Meeting

Yes Yes Yes Yes 300 0

Page 19: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

66 Apparel, Made-

Ups & Home

Furnishing

Specialized Sewing

Machine Operator

AMH/Q2301 4 1 1.0 70 170 240 7th

Meeting

Yes Yes Yes Yes 240 0

67 Apparel, Made-

Ups & Home

Furnishing

Washing Machine

Operator

AMH/Q1810 4 1 1.0 90 210 300 13th

Meeting

Yes Yes Yes Yes 300 0

68 Automotive Automotive Service

Technician (Two and

Three Wheelers)

ASC/Q1411 4 1 1.0 175 275 450 8th

Meeting

Yes Yes Yes Yes 450 0

69 Automotive Automotive Service

Technician Level 3

ASC/Q1401 3 1 1.0 190 256 446 8th

Meeting

Yes Yes Yes Yes 446 0

70 Automotive Automotive Service

Technician Level 4

ASC/Q1402 4 1 1.0 180 250 430 8th

Meeting

Yes Yes Yes Yes 430 0

71 Automotive Chauffeur L4 ASC/Q9712 4 1 1.0 100 150 250 10th

Meeting

Yes Yes Yes No 250 0

72 Automotive Commercial Vehicle

Driver Level 4

ASC/Q9703 4 1 1.0 160 240 400 10th

Meeting

Yes Yes Yes Yes 400 0

73 Automotive Forklift Operator

(Driver)

ASC/Q9707 4 1 1.0 90 210 300 8th

Meeting

Yes Yes Yes Yes 300 0

74 Automotive Sales Consultant

(Automotive finance)

ASC/Q2001 4 2 1.0 250 150 400 8th

Meeting

Yes Yes Yes Yes 400 0

75 Automotive Sales Consultant Level

4

ASC/Q1001 4 2 1.0 100 150 250 8th

Meeting

Yes Yes Yes Yes 250 0

76 Automotive Showroom

Hostess/Host

ASC/Q1103 3 2 1.0 80 120 200 8th

Meeting

Yes Yes Yes Yes 200 0

77 Automotive Taxi Driver ASC/Q9705 4 1 1.0 100 120 220 8th

Meeting

Yes Yes Yes Yes 220 0

78 Automotive Telecaller ASC/Q1105 4 2 1.0 100 120 220 8th

Meeting

Yes Yes Yes Yes 220 0

79 Beauty & Wellness

Spa Therapist BWS/Q1002 4 2 1.0 56 304 360 21st

Meeting

Yes Yes Yes No 360 0

80 Beauty & Wellness

Wellness

Neurotherapist

BWS/Q2301 4 2 1.0 90 210 300 21st

Meeting

Yes Yes Yes No 300 0

81 Beauty & Wellness

Yoga Instructor BWS/Q2201 4 2 1.0 52 174 226 17th

Meeting

Yes Yes Yes Yes 226 0

82 Banking,

Financial

Services and

Insurance

Goods & Services Tax

(GST)

Accounts Assistant

BSC/Q0910 4 3 1.0 53 47 100 18th

Meeting

Yes Yes Yes Yes 100 0

83 Capital Goods CNC Operator - Turning CSC/Q0115 3 1 1.0 140 260 400 6th

Meeting

Yes Yes Yes Yes 400 0

84 Capital Goods Draughtsman -

Mechanical

CSC/Q0402 4 1 1.0 100 300 400 6th

Meeting

Yes Yes Yes Yes 400 0

85 Capital Goods Fitter – Electrical and

Electronic Assembly

CSC/Q0305 3 1 1.0 150 350 500 6th

Meeting

Yes Yes Yes Yes 500 0

86 Capital Goods Fitter - Fabrication CSC/Q0303 3 1 1.0 140 360 500 4th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 500 0

87 Capital Goods Fitter – Mechanical

Assembly

CSC/Q0304 3 1 1.0 150 350 500 5th

Meeting

Yes Yes Yes Yes 500 0

88 Capital Goods Manual Metal Arc

Welding/Shielded

Metal Arc Welding

Welder

CSC/Q0204 3 1 1.0 150 350 500 5th

Meeting

Yes Yes Yes Yes 500 0

89 Capital Goods Metal Inert Gas / Metal

Active Gas /Gas Metal

Arc Welder

(MIG/MAG/GMAW)

CSC/Q0209 4 1 1.0 155 445 600 4th

Meeting

Yes Yes Yes Training Duration

more than 550

hours

Yes 600 0

90 Construction Mason General CON/Q0103 4 1 1.0 80 320 400 6th

Meeting

Yes Yes Yes Yes 400 0

91 Construction Mason Tiling CON/Q0104 4 1 1.0 90 310 400 6th

Meeting

Yes Yes Yes Yes 400 0

92 Construction Mason Concrete CON/Q0105 3 1 1.0 80 320 400 6th

Meeting

Yes Yes Yes Yes 400 0

Page 20: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

93 Construction Bar Bender and Steel

Fixer

CON/Q0203

4 1 1.0 80 320 400 6th

Meeting

Yes Yes Yes Yes 400 0

94 Construction Shuttering Carpenter

System

CON/Q0304

4 1 1.0 80 320 400 6th

Meeting

Yes Yes Yes Yes 400 0

95 Construction Scaffolder System CON/Q0305

4 1 1.0 84 320 404 6th

Meeting

Yes Yes Yes Yes 404 0

96 Construction Assistant Electrician CON/Q0602

3 1 1.0 110 290 400 6th

Meeting

Yes Yes Yes Yes 400 0

97 Construction False Ceiling & Drywall

Installer

CON/Q1107

3 1 1.0 80 320 400 20th

Meeting

Yes Yes Yes No 400 0

98 Construction Construction Painter

and Decorator

CON/Q0503

3 1 1.0 80 320 400 17th

Meeting

Yes Yes Yes Yes 400 0

99 Construction Tack Welder CON/Q1251

3 1 1.0 123 285 408 12th

Meeting

Yes Yes Yes Yes 408 0

100 Construction Fabricator CON/Q1206

4 1 1.0 184 416 600 18th

Meeting

Yes Yes Yes Training Duration

more than 550 hours

No 600 0

101 Domestic Worker Child Caretaker (Non

Clinical)

DWC/Q0201

3 2 1.0 80 120 200 21st

Meeting

Yes Yes Yes Yes 200 0

102 Domestic Worker General Housekeeper DWC/Q0102

3 2 1.0 80 120 200 21st

Meeting

Yes Yes Yes Yes 200 0

103 Domestic Worker Housekeeper cum Cook DWC/Q0101

3 1 1.0 122 278 400 144 21st

Meeting

Yes Yes Yes Yes 400 0

104 Domestic Worker Elderly Caretaker (Non-

Clinical)

DWC/Q0801

3 2 1.0 80 120 200 21st

Meeting

Yes Yes Yes Yes 200 0

105 Electronics &

Hardware

Assembly Operator -

RAC

ELE/Q3501 4 1 1.0 180 180 360 8th

Meeting

Yes Yes Yes Yes 360 0

106 Electronics &

Hardware

CCTV Installation

Technician

ELE/Q4605 4 2 1.0 180 180 360 7th

Meeting

Yes Yes Yes Yes 360 0

107 Electronics &

Hardware

DTH Set Top Box

Installation & Service

Technician

ELE/Q8101 4 2 1.0 80 120 200 7th

Meeting

Yes Yes Yes Yes 200 0

108 Electronics &

Hardware

Field Engineer - RACW ELE/Q3105 5 2 1.0 180 180 360 7th

Meeting

Yes Yes Yes Yes 360 0

109 Electronics &

Hardware

Field Technician - AC ELE/Q3102 4 1 1.0 120 180 300 8th

Meeting

Yes Yes Yes Yes 300 0

110 Electronics &

Hardware

Field Technician -

Computing and

Peripherals

ELE/Q4601 4 2 1.0 120 180 300 8th

Meeting

Yes Yes Yes Yes 300 0

111 Electronics &

Hardware

Field Technician -

Networking and

Storage

ELE/Q4606 4 2 1.0 180 180 360 7th

Meeting

Yes Yes Yes Yes 360 0

112 Electronics &

Hardware

Field Technician - Other

Home Appliances

ELE/Q3104 4 2 1.0 180 180 360 8th

Meeting

Yes Yes Yes Yes 360 0

113 Electronics &

Hardware

Field Technician - UPS

and Inverter

ELE/Q7201 4 2 1.0 180 180 360 7th

Meeting

Yes Yes Yes Yes 360 0

114 Electronics &

Hardware

Installation Technician -

Computing and

Peripherals

ELE/Q4609 3 2 1.0 120 180 300 7th

Meeting

Yes Yes Yes Yes 300 0

115 Electronics &

Hardware

IT Coordinator in

School

ELE/Q4701 4 2 1.0 180 180 360 8th

Meeting

Yes Yes Yes Yes 360 0

116 Electronics &

Hardware

LED Light Repair

Technician

ELE/Q9302 4 1 1.0 180 180 360 7th

Meeting

Yes Yes Yes Yes 360 0

117 Electronics &

Hardware

Mobile Phone

Hardware Repair

Technician

ELE/Q8104 4 2 1.0 180 180 360 7th

Meeting

Yes Yes Yes Yes 360 0

118 Electronics &

Hardware

Solar Panel Installation

Technician

ELE/Q5901 4 1 1.0 200 200 400 7th

Meeting

Yes Yes Yes Yes 400 0

119 Electronics &

Hardware

TV Repair Technician ELE/Q3101 4 2 1.0 180 180 360 5th

Meeting

Yes Yes Yes Yes 360 0

120 Electronics &

Hardware

Wireman – Control

Panel

ELE/Q7302 3 1 1.0 80 120 200 7th

Meeting

Yes Yes Yes Yes 200 0

Page 21: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

121 Food Processing Assistant Lab Technician -

Food and Agricultural

Commodities

FIC/Q7601 4 3 1.0 87 153 240 32 11th

Meeting

Yes Yes Yes Yes 240 0

122 Food Processing Baking Technician FIC/Q5005 4 1 1.0 90 150 240 90 11th

Meeting

Yes Yes Yes Yes 240 0

123 Food Processing Butter and Ghee

Processing Operator

FIC/Q2003 4 1 1.0 93 147 240 60 11th

Meeting

Yes Yes Yes Yes 240 0

124 Food Processing Cold Storage

Technician

FIC/Q7004 4 3 1.0 98.50 151.50 250 60 11th

Meeting

Yes Yes Yes Yes 250 0

125 Food Processing Craft Baker FIC/Q5002 4 1 1.0 90 150 240 21st

Meeting

Yes Yes Yes Yes 240 0

126 Food Processing Dairy Processing

Equipment Operator

FIC/Q2002 4 1 1.0 88 152 240 90 11th

Meeting

Yes Yes Yes Yes 240 0

127 Food Processing Dairy Products

Processor

FIC/Q2001 5 1 1.0 81 159 240 11th

Meeting

Yes Yes Yes Yes 240 0

128 Food Processing Fish and Sea Food

Processing Technician

FIC/Q4001 4 1 1.0 84.5 155.5 240 90 11th

Meeting

Yes Yes Yes Yes 240 0

129 Food Processing Food Products

Packaging Technician

FIC/Q7001 5 1 1.0 90 150 240 90 11th

Meeting

Yes Yes Yes Yes 240 0

130 Food Processing Fruit Pulp Processing

Technician

FIC/Q0106 4 1 1.0 95 145 240 90 11th

Meeting

Yes Yes Yes Yes 240 0

131 Food Processing Fruit Ripening

Technician

FIC/Q0104 4 1 1.0 87 153 240 11th

Meeting

Yes Yes Yes Yes 240 0

132 Food Processing Fruits and Vegetables

Canning Technician

FIC/Q0107 4 1 1.0 80 160 240 56 11th

Meeting

Yes Yes Yes Yes 240 0

133 Food Processing Fruits and Vegetables

Drying/ Dehydration

Technician

FIC/Q0105 4 1 1.0 82.5 157.5 240 60 11th

Meeting

Yes Yes Yes Yes 240 0

134 Food Processing Fruits and Vegetables

Selection In-Charge

FIC/Q0108 3 3 1.0 80 160 240 80 11th

Meeting

Yes Yes Yes Yes 240 0

135 Food Processing Grain Mill Operator FIC/Q1003 4 1 1.0 90 150 240 11th

Meeting

Yes Yes Yes Yes 240 0

136 Food Processing Ice Cream Processing

Technician

FIC/Q2004 4 1 1.0 84 156 240 40 11th

Meeting

Yes Yes Yes Yes 240 0

137 Food Processing Jam, Jelly and Ketchup

Processing Technician

FIC/Q0103 4 1 1.0 90 150 240 11th

Meeting

Yes Yes Yes Yes 240 0

138 Food Processing Milling Technician FIC/Q1002 5 1 1.0 79 161 240 11th

Meeting

Yes Yes Yes Yes 240 0

139 Food Processing Mixing Technician FIC/Q5004 4 1 1.0 77 163 240 20 11th

Meeting

Yes Yes Yes Yes 240 0

140 Food Processing Modified Atmosphere

Storage Technician

FIC/Q7003 4 3 1.0 84 156 240 60 11th

Meeting

Yes Yes Yes Yes 240 0

141 Food Processing Pickle Making

Technician

FIC/Q0102 4 1 1.0 90 150 240 90 11th

Meeting

Yes Yes Yes Yes 240 0

142 Food Processing Plant baker FIC/Q5001 5 2 1.0 75 165 240 21st

Meeting

Yes Yes Yes No 240 0

143 Food Processing Plant Biscuit Production

Specialist

FIC/Q5003 4 1 1.0 90 150 240 90 11th

Meeting

Yes Yes Yes Yes 240 0

144 Food Processing Processed Food

Entrepreneur

FIC/Q9001 5 3 1.0 88 152 240 21st

Meeting

Yes Yes Yes No 240 0

145 Food Processing Pulse Processing

Technician

FIC/Q1004 4 1 1.0 90 150 240 20 11th

Meeting

Yes Yes Yes Yes 240 0

146 Food Processing Purchase Assistant - Food

and Agricultural

Commodities

FIC/Q7005 4 3 1.0 74 166 240 30 11th

Meeting

Yes Yes Yes Yes 240 0

147 Food Processing Squash and Juice

Processing Technician

FIC/Q0101 4 1 1.0 90 150 240 80 11th

Meeting

Yes Yes Yes Yes 240 0

148 Food Processing Traditional Snack and

Savoury Maker

FIC/Q8501 4 1 1.0 88 152 240 90 13th

Meeting

Yes Yes Yes Yes 240 0

149 Food Processing Offal Collector FIC/Q3005 4 1 1.0 90 150 240 90 15th

Meeting

Yes Yes Yes Yes 240 0

Page 22: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

150 Food Processing Spice Processing

Technician

FIC/Q8502 4 1 1.0 90 150 240 90 15th

Meeting

Yes Yes Yes Yes 240 0

151 Furniture & Fittings

Assistant Carpenter-

Wooden Furniture

FFS/Q0103 3 2 1.0 108 132 240 21st

Meeting

Yes Yes Yes Yes 240 0

152 Furniture & Fittings

Lead Carpenter-

Wooden Furniture

FFS/Q0104 4 2 Option O1:Lock

Installer

1.0 132 176 308 16 32 22nd

Meeting

Yes Yes Yes Rationalized-

Option/Elective to be

finalized or make it

multiskilled

No 356 48

153 Furniture & Fittings

Assembler–Modular

Furniture

FFS/Q5101 3 2 1.0 98 142 240 21st

Meeting

Yes Yes Yes Yes 240 0

154 Furniture & Fittings

Cabinet

Maker–Modular

Furniture-Kitchen

FFS/Q5102 3 2 1.0 100 140 240 21st

Meeting

Yes Yes Yes Yes 240 0

155 Furniture & Fittings

Lead Assembler-

Modular Furniture

FFS/Q5103 4 2 Option O1:Lock

Installer

1.0 128 154 282 16 32 21st

Meeting

Yes Yes Yes Rationalized-

Option/Elective to be

finalized or make it

multiskilled

Yes 330 48

156 Furniture & Fittings

Design Assistant -

Wooden/Modular

Furniture

FFS/Q0106 4 2 1.0 156 164 320 21st

Meeting

Yes Yes Yes Yes 320 0

157 Furniture & Fittings

Assembler-

Doors/Windows- Glass

FFS/Q6101 3 2 Option O1:Wooden/

Aluminium

1.0 60 180 240 24 168 21st

Meeting

Yes Yes Yes Rationalized-

Option/Elective to be

finalized or make it

multiskilled

Yes 432 192

158 Furniture & Fittings

Sales Executive-

Furniture & Fittings

FFS/Q8101 4 2 1.0 108 150 258 21st

Meeting

Yes Yes Yes Yes 258 0

159 Gems & Jewellery

Cast and diamonds-set

jewellery - CAD

Designer

G&J/Q2303 4 1 1.0 72 288 360 9th

Meeting

Yes Yes Yes Yes 360 0

160 Gems & Jewellery

Cast and diamonds-set

jewellery - Hand Sketch

Designer (Basic)

G&J/Q2301 3 1 1.0 24 126 150 9th

Meeting

Yes Yes Yes Yes 150 0

161 Gems & Jewellery

Handmade Gold and

Gems-set Jewellery -

Goldsmith -

Components

G&J/Q0603 3 1 1.0 24 126 150 9th

Meeting

Yes Yes Yes Yes 150 0

162 Gems & Jewellery

Handmade Gold and

Gems-set Jewellery -

Goldsmith - Frame

G&J/Q0604 4 1 1.0 48 192 240 9th

Meeting

Yes Yes Yes Yes 240 0

163 Gems & Jewellery

Diamond Processing-

Assorter (Basic)

G&J/Q3601 3 1 1.0 24 126 150 22nd

Meeting

Yes Yes Yes Yes 150 0

164 Gems & Jewellery

Cast & Diamonds set

Jewellery-Wax Setter

G&J/Q1701 3 1 1.0 24 126 150 22nd

Meeting

Yes Yes Yes Yes 150 0

165 Gems & Jewellery

Jewellery Retail-

Jewellery Retail Sales

Associate (Basic)

G&J/Q6802 4 3 1.0 65 85 150 22nd

Meeting

Yes Yes Yes Yes 150 0

166 Gems & Jewellery

Stone Fixer - Imitation

Jewellery

G&J/Q1504 3 1 1.0 24 126 150 22nd

Meeting

Yes Yes Yes No 150 0

167 Green Jobs Solar PV Installer - Civil SGJ/Q0103 4 1 1.0 60 120 180 12th

Meeting

Yes Yes Yes Yes 180 0

168 Green Jobs Solar PV Installer -

Electrical

SGJ/Q0102 4 1 1.0 65 135 200 12th

Meeting

Yes Yes Yes Yes 200 0

169 Green Jobs Solar PV Installer

(Suryamitra)

SGJ/Q0101 4 1 1.0 115 185 300 12th

Meeting

Yes Yes Yes Yes 300 0

170 Green Jobs Wastewater Treatment

Plant Helper

SGJ/Q6602 3 3 1.0 50 110 160 22nd

Meeting

Yes Yes Yes Yes 160 0

171 Green Jobs Wastewater Treatment

Plant Technician

SGJ/Q6601 4 3 1.0 70 130 200 22nd

Meeting

Yes Yes Yes Yes 200 0

172 Green Jobs Recyclable Waste

Collector & Segregator

SGJ/Q6101 4 3 1.0 30 130 160 22nd

Meeting

Yes Yes Yes No 160 0

Page 23: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

173 Green Jobs Solar PV Maintenance

Technician - Electrical

(Ground Mount)

SGJ/Q0115 4 1 1.0 70 130 200 21st

Meeting

Yes Yes Yes No 200 0

174 Green Jobs Solar Lighting

Technician

SGJ/Q0201 4 1 Option O1: Solar

Home Lighting

System/Solar

Street Lights

1.0 30 130 160 10 30 10 30 21st

Meeting

Yes Yes Yes Rationalized QP No 240 80

175 Handicrafts &

Carpets

Bamboo Basket Maker HCS/Q8704 3 2 1.0 74 166 240 20th

Meeting

Yes Yes Yes Yes 240 0

176 Handicrafts &

Carpets

Bamboo Mat Weaver HCS/Q8702 3 2 1.0 75 165 240 20th

Meeting

Yes Yes Yes Yes 240 0

177 Handicrafts &

Carpets

Bamboo Utility

Handicraft Assembler

HCS/Q8705 3 2 1.0 80 150 230 20th

Meeting

Yes Yes Yes Yes 230 0

178 Handicrafts &

Carpets

Carving Artisan HCS/Q1502 4 2 1.0 85 220 305 9th

Meeting

Yes Yes Yes No 305 0

179 Handicrafts &

Carpets

Casting operator

(Metal Handicrafts)

HCS/Q2801 4 2 1.0 90 180 270 19th

Meeting

Yes Yes Yes No 270 0

180 Handicrafts &

Carpets

Crochet Lace Tailor HCS/Q7705 3 2 1.0 90 150 240 20th

Meeting

Yes Yes Yes Yes 240 0

181 Handicrafts &

Carpets

Engraving artisan

(Metal Handicrafts)

HCS/Q2902 4 2 1.0 85 195 280 19th

Meeting

Yes Yes Yes Yes 280 0

182 Handicrafts &

Carpets

Engraving/ Carving/

Etching Assistant

HCS/Q7001 3 3 1.0 75 175 250 19th

Meeting

Yes Yes Yes No 250 0

183 Handicrafts &

Carpets

Handloom Weaver

(Carpets)

HCS/Q5412 3 2 1.0 50 220 270 18th

Meeting

Yes Yes Yes Yes 270 0

184 Handicrafts &

Carpets

Stamping operator

(Metal Handicrafts)

HCS/Q2802 4 2 1.0 58 142 200 19th

Meeting

Yes Yes Yes Yes 200 0

185 Handicrafts &

Carpets

Inlay Artisan -

Stonecraft

HCS/Q1504 4 2 1 80 175 255 9th

Meeting

Yes Yes Yes No 255 0

186 Healthcare Pradhan Mantri Arogya

Mitra

HSS/Q6105 4 1 1.0 21 24 45 21st

Meeting

Yes Yes Yes No 45 0

187 Hydrocarbons Assistant Technician-

Drilling (Oil & Gas)

HYC/Q0101 4 2 1.0 400 600 1000 18th

Meeting

Yes Yes Yes Training Duration

more than 550 hours

No 1000 0

188 Hydrocarbons Assistant Technician-

Production (Oil & Gas)

HYC/Q0102 4 2 1.0 400 600 1000 18th

Meeting

Yes Yes Yes Training Duration

more than 550

hours

No 1000 0

189 Hydrocarbons Retail Outlet Attendant

(Oil & Gas)

HYC/Q3101 4 2 1.0 63 137 200 17th

Meeting

Yes Yes Yes Yes 200 0

190 Hydrocarbons Retail Outlet Supervisor

(Oil & Gas)

HYC/Q3102 5 1 1.0 40 160 200 17th

Meeting

Yes Yes Yes No 200 0

191 Hydrocarbons LPG Delivery Personnel HYC/Q3201 4 2 1.0 60 140 200 17th

Meeting

Yes Yes Yes Yes 200 0

192 Hydrocarbons LPG Supervisor HYC/Q3202 5 1 1.0 40 160 200 17th

Meeting

Yes Yes Yes No 200 0

193 Hydrocarbons Tank Lorry Driver-

Petroleum Products

HYC/Q3301 4 1 1.0 40 160 200 17th

Meeting

Yes Yes Yes Yes 200 0

194 Hydrocarbons Industrial Electrician

(Oil & Gas)

HYC/Q6101 4 1 1.0 200

800 1000 17th

Meeting

Yes Yes Yes Training Duration

more than 550 hours

Yes 1000 0

195 Hydrocarbons Pipe Fitter – City Gas

Distribution

HYC/Q6102 4 1 1.0 60 240 300 17th

Meeting

Yes Yes Yes Yes 300 0

196 Hydrocarbons Pipe Fitter (Oil & Gas) HYC/Q6103 4 1 1.0 60 240 300 17th

Meeting

Yes Yes Yes No 300 0

197 Hydrocarbons Industrial Welder (Oil &

Gas)

HYC/Q9101 4 1 1.0 200

800 1000 17th

Meeting

Yes Yes Yes Training Duration

more than 550 hours

Yes 1000 0

198 Hydrocarbons LPG Mechanic HYC/Q3401 4 2 1.0 60 140 200 19th

Meeting

Yes Yes Yes Yes 200 0

199 Infrastructure

Equipment

Backhoe Loader

Operator

IES/Q0101 4 1 1.0 60 150 210 7th

Meeting

Yes Yes Yes Yes 210 0

200 Infrastructure

Equipment

Excavator Operator IES/Q0103 4 1 1.0 60 150 210 7th

Meeting

Yes Yes Yes Yes 210 0

201 Infrastructure

Equipment

Junior Backhoe

Operator

IES/Q0102 3 1 1.0 40 110 150 7th

Meeting

Yes Yes Yes Yes 150 0

Page 24: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

202 Infrastructure

Equipment

Junior Excavator

Operator

IES/Q0104 3 1 1.0 60 110 170 7th

Meeting

Yes Yes Yes Yes 170 0

203 Infrastructure

Equipment

Junior Mechanic –

Elec/Electronics/

Instruments

IES/Q1106 3 1 1.0 50 110 160 7th

Meeting

Yes Yes Yes Yes 160 0

204 Infrastructure

Equipment

Junior Mechanic

(Engine)

IES/Q1102 3 1 1.0 50 110 160 7th

Meeting

Yes Yes Yes Yes 160 0

205 Infrastructure

Equipment

Junior Mechanic

(Hydraulic)

IES/Q1104 3 1 1.0 50 110 160 7th

Meeting

Yes Yes Yes Yes 160 0

206 Infrastructure

Equipment

Junior Operator Crane

IES/Q0111 3 1 1.0 40 110 150 7th

Meeting

Yes Yes Yes Yes 150 0

207 Infrastructure

Equipment

Junior Batching Plant

Operator

IES/Q0117 3 1 1.0 40 110 150 18th

Meeting

Yes Yes Yes Yes 150 0

208 Infrastructure

Equipment

Junior Transit Mixer

Operator

IES/Q0119 3 1 1.0 40 110 150 18th

Meeting

Yes Yes Yes Yes 150 0

209 Iron & Steel Bearing maintenance ISC/Q0906 3 1 1.0 80 220 300 7th

Meeting

Yes Yes Yes Yes 300 0

210 Iron & Steel Fitter - Instrumentation

ISC/Q1102 3 1 1.0 70 230 300 7th

Meeting

Yes Yes Yes Yes 300 0

211 Iron & Steel Fitter : Levelling ,

alignment , balancing

ISC/Q0905 3 1 1.0 100 230 330 7th

Meeting

Yes Yes Yes Yes 330 0

212 Iron & Steel Fitter Electrical

Assembly

ISC/Q1001 3 1 1.0 75 235 310 7th

Meeting

Yes Yes Yes Yes 310 0

213 Iron & Steel Fitter Electronic

Assembly

ISC/Q1101 3 1 1.0 80 220 300 7th

Meeting

Yes Yes Yes Yes 300 0

214 Iron & Steel Iron & Steel: Machinist

ISC/Q0909 3 1 1.0 120 270 390 7th

Meeting

Yes Yes Yes Yes 390 0

215 Iron & Steel Iron & Steel: Plasma

Cutter

ISC/Q0910 4 1 1.0 68 212 280 7th

Meeting

Yes Yes Yes Yes 280 0

216 Iron & Steel Rigger : Rigging of

heavy material

ISC/Q0908 3 1 1.0 70 180 250 7th

Meeting

Yes Yes Yes Yes 250 0

217 Iron & Steel Gas Tungsten Arc

Welding

ISC/Q0911 4 1 1.0 80 300 380 7th

Meeting

Yes Yes Yes Yes 380 0

218 IT-ITES CRM Domestic Non -

Voice

SSC/Q2211 4 2 1.0 100 300 400 6th

Meeting

Yes Yes Yes Yes 400 0

219 IT-ITES CRM Domestic Voice SSC/Q2210 4 2 1.0 100 300 400 6th

Meeting

Yes Yes Yes Yes 400 0

220 IT-ITES Domestic Biometric

data operator

SSC/Q2213 4 2 1.0 100 300 400 6th

Meeting

Yes Yes Yes Yes 400 0

221 IT-ITES Domestic Data entry

Operator

SSC/Q2212 4 2 1.0 100 300 400 6th

Meeting

Yes Yes Yes Yes 400 0

222 IT-ITES Domestic IT helpdesk

Attendant

SSC/Q0110 4 2 1.0 100 300 400 6th

Meeting

Yes Yes Yes Yes 400 0

223 IT-ITES Junior Software

Developer

SSC/Q0508 4 2 1.0 100 300 400 6th

Meeting

Yes Yes Yes Yes 400 0

224 IT-ITES Web Developer SSC/Q0503 5 2 1.0 109 291 400 6th

Meeting

Yes Yes Yes Yes 400 0

225 Leather Buffing Operator LSS/Q0801 4 1 1.0 30 170 200 7th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

226 Leather Cutter- Footwear LSS/Q2301 4 1 1.0 40 260 300 7th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 300 0

227 Leather Cutter-Goods

& Garments

LSS/Q5301 4 1 1.0 30 170 200 7th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

228 Leather Drum Operator LSS/Q0301 4 1 1.0 33 167 200 7th

Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

Page 25: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

229 Leather Lasting Operator LSS/Q2701

4 1 1.0 33 167 200 7th Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

230 Leather Moulding Operator LSS/Q7501

4 1 1.0 33 167 200 7th Meeting,

Submitte

d

Yes Yes Yes Yes 200 0

231 Leather Post Tanning Machine

Operator

LSS/Q0701

4 1 1.0 35 165 200 7th Meeting,

Submitte

d

Yes Yes Yes Yes 200 0

232 Leather Pre- Assembly

Operator

LSS/Q2601

4 1 1.0 35 165 200 7th Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

233 Leather Shaving Operator LSS/Q0501

4 1 1.0 33 167 200 7th Meeting,

Submitte

d

Yes Yes Yes Yes 200 0

234 Leather Skiving Operator (

Machine)

LSS/Q2401

4 1 1.0 40 260 300 7th Meeting,

22nd

Meeting

Yes Yes Yes Yes 300 0

235 Leather Stitcher (Goods &

Garments)

LSS/Q5501

4 1 1.0 30 170 200 7th Meeting,

22nd

Meeting

Yes Yes Yes Yes 200 0

236 Leather Stitching Operator LSS/Q2501

4 1 1.0 40 260 300 7th Meeting,

22nd

Meeting

Yes Yes Yes Yes 300 0

237 Leather Shoe Maker LSS/Q4101

5 1 Option O1:

Organization

al Compliance

1.0 39 155 194 1 5 21st

Meeting,

22nd

Meeting

Yes Yes Yes Rationalized-

Option/Elective to

be finalized or

make it

multiskilled

No 200 6

238 Life Sciences Production/ Machine

Operator - Life Sciences

LFS/Q0207

4 1 1.0 155

221 376 100 8th Meeting Yes Yes Yes Has mandatory OJT

Yes 376 0

239 Life Sciences QC Chemist LFS/Q1301

5 1 1.0 153

310 463 100 7th Meeting Yes Yes Yes Has mandatory OJT

Yes 463 0

240 Life Sciences Medical Sales

Representative

LFS/Q0401

4 2 1.0 160

320 480 80 7th Meeting Yes Yes Yes Has mandatory OJT

Yes 480 0

241 Life Sciences Fitter Mechanical - Life

Sciences

LFS/Q0213

3 1 1.0 120

140 260 48 8th Meeting Yes Yes Yes Has mandatory OJT

Yes 260 0

242 Life Sciences Lab Technician/ Assistant -

Life Sciences

LFS/Q0509

3 1 1.0 100

130 230 60 8th Meeting Yes Yes Yes Has mandatory OJT

Yes 230 0

243 Life Sciences Store Assistant-Life

Sciences

LFS/Q0604

3 1 1.0 130

150 280 80 8th Meeting Yes Yes Yes Has mandatory OJT

Yes 280 0

244 Logistics Warehouse Picker LSC/Q2102

3 1 1.0 80 190 270 6th

Meeting

Yes Yes Yes Yes 270 0

245 Logistics Warehouse Packer LSC/Q2303

3 1 1.0 80 190 270 6th

Meeting

Yes Yes Yes Yes 270 0

246 Logistics Inventory Clerk LSC/Q2108

3 1 1.0 75 175 250 6th

Meeting

Yes Yes Yes Yes 250 0

247 Logistics Warehouse Supervisor LSC/Q2307

5 1 1.0 208

32 240 6th

Meeting

Yes Yes Yes Yes 240 0

248 Logistics Consignment Booking

Assistant

LSC/Q1120

3 2 1.0 80 190 270 6th

Meeting

Yes Yes Yes Yes 270 0

249 Logistics Consignment Tracking

Executive

LSC/Q1121

3 2 1.0 80 190 270 6th

Meeting

Yes Yes Yes Yes 270 0

Page 26: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

250 Logistics Documentation

Assistant

LSC/Q1122 4 2 1.0 80 190 270 6th

Meeting

Yes Yes Yes Yes 270 0

251 Logistics Courier Delivery

Executive

LSC/Q3023 3 2 1.0 80 190 270 11th

Meeting

Yes Yes Yes Yes 270 0

252 Logistics Lead Courier LSC/Q3028 5 2 1.0 236 56 292 15th

Meeting

Yes Yes Yes Yes 292 0

253 Logistics Key Consignor

Executive

LSC/Q3035 5 2 1.0 236 56 292 11th

Meeting

Yes Yes Yes Yes 292 0

254 Management and

Entrepreneurship

& Professional

Secretary MEP/Q0201 4 3 1.0 432 648 1080 21st Meeting Yes Yes Yes Training Duration more

than 550 hours

Yes 1080 0

255 Management and

Entrepreneurship

& Professional

Office Assistant MEP/Q0202 3 3 1.0 72 108 180 21st Meeting Yes Yes Yes No 180 0

256 Management and

Entrepreneurship &

Professional

CCTV Supervisor MEP/Q7104 5 2 1.0 100 150 250 7th Meeting,

20th

Meeting

Yes Yes Yes Yes 250 0

257 Management and

Entrepreneurship &

Professional

Security Supervisor

MEP/Q7201 5 2 1.0 84 96 180 5th Meeting,

20th

Meeting

Yes Yes Yes Yes 180 0

258 Management and

Entrepreneurship &

Professional

Unarmed

Security

Guard

MEP/Q7101 4 2 1.0 80 80 160 6th Meeting,

20th

Meeting

Yes Yes Yes Yes 160 0

259 Media &

Entertainment

Animator MES/Q0701 4 1 1.0 120 120 240 10th

Meeting

Yes Yes Yes Yes 240 0

260 Media &

Entertainment

Make-up artist MES/Q1801 4 2 1.0 120 120 240 10th

Meeting

Yes Yes Yes Yes 240 0

261 Media &

Entertainment

Hairdresser MES/Q1802 4 2 1.0 120 120 240 10th

Meeting

Yes Yes Yes Yes 240 0

262 Media &

Entertainment

Character Designer

MES/Q0502 4 1 1.0 120 120 240 10th

Meeting

Yes Yes Yes Yes 240 0

263 Media &

Entertainment

Editor MES/Q1401 4 2 1.0 120 120 240 10th

Meeting

Yes Yes Yes Yes 240 0

264 Media &

Entertainment

Roto Artist MES/Q3504 4 2 1.0 120 120 240 10th

Meeting

Yes Yes Yes Yes 240 0

265 Media &

Entertainment

Modeller MES/Q2501 4 3 1.0 91 149 240 10th

Meeting

Yes Yes Yes No 240 0

266 Media &

Entertainment

Sound Editor MES/Q3404 4 2 1.0 120 120 240 10th

Meeting

Yes Yes Yes Yes 240 0

267 Mining Mining - Wire saw

Operator

MIN/Q0203 4 1 1.0 102 408 510 8th

Meeting

Yes Yes Yes Yes 510 0

268 Mining Mining - Loader

Operator

MIN/Q0208 4 1 1.0 102 408 510 8th

Meeting

Yes Yes Yes Yes 510 0

269 Mining Mining -

Mechanic / Fitter

MIN/Q0304 3 1 1.0 60 150 210 7th Meeting Yes Yes Yes V1 to be used - recvd

confirmation from SSC

Yes 210 0

270 Mining Mining-Bulldozer

Operator

MIN/Q0205 4 1 1.0 102 408 510 7th

Meeting

Yes Yes Yes Yes 510 0

271 Mining Mining-

HEMM

Mechanic

MIN/Q0433 4 1 1.0 60 150 210 8th Meeting Yes Yes Yes Confirmed with Bikram

- Mining SSC 26 June

Yes 210 0

272 Mining Mining Shot

Firer/Blaster

MIN/Q0428 4 1 1.0 60 150 210 7th

Meeting

Yes Yes Yes Yes 210 0

273 Mining Mine Electrician MIN/Q0416 4 1 1.0 108 432 540 7th

Meeting

Yes Yes Yes Yes 540 0

274 Mining Mine Welder MIN/Q0423 4 1 1.0 100 250 350 7th Meeting Yes Yes Yes V1 to be used - recvd

confirmation from SSC

Yes 350 0

275 Mining Jack Hammer Operator

MIN/Q0212 4 1 1.0 70 180 250 21st

Meeting

Yes Yes Yes No 250 0

276 Paints & Coatings Powder Coater PCS/Q5102 4 2 1.0 96 144 240 15th

Meeting

Yes Yes Yes Yes 240 0

Page 27: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

277 Paints & Coatings

Protective and Marine

Painter

PCS/Q5109 4 2 1.0 96 144 240 15th

Meeting

Yes Yes Yes Yes 240 0

278 Paints & Coatings

Shop Tinting Assistant PCS/Q5007 4 2 1.0 96 144 240 15th

Meeting

Yes Yes Yes Yes 240 0

279 Paints & Coatings

General Industrial

(Liquid) Painter

PCS/Q5108 4 2 1.0 96 144 240 15th

Meeting

Yes Yes Yes Yes 240 0

280 Paints & Coatings

Wood Polisher PCS/Q5004 4 2 1.0 96 144 240 19th

Meeting

Yes Yes Yes Yes 240 0

281 Paints & Coatings

Assistant Decorative

Painter

PCS/Q5006 3 2 1.0 96 144 240 20th

Meeting

Yes Yes Yes Yes 240 0

282 Plumbing Plumber (General) PSC/Q0104 3 1 1.0 130 280 410 4th

Meeting,

5th

Meeting

Yes Yes Yes Yes 410 0

283 Plumbing Plumber (After Sales

Service)

PSC/Q0303 3 1 1.0 70 130 200 8th

Meeting

Yes Yes Yes Yes 200 0

284 Plumbing Plumbing Product Sales

officer

PSC/Q0302 3 1 1.0 120 200 320 8th

Meeting

Yes Yes Yes Yes 320 0

285 Power Cable Jointer Electrical

Power System

PSS/Q1002 4 1 1.0 65 135 200 18th

Meeting

Yes Yes Yes No 200 0

286 Power Junior Engineer (JE)-

Power Distribution

PSS/Q3004 5 1 1.0 120 230 350 18th

Meeting

Yes Yes Yes No 350 0

287 Power Distribution Lineman PSS/Q0102 4 1 1.0 117 233 350 8th

Meeting

Yes Yes Yes Yes 350 0

288 Power Senior Lineman

Distribution

PSS/Q0103 5 1 1.0 120 230 350 8th

Meeting

Yes Yes Yes Yes 350 0

289 Power Consumer Energy

Meter Technician

PSS/Q0107 3 1 1.0 100 250 350 8th

Meeting

Yes Yes Yes Yes 350 0

290 Power Assistant-Electricity-

Meter-Reader-Billing-

and-Cash-Collector

PSS/Q3001 3 1 1.0 65 135 200 18th

Meeting

Yes Yes Yes Yes 200 0

291 Power Assistant Technician -

Street Light Installation

& Maintenance

PSS/Q6003 3 1 1.0 65 135 200 18th

Meeting

Yes Yes Yes Yes 200 0

292 Power Technician- Distribution

Transformer Repair

PSS/Q3003 4 1 1.0 120 230 350 20th

Meeting

Yes Yes Yes Yes 350 0

293 Power Attendant Sub-Station

(66/11, 33/11 KV)-

Power Distribution

PSS/Q3002 3 1 1.0 120 230 350 20th

Meeting

Yes Yes Yes Yes 350 0

294 Power Assistant-GIS-Mapping-

Power-Distribution

PSS/Q3006 3 1 1.0 70 130 200 20th

Meeting

Yes Yes Yes No 200 0

295 Power Electrician Domestic

Solutions

PSS/Q6001 3 1 1.0 150 200 350 20th

Meeting

Yes Yes Yes Yes 350 0

296 Power Lineman Distribution

(Multi-Skilled)

PSS/Q2011 4 1 1.0 100 200 300 19th

Meeting

Yes Yes Yes Yes 300 0

297 Retail Retail Sales Associate RAS/Q0104 4 2 1.0 140 140 280 6th

Meeting

Yes Yes Yes Yes 280 0

298 Retail Seller Activation

Executive

RAS/Q0301 4 2 1.0 140 140 280 19th

Meeting

Yes Yes Yes Yes 280 0

299 Retail Retail Trainee

Associate

RAS/Q0103 3 2 1.0 140 140 280 6th

Meeting

Yes Yes Yes Yes 280 0

300 Retail Individual Sales

Professional/ Self-

employed Retailer

RAS/Q0201 4 3 1.0 140 140 280 19th

Meeting

Yes Yes Yes Yes 280 0

301 Retail Distributor Salesman RAS/Q0604 4 2 1.0 140 140 280 6th

Meeting

Yes Yes Yes Yes 280 0

302 Retail Retail Team Leader RAS/Q0105 5 2 1.0 175 175 350 6th

Meeting

Yes Yes Yes Yes 350 0

303 Rubber Mill Operator RSC/Q0101 4 1 1.0 140 210 350 7th

Meeting

Yes Yes Yes Yes 350 0

Page 28: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

304 Rubber Material Handling and

Storage Operator

RSC/Q0108 4 1 2.0 140 210 350 7th Meeting Yes Yes Yes V2 to be used -recvd

confirmation from

SSC

Yes 350 0

305 Rubber Pneumatic Tyre

Molding Operator

RSC/Q0211 4 1 1.0 140 210 350 7th

Meeting

Yes Yes Yes Yes 350 0

306 Rubber Compression Molding

Operator

RSC/Q0205 4 1 1.0 140 210 350 7th

Meeting

Yes Yes Yes Yes 350 0

307 Rubber Injection Molding

Operator

RSC/Q0207 4 1 1.0 140 210 350 7th

Meeting

Yes Yes Yes Yes 350 0

308 Rubber Junior Rubber

Technician / Technical

Assistant

RSC/Q0831 3 1 1.0 140 210 350 7th Meeting Yes Yes Yes Yes 350 0

309 Rubber Rubber Nursery

Worker - General

RSC/Q6005 4 2 1.0 80 120 200 8th

Meeting

Yes Yes Yes Yes 200 0

310 Rubber Latex Harvest

Technician (Tapper)

RSC/Q6103 4 2 1.0 80 120 200 7th

Meeting

Yes Yes Yes Yes 200 0

311 Rubber General Worker -

Rubber Plantation

RSC/Q6107 4 2 1.0 80 120 200 8th

Meeting

Yes Yes Yes Yes 200 0

312 Sports Fitness Trainer SPF/Q1102 4 2 1.0 60 190 250 50 21st Meeting Yes Yes Yes Has mandatory OJT

Yes 250 0

313 Sports Sports Masseur SPF/Q1103 4 2 1.0 50 150 200 60 21st Meeting Yes Yes Yes Has mandatory OJT

Yes 200 0

314 Telecom Broadband Technician TEL/Q0102 4 1 1.0 120 180 300 6th

meeting

Yes Yes Yes Yes 300 0

315 Telecom Customer Care

Executive (Call Centre)

TEL/Q0100 4 2 1.0 80 120 200 7th Meeting Yes Yes Yes Yes 200 0

316 Telecom Customer Care

Executive (Relationship

Centre)

TEL/Q0101 4 2 1.0 80 120 200 7th Meeting Yes Yes Yes Yes 200 0

317 Telecom Customer Care

Executive (Repair

Centre)

TEL/Q2200 4 2 1.0 70 130 200 7th Meeting Yes Yes Yes Yes 200 0

318 Telecom Distributor Sales

Representative

TEL/Q2100 4 2 1.0 80 120 200 7th

Meeting

Yes Yes Yes Yes 200 0

319 Telecom Field Sales Executive-

Telecom Plan &

Services

TEL/Q0200 4 2 1.0 80 120 200 7th Meeting Yes Yes Yes Yes 200 0

320 Telecom Grass Root Telecom

Provider (GRTP)

TEL/Q6207 4 1 1.0 120 180 300 7th

Meeting

Yes Yes Yes Yes 300 0

321 Telecom Handset Repair

Engineer

TEL/Q2201 4 2 1.0 120 180 300 7th

Meeting

Yes Yes Yes Yes 300 0

322 Telecom Telecom -In-store

promoter

TEL/Q2101 4 2 1.0 80 120 200 7th

Meeting

Yes Yes Yes Yes 200 0

323 Telecom Optical Fiber Splicer TEL/Q6400 3 1 1.0 110 190 300 7th

Meeting

Yes Yes Yes Yes 300 0

324 Telecom Optical Fiber

Technician

TEL/Q6401 4 1 1.0 150 150 300 7th

Meeting

Yes Yes Yes Yes 300 0

325 Telecom Sales Executive

(Broadband)

TEL/Q0201 4 2 1.0 80 120 200 8th

Meeting

Yes Yes Yes Yes 200 0

326 Telecom Telecom- Tower

Technician

TEL/Q4100 4 1 1.0 120 180 300 8th

Meeting

Yes Yes Yes Yes 300 0

327 Telecom Telecom Technician -

IoT Device/System

(Installation & M2M

Communication Setup)

TEL/Q6210 4 1 1.0 120 180 300 22nd

Meeting

Yes Yes Yes No 300 0

328 Textiles &

Handlooms

Autoconer Tenter TSC/Q0301 4 1 1.0 100 200 300 8th

Meeting

Yes Yes Yes Yes 300 0

329 Textiles &

Handlooms

Balloon Squeezer

Machine Operator

TSC/Q5501 4 1 1.0 68.5 231.5 300 9th

Meeting

Yes Yes Yes No 300 0

330 Textiles &

Handlooms

Blowroom Operator TSC/Q0101 4 1 1.0 110 190 300 8th

Meeting

Yes Yes Yes No 300 0

Page 29: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

331 Textiles &

Handlooms

Carding Operator TSC/Q0102 4 1 1.0 100 200 300 8th

Meeting

Yes Yes Yes No 300 0

332 Textiles &

Handlooms

Cone Winding Operator TSC/Q0302 4 1 1.0 100 200 300 9th

Meeting

Yes Yes Yes Yes 300 0

333 Textiles &

Handlooms

Drawframe Operator TSC/Q0105 4 1 1.0 100 200 300 9th

Meeting

Yes Yes Yes Yes 300 0

334 Textiles &

Handlooms

Dyestuff & Chemical

Preparation Operator

TSC/Q5205 4 1 1.0 74.5 225.5 300 9th

Meeting

Yes Yes Yes Yes 300 0

335 Textiles &

Handlooms

Fabric Checker TSC/Q2301 4 1 1.0 100 200 300 9th

Meeting

Yes Yes Yes No 300 0

336 Textiles &

Handlooms

Hank dyer TSC/Q7201 4 1 1.0 110 190 300 11TH

Meeting

Yes Yes Yes Yes 300 0

337 Textiles &

Handlooms

Knitting Machine

Operator – Circular

Knitting

TSC/Q4101 4 1 1.0 90 210 300 9th

Meeting

Yes Yes Yes No 300 0

338 Textiles &

Handlooms

Open End Spinning

Tenter

TSC/Q0203 4 1 1.0 100 200 300 8th

Meeting

Yes Yes Yes Yes 300 0

339 Textiles &

Handlooms

Packing Checker TSC/Q0501 4 1 1.0 100 200 300 8th

Meeting

Yes Yes Yes Yes 300 0

340 Textiles &

Handlooms

Power Loom Operator TSC/Q2208 4 1 1 90 210 300 15th

Meeting

Yes Yes Yes V1 to be used -

recvd confirmation

from SSC

No 300 0

341 Textiles &

Handlooms

Ring Frame Doffer TSC/Q0202 3 1 1.0 100 200 300 8th

Meeting

Yes Yes Yes Yes 300 0

342 Textiles &

Handlooms

Ring Frame Tenter TSC/Q0201 4 1 1.0 100 200 300 9th

Meeting

Yes Yes Yes Yes 300 0

343 Textiles &

Handlooms

Shuttle-less Loom

Weaver - Airjet

TSC/Q2204 4 1 1.0 101.5 198.5 300 9th

Meeting

Yes Yes Yes No 300 0

344 Textiles &

Handlooms

Shuttle-less Loom

Weaver - Rapier

TSC/Q2203 4 1 1.0 101 199 300 9th

Meeting

Yes Yes Yes No 300 0

345 Textiles &

Handlooms

Speed Frame Operator

– Tenter & Doffer

TSC/Q0106 4 1 1.0 90 210 300 9th

Meeting

Yes Yes Yes Yes 300 0

346 Textiles &

Handlooms

Stenter Machine

Operator

TSC/Q5401 4 1 1.0 75 225 300 9th

Meeting

Yes Yes Yes Yes 300 0

347 Textiles &

Handlooms

Textile Designer-

Handloom Jacquard

TSC/Q7403 4 1 1.0 100 200 300 15th

Meeting

Yes Yes Yes Yes 300 0

348 Textiles &

Handlooms

TFO Tenter TSC/Q0303 4 1 1.0 100 200 300 8th

Meeting

Yes Yes Yes No 300 0

349 Textiles &

Handlooms

Two shaft Handloom

Weaver

TSC/Q7303 4 1 1.0 100 200 300 11th

Meeting

Yes Yes Yes V1 to be used -

recvd confirmation

from SSC

Yes 300 0

350 Textiles &

Handlooms

Warper TSC/Q7302 3 1 1.0 110 190 300 11th

Meeting

Yes Yes Yes Yes 300 0

351 Tourism &

Hospitality

Commis Chef THC/Q0406 4 1 1.0 175 325 500 240 10th

Meeting

Yes Yes Yes No 500 0

352 Tourism &

Hospitality

Counter Sale Executive THC/Q2903 4 2 1.0 70 170 240 240 10th

Meeting

Yes Yes Yes Yes 240 0

353 Tourism &

Hospitality

Food & Beverage

Service-Steward

THC/Q0301 4 2 1.0 90 210 300 240 8th

Meeting

Yes Yes Yes Yes 300 0

354 Tourism &

Hospitality

Front Office Associate THC/Q0102 4 3 1.0 110 170 280 240 8th

Meeting

Yes Yes Yes Yes 280 0

355 Tourism &

Hospitality

Home Delivery Boy THC/Q2902 3 2 1.0 50 150 200 240 8th

Meeting

Yes Yes Yes Yes 200 0

356 Tourism

&

Hospitalit

y

Housekeeping Attendant

(Manual

Cleaning)

THC/Q0203 3 2 1.0 75 175 250 240 8th

Meeting

Yes Yes Yes Yes 250 0

357 Tourism &

Hospitality

Multi-cuisine Cook THC/Q3006 4 1 1.0 200 300 500 240 10th

Meeting

Yes Yes Yes Yes 500 0

358 Tourism &

Hospitality

Room Attendant THC/Q0202 4 2 1.0 90 210 300 240 8th

Meeting

Yes Yes Yes Yes 300 0

359 Tourism &

Hospitality

Street Food Vendor-

Standalone

THC/Q3007 4 1 1.0 116 174 290 10th

Meeting

Yes Yes Yes Yes 290 0

360 Tourism &

Hospitality

Travel Consultant THC/Q4404 4 3 1.0 70 160 230 240 8th

Meeting

Yes Yes Yes Yes 230 0

Page 30: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

361 People with

Disability*

Retail Sales Associate PWD/RAS/Q0104

4 2 1.0 140 140 280 6th Meeting

(RAS/Q01 04)

Yes Yes Yes QP Code changed.

Orginal code was

PWR/Q0104

No 280 0

362 People with

Disability*

Housekeeping Attendant

(Manual Cleaning)

PWD/THC/Q020

3 2 1.0 75 175 250 240 8th Meeting

(THC/Q02

03)

Yes Yes Yes QP Code changed.

Orginal code was

PWT/Q0203

No 250 0

363 People with

Disability*

Food & Beverage

Service-Steward

PWD/THC/Q030

4 2 1.0 90 210 300 240 8th Meeting

(THC/Q03

01)

Yes Yes Yes QP Code changed.

Orginal code was

PWT/Q0301

No 300 0

364 People with

Disability*

CRM Domestic Non-

Voice

PWD/SSC/Q2211

4 2 1.0 82 318 400 6th Meeting

(SSC/Q22

11)

Yes Yes Yes No 400 0

365 People with

Disability*

Domestic Data Entry

Operator

PWD/SSC/Q2212

4 2 1.0 117 283 400 6th Meeting

(SSC/Q22

12)

Yes Yes Yes Yes 400 0

366 People with

Disability*

Customer Care Executive

(Call Centre)

PWD/TEL/Q0100

4 2 1.0 80 120 200 7th Meeting

(TEL/Q01

00)

Yes Yes Yes No 200 0

367 People with

Disability*

Dairy Farmer/

Entrepreneur

PWD/AGR/Q410

4 1 1.0 80 120 200 6th Meeting

(AGR/Q4

101)

Yes Yes Yes No 200 0

368 People with

Disability*

Hand Embroiderer WD/AMH/Q100

4 1 1.0 60 140 200 7th Meeting

(AMH/Q1

001)

Yes Yes Yes No 200 0

369 People with

Disability*

Telecom -In-store promoter PWD/TEL/Q2101

4 2 1.0 80 120 200 7th Meeting

(TEL/Q21

01)

Yes Yes Yes No 200 0

370 People with

Disability*

Jam, Jelly and Ketchup

Processing Technician

PWD/FIC/Q0103

4 1 1.0 90 150 240 90 11th Meeting

(FIC/Q01

03)

Yes Yes Yes No 240 0

371 People with

Disability*

Pickle Making

Technician

PWD/FIC/Q0102

4 1 1.0 90 150 240 90 11th Meeting

(FIC/Q01

02)

Yes Yes Yes No 240 0

372 People with

Disability*

Handmade Gold and

Gems-set Jewellery -

Polisher and Cleaner

PWD/G&J/Q070

3 1 1.0 24 126 150 9th Meeting

(G&J/Q07

01)

Yes Yes Yes No 150 0

373 People with

Disability*

Room Attendant PWD/THC/Q020

4 2 1.0 90 210 300 240 8th Meeting

(THC/Q02

02)

Yes Yes Yes No 300 0

374 People with

Disability*

Sewing Machine Operator WD/AMH/Q030

4 1 1.0 80 190 270 7th Meeting

(AMH/Q0

301)

Yes Yes Yes No 270 0

375 People with

Disability*

Retail Trainee

Associate

PWD/RAS/Q0103

3 2 1.0 140 140 280 6th Meeting

(RAS/Q01

03)

Yes Yes Yes No 280 0

376 Management and

Entrepreneurship

& Professional

Assessor MEP/Q2701 5 3 1.0 150 250 400 22nd Meeting Yes Yes Yes No 400 0

Page 31: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally

377 Handicrafts

& Carpets

Hand Rolled

Agarbatti Maker

HCS/Q7901 3 2 2.0 110 190 300 20th

Meeting

Yes Yes Yes Yes 300 0

378 Beauty & Wellness

Hair Stylist (Version 2)

BWS/Q0202 4 2 2.0 90 310 400 18th

Meeting

Yes Yes Yes Version 2.0 Yes 400 0

379 Beauty & Wellness

Assistant Beauty

Therapist (Version

2)

BWS/Q0101 3 2 2.0 56 294 350 18th

Meeting

Yes Yes Yes Version 2.0 Yes 350 0

380 Beauty & Wellness

Beauty

Therapist

(Version 2)

BWS/Q0102 4 2 2.0 80 320 400 18th

Meeting

Yes Yes Yes Version 2.0 Yes 400 0

381 Beauty & Wellness

Assistant Hair

Stylist (Version 2)

BWS/Q0201 3 2 2.0 50 250 300 18th

Meeting

Yes Yes Yes Version 2.0 Yes 300 0

382 Beauty & Wellness

Assistant Nail

Technician (Version

2)

BWS/Q0401 3 2 2.0 30 170 200 18th

Meeting

Yes Yes Yes Version 2.0 Yes 200 0

383 Beauty & Wellness

Pedicurist & Manicurist

(Version 2)

BWS/Q0402 3 2 Option 2.0 33 227 260 4 14 18th

Meeting

Yes Yes Yes Version 2.0/

rationalized

Yes 278 18

384 Beauty & Wellness

Assistant Spa Therapist

(Version 2)

BWS/Q1001 3 2 2.0 50 250 300 18th

Meeting

Yes Yes Yes Version 2.0 Yes 300 0

Page 32: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally
Page 33: of the scheme ‘Pradhan Mantri Kaushal Vikas Yojana 2.0 DNHdnh.nic.in/Docs/09Sep2019/RFP_industries.pdf · The PMKVY 2.0 scheme is being implemented under two components: I. Centrally