offshore packages
TRANSCRIPT
Engineers India Limited
Offshore Equipment / Packages AUGUST 2013
May 7, 2016 2
OFFSHORE PRODUCTION
Offshore 35 % of world production
May 7, 2016 3
MARINE LIFE AND SEA BED EFFECTS
May 7, 2016 4
What is an Offshore Platform
Offshore platforms are used for exploration of Oil and Gas from under seabed and processing.
May 7, 2016 5
OVERVIEW
Offshore platforms are used for exploration of Oil and Gas from under Seabed and processing.
The First Offshore platform was installed in 1947 off the coast of Louisiana in 6M depth of water.
Today there are over 7,000 Offshore platforms around the world in water depths up to 1,850M
EIL has executed more than 210 offshore platforms
May 7, 2016 6
OVERVIEW
Platform size depends on facilities to be installed on living quarters, power generation unit, process facilities, water injection facilities, Helipad etc.
Classification of water depths:
< 350 M- Shallow water
< 1500 M - Deep water
> 1500 M- Ultra deep water
May 7, 2016 7
FLOW DIAGRAMFLOW DIAGRAM
22/11/2010
May 7, 2016 8
TYPES OF OFFSHORE PALTFORM
May 7, 2016 93
JACKETED PLATFORM
Used for moderate water depths up to 350 M.
Jackets provides protective layer around the pipes.
Typical offshore structure will have a deck structure containing Cellar Deck, Main Deck, Top Deck and a Helideck.
Piles extend through the seabed into the soil.
Cathodic protection used to prevent corrosion.
May 7, 2016 10
JACKETED PLATFORM
Jacket serves as a template for the initial driving of the piles.
Foundation piles are driven through the inside of the legs of the jacket structure
95% of offshore platforms around the world are Jacket supported.
More economical & easy to expansion
May 7, 2016 11
TransportationJacket Lifting /LaunchingJacket upendingPile installationJacket LevelingConductor installationDeck Installation
PLATFORM INSTALLATION
May 7, 2016 12
JACKET LAUNCHING
May 7, 2016 13
JACKET INSTALLATION
May 7, 2016 14
FOUNDATION: Loads due to platform
weight and environment.
Soil investigation performed in-situ and Lab test.
Pile penetrations depends on platform size and loads, and soil characteristics, but normally range from 30 meters to about 100 meters.
PLATFORM FOUNDATION
May 7, 2016 15
BARGE CARRYING DECK
May 7, 2016 16
DECK INSTALLATION
May 7, 2016 17
OFFSHORE COMPLEX
May 7, 2016 18
Jack-up rig
Jack-up Mobile Drilling are rigs that can be jacked up (rack and pinion mechanism) above the sea using legs that can be lowered. These are typically used in water depths up to 500-600 Feet.
May 7, 2016 19
JACK-UP PLATFORM (DRILLING)
May 7, 2016 20
DRILLSHIP
May 7, 2016 21
DRILLSHIP
It is most often used for exploratory drilling of new oil or gas wells in deep water. They can drill in water depths up to 12,000 ft (3,700 m).
May 7, 2016 22
DRILL BITT
May 7, 2016 23
DRILLING EQUIPMENT
May 7, 2016 24
DRILLING PROCESS
May 7, 2016 25
BOMBAY HIGH FIELD
May 7, 2016 26
Generally 4 legged Unmanned Platform
Designed to operate remotely Facilities available are Wells Production / Lift gas manifolds Well control panel, RTU etc. Process facilities Helideck, emergency shelter Solar power / Battery Pack Material handling facilities Subsea lines to Process platform Safety equipments
WELL HEAD PLATFORM
May 7, 2016 27
GAS LIFT WELL (ARTIFICIAL LIFTING)
May 7, 2016 28
WATER / GAS INJECTION
May 7, 2016 29
Generally 6 or 8 legged manned Platform
Personnel work in shifts Topside Facilities Available
are Well fluid Process facility Sea water Treatment/Injection
facility HP / LP Flare Power generation & switch
gear module Living quarters and associated
requirements Emergency Generators
PROCESS CUM LIVING QUARTER PLATFORM
May 7, 2016 30
HVAC system Launchers / Receivers Material handling equipment Communication systems Fire fighting & Suppression
system Life saving systems Helideck & Jet fuel storage &
refueling system Cathodic protection system
Continued…
May 7, 2016 31
OFFSHORE PRODUCTION PROCESS
May 7, 2016 32
SEA WATER TREATMENT FOR WATER INJECTION
May 7, 2016 33
DDW1- PLQP (recently commissioned)
May 7, 2016 34
DDW1- PLQP (recently commissioned)
May 7, 2016 35
DECK CRANE HVAC SURVIVAL CRAFT PRODUCED WATER CONDITIONOR ELECTROCHLORINATOR WATER MAKER SEWAGE TREATMENT PLANT DIESEL CENTRIFUGE FLARE TIP HYDRAULIC POWER UNIT/UMBILICAL INSTRUMENT AIR DRYER INERT GAS GENERATOR FILTER/SEPARATOR
Major Offshore Equipment / Packages (PED)
May 7, 2016 36
Used for transfer of equipment / materials and personnel
TYPE OF OFFSHORE CRANE• PEDESTAL MOUNTED • KING POST MOUNTED
Design, Construction and Testing as per API Spec. 2C.
TYPE OF BOOM• Box Section boom• Lattice boom• Telescoping boom• Knuckle or Articulated boom
OFFSHORE CRANE
May 7, 2016 37
DECK CRANES CONTINUED……
KING POST MOUNTED PEDESTAL MOUNTED
May 7, 2016 38
Design Features Dynamic loading Prime mover (Diesel engine cum hydraulic unit)
360 deg slewing
PEDESTAL MOUNTED DECK CRANE
May 7, 2016 39
Safe Working Load (SWL) / Rated capacityOnboard liftsOff board liftsSwing (Slewing)LuffingBoom lengthSignificant wave heightList Trim
MAIN TERMINOLOGIES OF DECK CRANE
May 7, 2016 40
DECK CRANE
May 7, 2016 41
DECK CRANE (SLEW BEARING)
May 7, 2016 42
Reach Radius (ft) Boom Angle (degrees)
On Board Lift (lbs)
Off Board Lift(lbs) Auxiliary Hoist Lift
Personal Rating Lift (lbs)
20 82 220,000 192,000 10,000 3,300
25 79 220,000 186,000 10,000 3,300
30 76 220,000 155,500 10,000 3,300
35 73 220,000 132,166 10,000 3,300
40 70 173,400 114,433 10,000 3,300
45 67 152,700 100,633 10,000 3,300
50 64 136,200 89,633 10,000 3,300
55 60 122,600 80,566 10,000 3,300
60 57 111,390 73,093 10,000 3,300
65 54 101,855 66,733 10,000 3,300
70 50 93,676 61,284 10,000 3,300
75 46 86,586 56,557 10,000 3,300
80 42 80,383 52,422 10,000 3,300
85 37 74,910 48,773 10,000 3,300
90 32 70,045 45,530 10,000 3,300
95 26 65,692 42,628 10,000 3,300
100 0 61,774 40,016 10,000 3,300
108 0 10,000 3,300
LOAD RATING CHART
May 7, 2016 43
Favelle Favco, Australia / Malaysia Manitowac Crane, USA Raina Engineering, India Energy Cranes International, USA Oil State Applied hydraulic system, USA
VENDORS (DECK CRANE)
May 7, 2016 44
FEATURES / CONSTRAINTS Chilled water system
Air cooled condensing unit due to unavailability / minimum utility water.
Positive Pressurization through Purging
Fresh Air Ducting from Safe area
Spot cooling & negative pressurization of toilets etc.
No return air from kitchen, dining hall, toilets etc.
Fire Dampers at every juncture of zone / level penetration
Material of construction to suit the corrosive environment viz. SS ducting or heavy galvanized (270 GSM) ducting
HVAC EQUIPMENT
May 7, 2016 45
Area classified equipment
AHUs installation in open
Safety
Severe environmental condition persists
Space
Limited logistics / labor enforces to consider redundancy in equipment selection
HVAC EQUIPMENT
May 7, 2016 46
Tisdale, USA Speciality Services, UAE Direct Engineering services, Australia HI-PRES, Korea JL Marine & Engineering, Singapore
VENDORS (HVAC)
May 7, 2016 47
To provide a safe means of personnel evacuation in emergency situations
SURVIVAL CRAFT
May 7, 2016 48
SURVIVAL CRAFT
Design and Safety provisions as per SOLAS & LSA.
Designed for 100 years storms condition.
Diesel engine driven totally enclosed craft with gear box to be driven to both ahead and astern side.
Material of construction- Fire retardant fiber glass reinforced plastic.
Water spray system for fire protection.
Compressed air system for personnel, engine and to maintain overpressure.
Launch and recovery electric motor driven winch.
Hold and launch platform.
May 7, 2016 49
HOLD & LAUNCH PLATFORM
May 7, 2016 50
Schatt Harding Ltd., UK Master Craft, USA Norsafe, Norway Holland Lifeboats International, Netherlands
VENDORS (SURVIVAL CRAFT)
May 7, 2016 51
PURPOSE To meet Environment norms, water containing oil from
separators etc. should be treated before injection, disposing of
As per OPPC (Oil Pollution, Prevention & Control) regulations maximum concentration of oil discharged in Produced water shall be 30 mg/l.
To mainly remove oil and gas from the water (oil well)
Further treatment viz. de-oxygenation if to be used for water injection in well.
PRODUCED WATER CONDITIONER
May 7, 2016 52
Working Principle
First stage separation via hydro cyclone / corrugated plate interceptor / skimmer
Second stage separation via induced gas floatation (Horizontal / Vertical)
Third stage separation via walnut media filter (if desired)
PRODUCED WATER CONDITIONER
May 7, 2016 53
PRODUCED WATER TREATMENT
May 7, 2016 54
PRODUCED WATER TREATMENT
May 7, 2016 55
HYDROCYCLONE (Primary Treatment)
May 7, 2016 56
IGF VESSEL (Secondary Treatment)
May 7, 2016 57
NUTSHELL MEDIA FILTER (Tertiary treatment)
May 7, 2016 58
Burgess-Manning Europe, UK Wemco, USA Axia Serck Baker, UK Petreco International, UK FLSmidth gMAX systems, USA
VENDORS (PWC)
May 7, 2016 59
ELECTROCHLORINATOR
Usage: To control micro-organisms, control algae growth and keeps transmission pipes clean.
May 7, 2016 60
ELECTROCHLORINATOR CONTINUED…..Seawater normally contains chloride ion (Cl-) at a concentration of from 15,000 to 20,000 ppm. By electrolysis of seawater, the following reactions occur:At anode: 2Cl- →Cl2 + 2e-
At cathode: 2H2O + 2e- →2OH- + H2
2Na+ + 2OH- →2NaOH
Free chlorine (Cl2) generated at the anode reacts with caustic soda (NaOH) generated at the cathode and forms sodium hypochlorite solution (NaOCl).
Cl2 + 2NaOH → NaOCl + NaCl + H2O
Injection of sodium hypochlorite solution is very effective to avoid accumulation of marine life like shellfish and seaweed etc.
May 7, 2016 61
Engel Hard, UK Diaki Engineering, Japan Petreco International, UK Titanium Tantalum, India Mitsubishi Heavy, Japan
VENDORS (ELECTROCHLORINATOR)
May 7, 2016 62
WATER MAKER (RO TYPE)
Desalination by Reverse Osmosis (RO) is a process whereby fresh water is extracted from seawater through the use of a semi permeable membrane.
May 7, 2016 63
WATER MAKER (RO TYPE) CONTINUED….
May 7, 2016 64
WATER MAKER (RO TYPE) CONTINUED….
May 7, 2016 65
Membrane SRL, Italy Aqua-Chem, USA Meco, USA Rochem Separator System, India
VENDORS (WATER MAKER)
May 7, 2016 66
Marine Environment Protection Committee (MEPC) underlay the guidelines. Thermotolerant Coliform < 100 / 100 ml Effluent
Total Suspended Solid (TSS) < 35 mg / l
BOD (5) < 25 mg / l
COD < 125 mg / l
pH ~ 6 to 8.5
SEWAGE TREATMENT PLANT
May 7, 2016 67
BIOLOGICAL TYPE (STP)
AEROBIC TYPE
May 7, 2016 68
ELECTROCATALYTIC TYPE
ELECTROCATALYTIC TYPE (STP)
May 7, 2016 69
Omnipure, USA Red Fox, USA ExcelTech, USA SasaKura Engineering, Japan Demco Cooper Industries, USA
VENDORS (SEWAGE TREATMENT PLANT)
May 7, 2016 70
PURPOSE Cleaning of the diesel fuel before using in utility
generator diesel engine / Deck crane diesel engine / others.
Pollutants generally are solid particles came from abrasion / erosion of container material / etc. during transportation till use.
DIESEL CENTRIFUGE
May 7, 2016 71
DIESEL CENTRIFUGE
May 7, 2016 72
GEA Westfalia, Germany Alfa Lavel Mid Europe, Germany
PROBABLE VENDORS
May 7, 2016 73
HP / LP FLARE
May 7, 2016 74
Flare tip Purge reduction device (velocity / buoyancy Seal)
Flame Front generator Pilot monitoring system
FLARE TIP COMPONENTS
May 7, 2016 75
FLARE TIP COMPONENTS
May 7, 2016 76
Flame Front Generator
May 7, 2016 77
Flare Industries, USA Zeeco Flares, USA John Zink
VENDORS (FLARE TIP COMPONENTS)
May 7, 2016 78
SPM- A Single Pont Mooring System is a complete, self-contained offshore terminal facility which provides the means for both mooring and transferring cargo of very large transport vessels or floating offshore facilities.
SINGLE POINT MOORING SYSTEM (SPM)
There are 5 main components of an
SPM system:
a. Buoy with central swivel and rotating arm
b. Anchoring System (Chains)c. Product Transfer System (Floating
& Under-buoy Hoses)
d. Mooring System
e. Pipeline End Manifold (PLEM)
May 7, 2016 79
SINGLE POINT MOORING (SPM)
May 7, 2016 80
PLEM- A Structural skid for supporting piping, equipment, hoses connections, subsea valves etc.
Sub sea valves are hydraulically operated. Actuators are designed for operation by hydraulic fluid
ranging from 70 to 105 kg/cm2 . Hydraulic power unit is installed on buoy. The hydraulic pressure and electric signal are
transmitted through Umbilical which runs from HPU on buoy to PLEM valves.
SPM continued…..
May 7, 2016 81
Hydraulic Power Unit
HPU with pneumatically driven hydraulic pump
Major items of HPUPneumatically driven hydraulic
pumpHydraulic accumulatorHydraulic reservoirHydraulic fluidPressure filters
May 7, 2016 82
UMBILICAL
Typical Umbilical with inner and outer thermoplastic sheath
Typical Umbilical cross sectional arrangement
Design and manufacture as per API Spec. 17E. Design consideration based on
Services- Dynamic or Static Service Fluid Environment conditions Temperature Range
May 7, 2016 83
PORTS & TERMINALS
83
May 7, 2016 84
Marine Loading Arm Mooring Hooks Mooring Winches Access Gangway Tower
PORTS & TERMINALS (EQUIPMENT)
May 7, 2016 85
PORTS & TERMINALS
May 7, 2016 86
PORTS & TERMINALS
May 7, 2016 87
PORTS & TERMINALS
May 7, 2016 88
PORTS & TERMINALS
May 7, 2016 89
MARINE LOADING ARM
89
May 7, 2016 90
MARINE LOADING ARM
May 7, 2016 91
MARINE LOADING ARM
91
May 7, 2016 92
MARINE LOADING ARM WITH PIGGY BACK
92
May 7, 2016 93
MARINE LOADING ARM (CRYOGENIC)
93
May 7, 2016 94
MARINE LOADING ARM
May 7, 2016 95
QCDC
95
May 7, 2016 96
SWIVEL JOINT (DOUBLE RACE)
96
May 7, 2016 97
SWIVEL JOINT
97
May 7, 2016 9898
TRIPLE SWIVEL ASSEMBLY
May 7, 2016 99
Constant Position Monitoring System
99
May 7, 2016 100
FMC, EUROPE NIIGATA, Japan SVT, Germany EMCO WHEATON, Germany
VENDORS (MARINE LOADING ARM)
May 7, 2016 101
MOORING WINCH
May 7, 2016 102
MOORING WINCH
May 7, 2016 103
MOORING WINCH
May 7, 2016 104
Alfred Cheyne Engineering (ACE) Winches, UK Rolls-Royce, UK
VENDORS (MOORING WINCHES)
May 7, 2016 105
MOORING HOOK
May 7, 2016 106
MOORING HOOK
May 7, 2016 107
MOORING HOOK
May 7, 2016 108
TrellerBorg, Australia MarimaTech, Denmark Mampaey, Netherland
VENDORS (MOORING HOOKS)
May 7, 2016 109
MOORED SHIP
May 7, 2016 110
ACCESS GANGWAY (LIFT TYPE)
May 7, 2016 111
ACCESS GANGWAY (LIFT TYPE)
May 7, 2016 112
ACCESS GANGWAY (COLUMN TYPE)
May 7, 2016 113
ACCESS GANGWAY (COLUMN TYPE)
May 7, 2016 114
Verhoef, Germany Samgong, South Korea STK Engineering, Singapore Prosertek, Spain
VENDORS (ACCESS GANGWAY)
May 7, 2016 115
THANK YOU