OFFSHORE SURVEY IN DEVELOPMENT PROJECTS

Ian Douglas

Head, Offshore Surveys,

Shell Projects & Technology Europe

Page 2: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

GOLDENEYEPLATFORM

ST. FERGUS

GOLDENEYE FACTS

• Gas Condensate Field

• Located in Outer Moray Firth, only 100km NE of St Fergus Gas Terminals

• Low safety risks due to normally unmanned operations offshore

• Total lifetime production expected to be in excess of 500 Billion scf Gas and 17 Million barrels Condensate over a 10 Year period

• Greatest water depth (120 metres) in which a Jack-Up rig will be used for production well drilling

THE PROJECT: GOLDENEYE

Geomatics Foundation

2

Page 3: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

TIMELINE

Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11

Exploration seismic Acquisition

Interpretation

Exploration Drilling

Appraisal

Final Investment Decision

Concept Select

Route Survey & Site Investigation

Front End & Detailed Design

Offshore Construction

Development Drilling

Production Start Up

Page 4: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

EXPLORATION & APPRAISAL

Page 5: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

CONCEPT SELECT

5

Proximity to infrastructure

`

Location of marketsGeographic restrictions (legal, environmental, physical)

Distribution of geology

Page 6: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

CONCEPT SELECT

6

`

Page 7: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

CONCEPT SELECT & FEEDROUTE SURVEY

Page 8: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

� Pre-Award Survey Input

� Pre-Construction Survey Activities

� Pipelay – Shore Pull – Near shore / Offshore Operations

� Trenching

� Backfilling

� Tie-In & Pre-Commissioning Works

� Rock dumping – Crossings and Pipeline Protection

� Platform Installation

� Drilling Phase

8

CONSTRUCTION OPERATIONS

Page 9: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

Laybarge Heavy Lift Barge

Rock Dumper Trenching Support

Survey Vessel

Inshore Survey Vessels

Dive Support Vessel

THE HARDWARE

9

Page 10: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

PRE-INSTALLATION SURVEY

Ensures route / site is free of

obstructions

Side Scan Sonar and MBES

ROV centre line / site visual survey

� Digital Terrain Model

� Route Topography Analysis

� Array visibility Analysis

10

ROV visual surveys

Page 11: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

SURVEY SUPPORT FOR CONSTRUCTION OPS

� Pipelay Barge Navigation

� Tug Management

� Shore Pull

� Pipeline crossing

� Pipe lay down

� Trenching & Backfill for service line

� Heavy lift vessel positioning

� Acoustic positioning USBL or LBL of

structures

� EDM (Total Station) positioning of

structures

11

Page 12: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

Landfall Preparation & Plant Construction

Pre-Lay Survey – Onshore, Inshore & Offshore

Liaison with local stakeholders e.g. fishermen

3rd Party Agreements

Crossing Construction

� 36” Flags Brent - approx. KP 8.72

� 32” Frigg/2 - approx. KP 13.42

� 32” Frigg/1 - approx. KP 13.60

� 30” Miller - approx. KP 14.63

� 28” Britannia - approx. KP 17.16.

12

PRE-LAY PREPARATIONS

Page 13: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

Elevation of Pipeline Crossing

Plan of Pipeline Crossing

MattressesSLEEPER TYPE LOADSPREADING MATTRESSES SEGMENTED CONCRETE

MATRESSES

SEGMENTED CONCRETEMATRESSES

SLEEPER TYPE LOADSPREADING MATTRESSES

MEAN SEABED LEVEL

TYPICAL PIPELINE CROSSING

13

Page 14: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

P/L CROSSING PREPARATION

14

A Work vessel or barge to place “mat” at required location: Vessel and mat positioning

Page 15: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

� Semi submersible pipelay barge

� Deep & shallow water capability with dedicated pipelay ramp

� Dual lay and piggyback lay capabilities

� Large diameter pipelay capability

� Lay rate up to 7km/day

� Semi automatic welding system

� Self propelled vessel

� Certified with NMD, HSE Letter of Compliance

� 12 point mooring system & thruster assistance

Main Features

PIPE LAYBARGE - CASTORO SEI

15

Page 16: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

SHORE PULL OF PIPELINE

16

Page 17: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

ST. F

ERG

US

KP101.2

GOLDENEYEPLATFORM

WATER DEPTH = 120m

17

PIPELINE ROUTING

Page 18: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

ST. F

ERG

US

WATER DEPTH 79m

9

CROSSING OF28” BRITANNIAApprox. KP 17.16

WATER DEPTH 77m

8

WATER DEPTH 79m

7

CROSSING OF30” MILLER

Approx. KP 14.63WATER DEPTH 89m

6

CROSSING OF32” FRIGG/1

Approx. KP 13.60WATER DEPTH 84m

5

CROSSING OF32” FRIGG/2

Approx. KP 13.42WATER DEPTH 84m

4

CROSSING OF36” FLAGS BRENT

Approx. KP 8.72WATER DEPTH 59m

3

WATER DEPTH 58m

2

WATER DEPTH 29m

1

18

PIPELINE ROUTING – NEAR SHORE SECTION

Page 19: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

11-B 12-B 1-B2-B

3-B

5-B

6-B

7-B

9-B

10-B

4-B

PIPELINE START-UPST. FERGUS

KP -0.2WATER DEPTH = M.L.W.S.

ST. F

ERG

US

PROPOSEDWINCH

SITE

19

SET UP AND LAY AWAY

Page 20: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

WELDING OF PIPE FIELD JOINTS

20

Page 21: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

P/L POSITIONING FOR CROSSING

21

Note: Pipelay barge to place “pipe” at required location: Pipelay barge and pipe positioning

Page 22: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

PIPE LAYING IN CURVES

22

Pipe Design Route

Barge Track

BargeLeavingCurve

BargeEntersCurve

Page 23: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

PROPOSED20” SPOOLPIECE

PROPOSED4” SPOOLPIECE

4” SERVICE LINE LAYDOWN

20” EXPORT LINELAYDOWN

GOLDENEYEPLATFORM

(Not Installed)

WATER DEPTH = 120m

Geomatics Foundation

23

PLATFORM APPROACH

Page 24: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

PIPE LAYDOWN

24

Note: Pipelay barge to place “pipe end” at required location: Pipelay barge and pipe-end positioning

Page 25: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

ST. F

ERG

US

KP101.2

4” SERVICE LINETRENCHED to GOLDENEYE

GOLDENEYEPLATFORM

(Not Installed)

WATER DEPTH = 120m

25

PLOUGH PIPELINE

Page 26: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

LAUNCHING PLOUGH - PL2

26

Geomatics Foundation

Page 27: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

BACKFILL PLOUGH - BPL2

27

Page 28: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

PLATFORM INSTALLATION

28

Page 29: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

PROPOSED20” SPOOLPIECE

PROPOSED4” SPOOLPIECE

PERFORM METROLOGY FOR 20” & 4” SPOOLS AT PLATFORM

GOLDENEYEPLATFORM(Installed)

WATER DEPTH = 120m

29

PLATFORM TIE-IN WORKS

Page 30: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

PROPOSED20” SPOOLPIECE

PROPOSED4” SPOOLPIECE

INSTALL 20” + 4” SPOOL, FLANGE PROTECTOR AND

SSIV

20” + 4”HYDROTEST

30

PLATFORM TIE-IN WORKS

Page 31: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

Typical Rockdumping Vessel – Rollingstone

31

ROCK DUMPING

Page 32: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

TYPICAL LIMIT OFFINAL ROCK DUMP

ROCK DUMP Elevation of Pipeline Crossing

Plan of Pipeline Crossing

MattressesSLEEPER TYPE LOADSPREADING MATTRESSES SEGMENTED CONCRETE

MATRESSES

PIPE TOUCHDOWN POINT

PIPE TOUCHDOWN POINT

SEGMENTED CONCRETEMATRESSES

SLEEPER TYPE LOADSPREADING MATTRESSES

MEAN SEABED LEVEL

32

ROCK DUMP - CROSSINGS

Page 33: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

33

Geomatics Foundation

AS-BUILT RECORDS

Page 34: OFFSHORE SURVEY IN DEVELOPMENT PROJECTS - … · 2015-05-12 · OFFSHORE SURVEY IN DEVELOPMENT PROJECTS Ian Douglas Head, ... Crossings and Pipeline Protection Platform Installation

Q + A

34