7
Project Management, India SI No. OHSE Observations Area \ Location Action Required Action By Complaince by date Remarks 1 Material kept in front of fire point blocking the access to fire point. 3rd Floor Entrance gate. Remove the material from there and make the access to the fire point neat & clean. Ambience Today 2 Damaged ladder is being used at site. 3rd Floor Entrance gate. Instructed to replace the damge ladder by safe one. Dynaaircon Today Daily OHSE Observation,Site instruction/Compliance Report Project Name : Amex Contractor : All vendors Area\location of site inspected : All Around The site CBRE South Asia Pvt. Ltd. Page 1 of 7

Upload: saddam-hussian

Post on 13-Apr-2018

231 views

Category:

Documents


0 download

TRANSCRIPT

7/24/2019 OHSE Daily Obsrvn Report 12.10.15.pdf

http://slidepdf.com/reader/full/ohse-daily-obsrvn-report-121015pdf 1/7

Project Management, India

SI No. OHSE Observations Area \ Location Action Required Action By Complaince by date Remarks

1

Material kept in front of fire point blocking the access to fire

point.

3rd Floor Entrance

gate.

Remove the material from there

and make the access to the fire

point neat & clean.

Ambience Today

2

Damaged ladder is being used at site.

3rd Floor Entrance

gate.

Instructed to replace the damge

ladder by safe one.Dynaaircon Today

Daily OHSE Observation,Site instruction/Compliance Report

Project Name : Amex

Contractor : All vendors

Area\location of site inspected : All Around The site

CBRE South Asia Pvt. Ltd. Page 1 of 7

7/24/2019 OHSE Daily Obsrvn Report 12.10.15.pdf

http://slidepdf.com/reader/full/ohse-daily-obsrvn-report-121015pdf 2/7

Project Management, India

3

Worker working at height without hand rail and mid rail in

the scaffolding.

3rd Floor.Provide hand rail and mid rail to

the scaffolding.Ambience Today

4

Insertion of electrical wire without top plug.

3rd floor near lift

lobbyinstructed to provide top plug. Ambience Today

CBRE South Asia Pvt. Ltd. Page 2 of 7

7/24/2019 OHSE Daily Obsrvn Report 12.10.15.pdf

http://slidepdf.com/reader/full/ohse-daily-obsrvn-report-121015pdf 3/7

Project Management, India

5

The height of the stacking material is more than 1.5 m and

the stacked materials are not barricaded.

3rd floor near dyna

office

Instructed to provide soft

barrication around materials kept

on the floor.

Dynaaircon Today

6

Gas cylinders laying on the floor.

3rd floor near dyna

office

Instructed to provide trolley and

keep the cylinders on the trolley

only.

Dynaaircon Today

7

Materials scattered on the floor showing poor housekeeping

of the floor.

3rd floor south area

Remove unwanted materials from

floor and keep the materials to be

used at site in proper barricaded

area.

DSCPL Today

CBRE South Asia Pvt. Ltd. Page 3 of 7

7/24/2019 OHSE Daily Obsrvn Report 12.10.15.pdf

http://slidepdf.com/reader/full/ohse-daily-obsrvn-report-121015pdf 4/7

Project Management, India

8

Unwanted materials stacked on the floor.

3rd floor near ups

room

remove all the unwanted

materials from the floor to make

the floor in presentable.

Emerssion Today

9

Gas cylinders kept on the floor without any protection.

3rd floor near

comms room

Instructed to provide trolley and

keep the cylinders on the trolley

only.

Emerssion Today

CBRE South Asia Pvt. Ltd. Page 4 of 7

7/24/2019 OHSE Daily Obsrvn Report 12.10.15.pdf

http://slidepdf.com/reader/full/ohse-daily-obsrvn-report-121015pdf 5/7

Project Management, India

10

Poor housekeeping of the floor.

4th floor south area

remove all the unwanted

materials from the floor to make

the floor in presentable.

ALL Today

11

Poor housekeeping of the floor.

4th floor south area

remove all the unwanted

materials from the floor to make

the floor in presentable.

ALL Today

CBRE South Asia Pvt. Ltd. Page 5 of 7

7/24/2019 OHSE Daily Obsrvn Report 12.10.15.pdf

http://slidepdf.com/reader/full/ohse-daily-obsrvn-report-121015pdf 6/7

Project Management, India

12

Poor housekeeping of the floor.

4th floor near toilet

area.

remove all the unwanted

materials from the floor to make

the floor in presentable.

Ambience Today

13

Worker doing height work without any protection.

2nd floorProvide hand rail and mid rail to

the scaffolding.Ambience Today

CBRE South Asia Pvt. Ltd. Page 6 of 7

7/24/2019 OHSE Daily Obsrvn Report 12.10.15.pdf

http://slidepdf.com/reader/full/ohse-daily-obsrvn-report-121015pdf 7/7

Project Management, India

14

Gas cylinders laying on the floor.

2nd floor

Instructed to provide trolley and

keep the cylinders on the trolley

only.

Ambience Today

Format No. L006-OHS-DO-Fr-006/Rev02/May2015

CBRE South Asia Pvt. Ltd. Page 7 of 7