Oil & Gas Drainage Task Force Meeting02/28/2020

Page 2: Oil Gas Drainage Task Force Meeting - weldgov.com

Drainage Calculation Process1. Site Information/Basin Delineation

2. Rainfall

3. Runoff Calculations

4. Detention

5. Culverts/Open Channels

Page 3: Oil Gas Drainage Task Force Meeting - weldgov.com

Weld County Preferred Formulas and Calculations• Runoffo Rational Methodo 2007 UD Runoff Coefficientso UD Rational v1.02a

• Detention oModified FAA Methodo UD Detention v2.35

Page 4: Oil Gas Drainage Task Force Meeting - weldgov.com

Rainfall Intensity

Source: USDCM 2004 (same as current edition)

Page 5: Oil Gas Drainage Task Force Meeting - weldgov.com

Time of Concentration

Source: USDCM 2007 (same as current edition)

Page 6: Oil Gas Drainage Task Force Meeting - weldgov.com

Time of Concentration (Overland/Initial)

Source: USDCM 2007 (same as current edition)

• Max length for rural = 500 feet• Max length for urban = 300 feet

Page 7: Oil Gas Drainage Task Force Meeting - weldgov.com

Time of Concentration (Channelized)

Source: USDCM 2007 (same as current edition)

Page 8: Oil Gas Drainage Task Force Meeting - weldgov.com

Time of Concentration (Channelized)

Source: USDCM 2018 (same as 2007 edition)

Page 9: Oil Gas Drainage Task Force Meeting - weldgov.com

Time of Concentration (Urban Check)

Source: USDCM 2007

Only to be used in urbanized growth areas or urban areas

Page 10: Oil Gas Drainage Task Force Meeting - weldgov.com

Runoff Coefficients, C

Source: USDCM 2007

Page 11: Oil Gas Drainage Task Force Meeting - weldgov.com

Runoff Coefficients, C

Source: USDCM 2007

Page 12: Oil Gas Drainage Task Force Meeting - weldgov.com

Runoff Coefficients, C

Source: USDCM 2007

Page 13: Oil Gas Drainage Task Force Meeting - weldgov.com

Runoff Coefficients, C

Source: USDCM 2007

Page 14: Oil Gas Drainage Task Force Meeting - weldgov.com

Runoff Coefficients, C

Source: USDCM 2007

Page 15: Oil Gas Drainage Task Force Meeting - weldgov.com

Detention

Source: USDCM 2011

Page 16: Oil Gas Drainage Task Force Meeting - weldgov.com

Detention

Source: USDCM 2011

Page 17: Oil Gas Drainage Task Force Meeting - weldgov.com

Detention

Source: USDCM 2011

Page 18: Oil Gas Drainage Task Force Meeting - weldgov.com

Detention

Source: USDCM 2011

Page 19: Oil Gas Drainage Task Force Meeting - weldgov.com

Culverts and Open Channels• Culverts

o HY‐8o Culvert Master

• Open Channels o Flowmastero AutoCAD

Page 20: Oil Gas Drainage Task Force Meeting - weldgov.com

Calculations

Page 21: Oil Gas Drainage Task Force Meeting - weldgov.com

Code Change Recommendations• Allow detention pond area to be calculated at 2% imperviousness (Policy Change)

• Allow alterative materials for the emergency spillway cutoff wall (Chapter 21)

• Allow retention ponds without a variance only for the construction phase (Chapter 21)

• Consider less than 1 foot of freeboard only for the construction phase (Chapter 21)

• Allow secondary containment areas to be subtracted from site imperviousness calculations (Chapter 21)

• NEW: Define the construction phase for oil and gas developments (Chapter 21)

• NEW: Allow a 5 cfs release rate only during the construction phase, production phase is still held to Chapter 8 requirements (Chapter 21)