Oil & Gas Equipment Design and Manufacture
2
ABOUT THE COMPANY
Technotecs Company is a modern multidisciplinary production
and engineering company that participates in projects for oil
and gas facilities construction and reconstruction, from
feasibility study stage to commissioning.
Capabilities and expertise of our company allow us to
implement integrated solutions on development and
manufacture of plants for oil, gas and water treatment,
processing, metering and transportation as well as other
process plants of various application.
Many years of multidisciplinary expertise of our team,
traditionally solid approach to quality issues, partnership with
leading domestic and foreign equipment manufacturers,
cooperation with engineering organizations and clear focus on
market needs allow us to offer the most effective and
advanced solutions of any scale.
3
ABOUT THE COMPANY
Manufacturing sites with a total area of over 5,000 m2 are located in
the Republic of Bashkortostan.
• implemented quality management system ISO 9001:2008
• the company’s in-house accredited and certified quality control
laboratory
• control of all manufacturing stages – from materials and
components procurement to constant verification of
manufacturing, processing and equipment assembly quality
• use of innovative solutions
• use of high quality manufacturing equipment
Schedule guarantee, high quality of work complying with
the requirements of Russian and international standards.
4
FIELD OF WORK
Technotecs Company offers the following services:
• Development of projects for newly constructed facilities.
• Development of projects for reconstruction and technical
re-equipment.
• Manufacture, supply and installation of process
equipment of various application.
• Engineering and supply of automatic control systems and
instrumentation.
• Designer supervision, personnel training, commissioning
and installation supervision.
5
UNIFIED OIL PROCESSING
Unified oil processing units (UOPU) are designed to obtain
commercial product in accordance with GOST R 51858-02
from products of oil and gas fields.
Our solutions allow you to treat any type of oil – from light
and medium to heavy and highly viscous.
UOPU can be provided with automated control systems for
equipment and processes enabling unmanned operation.
If UOPU compact arrangement is required, a multi-layered
layout of process units is possible.
Terms of delivery depend on complexity of UOPU and range
from three to ten months.
6
UNIFIED OIL PROCESSING
Main process equipment supply:
• Oil degasification and dehydration skids
• Fluids heating/cooling skids
• Fluids metering skids
• Process and buffer vessel skids
• Electrostatic dehydrating skids
• Internal and main pump skids
• Chemical dosing skids
• Process automation systems
• Associated gas internal use systems
• Gas disposal systems
Index ValueLiquid output up to 20 mln tons/year
Gas output up to 3.5 bln nm3/year
Inlet pressure up to 25 MPa
Commercial oil quality As per
GOST 51858-2002
Equipment lifetime minimum 20 years
7
UNIFIED OIL PROCESSING
8
Complex gas treatment units (CGTU) are designed for service
with natural and associated petroleum gas. The equipment
allows you to treat the product that meets the requirements
of STO 089-2010 (for further transportation) and GOST 5542-
2014 (for use as fuel).
CGTU can be provided with automated control systems for
equipment and process solutions enabling unmanned
operation.
If CGTU compact arrangement is required, a multi-layered
layout of process units is possible.
Terms of delivery depend on complexity of CGTU and range
from three to ten months.
COMPLEX GAS TREATMENT
9
COMPLEX GAS TREATMENT
Main process equipment supply:
• Process vessel and column skids
• Fluids heating/cooling skids
• Fluids metering skids
• Packaged compressor stations
• Gas disposal systems
• Process automation systems
• Gas internal use systems
Index ValueGas output up to 4 bln nm3/year
Inlet pressure up to 25 MPa
Outlet gas quality As per
STO 089-2010 / GOST 5542-2014
Equipment lifetime minimum 20 years
10
COMPLEX GAS TREATMENT
11
WELL CLUSTER INFRASTRUCTURE SETUP
Cluster packages (CP) enable collection, processing, gas-liquid
mixture amount and parameters measuring, formation water
treatment and injection into absorption wells or its disposal.
Terms of delivery depend on complexity of a skid and range
from three to six months.
Index ValueLiquid output up to 20,000 m3/day
Inlet pressure up to 25 MPa
Outlet water cut up to 10 %
Equipment lifetime minimum 20 years
12
MOBILE OIL & GAS TREATMENT SKIDS
Mobile oil and gas treatment skids allow both to carry out
well studies and obtain finished product at the initial stages of
field operation.
These units do not require expensive projects development
and permits for construction.
Terms of delivery depend on complexity of a skid and range
from three to five months.Index Value
Liquid output up to 5,000 m3/day
Design pressure up to 16 MPa
Equipment lifetime minimum 15 years
13
FUEL & IMPULSE GAS TREATMENT
Fuel & impulse gas treatment units (UPTIG) are
designed for natural and associated petroleum gas
treatment to meet the requirements of GOST 5542-
2014 for use as fuel and for valves control.
Terms of delivery depend on complexity of UPTIG and
range from three to six months.Index Value
Gas output up to 4 mln nm3/day
Inlet pressure up to 16 MPa
Outlet gas quality As per
GOST 5542-2014
Equipment lifetime minimum 20 years
14
PUMP STATIONS
Pump stations manufactured by Technotecs Company are designed to
transport various liquid media in field gathering systems, reservoir
pressure maintenance systems, process plants of various application,
and fire fighting systems.
The stations can be equipped with: pumping units, filtration systems,
piping and cabling, valves, required automation devices, auxiliary
equipment, and life support systems.
The supplied units are provided with automated control systems for
equipment and systems enabling unmanned operation.
Terms of delivery depend on complexity of a pump station and range
from three to six months.
15
FLARE UNITS
Flare units (FU) are designed to burn emergency, permanent
and periodic gas discharges at various oil & gas and processing
facilities.
FU can be both stationary and mobile.
Terms of delivery depend on complexity of FU and range from
three to five months.
Index ValueGas output up to 8 bln nm3/day
Gas flow to main burners up to 16 nm3/h
FU stack diameter up to 1,400
FU height up to 120 m
16
INNOVATIONS
We understand that development of existing technologies and
creation of innovative solutions is the key to prosperity of both our
company and industry as a whole. Therefore, we put proactive
efforts to develop, and implement the best technical solutions.
Our team participates in making R&D programs for production
divisions of OC Rosneft PJSC, Gazprom Neft PJSC, LUKOIL PJSC and
Tatneft PJSC.
We are actively investing resources in development and
adaptation of innovative solutions that meet the needs of
the industry, contributing to its growth.
17
INTERNALS AND PACKINGS
Technotecs Company offers internals and packings for horizontal
and vertical process units that can significantly improve separation
efficiency of oil and gas mixtures, reduce specific content of metal
in process units of various application, and reduce the number of
equipment maintenance shutdowns.
18
OIL DESALTING
Oil desalting system offered by our company allows you to increase
significantly removal efficiency of chloride salts from oil both at newly
constructed and existing oil and gas production facilities.
Depending on the characteristics and parameters of fluid, it is possible
to reduce the number of electrical dehydration stages or exclude
electrical dehydrators from the general flowsheet.
Node and mixer design, standard sizes of injectors for fresh water feed,
as well as used auxiliary equipment are selected on the basis of
preliminary studies conducted directly with the fluid.
19
Formation water purification technologies offered by our company
allow to fully meet the process and environmental requirements
during oil reservoirs flooding.
Our solutions are based on domestic equipment, reagents and
materials ensuring capital and operating costs minimization, re-
equipment of existing units.
Fine water purification skids manufactured by our company can be
provided with automated control systems for equipment and
process solutions enabling unmanned operation.
ENVIRONMENT AND ECOLOGY
20
FORMATION WATER FINE PURIFICATION TECHNOLOGIES
Inlet – 10-53 mg/dm3
Outlet – 0.05-0.15 mg/dm3
Inlet – 86-232 mg/dm3
Outlet – 1.5-2.0 mg/dm3
Inlet – 82-227 mg/dm3
Outlet – 0.13-0.32 mg/dm3
21
MODIFIED END TUBE PHASE SPLITTER
Modified end tube phase splitter is intended for preliminary
dehydration of oil to obtain water content up to 5 %.
Modified lower end part allows for removal of accumulated sludge
in automated mode without process interruption.
Also modified end tube phase splitter can be equipped with
formation water post-treatment skid so that the content of oil and
oil products is less than 5 mg/dm3.
Modified end tube phase splitter can be provided with automated
control systems for equipment and processes enabling unmanned
operation.
22
ENVIRONMENT AND ECOLOGY
We are aware of the importance of maintaining the ecological
balance, which is key to health and well-being of our and future
generations. The global trend implies gradual stricter
requirements to production facilities in the field of environmental
safety.
The most reasonable solution for any production facility in such
situation would be the purchase and installation of equipment
that strictly complies with environmental standards.
Being a socially responsible company, Technotecs seeks to
minimize the negative impact on environment when developing
and implementing its process solutions and equipment.