oil statistics and issues · –pusdatin will coordinate with the units in each relevant to verify...

15
1 Ministry of Energy and Mineral Resources Republic of Indonesia Tokyo, 11-13 June 2019 OIL STATISTICS AND ISSUES Center for Data & Information Technology on Energy & Mineral Resources The 17 th APEC Workshop on Energy Statistics

Upload: others

Post on 27-Dec-2019

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

1

Ministry of Energy and Mineral Resources

Republic of Indonesia

Tokyo, 11-13 June 2019

OIL STATISTICS AND ISSUES

Center for Data & Information Technology

on Energy & Mineral Resources

The 17th APEC Workshop on Energy Statistics

Page 2: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

2

• SOURCE• SOURCE

• SOURCE• SOURCE*

PUSDATINESDM

DG Oil & Gas;

SKK Migas/

BPH Migas

DG Mineral & Coal

DG

ElectricityDG

Renew.

Energy and Geologi

Agency

* Source :

Industry (Business Entity)

Oil & Gas Company

(Pertamina &PGN)

State Electricity Company (PLN)

Ministries / Other Institution

(BPS, BI, Ministry of Trade, Ministry of

Finace, Custom, etc)

How to Collect The Data

Obstacles:- differences in availability

data source;- differences in standards

and formats of data;- limitations of data

managers; and- technology system

Page 3: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

3

PUSDATIN

Data Used For?12

Daily Report

Weekly Report

Executive Information

System

Data Request

Data Request from Tax OfficeData Request from Central Bank

Data Services for Other Ministry

JODI

APEC

IEA

OPEC

Oil and Gas Upstream

Data Management

Page 4: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

4

ONE MAP POLICY

PublicK/L/P

(AKSES DATA JOINT STUDY DAN WELL GEOKIMIA)

ONE MAPhttps://geoportal.esdm.go.id

Page 5: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

5

INDONESIAN DEVELOPMENT OF OIL RESERVE

2010 - 2018

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

MM

ST

B

Terbukti 4230.2 4039.6 3741.3 3692.5 3624.3 3602.5 3306.91 3170.9 3154

Potensial 3534.3 3692.7 3666.9 3857.3 3750.9 3702.5 3944.2 4364 4358

Total 7764.5 7732.3 7408.2 7549.8 7375.1 7305 7251.11 7534.9 7512

2010 2011 2012 2013 2014 2015 2016 2017 2018

Page 6: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

6

PAPUA

NATUNA

MALUKU

NAD

SUMATERA TENGAH

SUMATERA

SELATAN

JAWA TIMUR

JAWA BARAT

KALIMANTAN

SUMATERA UTARA

64.723.1

15.0

57.1

83.5

39.0

662.1

1,152.0

495.7

413.0

231.6

201.1

117.6

73.2

141.6

604.6

207.0

817.5

593.1317.4

193.3

228.7

101.2

124.0

66.1

17.2

242.5

18.5

66.111.0

78.8

SULAWESI

P13,154,3

P22,294.4

P32,063.5

INDONESIA7,512.2 MMSTB

P1 = TerbuktiP2 = MungkinP3 = Harapan

104.9

9.4

6.9

INDONESIAN DISTRIBUTION OF OIL RESERVE

STATUS 01.01.2018

Page 7: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

7

0

100

200

300

400

500

600

700

800

900

1000

Rib

u B

arel

Per

hari

Total 945 902 860 824 789 786 831 801 773

2010 2011 2012 2013 2014 2015 2016 2017 2018

INDONESIAN OF OIL PRODUCTION

2010 - 2018

Page 8: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

8

0

20

40

60

80

100

120

140

160

TS

CF

Terbukti 108,4 104,7 103,3 101,5 100,3 98,0 101,2 100,4 96,1

Potensial 48,74 48,2 47,4 48,9 49,0 53,3 42,8 42,4 39,4

Total 157,14 152,9 150,7 150,4 149,3 151,3 144,0 142,7 135,5

2010 2011 2012 2013 2014 2015 2016 2017 2018

INDONESIAN DEVELOPMENT OF GAS RESERVE

2010 - 2018

Page 9: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

9

PAPUA

NATUNA

MALUKU

NAD

JAWA TIMUR

JAWA BARAT

KALIMANTAN

SUMATERA TENGAH

SUMATERA

SELATAN

SUMATERA UTARA

SULAWESI0.32 0.40

0.841.57

46.96

1.84

1.40

1.40

2.15

1.636.65

1.59

1.00

2.89 0.95

1.16 2.98

3.19

4.20

5.41

0.89

1.26

1.783.88

11.93

0.93

4.13

2.29 14.33

P199.06P2

21.26

P318.23

INDONESIA135.55 TSCF

P1 = TerbuktiP2 = MungkinP3 = Harapan

0.08

INDONESIAN DISTRIBUTION OF GAS RESERVE

STATUS 01.01.2018

Page 10: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

10

0

1.000

2.000

3.000

4.000

5.000

6.000

7.000

8.000

9.000

10.000

MM

SC

FD

Produksi Net 8.857 8.415 8.150 8.130 8.218 8.078 7.938 7.620 7.765

2010 2011 2012 2013 2014 2015 2016 2017 2018

INDONESIAN OF GAS PRODUCTION

2010 - 2018

Page 11: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

11

Page 12: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

12

Page 13: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

13

Page 14: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

14

CHALLENGES– Constrained by personnel changes in SKK Migas (Special Task Force

for Upstream Oil and Gas Business Activities) and BPH Migas , so it is necessary to coordinate and re-educate the new personnel regarding the form and procedure of filling the JODI & APEC questionnaire.

– Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire.

– Pusdatin needs to know, coordinate and study about APEC plans to implement JODI Coal and JODI Renewable Energy activities.

Page 15: OIL STATISTICS AND ISSUES · –Pusdatin will coordinate with the units in each relevant to verify in filling out the JODI questionnaire. –Pusdatin needs to know, coordinate and

15

Ministry of Energy and Mineral Resources

Republic of Indonesia

Medan Merdeka Selatan Road No. 18, Jakarta, Indonesia