olympic stadium in london
DESCRIPTION
TRANSCRIPT
Olympic Stadium in London
Marten VisnapC.R.Jakobson Gymnaasium
From 9cSuprvisor: Marje Maasen
2012
Introduction
Olympic Stadium – The centrepiece of the 2012 summer olympics
Built for these olympics
The newest stadium in London
60,000 seats 80,000 in the olympics Located in London - south of the Olympic
Park New stadium – started in 2008
Key Facts
Design And Construction
Design - launched on November 2007
The archidect – Populus
Designed for 2012 summer olympics
Building started in 2008 The most sustainable stadium ever built With steel a resource in short supply Also features a low-carbon concrete Construction finished in April 2011
About the Stadium Build
Roof
Cable supported roof Covers two thirds of
the stadium's seating Construction of the
roof studied about six months
The stadium is between the two rivers Old River Lea The city Mill River The stadium area is surrounded by water The area is also called as “Olympic Park”
Stadium Island
During the Games
Facilities for athletes Changing rooms Medical support 80m warm-up track
Designed to be flexible Accommodate a number of different
requirements Continues to be a venue for sport and
athletics Leaving a lasting legacy
After the Games
The Future of Stadium
The summer olympics in 2012
2015 World Athletics Championships
2017 World Athletics Championships
Newest Olympic stadium in the London Built for Olumpics Unique design
In the End
References
http://shrt.st/2cj4 http://shrt.st/2cj5 http://shrt.st/2cj6 http://shrt.st/2cj7
http://shrt.st/2cja http://shrt.st/2cjb http://shrt.st/2cj9 http://shrt.st/2cj8