1 www.esb.ie/esbnetworks

Philip Denmead

Metering LeadNational Smart Metering Program

ESB Networks , IRELAND

On the Road to full

Smart Meter Rollout

ICCS European Engagement Summit, Madrid 2015

2 www.esb.ie/esbnetworks

Overview of Presentation

ICCS European Engagement Summit, Madrid 2015

� ESB Networks

� Operating Environment / Market Structure

� Smart Metering

� Experience with Trials / Resulting plans

� Moving towards a full Smart Metering Rolloutin Ireland

� Expected Smart Metering Infrastructure

3 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Irish Electricity Industry

Others

Other Generators

Interconnectors

ESB Generation

TransmissionSystemOwner

DistributionSystem Owner

/ Operator

2.25 millioncustomers

Market

ElectricitySuppliers

4 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

• Meter Owner / Operator / Reader

• REGULATED

DSO for Republic of

Ireland

• 1.6m Urban / 0.65m Rural

• Avg. Consumption ~5,000 kWh p.a

• Multiple Suppliers / Retailers

2.25mElec.Customers

• Sprawling Rural Network200,000 Km of Network

• 200,000 Rural

• Impacts Comms. Choices for Smart Metering

250,000 Medium Voltage

Transformers

ESB Networks’ Operating Environment

5 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Smart Metering : Experience to Date

TRIALS:

� Customer Behaviour / Comms. TechnologyTrials / Dual Fuel / PayG

FINDINGS:

� Potential for Peak Shifting / Load Reduction with ToU Tariffs

� Communications technologies improving … but still immature

� System design needs to incorporate security requirements from start

� Cost Benefit Analysis broadly positive

� ����>> NATIONAL SMART METERING PROGRAM

� ����>> Program under control of Commissionfor Energy Regulation (CER)

� ����>> Final Go / No-Go decision when actual costs visible - bid submissions

6 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Regulatory Perspective – Core Design Principles

2008

Phase 1

Trials &

CBAs

Phase 2

High Level

Design

Phase 3Detailed Design&Procurement

Phase 5

Deployment

Phase 4

Build &

Test

20182013 2015 2020

7 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Very ambitious rollout in relative terms …

IHD for all

Embedded HAN

Integrated with Gas Meter

Consumption available to home

Daily profile reading

Automatic Meter Reading

Continuity mgt support

Remote meter operation

Event monitoring

Remote tariff configuration

8 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

CER High Level Design Requirements …1/2

9 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

CER High Level Design Requirements …2/2

10 www.esb.ie/esbnetworks

Current Status of Decision Points•Flexible Time of Use Tariffs Y

•Interval Data for Billing Y

•Remote De-Energisation Y

•Remote Re-Energisation (direct) Y

•Thin/ remote Pay As You Go Y

•Controlled Load (Aux Switch) Y

•Gas Meters + U-HAN Y

•In-Home Display Y

•Facilitate Customer CAD Y

•Load Limiting (capability) Y*

•Micro-Generators Y*

•Historical Data File Download Y

•Energy Costs from Meter N

..Standard ToU + new tariffs expected

..No meter ToU reconfig. / SAP HANA

..where WAN connection available

..meter not always accessible if Re-Arm

..Ease of switching / lifestyle choice

..legacy Night Storage load

..U-HAN to suit battery powered meter

..low cost, low complexity, 2yr support

..agreed values to be transmitted

..possible future use / standard feature

..modification to market system

..standard energy usage file format

..no ToU / costs to come from Suppliers

ICCS European Engagement Summit, Madrid 2015

11 www.esb.ie/esbnetworks

Further proposals leading towards Procurement

ICCS European Engagement Summit, Madrid 2015

Comms Module type Stand-alone Integral Intimate

Comms Protocols Cellular RF PLC

Pay As You Go options On-Meter / Thick Remote / Thin

Billing Mechanism Interval Data ** ToU Registers only

Data Privacy vs.

Interval Data Collection

Opt-In Opt-Out

Comms Procurement WAN connectivity

only

WAN connectivity

+ Data Collection

engine

Include

Data Collection

as Service

Module Procurement Separate Contract With Meters With Comms (incl

Design/ Integrate)

Meter Procurement Separate Contract With Comms With IHD

MDMS Procurement Separate Contract With Comms With SAP

upgrade

IHD Procurement Separate Contract With Meters

>Lead Consultant to assist in validating above positions prior to procurement

>Yellow = Proposed approach

12 www.esb.ie/esbnetworks

Reasoning behind proposed approach

Comms Protocols not being specified:

� No compelling reason to adopt one technology – mix required Urban / Rural?

� Will allow for greater variety of offers … but will make selection more complex

Comms Module to be supplied as part of Comms Contract:

� Split Meters <> Comms / facilitates Comms E-2-E management contract.

Meters to be procured separately:

� ESBN has choice of meter vendors for rollout + future … but integration risks

Data Collection as a Service:

� Not a core ESBN expertise … extra complexity - allow ESBN to manage Meters

ICCS European Engagement Summit, Madrid 2015

13 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Model proposed for Full Rollout

EE

GIHDIHD

HANHAN

Existing Electricitymarket system

ElectricitySuppliers

ESBN GNI

GasShippers

ElectricityMeter Data Storage

& Management

CommunicationsNetwork

CustomerPortal

ExistingGas Market

system

Datacollection/Network

management/ Security

Management systems

Gas MeterData Storage

& Management

Mic.GenMic.Gen

E = Electricity Meter, G = Gas

Mic Gen = Meter for Mic. Gen.

HAN = Home Area Network

** Comms Contract;WAN Connectivity

Comms Module for MeterModule IntegrationDaily Data CollectionU-HAN Management

IHD

HANMic.Gen

E

G

14 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Current Development Focus

15 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Smart Metering “Bucket List”

16 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Meter Design & Construction

17 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Cool new stuff we can do … and Remotely!

18 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Expanded view of Smart Capabilities

19 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

…. taking a closer look

20 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Correlation with EPRI AMI Survey

21 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Metrology Functions .. (formerly only on C&I Meters)

22 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Potential Operations Requirements

23 www.esb.ie/esbnetworks

Data being Recorded

ICCS European Engagement Summit, Madrid 2015

24 www.esb.ie/esbnetworks

Project Status

• Market-based workshops almost concluded

• Billing Data transfer / Change of Supplier or Tennant / Meter Works etc

• New consultations around ToU and PayG currently on-going

• Will further engage with Networks Business - Operational items

• Process to procure Consultant assistance in progress at present

• Finalise detailed designs / specs later this year > OJEU Notices

• Expect to go to tender for Comms / Meters early 2015

• Having Shortlisted vendors, Comms selection will proceed before Meters

ICCS European Engagement Summit, Madrid 2015

25 www.esb.ie/esbnetworks

Final Comments … with a Metering bias

• Ensure the installed Smart Meter population is specified to be fully

manageable from the central computer system

• Not enough to be able to collect metering & event data and operate the Switch

• Requires full integration between meters and Head-End / MDMS

• Don’t miss the opportunity to enhance a Utility’s Operational Capability

• Initial Focus getting the billing / market facing functions right,

• Attention will probably shift to more operational issues - (data collection stabilised)

• Certain features if not included in meters, will not be Firmware upgradeable

• There IS a Meter in Smart Metering

• Contrary to popular belief, not just an IT, or a Comms, or even a Customer Project

ICCS European Engagement Summit, Madrid 2015

26 www.esb.ie/esbnetworksICCS European Engagement Summit, Madrid 2015

Thank you !

[email protected]

+353 87 687 6019