www.pipeline-news.com • November 2017 • Pipeline News 29 construction underway ONGOING Projects (Projects added for the current month are highlighted and in bold face type) GAS – The Americas U.S. 3BEAR ENERGY LLC – (10/17) Project: 3Bear System Type: Project includes the development, ownership and operation of a gathering and processing system Length: 100 miles Location: Lea and Eddy counties, NM Completion: 1Q 2018 Comments: Project is designed for expansion and will accommodate the rapid production growth in the Delaware Basin AMERICAN MIDSTREAM – (8/17) Operator: High Point Gas Transmission LLC Project: Venice to Toca Pipeline Abandonment Project Type: Project includes pipeline abandonment and valve modifications Length: 62 miles Diameter: 12 to 22 inches Location: Plaquemines and St. Bernard parishes, LA Docket: CP16-474 ATMOS ENERGY – (9/17) Operator: Atmos Pipeline Texas Project: Atmos Pipeline Texas Replacement Type: Project includes pipeline replacement Length: 29 miles Diameter: 10 inches Location: Hopkins, Delta and Lamar, TX Operator: Atmos Pipeline Texas Project: Atmos Pipeline Texas Replacement Segment: Line M Pipeline Replacement Type: Project includes pipeline replacement Length: 19 miles Diameter: 11 inches Location: Ellis and Navarro, TX Operator: Atmos Pipeline Texas Project: Atmos Pipeline Texas Replacement Segment: WL 201 Pipeline Replacement Type: Project includes pipeline replacement Length: 5 miles Diameter: 11 inches Location: Clay, TX BLACK HILLS ENERGY – (6/17) Project: Northeast Nebraska Line Type: Line will run from Bancroft to Norfolk Length: 50 miles Location: Bancroft, NE - Norfolk, NE Completion: Project completion date has been extended BLUE FLAME PIPELINE – (3/17) Owner: Antero Midstream Project: Marcellus Gathering System Pipeline Type: Project includes the construction of 24-inch and 20-inch pipeline Length: 8 miles Location: Doddridge, Tyler and Ritchie counties, WV BRAZOS MIDSTREAM – (6/17) Project: Comanche II Plant Type: Project includes the construction of a second gas processing plant Location: Reeves County, TX Completion: 1Q 2018 Comments: Project will add 200 MMcf/d of incremental processing capacity and will increase Brazos’ total operated processing capacity in the Delaware Basin to 260 MMcf/d BRUCE ALLEN INC. – (6/17) Owner: Dominion Transmission Project: Transco to Charleston Project Type: Project will include the construction of new pipeline including the following: two new natural gas transmission pipelines, upgrades to an existing compressor station and the addition of a new compressor station Length: 60 miles Diameter: 4 and 12 inches Location: Charleston, Dillon, Lexington and Marlboro counties, SC Completion: November 2017

Upload: others

Post on 23-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

www.pipeline-news.com • November 2017 • Pipeline News 29

construction underwayONGOINGProjects(Projects added for the current month are highlighted and in bold face type)

GAS – The AmericasU.S.3BEAR ENERGY LLC – (10/17) Project: 3Bear SystemType: Project includes the development,

ownership and operation of a gathering and processing system

Length: 100 milesLocation: Lea and Eddy counties, NM Completion: 1Q 2018Comments: Project is designed for expansion and

will accommodate the rapid production growth in the Delaware Basin

AMERICAN MIDSTREAM – (8/17)Operator: High Point Gas Transmission LLCProject: Venice to Toca Pipeline Abandonment

ProjectType: Project includes pipeline abandonment

and valve modifi cationsLength: 62 milesDiameter: 12 to 22 inchesLocation: Plaquemines and St. Bernard parishes, LADocket: CP16-474

ATMOS ENERGY – (9/17)Operator: Atmos Pipeline TexasProject: Atmos Pipeline Texas ReplacementType: Project includes pipeline replacement

Length: 29 milesDiameter: 10 inchesLocation: Hopkins, Delta and Lamar, TX

Operator: Atmos Pipeline TexasProject: Atmos Pipeline Texas ReplacementSegment: Line M Pipeline ReplacementType: Project includes pipeline replacementLength: 19 milesDiameter: 11 inchesLocation: Ellis and Navarro, TX

Operator: Atmos Pipeline TexasProject: Atmos Pipeline Texas ReplacementSegment: WL 201 Pipeline ReplacementType: Project includes pipeline replacementLength: 5 milesDiameter: 11 inchesLocation: Clay, TX

BLACK HILLS ENERGY – (6/17)Project: Northeast Nebraska LineType: Line will run from Bancroft to NorfolkLength: 50 milesLocation: Bancroft, NE - Norfolk, NECompletion: Project completion date has been

extended

BLUE FLAME PIPELINE – (3/17)Owner: Antero MidstreamProject: Marcellus Gathering System Pipeline

Type: Project includes the construction of 24-inch and 20-inch pipeline

Length: 8 milesLocation: Doddridge, Tyler and Ritchie counties, WV

BRAZOS MIDSTREAM – (6/17)Project: Comanche II PlantType: Project includes the construction of a

second gas processing plantLocation: Reeves County, TXCompletion: 1Q 2018Comments: Project will add 200 MMcf/d of

incremental processing capacity and will increase Brazos’ total operated processing capacity in the Delaware Basin to 260 MMcf/d

BRUCE ALLEN INC. – (6/17)Owner: Dominion TransmissionProject: Transco to Charleston ProjectType: Project will include the construction of

new pipeline including the following: two new natural gas transmission pipelines, upgrades to an existing compressor station and the addition of a new compressor station

Length: 60 milesDiameter: 4 and 12 inchesLocation: Charleston, Dillon, Lexington and

Marlboro counties, SCCompletion: November 2017

Page 2: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

30 Pipeline News November 2017 • www.pipeline-news.com

ONGOINGProjects construction underway

Comments: Project has been approved by FERC. Project will consist of the following facilities: Moore to Chappells Pipeline; Dillon Pipeline; Moore Compressor Station; and Dor Compressor Stations

CANYON MIDSTREAM PARTNERS II LLC – (5/17)Project: Redcliff PlantType: Project includes the construction of a

new natural gas processing facility (the Redcliff Plant) and a gas gathering system, including of 20-inch steel trunkline, multiple field compression stations and low-pressure gathering pipelines

Length: 70 milesLocation: Woodward County, OKCompletion: 2018Comments: Once completed, the project will provide

its customers with 200 MMcf/d of cryogenic gas processing capacity and access to premium residue gas markets on ANR and Southern Star Central

CENTRAL NEW YORK OIL & GAS CO. LLC – (12/16)Project: MARC II Pipeline Type: Project includes the construction of a new

natural gas pipeline gathering headerLength: 30 milesLocation: Luzerne County, PACompletion: 4Q 2017Comments: Crestwood has received non-binding

indications of interest for firm transportation on the proposed MARC II Pipeline in excess of 700 MMcf/d

CFE– (REV 7/17)Project: Encino-La Laguna PipelineType: Pipeline will transport gas from southern

Texas and supply northern Chihuahua and Durango states

Length: 263 milesLocation: Texas - Chihuahua and DurangoCapacity: 1.5 MMcf/dCompletion: 3Q 2018

Contractor: GDI SICIM Pipelines SA De c.vType: Project includes engineering,

procurement and construction of pipelineCost: $372 million

CHENIERE CORPUS CHRISTI PIPELINE LP –(5/17)Project: Corpus Christi PipelineType: Project includes pipeline constructionLength: 23 milesDiameter: 48 inchesLocation: Sinton, TX – Corpus Christi, TXDocket: CP12-508Completion: 2019 Comments: Pipeline will allow for the interconnection

points with interstate and intrastate natural gas transmission pipelines in South Texas, including Tennessee Gas Pipeline, Southcross, Kinder Morgan Tejas Pipeline and Transcontinental Gas Pipeline. The line will terminate at the proposed Corpus Christi Liquefaction Plant

Contractor: Associated Pipe LineType: Project includes pipeline construction

COLUMBIA GAS TRANSMISSION LLC – (5/17)Project: Line SM-80 MAOP ProjectType: Project includes the abandonment

of a segment of existing pipeline and the replacement of the segment by constructing and operating a 30-inch-diameter pipeline

Length: 3.8 milesLocation: Wayne County, WVComments: The replacement pipeline would allow

that segment of Line SM-80 to operate at its original maximum allowable operating pressure

COLUMBIA MIDSTREAM – (7/17)Contractor: InterCon Construction Inc.Sub: Lone Star Directional DrillingProject: Big Pine System ExtensionType: Project includes the installation of 3,300

feet of pipeline via HDDDiameter: 20 inches Location: Westmoreland and Indiana counties, PASupt: David Chesney

COLUMBIA PIPELINE GROUP – (7/17)Project: Leach XPress ProjectType: Project includes the construction of

natural gas pipeline and compression facilities

Length: 160 milesDiameter: 30 and 36 inchesLocation: Fairfield, Perry, Noble and Monroe

counties, OH; Marshall County, WV; and Greene County, PA

Capacity: 1.5 Bcf/d

Contractor: Associated Pipe Line Contractors Inc.Sub: Pedero Pipe Support Systems USAtType: Project includes providing spray breakers

and pillows on pipelineHQ: Lancaster, OHSupt: Mark Nail and James Silva

Contractor: Associated Pipe Line Contractors Inc.Type: Project includes the installation of pipelineLength: 44.3 milesDiameter: 36 inchesLocation: Noble, Muskingum, Morgan and Perry

counties, OHForemen: Charles Beddingfield and Michael Steward

Contractor: Apex Pipeline Services Inc.Type: Project includes anomaly digs and

pipeline modificationsDiameter: 4 to 36 inchesLocation: Edinburg, VAForemen: Brandon Sampson and Matthew Steward

Contractor: Price Gregory InternationalType: Project includes the installation of pipelineLength: 28 milesDiameter: 36 inchesLocation: Monroe and Noble counties, OH Foremen: Stan Campbell and Colby Steward

Project: Rayne XPress ProjectType: Project involves the construction of

two new compressor stations along the existing Columbia Gulf System

Location: Marshall County, WV - Pennsylvania - Ohio - Wayne County, WV

Completion: 2017Comments: Project will increase capacity up to 1.0

Bcf/d of natural gas to efficiently transport Marcellus and Utica production to markets in the Gulf Coast region and beyond

Contractor: Minnesota Ltd. Project: Tri-County Bare Steel Project, Phase IIType: Project includes the construction of

20-inch pipelineLength: 8.3 milesLocation: Washington County, PACost: $138 million

CONSUMERS ENERGY – (10/17)Project: Saginaw Trail PipelineType: Project will be executed in five phases

and includes take up and relay of existing pipeline

Length: 94 milesDiameter: 24 inchesLocation: Saginaw, Genesee and Oakland counties,

MICost: $610 millionCompletion: 2022Comments: Project is part of the Transmission

Enhancements for Deliverability & Inrity (TED-I) and will be built in five stages

Contractor: Welded ConstructionType: Project includes construction of Phase 1

of the pipeline

CRESTWOOD EQUITY PARTNERS LP – (9/17)Project: Orla Expansion ProjectType: Project includes the construction of a

cryogenic gas processing plant, multiple third-party pipelines and a high-pressure pipeline (Orla Express Pipeline)

Length: 33 milesDiameter: 20 inchesLocation: Eddy County, NM - Orla, TXCapacity: 200 MMcf/d Cost: $170 millionCompletion: 2Q 2018

Contractor: T.G. Mercer Consulting Services Inc. Type: Project includes offloading and racking of

pipelineContact: Michael Magee Supt

Project: Bear Den Plant / Bear Den West PipelineType: Project includes the construction of a

new processing plant and an associated pipeline

Location: McKenzie County, NDCompletion:4Q 2017Comments: Project will have a capacity of 30 MMcf/d

of gas and will meet increasing production volumes from producers on the Arrow system and acreage surrounding the Fort Berthold Indian Reservation

DCP MIDSTREAM LP – (7/17)Project: Sand Hills Pipeline Extension (Phase II)Type: Project includes the partial looping of the

pipeline and the addition of seven new pump stations in the initial phase of the extension

Capacity: 85 MbpdCost: $500 millionLocation: Mont Belvieu, TXCompletion: 2Q 2018

Page 3: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

www.pipeline-news.com • November 2017 • Pipeline News 31

ONGOINGProjects construction underway

Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity by over 100 Mbpd to a minimum of 550 Mbpd

Project: Sand Hills Pipeline Extension (Phase I)Type: Project includes the expansion of existing

pipeline through the addition of four pump stations and a pipeline loop

Location: Mont Belvieu, TXCompletion: 4 Q2017Comments: Project will increase pipeline capacity by

30 percent to 365 Mbpd

DOMINION TRANSMISSION — (10/17)Project: New Market ProjectType: Project includes the installation of two

new compressor stations and additional compression at an existing station

Location: Madison and Chemung counties, NYCapacity: 112 MDth/dCost: $159 millionDocket: CP14-497Comments: Project will provide extra natural gas

capacity along 200 miles of existing Dominion pipeline across upstate New York with no new pipeline is being laid

Project: Eastern Market Access ProjectType: Project includes adding compression

and auxiliary facilities along Dominion’s existing interstate natural gas transmission pipeline

Location: Charles County, MD, Loudoun and Fairfax counties, VA

Capacity: 294 MDth/dDocket: CP17-24Completion: 4Q 2018

Contractor: Minnesota Ltd. LLC Type: Project includes the installation of 1,400

feet of pipelineDiameter: 30 inchesLocation: Loudoun County, VAHQ: Leesburg, VASupt: Roman McKown

DOMINION EOG – (7/17)Contractor: Minnesota Ltd. LLCProject: Pipeline Infrastructure Replacement

ProgramType: Project includes pipeline installationLength: 30 milesLocation: Cuyahoga County, OHHQ: Dover, OHSupt: Gary Hawk

EASTERN SHORE NATURAL GAS – (REV 6/17)Owner: Eastern Shore Natural Gas Project:

Reliability Expansion ProjectType: Project involves the construction of 15

miles of 16-inch pipeline and two loops (Dover and Porter)

Length: 15 milesLocation: New Castle, Kent and Sussex counties, DEDocket: CP15-498

EM ENERGY PIPELINE PENNSYLVANIA LLC –(7/17)Contractor: MG DyessProject: Constellation Pipeline Extension ProjectType: Project includes the installation of welded

steel natural gas pipelineLength: 21 milesDiameter: 8, 20 and 24 inchesLocation: Butler County, PA

ENABLE MIDSTREAM PARTNERS LP – (6/17)Project: Wildcat PipelineType: Project includes pipeline constructionLength: 140 milesDiameter: 20, 24 and 30 inchesLocation: Johnson County, TXCompletion: 2Q 2018Comments: Project will move up to 400 MMcf/d of

natural gas to a processing plant and pipeline hub in north Texas

Project: Kingfi sher ExtensionType: Project includes the construction of

a new transmission line to connect southeast Kingfi sher County with EOIT’s existing mainline facilities that deliver to Bennington, OK

Location: Kingfi sher County, OK – Bennington, OKComments: Project is currently in the evaluation

stage and will provide access to Enable Oklahoma Intrastate Transmission’s on-system power, LDC and industrial end users and EOIT’s East Pool

USA: +1-713-939-0007Canada: +1-780-377-0336

www.plmcat.com

Your Global Partner for Pipeline Solutions

©2017 Caterpillar. All rights reserved. CAT, CATERPILLAR, BUILT FOR IT, their perspective logos, “Caterpillar Yellow”, the “Power Edge” trade dress as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission.

PipeLine Machinery International (PLM) delivers maximum performance through quality machinery, solutions and people - and we’re ready to go to work for you. Cat® Pipelayers are purpose-built to provide increased lift-capacity, ease of operation and maximum performance. The Cat ACERTTM engines meet global emission standards and like all Cat machines, are designed for long life and serviceability to help keep your operating costs low. Let’s work together.

PERFORMANCE AT WORK.

PL87 PL83 PL72

Lift Capacity Net Power Max216, 000 lb. 345 hp

Lift Capacity Net Power Max170, 000 lb. 345 hp

Lift Capacity Net Power Max90, 000 lb. 245 hp

PL61

Lift Capacity Net Power Max40, 000 lb. 125 hp

PipelineNews_Jan2017_HalfPage.indd 1 10/16/17 11:09 AM

Page 4: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

32 Pipeline News November 2017 • www.pipeline-news.com

ONGOINGProjects construction underway

Project: Enable Gas Transmission Expansion/Enable Oklahoma Intrastate Transmission Expansion

Type: Project includes the expansion of two existing pipelines

Location: Oklahoma (SCOOP/STACK)Comments: The expansions will utilize existing

capacity on EGT and EOIT along with the installation of certain new facilities to provide over 600 MDth/d of new, firm natural gas transportation service

Project: Cana and STACK Expansion (CaSE) ProjectType: Project includes the expansion of existing

pipelineLocation: Oklahoma (SCOOP/STACK)Completion: 2018Comments: Project is expected to launch at an initial

capacity of 45 MDth/d, growing to the full 205 MDth/d of contracted capacity by 4Q 2018

ENERGY TRANSFER PARTNERS — (10/17)Project: Red Bluff PipelineType: Project includes pipeline constructionLength: 93 milesDiameter: 30 and 42 inchesLocation: Orla, TX - Waha, TXCapacity: 1.4 Bcf/dCompletion: 2Q 2018Comments: Project will connect the Orla Plant to

the Waha Plant to provide residue gas takeaway and has guaranteed fee based long-term commitments

Owner: Energy TransferProject: Revolution PipelineType: Project includes the construction of

pipeline and a fractionation facilityLength: 86 milesDiameter: 24 and 30 inchesLocation: Butler County, PA – Revolution PlantComments: Project will have a capacity in excess of

440 MMcf/d

Contractor: Capstone EnergyType: Project includes pipeline construction

Contractor: WillbrosType: Project includes pipeline construction

Contractor: PumpcoType: Project includes pipeline construction

EQT & RANGE RESOURCES – (5/17)Project: Mako Pipeline – Phase IIType: Project includes the construction of

24-inch pipelineLength: 20 milesLocation: PennsylvaniaComments: Pipeline will provide more than .5 Bcf/d of

firm capacity and is backed by a long-term firm capacity reservation commitment

EQUITRANS LP – (6/17)Project: Plasma InterconnectType: Project includes the construction of a

30-inch diameter pipeline (H-310 line), the Plasma Compressor Station and two header pipelines

Length: 35 milesLocation: Monroe County, OH

Comments: Project is part of the Ohio Valley Connector Project and will create 850 MDth/d of new firm transportation service

EXCEL ENERGY – (7/17)Contractor: Snelson Cos. Inc./KR Swerdfeger

Construction/SiteWise Corp./Q3 Contracting

Project: Residential Gas Service Replacement Program

Type: Project includes integrity management and maintenance work on existing pipeline

Location: Henderson, COComments: The program will result in the replacement

of 600 miles of natural gas pipeline throughout Colorado, with nearly 100 miles residing in the Denver metro area

GEOSOUTHERN OPERATING II LLC – (9/17)Project: DC PipelineType: Project includes gathering system

constructionLength: 9.2 milesDiameter: 10 inchesLocation: Martin County, TXDocket: T-4 01234

HARVEST PIPELINE CO. – (9/17)Project: St. Charles Ranch PipelineType: Project includes pipeline constructionLength: 9.8 milesDiameter: 10 inchesLocation: Aransas County, TXDocket: T-4 01234

HENKELS & MCCOY – (2/17)Owner: Spectra EnergyProject: Atlantic BridgeType: Project includes the take up, relay and

new lays of 12-inch to 42-inch pipeline and compressor station work

Length: 35 milesLocation: Westchester County, NY; Fairfield, New

Haven and New London counties, CT; Norfolk County, MA

Completion: 2017Comments: Project will have a peak capacity of

132,700 Dth/d

HOWARD MIDSTREAM ENERGY PARTNERS LLC – (1/17)Operator: Nueva Era Pipeline LLCProject: Nueva Era PipelineType: Project includes the construction of two

30-inch pipeline laterals— 17 miles in Webb County, TX (Impulsora Pipeline) and 171 miles in Mexico (Midstream de Mexico)

Length: 190 milesLocation: Webb County, TX - Escobedo, Nuevo LeónCompletion: 2018Comments: Project will provide seamless

transportation service for 600 MMcf/d of natural gas (expandable to 900 MMcf/d), connecting producers in South Texas directly with end-users in northern Mexico

Operator: Impulsora Pipeline LLCProject: Impulsora PipelineType: Project includes the construction and

operation of new border crossing pipeline facilities station

Length: 17 miles

Diameter: 30 inchesLocation: Webb County, TXDocket: CP16-70

INFRASOURCE CONSTRUCTION LLC – (5/17)Owner: Dominion East OhioType: Project includes the construction of

24-inch and 16-inch pipelineLength: 10 milesLocation: Mehoning and Trumball counties, OH

INTERSTATE POWER AND LIGHT CO. PIPELINE – (9/17)

Project: Clinton #3 LateralType: Project includes pipeline constructionLength: 12.3 milesDiameter: 16 inchesLocation: Clinton and Scott counties, IADocket: P-0893Completion: 1Q 2018

IROQUOIS GAS TRANSMISSION SYSTEM LP – (REV 2/16)Owner: Tennessee Gas Pipeline Co. LLCProject: South-to-NorthType: Project includes the reverse flow on

existing pipelineLocation: Canajoharie, NY; Brookfield, CT; and

Wright, NY Completion: 2017Comments: Project would transport up to 300 MDth/d

of natural gas

KINDER MORGAN INC. – (REV 8/17)Project: Mier-Monterrey PipelineType: Project includes the looping of the

existing system and construction a new lateral

Location: Pesquería, Nuevo León, MexicoCompletion: 1Q 2018Comments: Pipeline connects to a 1,000-megawatt

power plant complex and to the Pemex natural gas transportation system

Contractor: Gulf Interstate EngineeringType: Project includes engineering,

procurement and construction support for pipeline

Contractor: ARB Inc.Type: Project includes pipeline construction

Operator: Tennessee Gas Pipeline Co. LLC Contractor: Henkels & McCoy Inc. Project: Orion ProjectType: Project includes the construction

of pipeline looping (i.e., installation of additional pipe adjacent to and connecting with the existing pipeline) and minor modifications to one existing compressor station

Length: 13 miles Diameter: 36 inchesLocation: Pike and Wayne counties, PACapacity: 135 MDth/dCost: $143 millionHQ: Honesdale, PASupt: Chad SimmonsForemen: Jason Steed and Mark StewardCompletion: 3Q 2018

Page 5: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

www.pipeline-news.com • November 2017 • Pipeline News 33

ONGOINGProjects construction underway

Project: UTOPIA East ProjectType: Project includes construction of the first

two spreads of the 12-inch pipelineLength: 215 milesLocation: Harrison County, OH - Fulton County, OHCompletion: 2018Comments: UTOPIA will transport previously refined

or fractionated natural gas liquids, including ethane and propane, with an initial 50 Mbpd of capacity, which is expandable to more than 75 Mbpd

Contractor: Minnesota Ltd. LLCType: Project includes metering station

upgrades and pipe fabricationDiameter: 2 to 12 inchesLocation: Tuscarawas County, OHHQ: Dover, OHSupt: Gary Hawk

Contractor: Letourneau Enterprises LLCType: Project includes the clearing, grubbing

and matting of pipeline right-of -wayLength: 4 milesDiameter: 12 inchesLocation: Harrison County, OHHQ: Cadiz, OHSupt: Tyson L. Shook

Contractor: Henkels & McCoy Inc.Project: Connecticut ExpansionType: Project includes the fabrication and

installation of pipeline loopingLength: 13.4 milesDiameter: 24 and 36 inches

Location: Albany County, NY, Berkshire and Hampden counties, MA and Hartford County, CT

Capacity: 72.1 MDth/dCost: $93 millionForemen: Timothy Hathaway and Mark StewardCompletion: 4Q 2017

Project: Gulf Coast Southbound Expansion Phase IType: Project includes the construction of

a new compressor station, modifying existing valve sites and replacement of a minimal length of pipeline facilities, as well as modifications to NGPL’s existing compressor station facilities

Location: Cass, Victoria, Wharton and Angelina counties, TX; White County, AR

Capacity: 460 MDth/dCompletion: 4Q 2018

Project: Gulf Coast Southbound Expansion Phase II

Type: Project includes construction of additional compression facilities at NGPL’s new compressor station

Location: Chicago Market, IL - Agua Dulce Hub, LACapacity: 250 MDth/dCompletion: 4Q 2019

LATEX CONSTRUCTION – (5/17)Owner: PSNC Energy Project: T-001A Gas PipelineType: Project involves the construction of

24-inch and 8-inch pipeline Length: 50 miles

Location: Cleveland, Rutherford and Polk counties, NC

MARKWEST – (7/17)Contractor: Apex Pipeline Services Inc.Project: Sherwood ExpansionType: Project includes the installation of

pipelineLength: 3 milesDiameter: 30 inchesLocation: Doddridge County, WVCapacity: 600 MMcf/dHQ: Sherwood, WVSupt: Roman McKown

MEADE – (6/17)Owner: NIPSCOProject: LaPorte to Gary Aetna Natural Gas Line

UpgradeType: Project includes the replacement of

existing 22-inch natural gas transmission line with a 24-inch lineLength: 30 milesLocation: LaPorte County, INComments: Work will be conducted in existing

NIPSCO easements and construction will begin on the La Porte side of the route and move west toward Gary

MICHELS – (5/17)Owner: Northern Natural GasProject: Northern Lights 2017 ExpansionType: Project includes the construction of

5.3 miles of 16-inch pipeline (Chisago

Page 6: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

34 Pipeline News November 2017 • www.pipeline-news.com

ONGOINGProjects construction underway

Interconnect Loop), the construction of 1.3 miles of 6-inch pipeline (Belle Plaine Loop Extension) and the construction of 2.8 miles of 12-inch pipeline (St. Cloud Loop Extension)

Length: 10 milesLocation: Chisago, LeSueur, Scott and counties, MNComments: Project will transport an incremental

peak day firm service load of 76 MDth/d through the addition of the pipeline and compression facilities on Northern’s existing system

Owner: Spectra EnergyProject: Lebanon ExtensionType: Project includes the construction of

36-inch pipelineLength: 2.1 milesLocation: Monroe County, OH

MIDAMERICAN ENERGY HOLDINGS CO. –(9/17)Operator: Northern Natural Gas Co.Project: Des Moines B-line Loop ProjectType: Project includes pipeline looping and

pipeline abandonmentLength: 14 milesDiameter: 20 inchesLocation: Boone and Polk counties, IACost: $32.5 millionDocket: CP17-434Status: Project is in the bidding phase

Contractor: Appalachian Pipeline Contractors LP Type: Project includes pipeline installationContact: Bobby Rose Supt

MOGAS PIPELINE LLC – (5/17)Project: MoGas PipelineType: Project includes looping the MoGas

natural gas pipeline to add incremental firm capacity

Location: MissouriComments: Project is currently undergoing an open

season

NATIONAL FUEL GAS SUPPLY CORP. – (5/17)Project: Line T2KNY Install, Line TNY Replacement,

and Line KNY Abandonment Type: Project includes the installation of 1.2

miles of new 20-inch natural gas pipeline (Line T2KNY), replacement of 6.7 miles of 20-inch bare steel pipeline with 7 miles of 24-inch coated natural gas pipeline (Line TNY), abandonment of 14.9 miles of 20-inch bare steel natural gas pipeline (Line KNY), modifications at two existing meter and regulator stations (North Boston and East Eden), and modifications at the existing Zoar Compressor Station

Length: 14 milesLocation: Erie County, NYComments: Project will provide an additional

2.6 MDth/d of new firm capacity

NEW MEXICO GAS CO. – (8/17)Project: Taos Mainline Re-route ProjectType: Project includes take up and relay of

existing pipelineLength: 6 miles

Diameter: 12 inchesCost: $14 millionLocation: Pilar, NMCompletion:4Q 2017

Contractor: Crossfire LLCType: Project includes pipeline replacement

ONEOK INC. – (9/17)Operator: ONEOK WesTex Transmission LLCProject: ONEOK WesTex Transmission Pipeline

ExpansionType: Project includes pipeline constructionLength: 15 milesDiameter: 24 inchesLocation: Reeves County, TXCapacity: 100 MMcf/dCompletion: 2Q 2018

Project: STACK Gathering SystemType: Project includes pipeline constructionLength: 32 milesDiameter: 16 inchesLocation: Blaine County, OKCapacity: 200 MMcf/dCost: $40 millionCompletion: 4Q 2017

Contractor: T.G. Mercer Consulting Services Inc.Type: Project includes offloading and racking of

pipelineContact: Michael Magee Supt

ORYX MIDSTREAM SERVICES LLC – (9/17)Operator: Oryx Southern Delaware Oil Gathering

and Transport LLCProject: Oryx Trans Permian Pipeline Gathering

SystemType: Project includes pipeline gathering system

constructionLength: 15 milesDiameter: 10 inchesLocation: Reeves County, TX

Operator: Oryx Southern Delaware Oil Gathering and Transport LLC

Project: Pecos Big Tex Gathering SystemType: Project includes trunkline constructionLength: 24 milesDiameter: 12 inchesLocation: Pecos, TX

Operator: Oryx Southern Delaware Oil Gathering and Transport LLC

Project: Pecos Utah Gathering SystemType: Project includes pipeline gathering system

constructionLength: 7 milesDiameter: 12 inchesLocation: Pecos, TX

PACIFIC GAS AND ELECTRIC CO. – (8/17)Operator: Northwest Natural Gas Co.Project: North Mist Expansion ProjectType: Project includes pipeline construction, a

new reservoir and a compressor stationLength: 13 milesDiameter: 16 inchesLocation: Portland, ORCapacity: 2.5 Bcf/dCost: $125 millionCompletion: 4Q 2018

Contractor: FluorType: Project includes front-end engineering

and designCost: $125 million

Contractor: Snelson Companies Inc.Type: Project includes pipeline installationContact: David Wix Superintendent

Project: PG&E’s Pipeline Safety Enhancement PlanType: Project includes pipeline transmission

line work as part of ongoing gas-system improvements

Location: California

Contractor: InterCon Construction Inc. Type: Project includes pipeline hydrotesting,

installation of two launchers and three mainline valves

Length: 27 milesDiameter: 34 inchesLocation: Kern County, CAContact: Mary LaRue Superintendent

PASO NORTE PIPELINE GROUP – (REV 8/14)Project: Paso Norte PipelineType: Project includes the construction of

30-inch pipelineLength: 340 milesLocation: Deming, NM - Mexico/ChihuahuaComments: The pipeline will have a capacity of 366

MMcf/d of natural gas

PIPELINE SYSTEMS INC. – (4/17)Project: Tenaska Westmoreland PipelineOwner: Tenaska Pennsylvania PartnersType: Project includes mainline construction on

20-inch pipelineLength: 9.5 milesLocation: Westmoreland County, NEComments: Project will run from an existing Texas

Eastern pipeline and connect to a new electric power generator

PRICE GREGORY INC. – (4/17) Owner: Tennessee Gas Pipeline Co. LLCProject: Triad Expansion ProjectType: Project involves the expansion of 36-inch

pipeline looping along existing line right-of-way

Length: 7 milesLocation: Susquehanna County, PACompletion: 2017Comments: Project will have an additional capacity of

180 MDth/d

Owner: Energy Transfer Partners LP/Regency Energy Partners LP

Project: Roadrunner Gas Transmission PipelineType: Project includes the construction of

30-inch pipelineLength: 200 milesLocation: Coyanosa, TX – MexicoCompletion: 2019Comments: First phase of the pipeline project for 170

MMcf/d of available capacity is expected to be completed by 1Q 2016. The second phase, which will increase the pipeline’s available capacity to 570 MMcf/d, is expected to be completed by 1Q 2017. The third and final phase of the project

Page 7: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

www.pipeline-news.com • November 2017 • Pipeline News 35

ONGOINGProjects construction underway

is expected to be completed in 2019 and will increase available capacity on the pipeline to 640 MMcf/d

QEP ENERGY CO. – (9/17)Project: Fuel Gas LateralType: Project includes gathering system

constructionLength: 5 milesDiameter: 6 inchesLocation: Martin County, TXDocket: T-4 01234

RICE ENERGY — (8/17)Contractor: InterCon Construction Inc.Project: Prometheus PipelineType: Project includes pipeline installationLength: .5 milesDiameter: 16 inchesLocation: Monroe County, OHContact: Joe Schmelzer Superintendent

Contractor: Apex Pipeline ServicesProject: Utica Gathering LineType: Project includes the construction of a

gathering pipeline and an interconnectLength: 12 milesDiameter: 16 inchesLocation: Cameron and Monroe counties, OHCapacity: 350 Mcf/dHQ: Cameron, OHSupt: Dana Keaton

SEMGROUP CORP. – (6/17)Project: Canton PipelineType: Project includes the construction of

24-inch pipelineLength: 50 milesLocation: Woods County, OK - Blaine County, OKCompletion: 4Q 2017Comments: Project will have an initial capacity of 200

MMcf/d and, with additional compression, could be expanded up to 400 MMcf/d

SHELL PIPELINE – (12/16)Project: Falcon PipelineType: Project includes the construction of new

pipelineLength: 94 milesLocation: Pennsylvania, West Virginia and OhioCompletion:2018Comments: Project will collect ethane from MarkWest

Energy Partners LP’s Houston Processing and Fractionation facility in Washington County, PA and from its Cadiz Complex in Harrison County, OH

SIERRITA GAS PIPELINE LLC – (REV 3/17)Project: Sierrita Gas PipelineType: Project includes the construction of

36-inch pipelineLength: 60 milesLocation: Tucson, AZ - Sasabe, AZCapacity: 200 MMcf/dCost: $200 millionDocket: CP13-74

SOUTH JERSEY GAS – (4/17)Project: South Jersey Gas PipelineType: Project includes the construction of an

underground 24-inch pipelineLength: 22 milesLocation: Maurice River Township, NJ – Upper

Township, NJCompletion: 2019Comments: Project has been approved by the

Pinelands Commission and will serve more than 140,000 customers

SPECTRA ENERGY – (8/16)Owner: Comisión Federal de ElectricidadProject: Nueces-to-Brownsville PipelineType: Project includes constructing and

operating a header systemLength: 168 milesLocation: Nueces County, TX – Brownsville, TXStart: 2016Completion: 2018Comments: The pipeline will connect with the Sur de

Texas – Tuxpan Pipeline, which will extend into Mexico

STAR CENTRAL GAS PIPELINE INC. – (9/17)Project: Shidler Line Abandonment ProjectType: Project includes pipeline abandonmentLength: 31.2 milesDiameter: 16 inchesLocation: Osage County, OKDocket: CP16-456

To PerformanceDual/Multiple Diameter Pigs have a slotted cup/slotted

disc design for pigging dual diameter or multiple diameter

pipelines. Minimizing by-pass, these pigs provide a

near constant seal in multiple diameter conngurations.

800-752-1628 • 918-446-1934w w w.enduropls.com • [email protected]

Page 8: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

36 Pipeline News November 2017 • www.pipeline-news.com

ONGOINGProjects construction underway

STRIKE CONSTRUCTION – (5/17)Owner: Spectra EnergyProject: Valley CrossingType: Project includes the construction of

36-inch or 42-inch pipeline header systemLength: 168 milesLocation: Aqua Dulce Hub, Nueces County, TXCapacity: 2.6 Bcf/dCompletion: 2Q 2018Comments: Valley Crossing’s transportation services

will provide new market opportunities for Texas gas producers and help Mexico meet its growing electric generation needs as generators shift away from fuel oil and imported LNG

Owner: Spectra EnergyProject: Jackfish Lake ExpansionType: Project includes the construction of two

36-inch loops to expand to the Fort St. John mainline. Two compressor station additions will also be built to move the increased volume of gas

Length: 22 milesLocation: Taylor - ChetwyndComments: The project will add 137.5 MMcf/d of

transportation capacity to Spectra Energy’s BC Pipeline

SUNLAND CONSTRUCTION – (1/17)Operator: Gulf South Pipeline LPProject: Coastal Bend HeaderType: Project includes the construction of

36-inch pipeline, three compressor stations and seven meter stations

Length: 66 milesLocation: Wharton and Brazoria counties, TXCompletion: 3Q 2017

SUNOCO LOGISTICS – (7/17)Project: Mariner East IIType: Project includes pipeline constructionLength: 51 milesDiameter: 20 inchesLocation: Cumberland and Dauphin counties, PACapacity: 345 MbpdCompletion: 3Q 2017

Contractor: Precision Pipeline LLCSub: Northern Clearing Inc.Type: Project includes the clearing of pipeline

right-of-wayDiameter: 16 and 20 inchesLocation: Perry, York and Dauphin counties, PASupt: Duanne Kmieciak

Contractor: Welded ConstructionType: Project includes the dual lay of pipelineLength: 34 milesDiameter: 16 and 20 inchesLocation: Morgantown, PAForemen: Boyd Catching Jr., Steward Guffey and

Daniel Heath

Contractor: Welded ConstructionType: Project includes the new lay of pipelineLength: 27 milesDiameter: 12 and 20 inchesLocation: Washington, PAForemen: Anthony Loggins and Timothy Steward

Contractor: Welded ConstructionType: Project includes the new lay of pipelineLength: 25 milesDiameter: 20 inchesLocation: Smithton, PAForemen: Gary Weems and Edward Steward

TALL OAK MIDSTREAM – (10/17)Project: TOM Midcon TransportType: Project includes construction of pipelineLength: 25 milesDiameter: 16 inchesLocation: Alfalfa, OKCompletion: 1Q 2018

Contractor: ACT Pipeline ServicesType: Project includes construction of pipeline

TEXAS EASTERN TRANSMISSION LP – (5/17)Project: Marshall County Mine Panel 17W ProjectType: Project includes the excavation and

elevation of sections of Texas Eastern’s lines 10 (30-inch diameter), 15 (30-inch diameter), 25 (36-inch diameter) and 30 (36-inch diameter) to minimize and monitor potential strains on the pipelines due to anticipated longwall mining activities of Marshall Coal

Location: Marshall County, WV Comments: Once the mining-induced subsidence

and the 2017-2018 heating season have both finished, the two sections of Lines 10 and 15 located within wetlands will be removed and the four elevated pipeline sections will be re-installed below ground, hydrostatically tested, and placed back into service

Project: TEALType: Project includes the construction of

two 36-inch and 30-inch pipelines, new compressor stations and upgrades to existing compressor stations

Length: 5 milesLocation: Alabama and OhioStart: 2017Comments: One pipeline will tie into NEXUS

Project: Bayway LateralType: Project includes the construction of

24-inch pipeline, meter and regulating stations

Length: .5 milesLocation: Linden, NJStart: 2017

Project: Northern Supply AccessType: Project includes the modification of

existing facilities and construction of a new 23,877 horsepower compressor station

Location: Indiana, Ohio, Kentucky, Tennessee, and Mississippi

Completion: 2017Comments: Project will provide efficient north-to-

south natural gas transportation on Texas Gas’ existing system, while maintaining the current south-to-north flow

TEXAS GAS TRANSMISSION LLC – (9/17)Project: Calliou Bay—Dog Lake PipelineType: Project includes the abandonment of

certain pipeline assets and ancillary

facilitiesLength: 6 milesDiameter: 8 inchesLocation: Terrebonne Parish, LADocket: CP17-437

Project: Deep Saline—Peltex PipelineType: Project includes the abandonment of

certain pipeline assets and ancillary facilities

Length: 12 milesDiameter: 10 inchesLocation: Terrebonne Parish, LADocket: CP17-437

TRANSCANADA CORP. – (8/17)Operator: ANR Pipeline Co.Project: Wisconsin South Expansion ProjectType: Project includes installation of a new

compressor unit, lateral replacements and capacity enhancements at existing meter stations

Location: Kendall and Kane counties, IL; Rock County, WI

Capacity: 230 MDth/dCost: $57.7 millionDocket: CP17-9

Contractor: Minnesota Ltd. LLCType: Project includes the replacement of

pipelineDiameter: 22 and 30 inchesLocation: Lake County, INSupt: Kerry Schott Superintendent

Contractor: Henkels & McCoy Inc.Type: Project includes take-up and installation

of pipelineLength: .8 milesDiameter: 24 inchesContact: Andrew Lurkin Superintendent

TROY CONSTRUCTION – (REV 6/17)Owner: Williams PartnersProject: Virginia Southside Expansion Project IIType: Project includes the construction of new

24-inch pipeline, one delivery metering and regulator station, an additional unit at a compressor facility station and an additional electric motor for an existing Transco compressor station

Length: 4 milesLocation: Brunswick County, VA - Greensville

County, VACompletion: 4Q 2017Comments: FERC has approved Williams’ request to

use an additional 1.26 acres of temporary workspaces at six existing Transco meter and regulator stations. Once completed, project will provide 250 MDth/d of firm transportation capacity to a delivery point on a new lateral

VELOCITY CENTRAL OKLAHOMA PIPELINE LLC – (4/17)Type: Project includes the construction of

an 8-inch pipeline and four terminal expansions

Length: 41 milesLocation: Cushing, OK (SCOOP play)Completion: mid-2017

Page 9: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

www.pipeline-news.com • November 2017 • Pipeline News 37

ONGOINGProjects construction underway

Comments: Project will allow producers to transport up to 100 Mbpd of truck injected or pipeline gathered barrels

WASHINGTON GAS LIGHT – (7/17)Contractor: InfraSource LLCProject: WGL Loop ReplacementType: Project includes the replacement of a

pipeline loop and 10,500 feet of pipelineLength: 20 milesDiameter: 20 inchesLocation: Clarke County, VAHQ: Front Royal, VASupt: Jason NashComments: Project is part of a 40-year plan to

replace gas main and service lines called PROJECTpipes, which was approved by the Public Service Commission of the District of Columbia in Order No. 17602

WBI ENERGY INC. – (REV 5/17)Project: Demicks Lake PipelineType: Project involves the construction of a

24-inch lateralLength: 22 milesLocation: North DakotaCompletion: 2017Comments: Project will have an additional capacity of

222 MMcf/d

WHC ENERGY SERVICES – (2/17)Owner: ONEOK/FermacaProject: Roadrunner Pipeline

Type: Project includes the construction of 30-inch pipeline

Length: 200 milesLocation: Coyanosa, TX – Tarahumara, MexicoComments: Pipeline will connect to the Tarahumara

Pipeline

WHITEWATER MIDSTREAM – (4/17)Project: Agua Blanca PipelineType: Project includes construction of pipelineLength: 77 milesDiameter: 36 inchesLocation: Orla, TX - Waha HubCapacity: 1.25 Bcf/dCompletion: 4Q 2018

WILLIAMS TRANSCONTINENTAL – (REV 11/17)Owner: Williams Partners LPProject: Southeast Market Pipelines ProjectSegment: Hillabee Expansion (Phases I, II and III)Type: Project includes pipeline looping and

installation of additional compression on the mainline

Length: 45 milesDiameter: 42 inchesLocation: Coosa, Chilton and Choctaw counties,

ALCapacity: 1.2 MMDth/dDocket: CP15-16Status: Phase I is in service and FERC has

prepared a Draft Supplemental Environmental Impact Statement for the remaining two phases

Comments: Southeast Market Pipelines Project includes Sabal Trail Transmission LLC’s

Sabal Trail Project and NextEra’s Florida Southeast Connection

Completion: 4Q 2021

Owner: Williams Partners LP Project: Atlantic SunriseContractor: Latex Construction – Spread 4 / Welded –

Spread 7Type: Project consists of compression and

looping of the Transco Leidy Line in Pennsylvania along with a greenfi eld pipeline segment, referred to as the Central Penn Line, connecting the northeastern Marcellus producing region to the Transco mainline near Station 195. Additional Transco facilities are also being added or modifi ed to allow gas to fl ow bi-directionally

Length: 207 miles (183 miles of greenfi eld pipeline and two pipeline loops - the Chapman Loop and Unity Loop - totaling 12 miles)

Location: Pennsylvania, Maryland, Virginia, North Carolina and South Carolina

Comments: Project has been approved by the Federal Energy Regulatory Commission (FERC) and will add 1.7 MMDth/d of pipeline capacity to the existing Transco system

Segment: Central Penn LineType: Project includes construction of pipelineLength: 177 milesDiameter: 42 inchesLocation: Susquehanna County, PA - Lancaster

County, PACapacity: 1.7 MMDth/d

New York/Pennsylvania Based Company

Mainline Pipe Construction

Hydrostatic Testing

All Sizes of Horizontal andDirectional Drilling Services

National Leaders inNational Leaders inSafety and Environment

www.meridienenergy.com716 358 2131

P.O. Box 812647 Rt. 394 Randolph-Jamestown Rd.

Randolph, NY 14772e-mail: info @ meridienenergy.com

30 Years of exclusively constructinglarge diameter natural gas pipelines

up to 42” in Northeastern United States

Page 10: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

38 Pipeline News November 2017 • www.pipeline-news.com

ONGOINGProjects construction underway

Cost: $410 millionDocket: CP15-138

Owner: Williams Partners LPProject: Leidy Southeast ExpansionType: Project consists of construction of new

pipe within or parallel to existing pipeline and utility rights-of-way, horsepower additions at existing compressor stations and existing facility modifi cations along its mainline

Length: 30 milesLocation: Pennsylvania and New JerseyComments: Project will expand the Leidy Line’s

currently subscribed fi rm transportation capacity of 1.7 MMDth by about 30 percent

Owner: Williams Partners LPProject: Garden State ExpansionType: Project involves an expansion to deliver

180 MDth/d of additional natural gas capacity

Location: Burlington County, NJStart: 2016Completion: 2017Comments: Project is part of an expansion of the

Transco interstate natural gas pipeline

Owner: Williams Partners LPProject: Gulf Connector Expansion ProjectType: Project includes increasing compression

on the existing pipelineLocation: Texas – LouisianaCapacity: 475 MDth/dCost: $167.4 millionDocket: CP16-494Status: Project submitted an application

with FERC for a Certifi cate of Public Convenience and Necessity

Start: 4Q 2017Completion: 1Q 2019

WISCONSIN GAS – (10/17)Project: Dovre Lateral Natural Gas PipelineType: Project includes construction of pipelineLength: 9.5 milesDiameter: 12 inchesLocation: Barron County, WICompletion: 2Q 2018

WPX ENERGY – (8/17)Operator: Howard Energy PartnersProject: Stateline oil gathering and gas processing

projectsType: Project includes construction of a

gathering system and associated pipelinesLength: 50 milesDiameter: 36 inchesLocation: Lea and Eddy counties, NM; Reeves and Loving Counties, TXCapacity: 400 MMcf/d Cost: $863 millionCompletion: 2Q 2018Comments: JV plans to add a second train to double

capacity of the complex by 2Q 2019

XCEL ENERGY – (10/17)Project: Lancaster to Fort Lupton Pipeline Type: Project includes construction of pipelineLength: 4.1 milesDiameter: 24 inchesLocation: Weld County, CO

Status: Project is in the development stageStart: 3Q 2017Completion: 1Q 2018

CanadaTRANSCANADA CORP. – (9/17)Operator: Gas Transmission Northwest LLCProject: Gas Transmission Northwest PipelineType: Project is an existing pipelineLength: 1,353 milesLocation: Kingsgate, B.C. – Malin, ORCapacity: 2.9 MMcf/dComments: Pipeline transports Western Canadian

Sedimentary Basin and Rocky Mountain-sourced natural gas to third-party natural gas pipelines and markets in Washington, Oregon, and California

Contractor: United Piping Inc.Type: Project includes station modifi cations

along mainlineDiameter: 2 inches to 48 inchesLocation: Walla Walla County, WA - Morrow County,

ORContact: Mark Thomson Superintendent

Operator: NOVA Gas Transmission Ltd.Project: 2017 NGTL System Expansion ProjectType: Project includes construction of fi ve

pipeline sections and two compression facilities

Length: 143Diameter: 24, 30 and 36 inchesLocation: AlbertaCapacity: 443 MMcf/dCost: $1.3 billionFiling: 443 MMcf/dCompletion: 2Q 2018

Segment: Grande Prairie Mainline Loop 2 – McLeod River Section

Type: Project includes construction of pipeline looping

Length: 22 milesDiameter: 48 inchesLocation: Edson, AB

Section: Liege Lateral Loop 2 – Pelican Lake Section

Type: Project includes construction of pipeline looping

Length: 35 milesDiameter: 30 inchesLocation: Wabasca, AB

Segment: Kettle River Lateral Loop – Christina River Section

Type: Project includes construction of pipeline looping

Length: 12 milesDiameter: 24 inchesLocation: Fort McMurray, AB

Segment: Loop – Boundary Lake SectionType: Project includes construction of pipeline

loopingLength: 56 milesDiameter: 36 inchesLocation: Clear Hills County, AB

Segment: Northwest Mainline Loop No. 2 – Bear

Canyon SectionType: Project includes construction of pipeline

loopingLength: 18 milesDiameter: 36 inchesLocation: Saddle Hills County, AB

Segment: Alces River Compressor Station Unit Addition

Type: Project includes the addition of a compressor unit

Location: Grande Prairie, AB

Segment: Otter Lake Compressor Station Unit Addition

Type: Project includes the addition of a compressor unit

Location: Manning, AB

Operator: NOVA Gas Transmission Ltd.Project: Towerbirch Expansion ProjectType: Project includes construction of two

pipelines, two meter stations, valve sites and launcher/receiver facilities

Length: 75 milesDiameter: 30 and 36 inchesCost: $439 millionFiling: A79841Completion: 4Q 2017

Project: Vaughan Mainline Expansion ProjectType: Project includes construction of pipelineLength: 7.2 milesDiameter: 42 inchesLocation: Vaughan, OntarioFiling: A78823

Caribbean/South & Central AmericaCANACOL ENERGY LTD. – (10/17)Project: Sabanas Gas FlowlineType: Project includes pipeline constructionLength: 51 milesLocation: Cartagena - BarranquillaCapacity: 130 MMcf/dCost: $41 million Completion: 1Q 2018Comments: Project will connect the Jobo gas plant to

the connection point with the Promigas S.A. Gas Pipeline at Bremen

ENCANA – (REV 11/17)Owner: Argentine GovernmentProject: Noreste Argentino PipelineType: Project includes the construction of

a main trunk line, branch lines and compressor stations

Length: 910 milesDiameter: 30 inchesLocation: Buenos Aires - UruguayCapacity: 10 Bcm/yCost: $2 billionCompletion: 2Q 2018Comments: Project will be carried out in three

diff erent construction phases: Salta, Formosa and Santa Fe

Contractor: Siat and TubaceroType: Project includes pipeline supply

Contractor: Vertúa

Page 11: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

www.pipeline-news.com • November 2017 • Pipeline News 39

ONGOINGProjects construction underway

Segment: SaltaType: Project includes pipeline construction

Contractor: Techint-PanedileSegment: FormosaType: Project includes pipeline construction

Contractor: Helport-CPC-Rovella Carranza and Contreras Hermanos

Segment: Santa FeType: Project includes pipeline construction

PERU – (REV 11/17)Project: Southern Peruvian GaslineType: Project includes pipeline constructionLength: 620 milesDiameter: 32 inchesLocation: Camisea fi eld - Southern PeruCapacity: 800 MMcf/dCost: $2.1 billionStatus: Peru has canceled a contract for

construction of the pipeline after the consortium hired to build it failed to meet its fi nancing deadline. Odebrecht SA, the subject of a multinational corruption investigation, led the consortium with a 55% stake, Enagas SA held 25% and Grupo Grana y Montero 20%

Comments: If built, project will improve the existing Peruvian Energy Network, contributing to the development of an Energy Node and Petrochemical Hub in Southern Peru

Contractor: Tipiel SAType: Project includes the front-end

engineering and design for the pipeline

MexicoFERMACA PIPELINE EL ENCINO, S DE R.L. DE

C.V. – (REV 6/17)Owner: FermacaProject: La Laguna–Aguascalientes Natural Gas

PipelineType: Project involves building and operating a

natural gas pipelineLength: 290 milesDiameter: 42 inchesLocation: Durango - Zacatecas - AguascalientesCapacity: 1.2 Bcf/dCost: $1 billionCompletion: 2Q 2018Comments: Pipeline will supply CFE’s power plants

in Aguascalientes and Jalico states, as well as central and western parts of the country

Contractor: Fermaca Pipeline el Encino, S de R.L. de C.V.

Type: Project includes engineering, procurement and construction for the pipeline

Cost: $372 million

GASODUCTO DE AGUAPRIETA – (REV 9/17)Owner: Infraestructura Energética Nova S.A.B. de

C.V.Type: Project includes the construction and

operation of a natural gas pipelineLength: 127 milesDiameter: 42 inchesLocation: Ojinaga - El Encino, ChihuahuaCapacity: 1.4 Bcf/dCompletion: 3Q 2017Comments: Project will have a design capacity

capable of transporting approximately 1.4 Bcf/d of natural gas

Contractor: Gasoducto de AguaprietaType: Project includes engineering,

procurement and construction for the pipeline

Cost: $298 million

TRANSCANADA CORP. – (REV 7/17)Project: Tuxpan-Tula PipelineType: Project includes the construction and

operation of a natural gas pipelineLength: 155 milesDiameter: 36 inchesLocation: Tuxpan, Veracruz - TulaCapacity: 703 MMcf/dCompletion: 2Q 2018Comments: Pipeline will transport natural gas

brought from the US (through a future South Texas-Tuxpan Maritime Pipeline) to the states of Veracruz, Puebla and Hidalgo where it will be connected to the country’s pipeline network

“SAFETY FIRST - SERVICE ALWAYS”

• Pipeline Stringing - 60’ + 80’ pipe

• Unloading/Stockpiling Pipe from rail sidings

•Ship discharge/Project Pipe

• General/Heavy Hauling (Nationwide)

•Logistics/Cost Estimates

Contact:Jimmy MontgomeryJimmy@mtilogistics

Phone: (877) 787-4644, (713) 592-6766Fax: (713) 592-6769

Website: MTILOGISTICS.COM

Page 12: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

40 Pipeline News November 2017 • www.pipeline-news.com

ONGOINGProjects construction underway

Contractor: Jacobs Engineering GroupType: Project includes engineering,

procurement and construction for the pipeline

Project: Tula - Villa de Reyes PipelineType: Project involves pipeline constructionLength: 284 milesDiameter: 36 inchesLocation: Tula, Hidalgo - Villa de Reyes, San Luis

PotosíCapacity: 550 MMcf/dCost: $550 millionCompletion: 2Q 2018Comments: Pipeline will supply natural gas to the

CFE’s power generation plants located in the States of Hidalgo and San Luis

Potosí, as well as the Central and Western regions of the country

NGL – The AmericasU.S.DCP MIDSTREAM LP – (9/17)Project: Ramsey PipelineType: Project includes pipeline constructionLength: 10 milesDiameter: 12 inchesLocation: Reeves County, TXDocket: T-4 01234

ENTERPRISE PRODUCTS PARTNERS LP – (6/17)Project: Shin Oak NGL PipelineType: Project includes the construction of

24-inch pipelineLength: 571 milesLocation: Gaines County, TX - Mont Belvieu, TXCompletion: 2Q 2019Comments: Project will have an initial design capacity

of 250 Mbpd, expandable to 600 Mbpd

PEMBINA PIPELINE LTD. – (11/16)Project: Northeast B.C. (NEBC) ExpansionType: Project includes the expansion of existing

pipeline and construction of new pipelineLength: 100 milesDiameter: 12 inchesLocation: Wonowon to TaylorCapacity: 75 MbpdCost: $235 millionCompletion: 1Q 2018Comments: Expansion will add condensate NGLs to

the company’s system, while the Eagle Gas Pipeline is another step towards constructing B.C.’s first LNG export terminal

LNG – The AmericasU.S.FREEPORT LNG DEVELOPMENT LP – (5/17)Operator: Freeport LNG Development LLCProject: Freeport LNG Quintana Regas Terminal

ExpansionType: Project includes construction of three

liquefication trainsLocation: Quintana Island, TXCapacity: 13.4 MMtpaCost: $12.5 billionDocket: CP12-29

Completion: 2019Comments: Companies that have agreed to purchase

gas from Freeport LNG include Osaka Gas Co., a Japanese gas supplier; Chubu Electric Power Co., a Japanese electricity provider; and BP Energy Company, which provides gas and power to U.S. utilities and industries

Segment: Freeport LNG Pipeline FacilitiesType: Project includes pipeline construction and

facility modificationsLength: 11 milesDiameter: 42 inchesComments: Pipeline will connect the terminal with the

Sratton Ridge Meter Station

Contractor: Burns & McDonnellType: Project includes design of the terminal

Contractor: Zachry GroupType: Project includes construction of the

terminal

LIQUEFIED NATURAL GAS LTD. – (REV 8/17)Operator: Magnolia LNG LLCProject: Magnolia LNG Export TerminalType: Project includes the development of four

LNG production trains, two LNG tanks, and LNG ship and truck loading facilities

Location: Lake Charles, LACapacity: 8 MtpaDocket: CP14-347Completion:2Q 2018Comments: Project entered into a Precedent

Agreement for 20-year binding pipeline capacity with Kinder Morgan Louisiana Pipeline LLC to deliver gas to the site for the full capacity of the terminal

Contractor: KSJVProject: Magnolia LNG Export TerminalType: Project includes the engineering,

procurement, construction, commissioning, start-up and performance testing of the terminal

Cost: $4.3 billion

PUGET SOUND ENERGY INC. – (REV 8/17)Project: Puget Sound Energy LNG FacilityType: Project includes construction of an LNG

storage tank, infrastructure for loading marine vessels, mooring dolphins and distribution pipelines

Location: Port of Tacoma, WACapacity: 30 McmCost: $310 millionContact: Shirley Schultz Project Manager (253) 591-5121 [email protected]: 4Q 2019

Contractor: CB&IProject: Puget Sound Energy LNG FacilityType: Project includes the engineering,

procurement, fabrication and construction of a storage tank, liquefier and vaporizer

Cost: $200 million

TRANSCANADA CORP. – (5/17)Owner: Cameron LNGProject: Cameron Access ProjectType: Project includes the installation of pipelineLength: 34 milesDiameter: 34 and 36 inchesLocation: Lake Arthur, LAStart: 2016Completion: 2018

OIL - The Americas U.S.BAKKENLINK PIPELINE – (11/16)Project: Dry Creek to Beaver Lodge PipelineType: Project includes the construction of

16-inch pipelineLength: 37 milesLocation: Dry Creek, ND – Tioga, NDStart: 2016Comments: Pipeline would be designed with an initial

capacity of 100 Mbpd and will tie into the Garden Creek Pipeline

ENBRIDGE PIPELINES INC. – (10/17)Project: Line 3 Replacement ProgramType: Project includes replacement of pipeline

and construction of associated facilitiesLength: 1,031 milesDiameter: 34 and 36 inchesLocation: Hardisty, AB - Superior, WICapacity: 760 MbpdCost: $7.5 billionFiling: A81621Start: 3Q 2017Completion: 2Q 2019Comments: The existing Line 3 Pipeline will be

decommissioned

Contractor: MichelsType: Project includes replacement of a pipeline

segmentLength: 12 milesDiameter: 36 inchesLocation: Douglas County, WI

Contractor: Dun Transportation & Stringing Inc. Type: Project includes offloading and

stockpiling of pipeLength: 200 milesDiameter: 36 inchesLocation: Kittson, Polk, Red Lake and Carlton

counties, MNContact: Greg Norman Superintendent

Project: Line 78 Project Contractor: Minnesota Ltd. LLCType: Project includes the removal of pipelineDiameter: 24 inchesLocation: Will County, IL Supt: Kerry Schott

ENERGY TRANSFER PARTNERS – (REV 10/17)Operator: Rover Pipeline LLCProject: Rover PipelineType: Project includes construction of two dual

mainlines, four mainline compressor stations, eight supply laterals, eight supply lateral compressor stations and other ancillary facilities

Length: 713 miles

Page 13: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

www.pipeline-news.com • November 2017 • Pipeline News 41

ONGOINGProjects construction underway

Diameter: 24, 30, 36 and 42 inchesLocation: Ashland, OH - Howell, MICapacity: 3.25 Bcf/dCost: $4.2 billionDocket: CP15-93Status: Phase 1A of the pipeline is in-service and

construction has started on Phase II of the project

Completion: 4Q 2017

Contractor: AECOMType: Front-end engineering and design

Contractor: Ariel Corp.Type: Compressor supplyCost: $42 million

Contractor: Berg Steel Pipe Corp. Type: Pipe supplyLength: 620 milesDiameter: 36 and 42 inches

Contractor: Sheehan Pipeline Construction Inc.Spread: 1, 2Segment: Mainline A and BType: Pipeline constructionLength: 78 milesDiameter: 42 inchesLocation: Carroll, Tuscarawas, Stark, Wayne, Ashland, Richland, Crawford, Seneca,

Hancock, Wood, Henry, and Defiance, OH

Contractor: U.S. PipelineSpread: 3Segment: Mainlines A and BType: Pipeline constructionLength: 70 milesDiameter: 42 inchesHQ: St. Clairsville and Dennison, OHSupt: Jason West, Greg Norman and Dane

Hilsabeck Contractor: MichelsSpread: 4Segment: Mainlines A and BType: Pipeline constructionLength: 101 milesDiameter: 42 inchesSupt: Rick Zavitz

Contractor: Precision Pipeline LLCSpread: 5, 6Segment: Mainlines A and BType: Pipeline constructionLength: 208 milesDiameter: 42 inchesSupt: Bobby Poteete, Tommy Haynes and JW

Morgan

Contractor: Precision Pipeline LLCSpread: 7, 8Segment: Market Segment PipelineType: Pipeline constructionLength: 99 milesDiameter: 42 inchesLocation: Defiance, Henry, and Fulton, OH;

Lenawee, Washtenaw, and Livingston, MISupt: James Junker Jr., Cory Strandlien and

Toby Prawl

Contractor: Precision Pipeline LLCSegment: Berne LateralType: Supply lateral construction

Length: 3.7 milesDiameter: 24 inchesLocation: Noble and Monroe, OHSupt: Adam Minigh

Contractor: Precision Pipeline LLCSegment: Majorsville Lateral Type: Supply lateral constructionLength: 24 milesDiameter: 24 inchesLocation: Marshall, WV and Belmont, OHSupt: Dennis Bergman

Contractor: Precision Pipeline LLCSegment: Sherwood Lateral Type: Supply lateral constructionLength: 54 milesDiameter: 36 inchesLocation: Doddridge, Tyler, and Wetzel, WV;

Monroe, OHSupt: Jim Nierenda

Contractor: Precision Pipeline LLCSegment: CGT Lateral Type: Supply lateral constructionLength: 5.7 milesDiameter: 24 inchesLocation: Doddridge, WV

Contractor: MichelsSegment: Burgettstown Lateral Type: Supply lateral constructionLength: 52 milesDiameter: 36 inchesLocation: Washington, PA; Hancock, WV; Jefferson

and Carroll, OHSupt: Rick Zavitz

Contractor: Latex ConstructionSegment: Seneca Lateral Type: Supply lateral constructionLength: 26 milesDiameter: 42 inchesLocation: Noble and Monroe, OHSupt: Adam Minigh

Contractor: U.S. PipelineSegment: Cadiz Lateral Type: Supply lateral constructionLength: 3 milesDiameter: 30 inchesLocation: Harrison, OHSupt: Jason West

Contractor: U.S. PipelineSegment: Clarington Lateral Type: Supply lateral constructionLength: 32.6 milesDiameter: 42 inchesLocation: Monroe, Belmont and Harrison, OHSupt: Wayne Fontenot

Project: Trunkline Backhaul ProjectType: Project includes upgrades and

modifications at existing compressor stations to allow for bi-directional flow of natural gas on their existing pipeline systems

Location: Wayne County, IL; Massac County, IL; Dyer County, TN; Tate County, MI

Capacity: 750 MMcf/dCost: $50.8 millionDocket: CP15-96

Comments: Project will interconnect with the Rover Pipeline

Project: Panhandle Backhaul ProjectType: Project includes upgrades and

modifications to allow for bi-directional flow of natural gas on their existing pipeline systems

Location: Allen, Hamilton, Vermillion and Parke counties, IN; Douglas County, IL; Lenawee County, MI

Capacity: 750 MMcf/dCost: $50.8 millionDocket: CP15-94Comments: Project will interconnect with the Rover

Pipeline

Contractor: BigInch Fabricators and Construction Inc.Type: Project includes the installation of pipeline Length: 24 milesDiameter: 2 and 24 inchesLocation: Hamilton County, INHQ: Montezuma, INSupt: Jim Shepler

Contractor: BigInch Fabricators and Construction Inc.Type: Project includes the installation and

station fabrication of various pipelineDiameter: 2 to 36 inchesLocation: Parke County, INHQ: Montezuma, INSupt: Frank Ayers

Contractor: Northern Indiana Public Service Co.Type: Project includes the replacement of 1,800

feet of pipeline via HDD and in-line facility modifications

Diameter: 24 inchesLocation: Cass, Miami and Wabash counties, INSupt: Tim Dunn

ENERGY TRANSFER PARTNERS/PHILLIPS 66SUNOCO LOGISTICS – (7/17)Contractor: Troy Construction (spreads one and two)/ Sunland Construction (spreads three and

four)Project: Bayou Bridge ExpansionType: Project will be built in two phases and

includes the construction of new pipelineLength: 155 milesDiameter: 12 and 16 inchesLocation: Lake Charles, LA - St. James, LACompletion: 4Q 2017

MAGELLAN MIDSTREAM PARTNERS LP —(10/17)Project: Wink PipelineType: Project includes construction of pipeline

and a terminal, which will offer broad inbound and outbound pipeline access to parties that connect to the facility

Length: 60 milesDiameter: 24 inchesLocation: Wink, TX - Crane, TXCapacity: 250 Mbpd (initial) 600 Mbpd (expandable)Cost: $150 millionStatus: Project is under construction and will

undergo an open season at a later dateCompletion: 2Q 2019Comments: Project will offer direct service from the

Delaware Basin to the Crane origin of Magellan’s Longhorn Pipeline, which

Page 14: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

ONGOINGProjects construction underway

42 Pipeline News November 2017 • www.pipeline-news.com

provides crude oil and condensate transportation service to the Houston and Texas City refining complex and marine export facilities. In addition, the new pipeline segment will be able to provide service from the Delaware Basin to the new crude oil and condensate line to Corpus Christi, TX that has been proposed by Magellan as well as others in the industry

MEDALLION MIDSTREAM LLC – (9/17)Project: Delaware Basin Pipeline Gathering SystemType: Project includes gathering system pipeline

constructionLength: 3 milesDiameter: 11 inchesLocation: Reeves and Pecos, TXComments: Project will tie into the Delaware Basin

Pipeline

Operator: Medallion Pipeline Co. LLCProject: Wolfcamp ExpansionType: Project includes expansion of a partial

loop of the mainline Length: 47 milesDiameter: 16 inchesLocation: Howard, Glasscock, Mitchell and Scurry

counties, TXCapacity: 95 Mbpd Contact: Paige Snider Executive Assistant (972) 746-4401 [email protected]: 4Q 2017Comments: Project will be capable of providing

bi-directional services

Operator: Medallion Pipeline Co. LLCProject: Howard Lateral ExpansionType: Project includes installation of additional

pumping horsepower and construction of pipeline

Length: 15 milesLocation: Howard County, TXCapacity: 25 MbpdContact: Paige Snider Executive Assistant (972) 746-4401 [email protected]: 4Q 2017Comments: Project will be capable of providing

bi-directional services

MICHELS CORP./LOENBRO/PRECISION PIPELINE – (REV 5/16)Owner: NorthStar MidstreamProject: NST Express PipelineType: Project includes the construction of

12-inch and 30-inch pipeline, including a storage facility

Length: 1,134 milesLocation: Bakken/Three Forks area - Patoka, ILCompletion: 2018Comments: Michels will have spreads 1-3 and

Precision will have spreads 4-6. The pipeline will transport 450 Mbpd with a capacity as high as 570 Mbpd or more – which could represent approximately half of Bakken current daily crude oil production

NAVIGATOR ENERGY SERVICES – (9/17)Project: Lario Mott Gathering System ExtensionType: Project includes extension of an existing

gathering systemLength: 11 milesDiameter: 6 inchesLocation: Martin, Lario and East Willow, TXCapacity: 30 Mbpd

Project: Big Spring Gateway Pipeline ExpansionType: Project includes the construction of

a new 50-mile mainline and 25 miles of pipeline laterals to connect to new Midland destinations: Centurion Pipeline and Permian Express Terminal (formerly SunVit)

Length: 75 milesLocation: Midland, TXCapacity: 140 MbpdCompletion: 2017Comments: Upon completion of the expansion, the

system will include more than 650 miles of installed pipeline and a total system deliverability of 600 Mbpd of crude oil

NC CONTRACTORS – (5/17)Owner: Enterprise Products Pipeline LPProject: ECHO Phase IIType: Project includes the extension the 30-inch

ECHO PipelineLength: 80 milesLocation: Wilson County, TX – Gardendale, TXCompletion: 2017Comments: Project will increase capacity to

350 Mbpd

PRIMORIS/HOLLOMAN CORP./PUMPCO – (5/17)Owner: Enterprise Products Partners LPContractor: Primoris Pipeline has been awarded

spreads 1 and 2, Holloman Corp. has been awarded spreads 3 and 4, and Pumpco Inc. has been awarded spread 5

Project: Midland-to-Sealy PipelineType: Project includes the construction of

24-inch pipeline Length: 416 milesLocation: Midland, TX - Sealy, TXCompletion: 2018Comments: Pipeline will have the capability to provide

up to 540 Mbpd of take-away capacity for growing volumes of crude oil, and condensate from the Permian Basin

SANTA FE MIDSTREAM LLC – (10/17) Owner 2: Vermilion Cliffs Partners LLCProject: San Andres Gathering SystemType: Work scope includes construction of

a natural gas and crude oil gathering, treating and processing system

Diameter: 20 inchesLocation: Yoakum, Gaines and Cochran counties,

TX; Lea County, NMCapacity: 200 MMcfd (gas processing)Completion: 2Q 2018Contact: Cliff Rupnow Managing Partner and VP of Commercial (214) 308-9623 or (817) 239-5547 Comments: Residue from the natural gas processing

plant and treating facilities will be delivered to El Paso Natural Gas’ interstate pipeline with access to the WAHA hub and Western U.S. natural gas markets. NGLs

will be delivered to Enterprise Products’ Chaparral Pipeline for transportation to Mt. Belvieu, TX

SEABROOK LOGISTICS – (3/17)Owner: Magellan Midstream Partners LP/LBC Tank

Terminals LLCType: Project includes the construction of

270 Mcm of additional crude oil and condensate storage and the construction of a 24-inch bi-directional pipeline

Location: Seabrook, TXCompletion: 2018Comments: If warranted by market demand, Seabrook

Logistics could construct an additional 480 Mcm of storage, a second 24-inch diameter pipeline between the Seabrook Logistics’ facility and Magellan’s Houston crude oil distribution system and a second Aframax ship dock

SEMGROUP/NGL ENERGY PARTNERS – (3/17)Project: Glass Mountain Pipeline ExtensionType: Project includes the extension of 215

miles of existing pipelineLength: 44 milesLocation: Cushing, OKCompletion: 4Q 2017Comments: The extension will deliver crude oil from

north-central Oklahoma’s STACK resource play to Cushing, OK

SUNLAND CONSTRUCTION – (5/17)Owner: Enterprise Products Partners LPProject: RGP Pipeline and Rail Terminal Expansion Type: Project includes construction of a pipeline

lateralLength: 65 milesDiameter: 20 inchesLocation: Sorrento, LA - Breaux Bridge, LAComments: Enterprise will also upgrade rail receipt

points at Mont Belvieu to handle as many as 100 refinery grade propylene cars per day

Owner: TransCanada Corp./Magellan MidstreamProject: HoustonLinkType: Project includes the construction of a

24-inch pipelineLength: 9 milesLocation: Houston, TXStart: 2016Completion: 2017Comments: Project will provide TransCanada’s

customers access to Magellan’s Houston and Texas City crude oil distribution system

TALLGRASS ENERGY – (7/17)Contractor: Minnesota Ltd. LLCProject: REX Compressor StationType: Project includes the installation of a meter

stationDiameter: 12 inchesLocation: Hendricks County, INSupt: Kerry Schott

TALL OAK MIDSTREAM LLC – (7/15)Project: Eagle Ford JV Pipeline System ExpansionType: Project includes the construction of a

20-inch condensate gathering system and expansion on an existing pipeline system

Length: 125 miles

Page 15: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

ONGOINGProjects construction underway

www.pipeline-news.com • November 2017 • Pipeline News 43

Location: Gardendale, TX - Corpus Christi, TXCompletion: 2017Comments: Project includes a new terminal on the

Corpus Christi ship channel to support the increased volumes to be shipped via pipeline to the region

WELSPUN TUBULAR/PUMPCO/STRIKE – (10/16)Owner: Diamond Pipeline LLCProject: Diamond PipelineType: Project includes the construction of a new

pipelineLength: 440 milesLocation: Cushing, OK - Memphis, TNComments: The pipeline will be capable of

transporting 200 Mbpd of domestic crude oil from the storage hub in Cushing to Valero’s refi nery in Memphis

WESTERN REFINING INC. – (10/17)Operator: Western Refi ning Conan Gathering LLCProject: Conan Crude Oil Gathering Pipeline

SystemType: Project includes construction of a

gathering systemLength: 130 milesLocation: Lea County, NM - Loving County, TXCapacity: 246 MbpdsCost: $225 millionCompletion: 2Q 2018

CanadaENBRIDGE ATHABASCA – (REV 6/17)Project: Athabasca Pipeline TwinningType: Project includes: a new pump station at

the existing Kirby Lake Terminal; a new pump station at the existing Bonnyville Station; and a new 36-inch pipeline

Length: 214 milesLocation: Kirby LakeComments: The in-service date of the project has

been delayed until 2017 due to changes in production estimates from oil sands operations

ENBRIDGE – (3/17)Project: Enbridge Line 10 Westover Segment

Replacement ProjectType: Project includes the replacement of

12-inch pipeline with new 20-inch pipeline and three new sections for proposed reroutes from existing right-of-way

Length: 35 milesLocation: Ontario (Westover Terminal - Nanticoke

Junction Facility)Completion: 2018Comments: The National Energy Board (NEB) has

approved the project and has imposed a total of 46 conditions covering a wide range of matters, including emergency management and environmental protection

INTER PIPELINE – (2/17)Project: Kirby North Project Type: Project includes the construction of

16-inch and 8-inch pipeline laterals, as well as a new pumping and metering facility

Length: 15 miles

Location: Conklin, ABComments: Project will produce up to 100 Mbpd of

bitumen and require bitumen blend and diluent transportation capacity over the long term

KINDER MORGAN ENERGY PARTNERS – (10/17)Operator: Trans Mountain Pipeline ULCProject: Trans Mountain ExpansionType: Project includes construction of twinned

pipeline, 12 new pump stations and 20 tanks

Length: 608 milesDiameter: 30 inchesLocation: Edmonton - VancouverCapacity: 590 MbpdCost: $7.4 billionFiling: A85729Completion: 3Q 2019

Contractor: EVRAZ North AmericaType: Project includes pipe supplyLength: 497 miles

Contractor: Midwest Pipelines Inc.Type: Project includes construction of spreads

1 & 2 of the pipeline (Edmonton/Yellowhead)

Contractor: Ledcor Sicim Limited PartnershipType: Project includes construction of spreads 3

& 4 of the pipeline (North Thompson)

Contractor: Surerus Murphy Joint VentureType: Project includes construction of spread 5A

of the pipeline (BC Interior)

Contractor: Macro Spiecapag Joint VentureType: Project includes construction of spread 5B

of the pipeline (Coquihalla – Hope)

Contractor: Somerville-Aecon Energy GroupType: Project includes construction of spread 6

(Fraser Valley)

Contractor: Kiewit Ledcor TMEP PartnershipType: Project includes construction of spread 7

of the pipeline, Burnaby Mountain tunnel and three terminals (Westridge Marine Terminal, Burnaby Terminal and the Sumas Terminal)

PEMBINA PIPELINE CORP. – (REV 11/17)Project: Phase IV ExpansionType: Project involves the expansion of the

Fox Creek and Namao Pipeline through two new pump stations

Location: Fox Creek - NamaoCapacity: 180 MbpdCompletion:4Q 2018Comments: Pembina has the ability to further

expand capacity between Fox Creek and Namao by adding additional pump stations

Project: Phase V ExpansionType: Project involves pipeline construction,

installation of a new pump station and upgrading an existing pump station

Location: Lator and Fox Creek, AB

Length: 60 milesDiameter: 20 inchesCapacity: 260 Mbpd (transmission) 40 Mbbl (storage)Cost: $385 millionStatus: Clearing of the right-of-way is almost

completeCompletion: 4Q 2018Comments: Project will address capacity constraints

between Lator and Fox Creek by adding capacity, which will support growth in the prolifi c Monteny and Deep Basin resource plays

PRODUCTS –The Americas U.S.BUCKEYE PARTNERS LP – (REV 6/17)Project: Michigan/Ohio Pipeline Expansion Project

(Phase II)Type: Project includes the reversal on a portion

of the existing Laurel Pipeline to facilitate the transportation of refi ned petroleum products

Location: Pittsburgh, PACompletion: 2018

Project: Michigan/Ohio Pipeline Expansion (Phase I)Type: Project includes the reversal of a portion

of the existing Laurel PipelineLocation: Detroit, MI, Lima, OH and Midland, PAComments: This phase of the project is in addition to

the fi rst phase, which off ered expanded transportation services from Midwestern origin points to destination points as far east as the Pittsburgh area

MAGELLAN MIDSTREAM PARTNERS LP/TRANSMONTAIGNE PARTNERS LP – (6/16)Owner: Magellan Midstream Partners LP and

TransMontaigne Partners LPType: Project involves the construction of a 150-

mile, 16-inch diameter pipeline capable of transporting 150 Mbpd

Length: 150 milesLocation: Corpus Christi, TX - Brownsville, TXCompletion: 2018

VANCOUVER AIRPORT FUEL FACILITIES CORP. – (9/17)

Project: Vancouver Airport Fuel Delivery PipelineType: Project includes pipeline constructionLength: 8 miles Diameter: 14 inchesLocation: Richmond, B.C.Completion: 3Q 2018Comments: Project will supply aviation kerosene fuel

from an upgraded marine terminal and adjacent fuel storage facility

MexicoNUSTAR ENERGY LP – (8/17)Project: New Burgos Pipeline Type: Project includes construction of pipelineLength: 34 milesDiameter: 10 inchesLocation: Reynosa, Mexico - Edinburg, TX

Page 16: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

ONGOINGProjects construction underway

44 Pipeline News November 2017 • www.pipeline-news.com

Capacity: 108 MbpdComments: Project will parallel the existing Burgos

Pipeline

CanadaENBRIDGE INC. – (10/15)Project: Norlite SystemLocation: CheechamStart: 2017Comments: System will be capable of transporting

270 Mbpd of diluent from Edmonton into the oil sands region and has the potential to be further expanded with the addition of pump stations to an ultimate capacity of over 400 Mbpd

OFFSHORE – The Americas U.S.INFRAESTRUCTURA MARINA DEL GOLFO –(7/17)Owner 2: TransCanada Corp. (60%)Operator: Infraestructura Marina del GolfoProject: Sur de Texas-Tuxpan PipelineType: Project includes the engineering,

procurement, construction, operation and maintenance of an underwater pipeline

Length: 497 milesDiameter: 42 inchesCapacity: 2.6 MMcf/dCost: $1.3 billionLocation: Gulf of Mexico - Tuxpan, VeracruzCompletion: 4Q 2019Comments: The subsea gas pipeline will interconnect

with the Nueces-Brownsville Pipeline and the Tuxpan-Tula Pipeline

Contractor: AllseasSub: First SubseaType: Project includes the supply a Ballgrab

Pipeline Recovery Tool (PRT) for a subsea pipeline

Contractor: Nippon Steel & Sumitomo Metal Corp./Mitsui & Co. Ltd.

Type: Project includes the supply of a 600,000 ton steel order consisting of large diameter welded steel pipe and plate as raw material for the pipeline

Length: 242 milesDiameter: 42 and 48 inches

Contractor: Shawcor Ltd.Type: Project includes the coating of pipe

with the application of concrete weight coating in a variety of thicknesses (2.25, 2.75 and 3.5 inches) and the installation of 5,000 sacrificial anodes

SUBSEA 7 – (5/17)Owner: BPProject: Mad Dog 2 developmentType: Project includes the engineering,

procurement, construction and installation of the subsea umbilicals, risers and pipeline systems and associated subsea architecture for the project

Location: Offshore New Orleans

TECHNIP FMC – (5/17)Owner: Shell Offshore Inc.Project: Kaikias deep water projectType: Project includes the delivery, integration,

and installation of the subsea production system and subsea riser, jumper and flowline equipment for phase one of the project

Location: Gulf of Mexico

CanadaHUSKY ENERGY — (10/17)Owner 2: Suncor Energy (25%)Owner 3: Nalcor Energy (5%)Project: West White Rose Extension ProjectType: Project includes the construction of a new

fixed wellhead platform in the White Rose Field

Location: offshore St. JohnsCapacity: 75 MbpdCost: $2.2 billionCompletion: 1Q 2022

Contractor: TechnipFMC Type: Contract includes engineering,

procurement, construction and installation subsea equipment, including tie-in manifolds, flexible flowlines, and control umbilicals, which will connect the recently announced West White Rose platform to the existing SeaRose FPSO vessel

Caribbean/South & Central AmericaESSO EXPLORATION AND PRODUCTION

GUYANA LTD.– (7/17)Contractor: SaipemProject: Liza Project Type: Project includes the engineering,

procurement, construction and installation of the subsea umbilicals, risers and flowlines and associated structures and jumpers. Project also consists of transportation and installation of umbilicals, manifolds and associated foundations for the gas injection systems

Location: offshore GuyanaStart: 2019 Comments: Located 120 miles offshore Guyana at a

depth of 1,800 meters, the Liza field is a subsea development estimated to contain more than 1 billion BOE

BP TRINIDAD & TOBAGO LLC – (7/17)Contractor: McDermottProject: Angelin gas fieldType: Project includes the design, procurement,

fabrication, transportation, installation and commissioning of a six-slot wellhead platform and subsea pipeline

Diameter: 26 inchesLocation: offshore Trinidad and TobagoCapacity: 600 MMcf/dComments: The contract follows the successful

completion of a multi-phase engineering contract, including pre-front end engineering design, front-end engineering design, and pre-execution engineering contracts previously awarded

to McDermott for the initial design and execution planning of Angelin

Project: Lakach FieldType: Project includes the design, detailed

engineering, procurement, construction, load out, and mechanical completion of 4,300-ton topsides that can process 590 MMcf/d of gas, and a 6,100-ton jacket. Contract will also cover the design, detailed engineering, procurement, fabrication, transport, installation, and pre-commissioning of 10-inch and 8-inch inside-diameter flexible flowlines; 26-inch-outside-diameter, 6-mile concrete-coated rigid subsea pipeline; a diving campaign to support LNG train and field turnarounds; and a large number of subsea structures and tie-in spools

Location: TrinidadComments: Technip’s S-Lay pipelay vessel, the

G-1200, will install the rigid pipelines

OTHER – The Americas U.S.ENTERPRISE PRODUCTS PARTNERS LP – (6/17)Type: Project includes the construction of a

new 12-inch diameter ethylene pipeline and re-purposing of a large, high-capacity ethylene storage well expansion

Length: 24 milesLocation: Mont Belvieu, TXCompletion: 2018Comments: Upon project completion, the 5.3-million-

barrel cavern will be able to inject/withdraw ethylene at a rate of 2 Mbph expandable to 4 Mbph

TARRANT REGIONAL WATER DISTRICT –(8/17)Project: Integrated Pipeline ProjectType: Project includes construction of a water

transmission pipeline, three lake pump stations, and three booster pump stations

Length: 150 milesDiameter: 84 to 108 inchesLocation: Fort Worth, TX - Anderson, TXCapacity: 50 MMgpd Cost: $1.6 billionCompletion: 2018

XCL MIDSTREAM LLC — (8/17)Project: XCL Appalachia Connector Pipeline Phase

IType: Project includes construction of a gas

header system, wet gas system and a parallel fresh water pipeline

Length: 100 milesDiameter: 24 inchesLocation: West VirginiaCapacity: 800 MMcf/dCompletion: 2Q 2018Comments: Project will have interconnections with

TL-590, Leach Xpress, Mountaineer Xpress and TETCO M2 pipelines

Contractor: ProFoam LLCType: Project includes unloading pipeline and

pre-construction activities

Page 17: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

ONGOINGProjects construction underway

www.pipeline-news.com • November 2017 • Pipeline News 45

Location: Marshall County, WVContact: Kevin Smith Superintendent

GAS – International Africa GALSI PIPELINE – (REV 10/16) Owners: Sonatrach/Edison/Enel/Hera GroupProject: Galsi PipelineType: Project includes the construction of

351 miles of offshore pipeline crossing the Mediterranean Sea and 161 miles of onshore pipeline, including gas compression facilities

Length: 512 milesLocation: Koudiet Draouche - PiombinoCompletion: 2018Comments: The initial transport capacity will be 8 Bcm

per year

KINGDOM OF MOROCCO/FEDERAL REPUBLIC OF NIGERIA – (1/17)Pipeline: Trans-African Pipeline Type: Project includes the construction of a new

gas pipelineLocation: Nigeria – Morocco - Europe.Comments: The Trans-African Pipeline will improve

access to energy across West Africa and establish a competitive regional market for electricity

Asia PacificARROW ENERGY – (REV 5/16)Project: Arrow Bowen PipelineType: Project includes the construction of high-

pressure steel pipelineLength: 512 milesLocation: Bowen Basin - GladstoneCompletion: 2018

ABB – (2/16)Owners: SOCAR/BOTAS/BPProject: Trans-Anatolian Natural Gas PipelineType: Project includes delivering the control

infrastructure to contribute to safe, secure and reliable operation of the pipeline throughout its lifetime

Length: 1,150 milesLocation: Sangachal – Erzurum – Eskishehir –

Greece - Albania - ItalyCompletion: 2018Comments: Pipeline will interconnect with two others:

the South Caucasus at Turkey’s border with Georgia and the Trans Adriatic at its border with Greece and the capacity of the pipeline can reach 60 Bcm/y

AZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 11/15)Project: Azeri PipelineType: Project includes the construction of new

pipelineLength: 2,175 milesLocation: Georgia, Turkey, Greece, Bulgaria, Albania

and ItalyCompletion: 2019Comments: Pipeline will have a capacity of 16 Bcm/y

ESSAR PROJECTS – (4/17)Owner: GSPL India Gasnet Ltd.Project: Mehsana–Bhatinda–Jammu–Srinagar

Pipeline (segment)Type: Project includes laying natural gas

pipelines, a segment of the 1,305-mile Mehsana–Bhatinda–Jammu–Srinagar Pipeline

Length: 62 milesLocation: Jalandhar - AmritsarCompletion: 2017Comments: The company has recently completed the

tender process for three sections of the pipeline

GUJARAT STATE PETROLEUM CORP. – (REV 12/16)Contractor: GSPL India GasnetProject: Mehsana-Bhatinda PipelineType: Project includes the construction of new

pipelineLength: 1,037 milesLocation: Mehsana-BhatindaComments: Pipeline is currently being considered

for cancellation but, if built, will have a transportation capacity of 30 MMcf/d

Contractor: GSPL India TranscoProject: Surat-Paradip PipelineType: Project includes the construction of new

pipelineLength: 1,071 milesLocation: Surat - ParadipComments: Pipeline is currently being considered

for cancellation but, if built, will have a transportation capacity of 30 MMcf/d

Contractor: GAILProject: Mallavaram-Bhilwara PipelineType: Project includes the construction of new

pipelineLength: 984 milesLocation: Mallavaram - BhilwaraComments: Pipeline is currently being considered

for cancellation but, if built, will have a transportation capacity of 30 MMcf/d

IIL&FS ENGINEERING AND CONSTRUCTION CO. LTD. – (REV 2/17)Owner: Gas Authority of India Ltd.Project: Kochi-Koottanad-Bangalore-Mangalore

PipelineType: Project includes the laying and

construction of 30-inch pipeline along with associated works

Length: 685 milesLocation: KeralaCompletion: 2019Comments: GAIL has won a second extension for

completing the project as it faces unprecedented problems in getting land in Kerala and Tamil Nadu

KBR INC. – (2/17)Owner: PT PLNType: Project includes a feasibility study to

develop a reliable, efficient and robust infrastructure and logistics ecosystem for the LNG regasification of and gas supply to the multiple gas fired power plants in Sumatera, Maluku and Papua provinces, with the potential for additional locations. With the findings and recommendations

from the feasibility study, KBR will then perform the front-end engineering design work for the proposed infrastructure schemes, developing preliminary engineering designs and technical design basis

Location: IndonesiaComments: During the course of the project, KBR will

also provide on-the-job training to PLN’s project team members

NIPPON STEEL & SUMIKIN ENGINEERING – (REV 8/16)Owner: Tokyo Gas/JAPEXType: Project includes the construction of new

pipelineLength: 870 milesLocation: Sakhalin - Ibaraki Prefecture

NORTHERN TERRITORY GOVERNMENT –(7/17)Operator: JemenaProject: Northern Gas PipelineType: Project includes pipeline construction and

two compressor stationsLength: 386 milesDiameter: 14 inchesLocation: Tennant Creek, Northern Territory, -

Mount Isa, QueenslandCapacity: 87 MMcf/dCost: $800 millionCompletion: 2018

Contractor: Spiecapag AustraliaType: Project includes pipeline constructionLength: 88 miles

Contractor: McConnell DowellType: Project includes the engineering,

construction and commissioning of a section of pipeline

Length: 262 milesDiameter: 14 inchesCost: $300 million

Contractor: GPA EngineeringType: Project includes the design of the pipeline

Contractor: KBRType: Project includes the facility design of the

project

Contractor: EcOzType: Project includes providing environmental

consultation services for the project

Contractor: Maloney Field ServicesType: Project includes providing land access and

valuation services for the project

Contractor: MRC Global CoatedType: Project includes supplying pipeline for the

projectDiameter: 14 inches

Contractor: EnscopeType: Project includes providing project

management services for the natural gas treatment and compression facilities

Contractor: IntertekType: Project includes pipeline inspection for

the project

Page 18: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

46 Pipeline News November 2017 • www.pipeline-news.com

ONGOINGProjects construction underway

Contractor: SynertecType: Project includes the design, supply and

commissioning of the process control and safety system

PERUSAHAAN GAS NEGARA – (8/17)Operator: PertaminaProject: Duri-Dumai Pipeline SystemType: Project includes construction of

transmission and distribution pipelines Length: 75 milesDiameter: 24 inchesLocation: Dumai, RiauCapacity: 140 MMcf/d Cost: $574 million Start: 3Q 2017Completion: 4Q 2018

Contractor: P.T. Connusa EnergindoType: Project includes engineering,

procurement and design

Contractor: PertaminaType: Project includes construction of

transmission and distribution pipelines

PETROVIETNAM GAS/MOECO/PTTEP – (REV 6/16)Project: O Mon Gas PipelineType: Project includes the construction of risers,

subsea pipeline, onshore pipeline and a line break valve

Length: 248 milesLocation: Malay Basin - southern VietnamCompletion: 2023Comments: Pipeline will have a capacity of 20.3

MMcm/y

PUNJ LLOYD – (5/16)Type: Project includes the construction of a

14-inch pipeline (186 miles) and a 32-inch pipeline (187 miles) and the construction of a block valve and pigging stations

Length: 373 milesLocation: Oman New Delhi Completion: 2018

RELIANCE INDUSTRIES – (REV 11/16)Owner: China National Petroleum Corp.Project: Shahdol-Phulpur PipelineType: Project includes the construction of new

pipelineLength: 188 milesLocation: Shahdol - Jaysing Nagar - Beohari-Gurh

- PhulpurCompletion: 2023Comments: Pipeline will have a capacity of 4.3

MMcm/d

Project: Dahej Nagothane Ethane Pipeline Project Type: Project includes the construction of new

pipelineLength: 301 milesLocation: Dahej, Gujarat – Nagothane, Maharashtra Comments: Project will transport 1.25 MMtpa of liquid

ethane

SAPURAKENCANA – (3/17)Owner: Repsol Oil & Gas Malaysia Ltd.Project: Bunga Pakma Development ProjectType: Project includes the transportation and

installation of pipeline, substructure and topside

Location: MalaysiaCompletion: 2018

WOOD GROUP – (8/15)Project: HBWS gas fieldsType: Project includes the detailed design of

onshore raw gas and Mono-Ethylene Glycol pipelines from the well pad to the gas plant

Location: Victoria, Australia

Western Europe & EU CountriesFULCRUM UTILITY SERVICES LTD. – (1/17)Type: Project includes the construction of a new

gas pipeline, converting an existing fuel oil source to natural gas

Length: 7.5 milesCompletion: 2017Comments: Upon completion, Fulcrum will adopt,

own and operate the pipeline and gas meters

FSU Eastern EuropeAZERBAIJAN INTERNATIONAL OPERATING CO. – (REV 12/16)Project: South Caucasus Pipeline ExpansionType: Project includes pipeline looping and two

new compressor stationsLength: 303 milesCompletion: 2019Location: Azerbaijan - Georgia-Turkey borderComments: Project will connect with the Trans-

Anatolian Natural Gas Pipeline

SERINUS ENERGY INC. – (7/17)Contractor: Confind S.R.L.Project: Moftinu Gas Development ProjectType: Project includes the engineering,

procurement, construction and commissioning of a gas processing facility and associated flowlines and pipelines

Location: RomaniaCompletion: 1Q 2018

GAZPROM – (2/16)Project: Power of Siberia PipelineType: Project includes the construction of

55-inch pipeline that will run through swampy, mountainous and seismically hazardous areas

Length: 1,864 milesLocation: Irkutsk Region - Republic of Sakha

(Yakutia) - Amur RegionCapacity: 38 Bcm/y of natural gas from RussiaCost: $400 billionStatus: According to Russian media, the project is

moving ahead of schedule and 448 miles of the pipeline has been completed

Completion: 2018Comments: Project is a key element in a 30-year gas

supply deal between Moscow and Beijing

Project: Yakutia-Kahbarovsk-Vladivostok PipelineType: Project includes the construction of new

56-inch pipelineLength: 2,500 milesLocation: Yakutia - VladivostokCompletion: 2019

Comments: Project will have a design capacity of 61 Bcm/y of natural gas

GAZ-SYSTEM/EUSTREAM – (4/17)Project: Poland – Slovakia Pipeline ConnectionType: Project includes the construction of

new pipeline, a measuring station, a compressor station and compressor station modifications

Length: 102 milesLocation: Poland – SlovakiaCompletion: 2019Comments: Project is part of the North-South Corridor

Project and will connect the Slovak gas compressor station and the gas interconnection point

POLAND/LITHUANIA – (REV 3/12)Type: Project includes the construction of new

pipelineLength: 445 milesLocation: Estonia - Latvia - Lithuania - PolandComments: Project is in the feasibility stage

ROSTEC – (12/15)Owner: Russia/PakistanProject: Karachi-Lahore PipelineType: Project includes the construction of new

pipeline and eight compressor stations along the route

Length: 684 milesLocation: Karachi - Lahore Completion: 2018Comments: Project will have a capacity of 12.4 Bcm/y

will link the liquefied natural gas terminals in the port of Karachi and the city of Lahore

STROYGAZMONTAZH – (2/17)Owner: GazpromProject: Ukhta-Torzhok 2 PipelineType: Project includes the construction and

installation of 60-inch pipeline and seven compressor stations

Length: 173 miles (602 miles total)Location: Yamal - Ukhta - Torzhok Completion: 2019Comments: Project will play a key role in ensuring

the delivery of the needed gas volumes to northwestern Russia for domestic consumption and export purposes, including an order to deliver natural gas into Nord Stream 2, and will have an annual capacity of 45 Bcm of natural gas

TANAP NATURAL GAS TRANSMISSION CO. – (REV 9/17)

Owner 1: TANAP Natural Gas Transmission Co.Owner 2: SOCAR (58%)Owner 3: BOTAS (30%)Owner 4: BP (12%)Project: Trans-Anatolian Natural Gas PipelineType: Project includes pipeline construction,

two take-off stations and associated facilities

Length: 1,690 milesDiameter: 56 inchesLocation: Türkgözü – EdirneCost: $10 billionCapacity: 16 Bcm/yCompletion: 2018Comments: Project will bring natural gas produced

from Azerbaijan’s Shah Deniz-2 gas field,

Page 19: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

www.pipeline-news.com • November 2017 • Pipeline News 47

ONGOINGProjects construction underway

and other areas of the Caspian Sea, primarily to Turkey, but also on to Europe. The TANAP Project, along with the South Caucasus Pipeline (SCP) and the Trans-Adriatic Pipeline (TAP) form the elements of the Southern Gas Corridor

Contractor: BechtelType: Project includes front-end engineering

and design

Contractor: Corinth PipeworksType: Project includes pipeline supply

Contractor: SalzgittlerType: Project includes pipeline supply

Contractor: IntertekType: Project includes pipeline inspection and

testing services

Contractor: SpiecapagType: Project includes onshore engineering,

procurement and construction

Contractor: SaipemType: Project includes offshore engineering,

procurement and construction

Contractor: FERNAS Insaat ASType: Project includes pipeline constructionSpread: 1

Contractor: Sicim/Yüksel/Akkord Type: Project includes pipeline constructionSpread: 2

Contractor: Tefken Insaat ve Tesisat ASType: Project includes pipeline constructionSpread: 3

Contractor: SapuraKencana TL Offshore Sdn BhdType: Project includes offshore pipeline

construction

TRANS ADRIATIC PIPELINE AG – (10/16)Contractor: Himachal Futuristic Communications Ltd. Owner: Trans Adriatic Pipeline AG Project: Trans Adriatic PipelineType: Project includes the supply and delivery of

963 miles of fiber optic cableLength: 545 milesLocation: Azerbaijan – EuropeCompletion: 2020Comments: The pipeline will connect with the Trans

Anatolian Pipeline

Contractor: SPIECAPAGOwner: Trans Adriatic Pipeline AG Project: Trans Adriatic PipelineType: Project includes supplying 4-inch pre-

commissioning tools, tracking equipment, as well as accessories for the pipeline

Contractor: SiemensProject: Trans Adriatic Pipeline Type: Project includes the installation of six

15-megawatt SGT-400-driven turbo compressor trains

Contractor: TechnipProject: Trans Adriatic PipelineType: Project includes supplying 4-inch pre-

commissioning tools, tracking equipment, as well as accessories for the pipeline

Contractor: TechnipProject: Trans Adriatic PipelineType: Project includes the overall project and

site management, procurement and subcontracting for all the EPC packages throughout the engineering, procurement and construction phases, as well as warranty management and the project close-out

Contractor: Industria Meccanica Bassi S.p.AProject: Trans Adriatic PipelineType: Project includes two contracts: first,

for engineering, manufacturing and delivery of 48-inch and 36-inch piggable T-pieces and welded elbows of different characteristics and, second, scraper traps units for intelligent pigging

Contractor: Nuova GiungasProject: Trans Adriatic PipelineType: Project includes the engineering,

manufacturing and delivery of 48-inch and 36-inch isolating joints

Middle EastEXOVA – (12/16)Owner: SEPCOType: Project includes testing and validating

materials and environments throughout construction of a gas compressor station for the second phase of the Kingdom’s master gas system

Location: Saudi ArabiaCompletion: 2018Comments: Pipeline capacity will be boosted to 12.5

Bcf/d of gas

GASCO – (3/14)Project: Habshan-Maqta-Taweelah PipelineType: Project includes the demolition of two

existing pipelines and installation of two new 52-inch pipelines and one 42-inch pipeline

Length: 372 milesLocation: Habshan-Maqta-TaweelahCompletion: 2017

ILF CONSULTING ENGINEERS – (4/17)Owner: Asian Development BankProject: TAPI PipelineType: Project includes the front-end

engineering and design of 56-inch pipeline along with providing project management and technical supervision services

Length: 1,127 milesLocation: Turkmenistan-Afghanistan-Pakistan-IndiaCompletion: 2019Comments: TAPI Pipeline plans to export up to 33

Bcm/y of natural gas

JSIW INFRASTRUCTURE PVT. LTD/IL&FS ENGINEERING & CONSTRUCTION CO. LTD – (REV 12/16)Owner: GAIL IndiaProject: Jagadishpur-Haldia-Bokaro-Dhamra Gas

PipelineType: Project includes pipelaying on 214 miles

of the pipelineLength: 1,118 milesLocation: Phulpur - DobhiCompletion: 2020Comments: First phase of project will cover 470 miles

along Phulpur, Mani, Gorakhpur, Varanasi, Dobhi, Silao, Patna and Barauni

NATIONAL IRANIAN OIL CO. – (REV 8/14)Project: Iran-Kuwait PipelineType: Project includes the construction of new

pipelineLength: 350 milesLocation: Iran-Kuwait

NATIONAL IRANIAN OIL ENGINEERING AND CONSTRUCTION CO. – (REV 7/13)Type: Project includes the construction of

48-inch, 42-inch and 36-inch pipelineLength: 970 milesLocation: Neka - JaskDirector: Mir Aliasghar Sajedi

TAPI — (2/16)Project: Turkmenistan-Afghanistan-Pakistan-India

PipelineType: Project includes the construction of

56-inch pipelineLength: 1,118 milesLocation: Turkmenistan-Afghanistan-Pakistan-IndiaCompletion: 2019Comments: Pipeline will export up to 33 Bcm/y of

natural gas

Contractor: Esso AustraliaProject: Turkmenistan-Afghanistan-Pakistan-India

PipelineType: Project includes pipeline replacementLength: 116 milesLocation: Longford and Long Island PointCompletion: 2018

PETROJET – (3/17)Owner: Oman Gas Co.Project: Duqm PipelineType: Project includes the construction and

looping of 36-inch pipelineLength: 137 milesLocation: Saih Nihayda - Wusta coastCompletion: 2018

LNG - InternationalAsia PacificKUMUL PETROLEUM HOLDINGS LTD. —

(10/17)Project: Kikori Energy HubType: Project includes a mid-scale LNG

liquefaction and regional export facility,180MW power generation facility, methanol process facility and a condensate stabilization, storage and regional export facility

Location: Gulf Province, Papua New GuineaStatus: Project is in the preliminary front-end

engineering and design stageComments: Project is part of the Western Pipeline

Extension Project, which will allow stranded oil and gas fields in the western provinces to come to the coast for export

Contractor: KBR Inc.

Page 20: ONGOINGProjects - Amazon S3...ONGOINGProjects construction underway Comments: Future expansion could include the addition of a full loop of Sand Hills, which could increase capacity

48 Pipeline News November 2017 • www.pipeline-news.com

Ad Index Index provided as a courtesy to readers. While every effort is made to compile accurate listings, publisher assumes no responsibility for errors.

Aegion Corporation............................................................aegion.com ...........................29AGS ..........................................................................................agsgps.com ........................... 51BKW .........................................................................................bkwinc.com ........................... 52Challenger Services .................................................challengerservices.com ................ 53CRC-Evans Pipeline International ................................ crc-evans.com ........................IFCDarby Equipment Company .........................................darbyequip.com ......................... 3Denso North America ...................................................... densona.com ............................ 5Enduro Pipeline Services................................................enduropls.com ........................ 35E-Z Line Pipe Support Co., Inc. .........................................ezline.com .............................. 3Geo Corr ...............................................................................geocorr.com .......................... 53Geo360 Water Logistics ........................................... geo360logistics.com ................... 52Horizontal Technology, Inc. ..................................... horizontaltech.com .............35, 39HUB International Mid-America .............................hubinternational.com .................. 52Illinois Truck & Equipment ................................................ iltruck.com .....................26, 52Kidd Pipeline & Specialties...........................................kiddpipeline.com ...................... 21Knapp Polly Pig, Inc. ..........................................................pollypig.com ..........................23KS Energy Services, Inc. ........................................... ksenergyservices.com .................. 53LaBarge Coating LLC .................................................. labargecoating.com .................... 53Meridien Energy, LLC ................................................ meridienenergy.com ................... 37Midwestern Manufacturing Co. ...................................sidebooms.com ..........................7Montgomery Trucking Company ................................mtilogistics.com .......................39

Outlaw Padding Company .......................................outlawpadding.com .................... 52OZ Directional Drilling .......................................... ozdirectionaldrilling.com ............... 13Pe Ben USA......................................................................... pebenusa.com ......................... 51Pigs Unlimited International, Inc. ............................ pigsunlimited.com ..................... 15Pipeline & Gas Journal.................................................... pgjonline.com ......................... 52Pipeline Machinery .............................................................plmcat.com ........................... 31Pipeline Opportunities Conference ................pipeline-opportunities.com............. 53Pipeline Pigging Products, Inc. ..................................... pipepigs.com .......................... 52Pipeliners Local Union 798.........................................value.local798.org ......................11Polyguard Products, Inc. ................................................polyguard.com .......................... 9Precision Welding & Fabrication ....................................weweld.com........................... 19Proline Pipe Equipment ..............................................proline-global.com .................... 51Southeast Connections ............................................. seconnections.com ....................25Steel Etc. ....................................................................................................................................17Superior Tire & Rubber Company .............................. superiortire.com ....................... 33T&C Rentals ..................................................................... tcrentalsinc.com ....................... 51Tek Rock Trenching ............................................................................................................... 53Thomson Equipment Co ...................................... thomsonequipment.com ............... 52United Piping Inc. ............................................................ unitedpiping.us ........................ 13Williams Forestry and Associates .................................. wfatrees.com .......................... 53

Type: Project includes conceptual development and feasibility study services for the Kikori Energy Hub

OIL - InternationalAsia PacificCHINA – (8/16)Project: Gwadar-Kashgar PipelineType: Project includes the construction of

pipelineLength: 1,500 milesLocation: Gwadar - KashgarStart: 2017Completion: 2021

SOCAR – (11/13)Owner: Esso AustraliaProject: Batam Refinery ProjectType: Project includes the construction of a 600

Mbdp refineryLocation: Batam Island, IndonesiaCompletion: 2017

UGANDA/TOTAL E&P – (7/17)Contractor: Gulf Interstate Engineering has been

awarded a contract for the front-end engineering and design of the pipeline

Project: Uganda–Tanzania Crude Oil PipelineType: Project includes the construction of an

export pipeline and an associated oil refinery

Length: 897 milesDiameter: 24 inchesLocation: Hoima, Uganda - Tanga, TanzaniaCapacity: 200 MbpdCost: $4 billionStatus: President Museveni and his Tanzanian

counterpart John Pombe Magufuli signed the East African Crude Oil Pipeline Agreement in Dar es Salaam to express intent to go ahead with the construction of the project

Completion: 4Q 2020

AfricaBLACK RHINO/MOGS OIL & GAS SERVICES – (REV 12/16)Operator: EthiopiaProject: Lapsset ProjectType: Project includes the construction of new

pipelineLength: 341 milesLocation: Juba – LamuCompletion: 2018Comments: Project will transport diesel, gasoline and

jet fuel from Djibouti to central Ethiopia

PETROLEUM PRODUCTS PIPELINE SA/GOVIND DEVELOPMENT – (2/15)Owner: Esso AustraliaType: Project includes the construction of new

pipelineLength: 220 milesLocation: Limbe - Yaounde

FSU Eastern EuropeAFINA PALLADA – (10/15)Owner: RosneftProject: Eastern Siberia - Pacific Ocean PipelineType: Project includes the construction of new

pipelineLocation: Komsomolsk-on-Amur oil refinery - port

of De-KastriComments: Pipeline will have a capacity of 60 million

tons of oil per year

AMBO LLC – (9/13)Project: AMBO Pipeline Type: Project includes the construction of new

pipelineLength: 575 milesLocation: Burgas - VloreComments: Pipeline is on hold due to the lack of

availability of crude oil coupled with financial hurdles

HILL INTERNATIONAL – (REV 8/15) Owners: General Electric Oil and Gas/China

National Offshore Oil Corp./Chevron/

Texaco/BPProject: Pan-European Oil PipelineType: Project includes evaluating transport

capacity and the use of existing transit facilities; examining legal and environmental issues relating to the project; preparing cost and economic analyses; making recommendations on a route for the new pipeline; and developing a project execution plan

Length: 805 milesLocation: Romanian port of Constantza – Serbia -

Croatia - Slovenia - TriesteComments: Pipeline will have a capacity of 60 million

tons of oil per year

TRANSNEFT – (2/14)Project: Kuyumba-Taishet PipelineType: Project includes the construction of new

pipelineLength: 435 milesLocation: Kuyumba-TaishetComments: Pipeline will have an initial transportation

capacity of 15 million tons of oil per year

Project: Zapolyarye-Purpe PipelineType: Project includes the construction of new

pipeline and gathering lines, which will be completed in three phases

Length: 311 milesLocation: Zapolyarye-PurpeComments: Pipeline will have an initial transportation

capacity of up to 45 million tons of oil per year

Middle EastAL ROBAYA HOLDING CO./NATIONAL PETROLEUM CONSTRUCTION CO. – (11/15)Owners: Saudi Arabia/BahrainType: Project includes the construction of new

pipelineLength: 72 milesLocation: Saudi Arabia - BahrainCompletion: 2018Comments: Pipeline will have an initial transportation

capacity of 350 Mbpd of oil

ONGOINGProjects construction underway