online exam report1
TRANSCRIPT
-
7/27/2019 Online Exam Report1
1/52
APROJECT REPORT
ONLINE EXAMINATION SYSTEM
Submi tted by
Parmar Nayna N.(096450307540)
Gohil Kajal N.(096450307545)
Patel Trusha M.(096450307529)
i n partial ful fi llment for the award of the degree
of
DIPLOMAi n
COMPUTER ENGINEERING
Guided By:
MR.L.M.PANDYA
-
7/27/2019 Online Exam Report1
2/52
C E R T I F I C A T E
This is to certify that Miss Parmar Nayna N. having Enrollment
No.096450307540 has completed part-1 IDP project work having title
Online Examination System. She has undergone the process of
shodh yatra, literature survey and problem definit ion. She is supposed
to carry out residue IDP Part-2 work on same problem during
semester-6 for the final fulfillment of the IDP work which is
prerequisite to complete Diploma Engineering.
Date:
Signature of Guide: Head of Department
-
7/27/2019 Online Exam Report1
3/52
C E R T I F I C A T E
This is to certify that Miss Gohil Kajal N. having Enrollment
No.096450307545 has completed part-1 IDP project work having title
Online Examination System. She has undergone the process of
shodh yatra, literature survey and problem definit ion. She is supposed
to carry out residue IDP Part-2 work on same problem during
semester-6 for the final fulfillment of the IDP work which is
prerequisite to complete Diploma Engineering.
Date:
Signature of Guide: Head of Department
-
7/27/2019 Online Exam Report1
4/52
C E R T I F I C A T E
This is to certify that Miss Patel Trusha M. having Enrollment
No.096450307529 has completed part-1 IDP project work having title
Online Examination System. She has undergone the process of
shodh yatra, literature survey and problem definit ion. She is supposed
to carry out residue IDP Part-2 work on same problem during
semester-6 for the final fulfillment of the IDP work which is
prerequisite to complete Diploma Engineering.
Date:
Signature of Guide: Head of Department
-
7/27/2019 Online Exam Report1
5/52
C E R T I F I C A T E
This is to certify that Miss Parmar Nayna N. having Enrollment
No.096450307540 has completed part-1 IDP project work having title
Online Examination System. She has undergone the process of shodh
yatra, literature survey and problem definition. She is supposed to
carry out residue IDP Part-2 work on same problem during semester-6
for the final fulfillment of the IDP work which is prerequisite to
complete Diploma Engineering.
Date:
Signature Of Guide Signature Of Internal Signature Of External
Examiner Examiner
-
7/27/2019 Online Exam Report1
6/52
C E R T I F I C A T E
This is to certify that Miss Gohil Kajal N. having Enrollment
No.096450307545 has completed part-1 IDP project work having title
Online Examination System. She has undergone the process of
shodh yatra, literature survey and problem definit ion. She is supposed
to carry out residue IDP Part-2 work on same problem during
semester-6 for the final fulfillment of the IDP work which is
prerequisite to complete Diploma Engineering.
Date:
Signature Of Guide Signature Of Internal Signature Of External
Examiner Examiner
-
7/27/2019 Online Exam Report1
7/52
C E R T I F I C A T E
This is to certify that Miss Patel Trusha M. having Enrollment
No.096450307529 has completed part-1 IDP project work having title
Online Examination System. She has undergone the process of shodh
yatra, literature survey and problem definition. She is supposed to
carry out residue IDP Part-2 work on same problem during semester-6
for the final fulfillment of the IDP work which is prerequisite to
complete Diploma Engineering.
Date:
Signature Of Guide Signature Of Internal Signature Of External
Examiner Examiner
-
7/27/2019 Online Exam Report1
8/52
ACKNOWLEDGEMENT
The satisfaction that accompanies that the successful completion of anytask would be incomplete without the mention of people whose ceaseless cooperation
made it possible, whose constant guidance and encouragement crown all efforts withsuccess .We are grateful to our project guide Mr.L.K.Pandya for the guidance,
inspiration and constructive suggestions that helpful us in the preparation of thisproject. We also thank our colleagues who have helped in successful completion of the
project.
Parmar Nayna
Gohil Kajal
Patel Trusha
-
7/27/2019 Online Exam Report1
9/52
ABSTRACT
Online Examination is an Internet based questionnaire. The questions can be categorized according to
type, topic etc. The test is compiled with questions from different libraries. Tests are created on a random
basis per student with a particular time limit during which they are to be answered.
Online examination helps students and its mission is to offer a quick and easy way to appear for the
exam. It also provides the results immediately after the exam and security. The user can enter to write the
exam only with their valid username and password. This examination contains multiple choice questions and
appropriate number of options. There are no limitations on number of options and it can be randomized. More
than one option can be correct but the user can select only one option. This provides time limit. The user cansee their results after completing the exam. This helps the students to write the exam from far distance and
which can provide security and simplicity and other beneficial features to the user.
-
7/27/2019 Online Exam Report1
10/52
10
INDEX
SR NO TOPIC PAGE
NO1 CHAPTER 1 1
INDUSRY INTRODUCTION
2 CHAPTER 2 3
2.1) DESCRIPTION OF PROBLEM
2.2) FEASIBILITY STUDY
2.3) TOOLS /PLATFORMS /LANGUAGE ARE USED
3 CHAPTER 3 7
3.1) STUDY OF EXISTING SYSTEM3.2) PROPOSE SYSTEM
3.3) SYSTEM DESIGN DIAGRAM
3.4) DATA DICTIONARY
4 CHAPTER 4 19
4.1) DESCRIPTION OF INPUT/OUTPUT SCREEN
5 CHAPTER 5 34
5.1) IMPLEMENTATION DETAIL
5.2) USER MANUAL/GUIDE
6 CONCLUSION 40
7 REFERENCES 41
-
7/27/2019 Online Exam Report1
11/52
11
CHAPTER: 1
INDUSTRY INTRODUCTION
-
7/27/2019 Online Exam Report1
12/52
12
The institute which began at government polytechnic in 1961and later on known as
shire krishanalal Javari polytechnic. It was started to award diploma in civil
mechanical electrical engineering only on beginning.
It is seated on bharuch city old highway no-8 road at a distance of 1.5k.m from bus
stand and 1k.m from railway station. The institute is separate over a land area around
25acers .the diploma in computer added costume design and dress is making was
introduce specially for girls in 1991.
After establishment of very large fertilizer plant of GNFC and Asia biggest GIDC
having majority of chemical industries to cater to the man power. Need of thisindustry a diploma course in chemical engineering was introduced in 1982.
-
7/27/2019 Online Exam Report1
13/52
13
CHAPTER: 2
PROBLEM IDENTIFICATION
&DEFINATION
-
7/27/2019 Online Exam Report1
14/52
14
2.1) DESCRIPTION OF PROBLEM
Online Examination project assesses students by conducting online objectivetests. The tests would be highly customizable. This project will enable educational institutes
to conduct test and have automated checking of answers based on the response by thecandidates.
The project allows faculties to create their own tests. It would enable
educational institutes to perform tests, quiz and create feedback forms. It asks faculty tocreate his/her set of questions. Faculty then creates groups and adds related students into the
groups. Further the tests are associated with specific groups so that only associated studentscan appear for the test. The result of the response would be available to the faculty of thequestion set. Further the result would also be mailed to the student. This project would be
helpful for creating practice tests, say for educational institutes and as a feedback form.
Online Examination System is aimed at computerizing the activities involved inExamination. The primary activities in the exam include importing the question paper,generating the reports.This project includes the following Modules:
1. Administrator module
This module deals with the Question paper importing, Student list importing,Student userid and password generation, Report generation, User blocking and Unblocking.The administrator can import the question paper, import the student list and generate the
userid & password, generate the reports and take printouts. Administrator can generate themarks report of the particular user. Administrator can generate the rules & instructions for
each exam. The administrator can also set the time for each examination.
2. Student Module
This module deals with the student logging into the system and taking the exam. Thestudent can login into the system with the userid given to him by the administrator to take
up the exam. He is provided with the question and choices through which he can select theanswers for each question. He is able to move back to the previous question and can changethe previously selected answers.
PURPOSE:-
Responses by the candidates will be checked automatically and instantly.
No time wasting for checking the paper.
Online examination will reduce the hectic job of assessing the answers given by thecandidates and give fast results
Being an integrated Online Examination System it will reduce paper work.
Can generate various reports almost instantly when and where required.
For students they give papers according to their convenience and time and there isno need of using extra thing like paper, pen etc.
-
7/27/2019 Online Exam Report1
15/52
15
SCOPE:
Scope of this project is very broad in terms of other manually taking exams.
Few of them are:-
This can be used in educational institutions as well as in corporate world. Can be used anywhere any time as it is a web based application(user
Location doesnt matter).
No restriction that examiner has to be present when the candidate takes the test.
It can also be useful for anyone who requires feedback based on objective type
responses.
2.2)FEASIBILITY STUDY:
1.) ECONOMIC FEASIBILITY
Economic analysis is most frequently used for evaluation of the effectiveness of the
system. More commonly known as cost/benefit analysis the procedure is to determine thebenefit and saving that are expected from a system and compare them with costs, decisions
is made to design and implement the system. This part of feasibility study gives the topmanagement the economic justification for the new system. This is an important input to themanagement the management, because very often the top management does not like to get
confounded by the various technicalities that bound to be associated with a project of this
kind. A simple economic analysis that gives the actual comparison of costs and benefits ismuch more meaningful in such cases. In the system, the organization is most satisfied byeconomic feasibility. Because, if the organization implements this system, it need notrequire any Additional hardware resources as well as it will be saving lot of time.
2.) TECHNICAL FEASIBILITY
Technical feasibility centers on the existing manual system of the test managementprocess and to what extent it can support the system. According to feasibility analysis
procedure the technical feasibility of the system is analyzed and the technical requirementssuch as software facilities, procedure, inputs are identified. It is also one of the important
phases of the system development activities. The system offers greater levels of userfriendliness combined with greater processing speed. Therefore, the cost of maintenancecan be reduced. Since, processing speed is very high and the work is reduced in the
maintenancepoint of view management convince that the project is operationally feasible.
3) BEHAVIOURAL FEASIBILITY
People are inherently resistant to change and computer has been known to facilitatechanges. An estimate should be made of how strong the user is likely to move towards the
development of computerized system. These are various levels of users in order to ensureproper authentication and authorization and security of sens itive data of the organization.
-
7/27/2019 Online Exam Report1
16/52
16
2.3)TOOLS/PLATFORMS/LANGUAGES ARE USED
System Requirements:
Hardware Requirements:
Processor - PENTIUM IV and Above
Clock Speed - 750 MHz and AboveRAM - 1GB and aboveHard Disk - 40 GB and Above
Key Board - Standard
Mouse - SuitableMonitor - 14inch and above Color monitor
Software Requirements:
Operating System
- Windows 2000 Server, Window
2000, Windows XP
Front end Tool - HTMLDeveloping Technology - PHPBack End Tool - MySQLWeb Server - Apache, WAMP
Browser - Internet Explorer 6.0Application Software - MS-Office 2003
Supporting Browsers:
Internet Explorer (5), Mozilla, Firefox, Opera.
-
7/27/2019 Online Exam Report1
17/52
17
CHARTER: 3
THE WHOLE INDUSTRIAL PROCESS
AND STUDY
-
7/27/2019 Online Exam Report1
18/52
18
3.1) STUDY OF EXISTING SYSTEM:
The whole process of assigning test and evaluating their scores after the test, wasdone manually till date. Processing the test paper i.e. checking and distributing respective
scores used to take time when the software was not installed.
The current system is very time consuming.
It is very difficult to analyze the exam manually.
Results are not precise as calculation and evaluations are done manually.
The chances of paper leakage are more in current system as compared to proposed
system.
Result processing takes more time as it is done manually
The existing system is manual entry of up keeping of the details of the persons whoare registered already.
And it is very difficult for each person to come to the exam center. It is very difficult
to the students from far distance to reach the exam center.
This system is required to prepare registration\application form, question paper for
the students and required to print a lot of number manually.
To calculate how many students registered, and verification of details of these
students in a month by hand is very difficult.
This requires quite a lot of time and wastage of money as it requires quite lot of
manpower to do that. Another factor that takes into account that is the possibility of errors and which
requires verification and checking of data relating to various operations which isdone manually.
The limitation of existing system is that it is not all personalized. It cannot be usedfor personal and quick reference. Even the other staff members can make quick
entries if the responsible person is not present.
3.2) PROPOSED SYSTEM
The modern computerized system is developed with the aim to overcome the drawbacksof existing system. The proposed system has got many advantages.
People from different parts of the world can register very easily.
The new system is more personalized.
It is maze in such a manner that all the new users can understand all the options in itvery easily. It is made in a quick and easy referential manner.
Access to all important matters are not always locked and can be opened easily at
the time of urgency.
The advantages of proposed system are that security is maintained in the newsystem. Securities for all important data are maintained confidentially.
-
7/27/2019 Online Exam Report1
19/52
19
As it is easily understandable and user friendly, quick entries can be made in this
system.
In comparison to the present system the proposed system will be less timeconsuming and is more efficient.
Analysis will be very easy in proposed system as it is automated
Result will be very precise and accurate and will be declared in very short span oftime because calculation and evaluations are done by the simulator itself.
The proposed system is very secure as no chances of leakage of question paper as it
is dependent on the administrator only.
The logs of appeared candidates and their marks are stored and can be backup for
future use
-
7/27/2019 Online Exam Report1
20/52
20
3.3)SYSTEM DESIGN DIAGRAM
3.3.1) USE CASE DIAGRAM
-
7/27/2019 Online Exam Report1
21/52
21
3.3.2) CLASS DIAGRAM
-
7/27/2019 Online Exam Report1
22/52
22
3.3.3) SEQUENCE DIAGRAM
-
7/27/2019 Online Exam Report1
23/52
23
3.3.4) E-R DIAGRAM
-
7/27/2019 Online Exam Report1
24/52
24
3.3.5) LEVEL 0 DFD FOR ONLINE EXAM
-
7/27/2019 Online Exam Report1
25/52
25
3.3.6) LEVEL '1 DFD
-
7/27/2019 Online Exam Report1
26/52
26
3.3.7) LEVEL 2 DFD FOR STUDENT
-
7/27/2019 Online Exam Report1
27/52
27
3.4) Data Dictionary
1) Mst_admin
2) Mst_Question
3) Mst_Result
4) Mst_subject
-
7/27/2019 Online Exam Report1
28/52
28
5) Mst_test
6) Mst_user
7) Mst_useranswer
-
7/27/2019 Online Exam Report1
29/52
29
CHAPTER: 4
INPUT AND OUTPUT SCREEN
MODULE
-
7/27/2019 Online Exam Report1
30/52
30
4.1) Administrative Login Input Page
4.2) Administrative Login Output Page
-
7/27/2019 Online Exam Report1
31/52
31
4.3) Subject List form
4.4) Subject Add List(Input)
-
7/27/2019 Online Exam Report1
32/52
32
4.5) Subject Add List(Output)
4.6) Subject Edit List(Input)
-
7/27/2019 Online Exam Report1
33/52
33
4.7) Subject Edit List(Output)
4.8) Test List Form
-
7/27/2019 Online Exam Report1
34/52
34
4.9) Test List Add Test Input Form
4.10) Test List Add Test Output Form
-
7/27/2019 Online Exam Report1
35/52
35
4.11) Test List Edit Test Input Form
4.12) Test List Edit Test Output Form
-
7/27/2019 Online Exam Report1
36/52
36
4.13) Question List Form
4.14) Question List Add Input form
-
7/27/2019 Online Exam Report1
37/52
37
4.15) Question List Add Output form
4.16) Question List Edit Input form
-
7/27/2019 Online Exam Report1
38/52
38
4.17) Question List Edit Output Form
User Forms4.18) Login form
-
7/27/2019 Online Exam Report1
39/52
39
4.19) Home Page
4.20) Subject for Quiz
-
7/27/2019 Online Exam Report1
40/52
40
4.21) Test on Subject
4.22) Test on subject Mysql
-
7/27/2019 Online Exam Report1
41/52
41
4.23) Test of subject
4.24) Get Result
-
7/27/2019 Online Exam Report1
42/52
42
4.25) Review Question
-
7/27/2019 Online Exam Report1
43/52
43
4.26) Result for the test
-
7/27/2019 Online Exam Report1
44/52
44
CHAPTER: 5
IMPLEMENTATION DETAILS
-
7/27/2019 Online Exam Report1
45/52
45
5.1) IMPLEMENTATION DETAILS
Implementation includes all those activities that take place to convert from the old
system to the new. The old system consists of manual operations, which is operated in avery different manner from the proposed new system. A proper implementation is essential
to provide a reliable system to meet the requirements of the organizations. An improperinstallation may affect the success of the computerized system.
IMPLEMENTATION METHODS:
There are several methods for handling the implementation and the consequentconversion from the old to the new computerized system.
The most secure method for conversion from the old system to the new system is to
run the old and new system in parallel. In this approach, a person may operate in the manual
older processing system as well as start operating the new computerized system. Thismethod offers high security, because even if there is a flaw in the computerized system, wecan depend upon the manual system. However, the cost for maintaining two systems in
parallel is very high. This outweighs its benefits.
Another commonly method is a direct cut over from the existing manual system tothe computerized system. The change may be within a week or within a day. There are no
parallel activities. However, there is no remedy in case of a problem. This strategy requirescareful planning.
A working version of the system can also be implemented in one part of theorganization and the personnel will be piloting the system and changes can be made as andwhen required. But this method is less preferable due to the loss of entirety of the system.
IMPLEMENTATION PLAN:
The implementation plan includes a description of all the activities that must
occur to implement the new system and to put it into operation. It identifies the personnelresponsible for the activities and prepares a time chart for implementing the system. Theimplementation plan consists of the following steps.
List all files required for implementation.
Identify all data required to build new files during the implementation.
List all new documents and procedures that go into the new system.
The implementation plan should anticipate possible problems and must be able to deal with
them. The usual problems may be missing documents; mixed data formats between current
and files, errors in data translation, missing data etc.EDUCATION AND TRAINING
-
7/27/2019 Online Exam Report1
46/52
46
The implementation of the proposed system includes the training of system operators.
Training the system operators includes not only instructions in how to use the equipment,
but also in how to diagnose malfunctions and in what steps to take when they occur. Soproper training should be provided to the system operators. No training is complete without
familiarizing users with simple system maintenance activities. Since the proposed system is
developed in a GUI, training will be comparatively easy than systems developed in a non-GUI. There are different types of training. We can select off-site to give depth knowledge to
the system operators.
Success of the system depends on the way in which it is operated and used.
Therefore the quality of training given to the operating person affects the successfulimplementation of the system. The training must ensure that the person can handle all the
possible operations.
Training must also include data entry personnel. They must also be given training
for the installation of new hardware, terminals, how to power the system, how to power itdown, how to detect the malfunctions, how to solve the problems etc. The operators must
also be provided with the knowledge of trouble shooting which involves the determinationof the cause of the problem.
The proposed system requires trained personnel for operating the system. Data entry
jobs must be done utmost carefully to avoid errors. This will reduce the data entry errorsconsiderably. It is preferable to provide the person with some kind of operating manuals
that will explain all the details of the system.
POST IMPLEMENTATION REVIEW
After the system is implemented, a review should be conducted to determinewhether the system is meeting expectations and where improvements are needed. System
quality, user confidence and operating systems statistics are accessed through suchtechnique event logging, impact evaluation and attitude surveys. The review not only
assesses how well the proposed system is designed and implemented, but also is a valuablesource of information that can be applied to a critical evaluation of the system.
The reviews are conducted by the operating personals as well as the software
developers in order to determine how well the system is working, how it has been acceptedand whether adjustments are needed. The review of the system is highly essential to
determine the future enhancements required by the system. The system can be consideredsuccessful only if information system has met it objectives. The review analyses the opinionof the employees and identifies the attitudes towards the new computerized system. Only
when the merits and demerits of the implemented system are known, one can determinewhat all additional features it requires are. The following are the issues to be considered in
the evaluation of the system.
SYSTEM TESTING
System testing is a critical aspect of Software Quality Assurance and represents the
ultimate review of specification, design and coding. Testing is a process of executing aprogram with the intent of finding an error. A good test is one that has a probability of
-
7/27/2019 Online Exam Report1
47/52
47
finding an as yet undiscovered error. The purpose of testing is to identify and correct bugsin the developed system. Nothing is complete without testing. Testing is the vital to the
success of the system.
In the code testing the logic of the developed system is tested. For this every module
of the program is executed to find an error. To perform specification test, the examinationof the specifications stating what the program should do and how it should perform under
various conditions.
Unit testing focuses first on the modules in the proposed system to locate errors.
This enables to detect errors in the coding and logic that are contained within that module
alone. Those resulting from the interaction between modules are initially avoided. In unittesting step each module has to be checked separately.
System testing does not test the software as a whole, but rather than integration of
each module in the system. The primary concern is the compatibility of individual modules.One has to find areas where modules have been designed with different specifications of
data lengths, type and data element name.
Testing and validation are the most important steps after the implementation of thedeveloped system. The system testing is performed to ensure that there are no errors in the
implemented system. The software must be executed several times in order to find out theerrors in the different modules of the system.
Validation refers to the process of using the new software for the developed system
in a live environment i.e., new software inside the organization, in order to find out the
errors.The validation phase reveals the failures and the bugs in the developed system. It will be
come to know about the practical difficulties the system faces when operated in the trueenvironment. By testing the code of the implemented software, the logic of the program can
be examined. A specification test is conducted to check whether the specifications stating
the program are performing under various conditions. Apart from these tests, there are somespecial tests conducted which are given below:
Peak Load Tests: This determines whether the new system will handle the volume of
activities when the system is at the peak of its processing demand. The test has revealed that
the new software for the agency is capable of handling the demands at the peak time.
Storage Testing: This determines the capacity of the new system to store transactiondata on a disk or on other files. The proposed software has the required storage space
available, because of the use of a number of hard disks.
Performance Time Testing: This test determines the length of the time used by thesystem to process transaction data.
In this phase the software developed Testing is exercising the software to uncover
errors and ensure the system meets defined requirements.
-
7/27/2019 Online Exam Report1
48/52
48
MAINTENANCE
Maintenance is making adaptation of the software for external changes (requirements
changes or enhancements) and internal changes (fixing bugs). When changes are made during the
maintenance phase all preceding steps of the model must be revisited.
There are three types of maintenance:
1.Corrective (Fixing bugs/errors)
2.Adaptive (Updates due to environment changes)
3.Perfective (Enhancements, requirements changes)
-
7/27/2019 Online Exam Report1
49/52
49
5.2) User Manual/guide
In the project there are two login fist is for user and second is for admin. When we signup into user there are two options: 1) subject for quiz and
2) result.
When we select the subject for quiz the list of subject will be open.
We select any subject to give exam and questions related to the
particular subject will be appearing.
After finishing the exam user can see the result immediately.
User also can review the test question and can see the answers given by
the user are correct or wrong. Another login is for admin.
When we enter into admin there are three options:
1) Subject List
2) Test List
3) Question List
If we select the subject list we can add and remove subject for exam.
Test list is for enter the test name or subject name and can enter total
number of the question.
In question list we can add, edit or remove question.
-
7/27/2019 Online Exam Report1
50/52
50
CONCLUSIONS
This Web Application provides facility to conduct online examination worldwide. It
saves time as it allows number of students to give the exam at a time and displays the resultsas the test gets over, so no need to wait for the result. It is automatically generated by theserver.
Administrator has a privilege to create, modify and delete the test papers and itsparticular questions. User can register, login and give the test with his specific id, and can
see the results as well.
-
7/27/2019 Online Exam Report1
51/52
51
REFERENCES
1. Brian Pfaffenberger, Steven M. Schafer, Charles White, Bill Karow, HTML,
XHTML and CSS Bible, Edition 3, Wiley Publishing
2. Javier Eguiluz Perez, Introduction to JavaScript,
3. Vivek Chopra, Jon Eaves, Rupert Jones, Sing Li, John T. Bell, Beginning of Java
Server Pages, Wrox
4. Gray Adair, Ken Johnson, Damon Jordan, MySQL Language References, MySQL
Press
-
7/27/2019 Online Exam Report1
52/52
STUDENT'S SELF APPRAISAL FORM FOR IDP PART-I
As a IDP Group A B C D
1
2
3
4
5
All Students of group understood and agreed on how thewhole project was broken down into sub-tasks.Work was distributed according to the skills and knowledge
and capacity of of each student.All Students were clear about the time frame and their ownresponsibilities.
All students involved understood that their work wouldcontribute to the group's success.
Individual difficulties experienced by individuals were
discussed in the group and other students helped to resolve
the difficulties.
The Task Execution A B C D
6
7
8
9
10
11
12
The work was perfectly & clearly distributed among all
students.The timing and sequencing of sub-tasks done to progress
stage by stage.Survey and Data collected were organized systematically forlater use.
On-going checking throughout the process was made to
ensure that everything wason the right track.
Appropriate corrective measures were taken to handleunexpected problems.
The quality of work produced was assessed regularly duringthe process and also at the end.Systematic Survey and Literature study done.
My Roll in the IDP Group A B C D
1314
15
1617
I tried my level best to accomplish the part I taken and intime.
I tried my level best to complete IDP and produce goodquality Solution.
I fill strongly that the group success is my own success.I feel that this IDP is a Real life Problem.I learned from other students of the Group.
Marking : A= Strongly in favour , B = Moderately in favour , C = Not Much , D = Not