onp development engineering value management · management onp management company presentation 10...
TRANSCRIPT
ONPManagement 1ONP Management Company Presentation
ONPManagement
Development
Engineering
Value
ONP ManagementCompany Presentation
ONPManagement 2ONP Management Company Presentation
Our Mission
ˮWe are committed to fully support
the vision and technical innovation
of offshore windˮ
ONPManagement 3ONP Management Company Presentation
ONP Management GmbH
• Founded in 2014
• Employees: 28
• Technical advisory office focusing on offshore wind
• Involved in development & construction of offshore wind projects around the globe
• All our senior experts have extensive experience in offshore wind
• Headquarter: Hamburg (Germany)
• Shareholders: Zech Group, Bremen (70%), Managing Partners (30%)
Employees: >9.300
Turnover: € 2.13 Bn (2016)
Introduction
ONPManagement 6ONP Management Company Presentation
Tender &Contract Management
Support ServicesCapabilities and Staff Experience
Project Development
Owner's Engineer & Lenders' Technical
Advisor
Design Management
Ex
per
ien
ces
Sco
pe
Pa
cka
ge
FEW Baltic II 350 MW (PL)
Merkur 396 MW
Gode Wind I 332 MW
Bork.Riffg. II 450 MW
Haixia 600 MW (TW)
Baltic II 288 MW
Hohe See 497 MW
Merkur 396 MW
Albatros 112 MW
• Owner's engineer
• Technical due diligence
• Lenders technical advisor
• Investor relations &
preparation of FID
• Project information
memorandum (PIM)
• Design management
• Engineering management
• Certification management
• Employers requirements
• Contracting strategy
• Contract packages
• Tendering/evaluation
• Contract management
• Package management
Global Tech 1 400 MW
Baltic II 288 MW
Hohe See 497 MW
Merkur 396 MW
Albatros 112 MW
• Feasibility studies
• Permit management
• Grid connection
• Port assessments
• Development concepts
• Logistic concepts
• Concept design/design basis
Baltic II 288 MW
FEW Baltic II 350MW (PL)
Arcadis Ost 1 350 MW
Merkur 396 MW
Chu Feng 450 MW (TW)
Haixia 600 MW (TW)
ONPManagement 7ONP Management Company Presentation
RiskManagement
O&M Concept Development
ConstructionManagement
Ex
per
ien
ces
Sco
pe
Pa
cka
ge
Baltic II 288 MW
Merkur 396 MW
Nordseehotel © (offshore wind
accommodation platform)
R&D projects OWS-MV
• O&M concept development &
implementation
• Life-cyle cost analysis
• CAPEX-OPEX modelling
• O&M software simulation
• RDS-PP for offshore wind
• Document management
• Foundation fabrication
• Fabrication supervision &
reporting, QA/QC
• FAT, HAT, SAT
• Package management T&I
• Foundation installation
• Turbine installation
Global Tech 1 400 MW
Baltic II 288 MW
Nordsee One 332 MW
Merkur 396 MW
• Risk assessments
• FMECA
• Contract & claim
Management
• Technical expert in court
• Quality management
Global Tech 1 400 MW
Baltic II 288 MW
Gode Wind 1 332 MW
Merkur 396 MW
Bork.Riffg. II 450 MW
Nordsee One 332 MW
Port Development
• Port assessments
• Development concepts
• Logistic concepts
• Engineering & design
• Port improvement measures
• Construction management
• Quality management
• ABLE Marine Energy Park
(UK)
Bremerhaven (GER)
Świnoujście (PL)
Cuxhaven (GER)
Support ServicesCapabilities and Staff Experience
ONPManagement 8ONP Management Company Presentation
Project Name ONP Scope of Work ClientCapacity(MW)
Type ofFound.
Country Year
Haixia Owner's engineer, development TGP 600 MP/JKT Taiwan2017-ongoing
Borkum Riffgrund 2Technical due diligence & lenders' technical advisor
Talanx 450MonopileSB-Jacket
Germany2017-ongoing
OWF Albatros Design management & foundation engineering
GeoSea 117 Monopile Germany2017-ongoing
EnBW Hohe SeeDesign management & foundation engineering
GeoSea 500 Monopile Germany2016-ongoing
Kriegers Flak Bid preparation for auction Utility 600 n/a Denmark 2016
Merkur Offshore Client rep., set-up of SPV, PM untilFC, BoP package management
SPV 400 Monopile Germany2015-ongoing
FEW Baltic II Owner's engineer, feasibility studies, development services, IR
BTI 350 tbd Poland2015-ongoing
Nordsee OneClient representative foundationfabrication
Innogy/ NPI
332 Monopile Germany2015-2016
Gode Wind 1 Technical due diligence & Lenders' technical advisor
Talanx 330 Monopile Germany2015-2025
NobelwindTechnical advisory & construction services
Jan de Nul
165 Monopile Belgium 2015
Borssele I+II Bid preparation for auction Utility 700 n/a Netherlands 2015
ReferencesProject Selection
ONPManagement 9ONP Management Company Presentation
Scope of Work - Lenders' Technical Advisor
• Key data
German Bight/North Sea, 330 MW
55 Siemens turbines SWT-6.0-154 , 6 MW class
Monopile foundations
Project duration ONP 2015-2025
• Talanx coordinates a structured bond of EUR 556 mn with 5 institutional partners
• Bond finances Global Infrastructure Partners' fifty percent acquisition of Ørsted's Gode Wind 1 offshore wind farm; bond maturity = 10 years
• Talanx' new role: For the first time a group of institutional investors led by an insurer has financed an offshore wind power project
• Institutional consortium with following 5 main partners (Lenders Group):
Talanx Asset Management GmbH
Signal Iduna Asset Management GmbH
Versicherungskammer Bayern
Gothaer Krankenversicherung AG
Metzler Investment GmbH
• Follow-up contract awarded for OWF Borkum Riffgrund II (450 MW, debt financing 1,031 bn US $)
Project Reference - OWF Gode Wind 1Client - Talanx Asset Management GmbH + Lenders Group
© source all: Ørsted
ONPManagement 10ONP Management Company Presentation
Project Reference - OWF MerkurClient - Merkur Offshore GmbH
Scope of Work - Project Development, Interface, Package Management
• Key data
German Bight/North Sea, 396 MW
66 x GE-Haliade 150-6 MW
Water depths between 26.6 and 33.1 meters
66 x monopiles Ø 7.6 and 7.8 m, 700 t - 970 t
• Responsibility
Leading role in set-up and coordination of SPV assembly
Securing of building permit and grid access
Liaising debt financing
Management of design- and certification process (tower & foundation)
Contract management for EPCI and TSA-agreements, package management for construction phase (foundation, substation, installation logistics) and WTG package support
Project interface management and quality assurance
• Challenges
GE's first large offshore WTG supply contract
Untypical project organization (EPC contractor & OEM in the developer role)
Tight timeline to meet grid access requirements
© source: BSH
© source: Hydrotechnik Lübeck GmbH
ONPManagement 11ONP Management Company Presentation
Staff ExperienceOffshore Wind United States
OWF Block Island - Deepwater Wind
• Key data
United States, 30 MW
5 x GE-Haliade 150-6 MW
290 mUSD
Jacket foundations
• Scope of work
Technical expert, witness for
WTG installation
WTG commissioning
• Challenges
First offshore wind farm in the United States
2nd overall OWF featuring GE-Haliade 150-6MW wind turbines
Due to “Jones Act” no US port was entered for mobilization or take over of equipment
Nacelle spreader and blade yoke were taken to site by feeder barges
• Key Learnings (2016)
A variety of installation details where identified which are subject to procedural, logistical and technical optimization for the installation of 66 Haliade WTGs in the 396 MW OWF Merkur (Germany)
OWF Block Island
© source all: Deepwater Wind
ONPManagement 12ONP Management Company Presentation
Staff ExperienceOffshore Wind United States
OWF Cape Wind - Cape Wind Associates, LLC
• Key data
United States, 364 MW
101 x SWT-3.6-107
Water depths 4-17 m
Monopile foundations, design by Ramboll & Keystone
PCA signed with Client (Project implementation finally ceased)
• Scope of work
Preparation for supply and construction of
Foundations, transition pieces, cabling (inner-array and export) and full scope BoP (incl. ESP and onshore works)
Logistics concepts, scheduling, work preparation, interface management concept
Tendering (all relevant contract negotiations finalized (implementation status))
• Project partners
Flatiron Construction Corp. (HOCHTIEF Group)
Cal Dive International Inc.
Cashman Dredging & Marine Contracting Co., LLC• Key Learnings (2010-2012)
Strong involvement in local US project development
Familiarization with local supply chain, project partners, regulations and authorities
ONPManagement 13ONP Management Company Presentation
Staff ExperienceOffshore Wind United States
MassCEC Port Assessment
• Preparation for Participation in RFP
Massachusetts Clean Energy Center (“MassCEC”)
Request for proposal (Nov 2016)
• Topic
Ports and infrastructure assessment
• Scope
Assessment of waterfront sites (identification and suitability for Offshore Wind projects) and development of Employer's Requirements(definition of evaluation criteria and methodology)
Engineering and cost analysis
Report & recommendations
• Envisaged US Partners
Simpson Gumpertz & Heger
Keystone Engineering Inc.
Cashman Equipment Corp.
ONPManagement 14ONP Management Company Presentation
Staff ExperienceOffshore Wind United States
NYSERDA
• Participation in RFP
New York State Energy Research and Development Authority
Request for proposal (Jan 2017)
• Topic
New York Offshore Wind Energy Development Consulting Services
• Scope
Project Development and permitting assistance
Site selection and desktop development studies
Grid, offtake, supply chain/workforce development
Stakeholder engagement
Cost analysis
• Submission together with US Partners
Support Area 1: Project development and permitting assistance
Support Area 2: Site selection and desktop development studies
Support Area 6: Supply chain/workforce development
Support Area 7: Cost analysis
ONPManagement 15ONP Management Company Presentation
Your Contactin the Americas
ONP Management GmbH
Veritaskai 3 | 21079 Hamburg | Germany
www.onp-management.com
Dipl.-Ing. Knud Grimm
Senior Project Manager
Cph +49 172 265 8558
Dipl.-Ing. Frank Witte
Area Manager Americas
Project Development & Management
Cph +49 173 592 6166