OOO Energoservis/ Energoservice Engineering

Co. Ltd.

Innovative Solutions for

Infrastructural Assets/facilities

Page 2: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Over 20 years OOO Energoservis/Energoservice

Ltd taskforce operates at the steel wire rope and

non-insulated cable market. For many years we

design, test and implement into industrial

operation innovative wire rope products for the

target orders of the leading Russian customers

OAO MMC Norilsk Nickel/OJSC Mining and

Metallurgical Company Norilsk Nickel, OAO

SUEK/Syberian Coal Energy Inc. co., OAO FSK

EES/ OJSC Federal Grid Company of Unified

Energy System (JSC FGC UES), MRSK.

Amongst our objects are Ostankino TV Tower,

deep-earth hoisting/head frames, hundreds of

kilometers of power transmission lines and a lot

more.

The Volgograd Steel Wire & Rope plant, our

production facility – unique steel wire ropes

manufacture since the Soviet Union times –now is

the Volgograd branch of OAO Severstal Metiz/

Severstal Metiz Co. Inc.,is capable to produce

commercially viable goods, successfully

competitive with the leading European companies.

Page 3: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Cable design is the crucial element of bridge construction and

reconstruction especially for those water bridges (wet bridging) where

wave breake-through occurs during disastrous floods, as well as

hydroelectric units demolition.

When this happens, the most vulnerable are highlands.

Constructive improvements to prevent bridge destruction.

Page 4: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Volgograd branch of OAO Severstal Metiz/ Severstal Metiz Co. Inc. is the

first in the history of Russian cable industry to design the technology of

suspension cable manufacturing of any degree of compexity

Page 5: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

The most common model of bridge

demolition I-beam constructions hold floating boughs, small logs of

wood and other rubbish. They block the water flow under

the bridge if flood occurs. Moreover, emerging dam

attracts next lots of small woods. The water pressure

becomes higher and higher, as a result a bridge knocks

down like a house of cards.

Page 6: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Widely spread is the

bridge design consisting

of several fixed piers and

bridge vaults. The

shortage of this design is

that it can not be used at

the water barriers where

the wave outbreaks

happen with significant

depth and current

speed. Shock wave

velocity completely

demolish the bridge or

causes severe damage, making it out of use.

Page 7: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

This process is even more dangerous in highlands. Sharp downgrades of

mountain terrains determine (sudden) instant flood rise, up to 1,5-2,5 m and

higher within few hours. Simultaneously instant dumping of (overflow of

flood water) from tributaries located in the mountains into the river valley.

Totally in spring of 2011 3 thousand 29 residential areas, 315 railway

sections, 492 bridges (35 of them in the zone of excessive risk area) are

potentially flood exposed. This process is even more dangerous in

highlands. Sharp downgrades of mountain terrains determine (sudden)

instant flood rise, up to 1,5-2,5 m and higher within few hours.

Simultaneously instant dumping of (overflow of flood water) from

tributaries located in the mountains into the river valley.

Totally in spring of 2011 3 thousand 29 residential areas, 315 railway

sections, 492 bridges (35 of them in the zone of excessive risk area) are

potentially flood exposed.

Page 8: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO
Page 9: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Ministry of Regional Development of the Russian Federation

crutinized Your petition dated 10th of November, 2011 № 37-

89/HM on target program of scheduled replacement of bridge

crossings in flood- and mud torrent prone regions for the

suspended cable constructions and states upon the following:

Taking into consideration the urgent character of the issue,

described in your petition, the Ministry fully supports the concept

of the afore-mentioned target program and, whithin the scope of

its competence, is ready to examine the road maps prepared by

the concerned regional and federal bodies of executive

power of Russian Federation (regional governments, Ministry of

Economic Development, Ministry of Finance, Ministry of

Transport, Ministry of Emergency Situations).

Page 10: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO
Page 11: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Emercom of Russia scrutinized Your proposal on replacement of

bridge crossings in flood- and mud torrent prone regions of the

Russian Federation for the suspended cable bridges within the

frame of the federal target program and states upon the following:

In fact, a number of the Russian Federation regions’ bridge

crossings are prone to the threat of floods and mud torrents. Very

often beam bridges give favorable background for ice jams

facilitating potential emergency situations during the spring floods.

Suspended cable bridges availability will facilitate the vital activity

security in general and especially in mountain areas.

From our side Emercom has sent the letter of support of your

petition to the concerned federal bodies of executive power.

Signed by the Minister, Sergey Shogun

Page 12: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

It is worth mentioning mud torrents as well. They are extremely dangerous not

only due to they destructive power but also for their unexpected occurrence.

Rainfalls in rock habitat very often doesn’t cover the foothills and mud flow

happens all of a sudden in residential areas. Due to the fast speed of mud

torrent the time when it starts in the mountains and when it reaches the foothill

counts for 20-30 minutes.

Mud torrents are spread in all mountainous regions of this country (currently

there are some 6000 records).

For this very reason the suspension/cable bridge is the most feasible for the

mountainous areas. Due to the following reasons:

Absence of buttress – the most vulnerable part of construction during the flood

– allows to avoid the risk of washing away the I-beam constructions.

Relevantly low metal-consumption – solid rocks allow not to use huge concrete

carcasses, consequently, essentially reduce the cost of the whole construction

itself.

Page 13: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Take a special note on cable roads. Construction of highly efficient cable

road is in hundreds times less expensive than a bridge construction.

Cableways are eco-friendly and exotic means of transportation.

Since the USSR times Volgograd plant of OAO Severstal-Metiz is the

only one within the whole CIS territory with machinery and technologies

available, capable to build any cableways.

Page 14: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Sample of the greatest cable and beam

bridges with long spans/vaults manufactured

by the Volgograd plant:

In Riga (553,5 м), 1981

In Cherepovetz (194 м), 1979

In Kiev (300 м), 1976

Page 15: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Design decisions for mountain areas

Page 16: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO
Page 17: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

OOO Energoservis/Energoservice Ltd Engineering Co.

Technology

concept/solutions for

the road sector of

industry where

cables are applied

Page 18: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Fixing up crash barriers with the steel wire

rope application

The main trend of the passive impact measures on

highways and roads is, as a rule, connected with the

selection and installation of various types of railings and

shields which due to the bending deflection or

reversible/elastic deformation of construction are able to

change the trajectory of hitting them vehicles, to absorb

the kinetic energy of the impact or to reduce this impact to

the minimum

Page 19: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Unlike the rigid road barriers cable railings are damping the

vehicle impact, saving lives of accident participants, minimizing

vehicles and road damage in a car reck. Cable guardrails save

the road space and make road maintanance easier, especially in

winter time.

Page 20: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Let’s start with the fact that it is more safe rather than any other type of

guardrails. Its application reduces the level of injuries, accident rate

and vehicle damage level.

Advantages of wire cable guardrails

Quick and simple assembling (installation) does not require heavy installation

machinery or specialized tools.

Relatively low maintenance and repair cost. The repair is quick, simple and

manual (manhandled) without any mechanical equipment application.

Wire cable guadrails, installed at the traffic dividing strip, are more cost-efficient

(economically viable) rather than two-fold road barrier. Also the application of

this particular construction can reduce the width of the dividing barrier due to its

small size

Page 21: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Thin cross-section/profile blocks the formation of snow piles/banks. This

is very relevant for this country.

Also wire cable guadrails are aesthetically pleasing at highways.

Page 22: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

The most outstanding barkers - OAO Severstal

Metiz/ Severstal Metiz Co. Inc. full-scale

production – wire ropes for high-speed aircraft

landing at Admiral Kouznetsov aircraft carrier

deck, designed especially for suppressing

kinetic energy

On-position (operating position) wire ropes

are rolled up above the deck at designated

high to be cached by the landing aircraft’s

tail hook, making its complete stop after 90

meters of landing ground roll/run out with

longitude acceleration not more than 4,5 G

Page 23: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO
Page 24: OOO Energoservis/ Energoservice Engineering Co. Ltd.€¦ · OAO MMC Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel, OAO SUEK/Syberian Coal Energy Inc. co., OAO

Locked coil principal load lifting wire rope with omega-type wires technical

specifications/regulations 14-171-16-2001. The product is designed by the VSPKZ,

OOO Energoservis/Energoservice Ltd and OAO MMC Norilsk Nickel/OJSC Mining

and Metallurgical Company Norilsk Nickel Ltd. This wire rope undergone the

complete circle of industrial/field trials and accepted into service at OAO MMC

Norilsk Nickel/OJSC Mining and Metallurgical Company Norilsk Nickel Ltd. in

2003.

Technical characteristics: one layer omega-type, one layer wedge-wire

and TC – (point touch the wires between the layers)-type core. Processed from

zinc-coated wire and characterized by the large ratio of metal FU (fill up) of wire

rope, minimum elastic & residual elongations when used, ability of contour

forming if high-tensile wire breakage occurs

Volgograd Industrial site of OAO Severstal Metiz/ Severstal Metiz Co. Inc. –

formerly VSPKZ – is the unique CIS production facility, manufacturing locked-

coil and special purpose wire ropes.