3D Application Experience
• NIPI ONGM has more than 100 employees with work experience in 3D modelling
• NIPI ONGM uses software of such CAD developers as and
• For 3D design we use such software as PDS and Smart3D
![Page 3: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/3.jpg)
Heavy Oil Hydrocracking Complex, First Phase. Burgas (Bulgaria).
The project was performed together with Technip Italy. 2011-2013
Examples of Projects Completed
![Page 4: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/4.jpg)
Examples of Projects CompletedHeavy Oil Hydrocracking Complex, First Phase. Burgas (Bulgaria).
The project was performed together with Technip Italy. 2011-2013
![Page 5: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/5.jpg)
Examples of Projects CompletedHeavy Oil Hydrocracking Complex, First Phase. Burgas (Bulgaria).
The project was performed together with Technip Italy. 2011-2013
![Page 6: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/6.jpg)
Examples of Projects CompletedHeavy Oil Hydrocracking Complex, First Phase. Burgas (Bulgaria).
The project was performed together with Technip Italy. 2011-2013
![Page 7: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/7.jpg)
Design & Survey Services to Upgrade the Facility.
OAO NK RosNeft ZAO Otradny Gas Processing Plant
Comprising:
- Inlet Separators;
- Associated Gas Amine Treatment Unit to
strip out H2S and CO2;
- Gas and Gas Condensate Adsorption-based Dehydration and DMC Unit.
Key Performance Parameters:
- facility capacity for associated gas – 300
million nm3/year;
- associated gas is stripped of H2S
compounds and dehydrated to be fed to
Low-temperature Rectification Unit and
Ethane Recovery Unit.
![Page 8: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/8.jpg)
Design & Survey Services to Upgrade the Facility.
OAO NK RosNeft ZAO Otradny Gas Processing Plant
![Page 9: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/9.jpg)
Design & Survey Services to Upgrade the Facility.
OAO NK RosNeft ZAO Otradny Gas Processing Plant
![Page 10: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/10.jpg)
2514 CDU/VDU Complex Omsk Refinery - work in progress
![Page 11: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/11.jpg)
2514 CDU/VDU Complex Omsk Refinery
![Page 12: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/12.jpg)
Development of Wells Infrastructure in Eastern part of Orenburg Oil Gas Condensate
field. Phase 2. ZAO Gazprom Neft Orenburg
Field Well Site.
Comprising: construction of 36 well pads, 10 single
producing wells, 26 injection wells, construction of pipelines
with a total length of 300km, 110/35/6kV Substation
including a 100km 6kV power line, construction of 80km of
in-field roads.
Oil and Gas Treatment Unit.
Comprising:
separation equipment, gas dehydration
for the gas-lift oil recovery system, oil
treatment (dewatering, desalting), gas
compression for external transportation,
tank farm, and auxiliary equipment.
Capacity:
Oil 2944.4 KTA.
Liquids 4085.5 KTA.
Associated gas 3457.0 mscm p.a.
Gas-lift 400 cubic meters per tonne.
The key challenge of the project was
sour gas with H2S concentration of up
to 9 vol.%, which called for additional
safety measures.
![Page 13: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/13.jpg)
Development of Eastern area of Orenburg Oil Gas Condensate field. Associated
petroleum gas treatment unit. Stage Project Design ZAO Gazprom Neft Orenburg
![Page 14: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/14.jpg)
Condensate Stabilization Unit at Shinginsky Field
ООО Gazpromneft-Vostok
![Page 15: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/15.jpg)
Condensate Stabilization Unit at Shinginsky Field
ООО Gazpromneft-Vostok
![Page 16: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/16.jpg)
The contents of 3D model reviews
30% Model 60% Model 90% ModelPackage of design
and cost estimate
documentation
Comprising:
Equipment: In compliance
with standard library,
including outlet areas
Critical stress lines and
process lines, large lines
and lines with unusual
properties
Main pipe racks
Equipment foundations
(expected dimensions)
Steel structures (only main)
Comprising:
Equipment: General form,
including outlet areas, as
well as an external volume
of additional accessories.
Volumes for maintenance,
access and evacuation
routes
All pipes larger than 1.5”
Pipe racks with foundations
and staircases
Main steel structures with
foundations
Bearing steel structures
Comprising:
Equipment: General form,
including outlet areas, as
well as an external volume
of additional accessories.
All pipelines
All steel structures with
foundations, staircases,
ladders and fences
![Page 17: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/17.jpg)
An example of an action point as a result of Review
![Page 18: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/18.jpg)
Example of 3D documentation received
About 17 000 process lines
![Page 19: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/19.jpg)
H-Oil Hydrocracking Complex. Phase 1.
Burgas (Bulgaria).
Work in progress. Panoramic View.
![Page 20: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/20.jpg)
Modification of 3D model as a result of construction
![Page 21: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/21.jpg)
Automatic check for clashes
![Page 22: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/22.jpg)
Use of material classes and rules of design
For each project it own Material Classes are created
The user doesn’t choose an element from the base. He only chooses its
type. The software chooses it itself in compliance with the defined rules.
The use of Classes help to:
-Avoid confusion with various types of elements
-Simplify the work of a designer
-Eliminate human factor
-Simplify introductions of modifications into the project.
![Page 23: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/23.jpg)
Example of documentation obtained.
Drawings obtained and finalized from 3D
![Page 24: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/24.jpg)
Example of documentation obtained
Isometric sketches extracted automatically from 3D.
2,000 sheets for Otradnensky GPP
![Page 25: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/25.jpg)
Example of documentation obtained
A line list extracted automatically from 3D
![Page 26: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/26.jpg)
Example of documentation obtained
A bill of materials extracted automatically from 3D
![Page 27: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/27.jpg)
Example of interoffice memos obtained from 3D
![Page 28: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/28.jpg)
Example of interoffice memos obtained from 3D
![Page 29: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/29.jpg)
Example of design process automation
Automatic tagging of elements
![Page 30: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/30.jpg)
Example of design process automation
Calculation of support loads
![Page 31: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/31.jpg)
Example of design process automation
Drawing extracted automatically
![Page 32: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/32.jpg)
Example of design process automation
Report on supports
![Page 33: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/33.jpg)
Advantages and disadvantages of using Smart 3D for NIPI ONGM.
Advantages: Reduced manpower and higher quality of works
- The largest part of information is entered only 1 time in the 3D model, and in the future it is used to obtain all
deliverables (drawings, reports, interoffice memos).
-It is easier to introduce modifications – 3D is updated, and automatically all deliverables are modified as well.
-Automation some works to be performed.
-Easier interaction between departments Really multi-user work on the project.
-Software check for clashes in compliance with determined rules.
-Fewer mistakes and lower influence of human factor. Easier check of engineering solutions.
-Use of material classes. The uses only chooses the pipeline class, and pipes, fittings and valves are chosen in
compliance with rules determined in the class.
A disadvantage is only the cost of the software and the necessity to train personnel.
![Page 34: OOO NIPI ONGMnipi-ongm.ru/upload/Presentation_NIPI_ONGM_3D... · 2017-09-21 · strip out H2S and CO2; ... with a total length of 300km, 110/35/6kV Substation including a 100km 6kV](https://reader033.vdocuments.net/reader033/viewer/2022050215/5f6193d9d2029774ca4d5bbe/html5/thumbnails/34.jpg)
Email: [email protected]
Tel: +7 (347) 293-68-58, tel/fax: +7(347) 293-68-59
Address: #52/2 Sofia Perovskaya Str., Ufa, Bashkiria, RUSSIA
Thank you for your attention