REASON FOR REVISION: 1) O-320/360 Exhaust System installation instructions revised to include greater clarity, as well as information covering filtered air box options and scat tube routing. OP54-1 REV 1: Steps rewritten for clarity. Figure 3 moved to page OP54-3. OP54-2 REV 1: Steps rewritten for clarity. In Figure 1, 2 & 3, callouts revised to more accurately reflect installation. OP54-3 REV 0: New page OP54-4 REV 0: New page

Upload: rezicky-imam

Post on 08-Nov-2015

221 views

Category:

Documents


6 download

DESCRIPTION

oiehfwefdghfewefwejhf8wefwefwefweofhweelfhweft

TRANSCRIPT

  • REASON FOR REVISION: 1) O-320/360 Exhaust System installation instructions revised to include greater clarity, as well as information covering filtered air box options and scat tube routing. OP54-1 REV 1: Steps rewritten for clarity. Figure 3 moved to page OP54-3. OP54-2 REV 1: Steps rewritten for clarity. In Figure 1, 2 & 3, callouts revised to more accurately reflect installation. OP54-3 REV 0: New page OP54-4 REV 0: New page

  • 09/11/14 1 PAGEREVISION:DATE:

    VAN'S AIRCRAFT, INC.

    OP 54-1

    NOTE: Details of the engine installation that do not pertain to the exhaust system are shown forreference only as some features may have been omitted or are obsolete.

    Step 1: Fabricate the EX-00001F Heat Muff Clamp from the HW-00001 Hose Clamp by clamping it overthe Heat Muff Assembly. Mark the bend locations on theclamp, then remove the hose clamp and bend asrequired to ensure a close fit around the Heat MuffAssembly.

    WARNING: The Heat Muff Assembly must not beinstalled over the Exhaust Crossover Slip Joints.Doing so could cause exhaust gasses to enter theHeat Muff Assembly & associated ducting.

    Step 2: For installations using O-320 engines, trim theexhaust tube ends to be inserted into the ExhaustCrossover Slip Joints by 1 (25.4 mm) and install asshown in Figure 1 and Figure 2.

    Only install lock washers upon final installation.

    Step 3: For installations using O-360engines, install as shown in Figure 1and Figure 2.

    Only install lock washers uponfinal installation.

    FIGURE 1: EXHAUST ASSEMBLY OVERVIEW

    HEAT MUFF ASSEMBLY

    EX-00005

    EX-00004A

    EX-00002

    EXHAUSTCROSSOVERSLIP JOINT, 2 PL

    EX-00003

    EX-00008

    EX-00001

    2X EX-00001F

    CARB HEATTUBE

    CABIN HEATTUBE

    AIR INTAKE TUBE

    OP-54: O-320/360 EXHAUST

    MS35333-41 (LOCK WASHER)NAS1149F0563P

    NUT-00003

    EA GASKET 77611

    EX-00003B,8 PL FIGURE 2:

    HEAT MUFF ASSEMBLY

    RV 3,4,6,7,8,9

  • FIGURE 3:EXHAUST HANGER ASSEMBLY

    OP 54-209/11/14DATE: 1REVISION: PAGE

    VAN'S AIRCRAFT, INC.

    FWD

    LEFT

    OIL SUMP

    1/4 [6.4 mm]

    RIGHTFWD

    UP

    ROUND CORNERS

    FIGURE 2: TUBING DETAIL(TYPICAL)

    6X EX-00004B

    Step 1: Position the exhaust tubes as desired for cowl and engine mount clearance. Use safety wire to temporarily hold them in place if necessary.

    Step 2: Temporarily install the EX-00004A Exhaust Hanger Brackets onto the exhaust tubes.

    NOTE: The EX-00004E Exhaust Hanger Support Tab locations shown may vary between aircraft firewall forward installations, use the most convenient bolt locations on the OilSump.

    Step 3: Install the EX-00004E Exhaust Hanger Support Tabs in positions somewhat forward and above the EX-00004A Exhaust Hanger Brackets. See Figure 1.

    Step 4: Trim all the EX-00004B Exhaust Support Tubes so that the ends reside in the center of their respective spans. Gaps between exhaust support tube ends should be between1/4 [6.35 mm] and 1/2 [12.7 mm] to allow for motion due to engine vibration. Straight lines between the EX-00004A Exhaust Hanger Brackets and EX-00004E Exhaust Hanger Support Tabs areprefferable, but may not be possible depending on engine configuration. Slight angles in the connecting geometry formed by the exhaust support tubes are acceptable.

    Step 5: Once the optimum orientation and lengths for the EX-00004B Exhaust Support Tubes have been found, bend the flat ends as necessary to ensure a flat fit against the faces of themounting hardware EX-00004A Exhaust Hanger Brackets & EX-00004E Exhaust Hanger Support Tabs. This will help reduce wear and tear on the exhaust support tubes. Ensure each exhaustsupport tube is still aligned in an approximately straight line with its counterpart.

    Step 6: Slightly crimp the open ends of all the EX-00004B Exhaust Support Tubes, creating a tube flare that will help to retain the EX-00004C Support Tubing. Round down the sharp cornerscreated by crimping as shown in Figure 2.

    Step 7: Trim the EX-00004C Support Tubing approximately as shown in Figure 2.

    Step 8: Install all Exhaust Hanger Assembly hardware as shown in Figure 1.

    FIGURE 1:EXHAUST HANGER

    ASSEMBLY

    AN3-4ANAS1149F0363PMS21042-3

    6X

    6X AN737TW-4

    3X EX-00004C

    2XEX-00004E

    2X EX-00004A

    2X EX-00004E

    6X EX-00004B

    2X EX-00004A

    3X EX-00004C

    RV 3,4,6,7,8,9

  • 09/11/14 0 PAGEREVISION:DATE:

    VAN'S AIRCRAFT, INC.

    OP 54-3

    Step 1: If carb heat is not required, bend the EX-00008GCarb Heat Cover as shown in Figure 1 and match drill thethree #30 holes into the EX-00008 Carb Heat Tube.

    Step 2: Rivet the EX-00008G Carb Heat Cover tothe EX-00008 Carb Heat Tube as shown in Figure 1.

    NOTE: Perform Steps 3 thru 13 as part of the VA-130 or VA-131 Filtered Air Box fabrication and assemblyinstructions. Steps provided here are only a guide, Individual aircraft firewall forward installations may vary.The position of the carb heat tube from the EX-00001 Heat Muff will affect placement of the filtered air boxdoor and cutout. See Step 4.

    Step 3: Begin assembly and installation of the VA-130 or VA-131 Filtered Air Box as described in the filtered air boxinstructions. Perform enough assembly work to determine the physical alignment of the filtered air box to the inductionair inlet on the cowling, then proceed with the steps below.

    Step 4: Temporarily install the VA-130B or VA-131B Air Box Top Plate onto the carburetor as described in the FilteredAir Box instructions.

    Step 5: Use a grinder to remove the "lip" inside the tube of the FF-01407 FAB Carb Heat Inlet.

    Step 6: Position the FF-01407 FAB Carb Heat Inlet on as straight a line as possible with the carb heat tube from theEX-00001 Heat Muff on top of the VA-130B or VA-131B Air Box Top Plate. This is especially critical for O-320installations where there is a very short distance between the filtered air box and the heat muff carb heat tube due tothe shorter height of the O-320 carburetor.

    Step 7: Mark and trim the FF-01407 FAB Carb Heat Inlet to fit inside the VA-130B or VA-131B Air Box Top Platein the position found in Step 6. Be aware of the location and travel of the VA-122 Arm per the FilteredAir Box instructions and make allowances in the trim of the FAB carb heat inlet accordingly.

    Step 8: Clamp the FF-01407 FAB Carb Heat Inlet Mounting Brackets to the FF-01407FAB Carb Heat Inlet as shown in Figure 2.

    Step 9: Final-Drill #40 six rivet holes into the FF-01407 FAB Carb Heat Inletand FF-01407C FAB Carb Heat Inlet Mounting Brackets approximately as shownin Figure 2.

    Step 10: Mark and trim the FF-01407C FAB Carb Heat Inlet Mounting Bracketsas shown in Figure 2.

    Step 11: Cleco and rivet the FF-01407C FAB Carb Heat Inlet MountingBrackets to the FF-01407 FAB Carb Heat Inlet as shown in Figure 2.

    CARB HEAT TUBE

    FF-01407

    VA-130A OR VA-131A FIGURE 3:CARB HEAT INLET INSTALLATION

    (O-320 INSTALLATION SHOWN FOR TIGHTEST CLEARANCE)

    CARBURETOR

    2X FF-01407C,TRIM AS NECESSARY TO FITINSIDE VA-130B OR VA-131B

    FINAL-DRILL #40 AN470AD3-4

    TRIM AS NECESSARYTO FIT INSIDE VA-130B OR VA-131B

    FF-01407

    Step 12: Match-Drill #40 the FF-01407 FAB Carb Heat Inlet to the VA-130B or VA-131B Air Box Top Plate asshown in Figure 3.

    Step 13: Coordinate the final installation of the FF-01407 FAB Carb Heat Inlet with the final assembly of the filtered air box,particularly with respect to the carb heat door.

    MATCH-DRILL #40 AN470AD3-4

    3X LP4-3

    EX-00008G FIGURE 1:CARB HEAT COVER

    (OPTIONAL)

    6X

    FIGURE 2: CARB HEAT INLET ASSEMBLY(EXACT SHAPE MAY VARY BY AIRCRAFT)

    VA-130B OR VA-131B

    CARB HEAT INLET ASSEMBLYLINE

    STRAIGHT

    6X

    RV 3,4,6,7,8,9

  • OP 54-409/11/14DATE: 0REVISION: PAGE

    VAN'S AIRCRAFT, INC.

    NOTE: The CB-907A or CB-1007A Right Aft Case Baffle may already have an air intake hole pre-punched. If present, seal this hole with a block-off.

    Step 1: Create the air intake hole in the CB-902A or CB-1002A Forward Left Air Ramp as shown in Figure 1. Position the hole aft of the bend line in the CB-907A orCB-1007A Right Aft Case Baffle as shown in Figure 1.

    Position the hole left and right so that the scat tube will naturally route from the Heat Muff Air Intake to the VENT DL-03 Scat Tube Flange while avoiding interferencefrom the starter or any other components.

    Experiment with the scat tube routing prior to creation of the air intake hole. If necessary, the flange of the VENT DL-03 Scat Tube Flange may be bent to facilitatepositioning. Clamp the VENT DL-03 Scat Tube Flange into position.

    Step 2: Clamp, then final-drill #30 the holes in the VENT DL-03 Scat Tube Flange to the CB-902A or CB-1002A Forward Left Air Ramp as shown in Figure 1.

    WARNING: Install a vent screen in this location if the vent hole is ONLY to provide cabin heat. A vent screen installed upstream of a carburetor heatsystem may obstruct airflow and drastically reduce engine performance.

    Step 3: Rivet the VENT DL-03 Scat Tube Flange and VENT SCREEN 3X3 (optional) to the CB-902A or CB-1002AForward Left Air Ramp as shown in Figure 1.

    WARNING: For proper carb heat performance, a vent screen must be installed over the cabin heat tube at the locationshown in Figure 3.

    Step 4: (If using carb heat) Form the VENT SCREEN 3X3 over the end of the cabin heat tube coming from the Heat Muff Assembly.See Figure 3 for location.

    Step 5: Cut lengths of scat tubing to connect the VENT DL-03 Scat Tube Flange to the heat muff air intake tube; the FF-01407FAB Carb Heat Inlet to the heat muff carb heat tube; and the heat muff cabin heat tube to the VENT TG-10 Assembly installed on thefirewall in OP-29 or OP-33. See Figure 2 and Figure 3.

    Step 6: Secure the Scat Tubes as shown in Figure 2 and Figure 3. Use additional tie-wraps and clamps as necessary to ensurethe scat tubes do not interfere with the oil sump drain, exhaust tube, engine mount or any other components.

    FIGURE 2: SCAT TUBE ROUTING(O-360 INSTALLATION SHOWN)

    FIGURE 3: SCAT TUBE ROUTING(O-360 INSTALLATION SHOWN)

    FIGURE 1: AIR INTAKE HOLE LOCATION

    POSITION AIRINTAKE HOLEAFT OF THIS BENDLINE

    CB-902AOR CB-1002A

    2 [50.8 mm]FINAL-DRILL #30

    AN470AD3-4 4X

    VENT DL-03

    AIR INTAKE TUBE

    VENT DL-03

    AIR

    INTA

    KE

    CABIN HEAT

    CABIN

    HEAT

    CARB HEAT TUBE

    FF-01407

    FF-01407

    HEAT MUFFHEAT MUFF

    AN737TW, 2 PL

    AN737TW, 2 PL

    AN737TW, 2 PL

    CARB

    HEAT

    STARTER

    3X3 VENT SCREEN

    CARB

    HEA

    T

    MS21919-DG12

    SAFETY WIREWRAPPED AROUND

    CLAMP

    AN3-4AN310-3

    MS21919-WDG34

    RV 3,4,6,7,8,9