Page 1: OPD Design Alternatif

Design OptionOut Pit Dump – West PitSouth Kalimantan Projcet

Page 2: OPD Design Alternatif

Design

South Out Pit Dump

Creek

Distance : 980 meters

Distance : 670 meters

North Out Pit Dump

Nor

th

Page 3: OPD Design Alternatif

Capacity

South area, Fill 8,160,026.29 Lcm & Cut 60,683 Bcm North area, Fill 1,219,700.42 Lcm & Cut 37,232 Bcm

S W O T analysis

Strength

- Not construct stream diversion

- Reduce environment & social effect

- Reduce land compensation cost

- Distance following require ( max 1,000 meters )

Weakness

- Cut for construct road access

- Capacity less than old design ( 2 million lcm )

Opportunity- Possible to increase capacity on the south area

Treatment- Possible for reduce cut for road construction

Note : Need geo tech analysis