Page 1: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Open BIMWolfgang Hass

Principal Expert –

Press Conference December 4, 2018

siemens.comRestricted © Siemens Switzerland Ltd 2018

Page 2: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 2 Wolfgang Hass/Press Conference, Siemens Building Technologies

Source: Statistisches Bundesamt, Fachserie 18, Reihe 1.5, 2013; Volkswirtschaftliche Gesamtrechnungen

Productivity per employee

The manufacturing industry faced similar challenges –

How did it improve?

100

200

1991 2001 2011

Manufacturing industry

(without construction industry)

Construction industry

Services

Overall

Page 3: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 3 Wolfgang Hass/Press Conference, Siemens Building Technologies

Construction sector realities driving the adoption of BIM

Source: CMAA Owners Survey, CMAA Industry Report, Economist Magazine

of materials

used in construction

become waste

37%of planners confirm

that not all information

is available when

plans are made

92%30%of projects do not

meet original program

or budget

10%of the cost of a project

is typically due

to change orders

38%of carbon emissions

are from buildings,

not cars

Page 4: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 4 Wolfgang Hass/Press Conference, Siemens Building Technologies

Patrick McLeamy

Page 5: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 5 Wolfgang Hass/Press Conference, Siemens Building Technologies

Power Management

Fire Safety

HVACMechanical

Video Management

Intrusion Detection

Access Management

Lighting ManagementBAS

(Comfort)

Data

Analytics

Dismantling

Phases of the building life cycle

Page 6: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 6 Wolfgang Hass/Press Conference, Siemens Building Technologies

These are levers of success according to our experience

Process

Data

Tools

• Consistent data

• Enriched data (new dimensions)

• Accessible data

• Holistic process optimization

• Reduction of interfaces

• Eliminate double work

• Testing and model checking

(e.g. clash detection)

• Simulation and analytics

(big data approach)

Time

Quality

Costs

Page 7: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 7 Wolfgang Hass/Press Conference, Siemens Building Technologies

Product Data –

The base for BIM

We already have 2,200 products

available – and more to come

BIM-compliant data according to …

VDI 3805/ISO 16757

Data structures for electronic product

catalogues for building services

IFC/ISO 16739

Industry Foundation Classes (IFC)

for data sharing in the construction

and facility management industries

COBie standard

Construction Operations

Building Information Exchange

Page 8: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 8 Wolfgang Hass/Press Conference, Siemens Building Technologies

Common

Project

DataBase>200 exchange “standards”

BIM Data today and tomorrow

Page 9: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 9 Wolfgang Hass/Press Conference, Siemens Building Technologies

Virtual build

phase

Physical

construction

phase

BIM

Idea Operation De-

mantling

Plan

Construction

How does BIM change the construction process

Physical

construction

phase

Operation

Conceptual

phase

Detail

planning

Product/System definition

Page 10: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 10 Wolfgang Hass/Press Conference, Siemens Building Technologies

The Digital Twin

Virtual

build

phase

Physical

build phase

Common project database

Idea Operation De-

mantling

Page 11: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 11 Wolfgang Hass/Press Conference, Siemens Building Technologies

Page 12: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 12 Wolfgang Hass/Press Conference, Siemens Building Technologies

4 key elements of BIM

Build twice

Create data

only oncePlan and

build together

For the entire life-cycle

Page 13: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 13 Wolfgang Hass/Press Conference, Siemens Building Technologies

Change

Page 14: Open BIM - Siemens · The base for BIM We already have 2,200 products available –and more to come BIM-compliant data according to … VDI 3805/ISO 16757 Data structures for electronic

Restricted © Siemens Switzerland Ltd 2018

December 4, 2018Page 14 Wolfgang Hass/Press Conference, Siemens Building Technologies

Contact page

Wolfgang Hass

Principal Expert

Siemens Building Technologies

Theilerstrasse 1a

6300 Zug

E-Mail: [email protected]

siemens.com