operating instructions superstar e-3000 / f2 for 1 1/2

10
2 3 G / 4 C 5 6 7 - 8 9 10 Page Safety references eneral regulations / Intended use Assembly ycle sequence/rinsing times Digital clock/Prog. Back rinsing trigger time Function film keyboard Settings for back and clear rinsing duration Setting for deceleration time Electr. Connection Board for E-3000/F2 - 24V Exploded view G F E D A C H B L K I M Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2", 2"and 3" 24 VAC Table of contents: Ensuing damage due to neglect of the operating instructions or due to damaging sealed parts lead to a lapse of the warranty. We do not take on liability for thus resulting damages! Please read the operating instructions carefully before starting. PRECISION - POWER - PROGRESS - PRODUCTION

Upload: others

Post on 22-Nov-2021

8 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

2

3 G

/

4 C

5

6

7 - 8

9

10

Page

Safety references

eneral regulations / Intended use

Assembly

ycle sequence/rinsing times

Digital clock/Prog. Back rinsing trigger time

Function film keyboard

Settings for back and clear rinsing duration

Setting for deceleration time

Electr. Connection

Board for E-3000/F2 - 24V

Exploded view

G

F

ED

A

CH

B

L

K

I

M

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

Table of contents:

Ensuing damage due to neglect of the operating instructions or due to damaging sealed parts lead to a lapse of the warranty. We do not take on liability for thus resulting damages! Please read the operating instructions carefully before starting.

PRECISION - POWER - PROGRESS - PRODUCTION

Page 2: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

Page 2

1. Safety Instructions:

• T

This equipment has been built and examined according to the safety precautions for electronic

devices and has left the plant in a perfect safety-related condition.

To keep this status and to guarantee a safe operation, the user must

observe the safety instructions, which are included in these operating instructions.

The installation work may only be undertaken by an authorized and licensed installer or

electrical business.

The electrical installations must be carried out according to the respective local and regional

regulations (e.g. OEVE, VDE...) and possible official regulations.

he electrical connection must have separating device built into the permanently installed

electrical installation, which enables the disconnection of all electrical contacts with a contact space of minimum 3 mm from the mains.

Pay attention that the supply voltage is correctly protected and an

earth-leakage circuit breaker 30 mA is installed.

Only use the equipment in dry rooms, in which no combustible gases and

vapors are present.

Do not operate the equipment immediately if it has been taken from a cold into a warm area

The thereby developing condensation water could destroy your equipment

If the equipment has visible damages doesn't work anymore or has been stored for longer

periods under adverse conditions then it is to be expected that a safe operation is not possible anymore.In this case the equipment is to be secured against unintentional start-up and if necessary to be decommissioned.

Live parts can be uncovered when opening the cover or removing parts.

Before an alignment, maintenance, a repair or a change of parts or devices, the equipment must be separated from all voltage supplies, if opening the equipment is necessary. If after that an alignment, maintenance or a repair on the opened equipment under voltage is inevitable, it may only be done by experienced skilled personnel, who have knowledge of the associated dangers and/or the relevant regulations.

Capacitors in the equipment can be still charged, even if the equipment

is separated from all voltage supplies.

Assembly and/or disassembly of the armature only in a pressure-free status (i.e. empty piping

beforehand).

Armature flow and/or direction of flow must be considered!

<

PRECISION - POWER - PROGRESS - PRODUCTION

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

Page 3: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

2. General:

PRAHER superstar controls are significant technical products, which are manufactured with high accuracy and according to the most modern technical production methods. Entitled complaints will naturally be rectified as fast as possible if they occur.Warranty: According to “EU”-law. The warranty begins on the delivery day. The date is in the serial number on the rate plate.

3. Intended use:

It is a control unit for a 6-way valve, with which a filter is fully automatically flushed by pressure application. A filter pump connector is available, which when reaching the respective valve positions switches on delayed for approx.. 20 seconds. Parallel there is also a potential-free signal. The dry operation protection ensures a safe operation of the plant.

Additional electrical connections are possible:

To position flush, to position back and clear rinse, for the serial connection of various valves, for the interruption of a heating or heat exchanger before cycle start, for ball valve during the cycle

4. Assembly:

Equipment installation - installation of the valveIntegrate the valve into the piping according to the inscription and the following sketch. Use transition screw connections. Seal threaded connections only with teflon band. The equipment is functional in any position, however if possible should not be installed with the actuator downwards.

Pump

Basin

Drain

To the Filter

From the Filter

PUMP from the pumpto the filter

BOTTOM from the FilterReturn to the basinWaste to the Drain

TOP

I FILTER

Pump

Basin

Drain

To the Filter

From the filter

I : Filtration of medium (e.g. water): pool

II : D pool

III : Cleaning up filter medium (e.g. Sand) in upstream (reserved flow in filter): pool

V : pool

- pump - valve (to the filter) - valve (from the filter) - pool

rainlage of pool with pump: - pump - valve - drain

- pump - valve (from the filter) - filters - valve (to the filter) - waste

Cleaning of filter medium (e.g. Sand) after backwash:- pump - valve (to the filter) - filters - valve (from the filter) - waste

II EMPTY

Pump

Basin

Drain

To the Filter

From the filter

III BACK RINSE

Pump

Basin

Drain

To the Filter

From the filter

V RINSE

Pump

Basin

Drain

To the Filter

From the filter

Page 3

6 - way valve-type 1 1/2”, 2”, 3”Connections: Thread or stick (all connectors open)max. Operating pressure: ABS 1 1/2", 2": 3,5 bar ; GFK 1 1/2", 2": 6 bar; GFK 3": 5 bar

PRECISION - POWER - PROGRESS - PRODUCTION

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

Page 4: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

Page 4

5. Cycle sequence: Starting position "filter" - equipment ON

- Start of the back rinsing cycle- Control light "test key" for back rinsing cycle running, lights up- Output heating COM-NO switches to Com-NC control.- Adjusted time of potentiometer (deceleration time) runs off (cooling time for heat exchanger).- Output pump COM-NO switches off- Output serial connection switches from COM-NC to Com-NO - Output ball valve switches from COM-NO to COM-NC- Valve on back rinse- Output back rinse/clear rinse COM-NC switches to COM-NO - Pump deceleration time of approx. 20 seconds runs- Output pump COM-NO closes- Output back rinse COM-NC switches to COM-NO- Adjusted time of potentiometer runs (back rinsing time)- Output pump COM-NO switches off- Output back rinses switches from COM-NO to COM-NC- Output back rinse, clear rinse switches from COM-NO to COM-NC- Valve on clear rinse- Output back rinse/clear rinse switches from COM-NC to COM-NO- pump deceleration time of approx. 20 seconds runs- Output pump COM-NO closes- Adjusted time of potentiometer runs (clear rinse)- Output pump COM-NO switches off- Output back rinse/clear rinse switches from COM-NO to COM-NC- Valve on filter- Output serial connection COM-NO switches to COM-NC- Output ball valve switches from COM-NC to COM NC- Pump deceleration time of approx. 20 seconds runs- Output pump COM-NO closes- Output heating switches from COM-NC to COM-NO

7

5

6

TransposeFilter - back rinse

Back rinse

TransposeBack rinse - clear rinse

Clear rinse

TransposeClear rinse - filters

Cycle period

approx. 45 sec.

25 sec. - 11 min.

approx. 35 sec.

20 sec. - 3 min.

approx. 25 sec.

Rinsing times and changing over time:

Deceleration time 25 sec. - 23 min.

approx. 3 - 40 min.

PRECISION - POWER - PROGRESS - PRODUCTION

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

Page 5: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

Page 5

9. Function:

Operating this key switches off the equipment, regardless of the positionof the valve.

Operating this key switches on the equipment, the valve takes onbasic position - position "Filter" - (yellow control light shines)

TEST KEYOperating this key triggers the back rinsing cycle for the length of a back rinse procedure (greencontrol light shines)

EMPTYOperating this key sets the valve to position "Empty" (red control light shines)

OFF

ON

1

2

3

4

This product corresponds to the following EEC - Guidelines:

l Electromagnetic compatibility 89/336/EECl Low voltage directive 73/23/ EEC

2 1 43

7. Adjusting the digital clock:

- attach equipment to line voltage- with pointed article [ Res. ] - press key - clock - keep key pressed and with Day - key select desired day - clock - keep key pressed and with h+ - key select desired hour - clock - keep key pressed and with m+ - key select desired minute

8. Program back rinsing time:

- Prog. - press key- Manual - key ¤ press ‘ON’ - on display appears “ON-Time programmming” - with Day - key select day (E) - with h+ - key select hour - with m+ - key select minute (- with Manual - key programming time can be switched between ON and OFF) - Prog. - press key- Manual - key ¡ press ‘OFF’ - on display appears “OFF-Time programming”- with Day - key select day (E)- with h+ - key select hour- with m+ - key select minute- Prog. - --> press key program

Terminated

NOTE:Trigger back rinsing program for max. 1 minute!

e.g.: ON ¤ 8:00OFF ¡ 8:01

Programmable 20 times/week! When programming several back rinsing times

--> repeat aforementioned steps.

PRECISION - POWER - PROGRESS - PRODUCTION

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

Page 6: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

Page 6

10. Adjust duration of back rinsing

The back rinsing time is adjusted with the potentiometer (rotary button) .

- turn potentiometer clockwise direction for a lengthy periodagainst clockwise direction short period

- triggering a back rinsing procedure with the test key- checking the back rinsing time

- repeat the sequence, until the desired time is set.

10.1 Adjusting the clear rinsing duration

The clear rinsing time is adjusted with the potentiometer (rotary button) .

- turn potentiometer clockwise direction for a lengthy period against clockwise direction short period

- trigging a back rinsing procedure with the test key- checking the clear rinsing time

- repeat the sequence, until the desired time is adjusted.

10.2 Adjusting the deceleration time

The deceleration time can be stopped with the potentiometer (rotary button) .

- turn the potentiometer clockwise direction clockwise direction against clockwise direction short period

- trigger a back rinsing procedure with the test key. check the deceleration time- repeat the sequence, until the desired time is adjusted.

6

5

7

PRECISION - POWER - PROGRESS - PRODUCTION

8

5

6

7

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

Page 7: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

Page 7

11. Electrical connections

a) Supply voltage connection:

b) Connector for dry operation protection (float switch):

The clamps [ 9 ] and [ 10 ] are connected. If this connection is interrupted, the pump is switched off.

c) Pump connection:

Zero potential: I max. 8 ASwitches to the positions filter, back rinse, clear rinseand empty approx. 30 sec. later.

d) Connection for ball valve:

Zero potential: I max. 8 AIn position filter G --> 6 is connected through . G --> 2 connected through, during entire back rinsing cycle and position emptying.

e) Connection for 2. Back rinsing pump:

Zero potential: I max 4 AIn position back rinse 28 --> 27 is connected through.Switches only if pump is [ 13, 14 ] switched on.

f) Connection for signal on position back rinse and clear rinse:

Zero potential: I max 4 A25 --> 24 connected through in position back rinse and clear rinse.Switches independently of the pump to position back rinse and clear rinse.

24 VAC, 50/60 Hz.L1 N

9 10

13 14

NO COM

6 G 2

NO COM NC

NO COM NC

NO COM NC

27 28 29

24 25 26

PRECISION - POWER - PROGRESS - PRODUCTION

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

Page 8: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

Page 8

g) connection for signal for heating/heat exchanger:

Zero potential: I max. 4 AAfter triggering a back rinsing cycle 22 becomes --> 23 durchgeschaltet.Filter pump remains for the duration of the adjusted deceleration time (rotary button ) switched on. Afterwards the pump switches off (Heat exchanger cools down).

h) connection for signal for serial connection:

Zero potential: I max. 4 A.During the entire cycle 19 is connected through -->18.Connecting several valves:

i) Push button switch input:

Trigger cycle EXTERNAL: Floating Connection possibilities (SPS, push button switch...)

push button switch cycle strarts about 40 - 50 seconds later (to compensate pressure peaks).

j) Trigger cycle EXTERNAL:

Zero potential: Note: trigger only short pulse.(SPS, ...)

(Pressure switch)

NO COM NC

NO COM NC

21 22 23

18 19 20

- G 1820 + CH2 CH1 19 201918

Valve 3

+ G CH2 CH1-

Valve 2

201918

Valve 1

Serial connection for several valves

Technical data:Voltage: Protective system:Frequency: clock: approx. 1 month accu backupmax. Power consumption: approx. 4 Watts/12 Watts 1 1/2 “, 2"- approx. 4 Watts/20 Watts 3 "

24 VAC IP 5450/60 Hz

II+ Ch1

7

PRECISION - POWER - PROGRESS - PRODUCTION

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

Page 9: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

Page 9

PRECISION - POWER - PROGRESS - PRODUCTION

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

schaltungCircuit diagram for

1,5" / 2" / 3"

1,5

" / 2

" =

50

0m

A T

Co

ntr

ol-F

use

Ste

ue

rsic

he

run

g

Motor2 nur

Motor 2

24V~50-60Hz

supplyElectricityspannung

Digi-Uhr 2Kanal

Kanal1= Backwash

Kanal1=Rückspülzyklus

Kanal2=Filterpumpe

Kanal2=Filterpumpe

CH2=

CH2=

CH1=

CH1=

Pu

mp

ma

x.8

ASerien-

bei Ventil 3"

ma

x.8

A

Re

lais

-

24V~

SG

SS-5GLD1

S

G

SS-5GLD1

12VDC Clock

Clock

Ve

ntil-

24V~ 3VA

Pa

rkste

llu

ng

Mo

torK

on

de

nsa

tor

Anschlußplan für

MIL 72E Analog-12VCD

4C

H1

we

AKKUAKKU

+1h

H1

h+

CH2

OFF

Res.

H2

m+

E-6000/F E-3000/F

MIL 72E Analog

S14K35

14:28

OFF

Day

CH2

CH1CH1

MO

CH1

Clo

ck

Uh

r

pot.freiOutputKugelhahnAusgang-

Ku

ge

lha

hn

Ba

llva

lve

Re

lais

-

PumpOutput

pot.frei

Pumpe

Ausgang-

13 14

Pu

mp

e

SwitchLevelSchalterNiveau-

9 10

Digital Uhr/

E-P

rom

SS-5GLD

1

Versorgungs-

SG

S

G

SS

-5G

LD

1

Mo

torK

on

de

nsa

tor

3"

= 1

,6A

T

E-Type - 24VAC

-2

gra

u

+1

bra

un

3g

rün

G

C3

C2

27

CK

SP

ÜL

EN

28

BA

CK

WA

SH

RÜCKSPÜLZEIT

ZEITKLARSPÜL

R.4

29

VERZÖG.-ZEITDELAY TIME

-

switchpump

RINSE

BACKWASH

+

TIME

pressureswitch

TIME

3min.25sec-

-

BackwashRückspülen

+

Entleeren

G CH

2

Drain

CH

1

DELAYVERZÖGERUNG

RinseKlarspülen

24 25 26

RINSE BACKWASH

KLARSPÜLENRÜCKSPÜLEN

R.3

21

FilternFilter

22 23

R.5

Se

rie

SE

QU

EN

CIN

G

R.6

RINSE

L1 N

- +

23min

25sec-

- +

11min.

25sec-

Praher

R

Motor1

sw gr gn

6 G 2

18 19 20

LE

DL

ED

5

4

2

sw gr gn

NE

TZ

LP004.0370.01.A

DELAY

3

BACKWASH

BACKWASH

Page 10: Operating instructions SUPERSTAR E-3000 / F2 for 1 1/2

Page 10© by PRAHER, Austria

13

12

1

2

3

5

8

10

4

6

7

9

11

1. Deckel

2. Dichtung (Moosgummi)

3. Steuerkopf

4. Kurvenzahnrad

5. Motor

6. Steuerplatine

7. Pumpenendschalter

8. Automatikunterteil

9. Anbauverschraubung

10. Kupplung

11. Ventil

12. Rückspüluhr

13. Folientastatur

QUALITY

INNOVATION

ENTLEEREN

DRAIN

AUS

OFF

EIN

ON

PRÜFTASTE

TESTBUTTON

SERVICERR

R

SUPERSTAR

1 Cover

2 Seal (foam rubber)

3 Control switch

4 Curve gear wheel

5 Motor

6 Control board

7 Pump limit switch

8 Automatic lower part

9 Mounted screw connection

10 Clutch

11 Valve

12 Back rinsing clock

13 Film keyboard

Operating instructionsSUPERSTAR E-3000 / F2

for 1 1/2", 2"and 3" 24 VAC

PRAHER VALVESTel.: ++ 43 / ( 0 ) 72 62 / 61 178 - 0*

Fax: ++ 43 / ( 0 ) 72 62 / 61 203

[email protected] ; www.praher.com