Page 1: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

Operation and Maintenance

Presentation

By

APT Power Engineering Ltd

Page 2: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

2

APT Power Engineering Ltd

Introduction

• Established in the year 1996 and dedicated to power sector.

• Promoted by Mr.DK Naidu and Mr.DVG Naidu.

• Supply and Manufactures Balance of Plant for Turbines.

• Specialized in Erection and Commissioning of various makes of

turbines including BHEL, Russian, Siemens and others.

• Supported by well experienced Technocrats.

• Represented Kaluga Steam turbine from 1998 to 2003

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

Page 3: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

3

• We are representing M/s. Qingdao Jieneng Power Station (QJPS) China

from the year 2004, for supply of TG sets ranging from 5MW to 60MW

and its auxiliaries on turnkey basis in India and African countries. Since

then we have supplied & commissioned more than 63 machines (about

1085 MW in total).

• We are also representing M/s. Shanghai Turbine Works Co. Ltd., (STWC)

China for the supply, Erection and commissioning, Testing and Servicing

of TG sets ranging from 60 MW to 250 MW in India.

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

Page 4: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

BRIEF INTRODUCTION ON O&M BUSINESS

We play a keen role of comprehensive services in Operation & Maintenance

of the plant. In this connection we would like to place before you our credentials

in the following few lines:

• Backed with comprehensive technical strengths as a solution provider from

the year 2000, APT had been undertaking Operation and Maintenance of

Biomass, Co-generation, Captive and Combined Cycle Power Plants

accomplishing an average PLF of 85% and above.

• We have handled Boilers of travelling grate, AFBC, CFBC types of CVL,

Thermax and TG sets of HTC, BHEL, SIEMENS makes. Our technocrats with

decades of experience and expertise in mature Technology are well involved in

rectifying various problems related to power plants, whether it is a routine

maintenance or trouble shooting of complex machine problems like high

vibration, blade breakages, severe hunting, low plant efficiency etc.

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

Page 5: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

Organization Strength

• All the departments are headed with well experienced Technical Managers,

who have affluent experience in executing various critical projects in

different organizations.

• We have our own young and talented engineers, experienced technicians and

skilled artisans guided by well experienced technocrats from corporate office.

Total in house Man power-700

• Erection and commissioning - 200

• Over hauling & Trouble shooting -50

• Corporate/design - 50 including well experienced technocrats heading the

various departments.

• Work shop maintenance - 150

• Operation and maintenance - 250

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

Page 6: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

List of O&M Projects Executed by APT

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

SL No. Name of the Client Project Description Tenure of Contract

1 M/s. My Home Power Ltd,

Patancheru, Telangana 9 MW Biomass Power Plant 1999 to 2011

2 M/s. Indur Green Power Ltd,

Nizambad, Telangana 6 MW Biomass Power Plant 2001 to 2008

3 M/s.Aurobindo Pharma Ltd,

Srikakulam, Andhra Pradesh 2.2 MW Captive Power Plant 2002 to 2011

4 M/s. Usha Martin Ltd,

Jamshedpur, Jarkhand 15 MW Captive Power Plant 2004 to 2006

5 M/s. Viraj Power Ltd,

Tarapur, Maharashtra 15 MW Captive Power Plant 2004 to 2006

6 M/s. KVK Bio-Energy Pvt Ltd,

Champa, Chattisgarh 15 MW Biomass Power Plant 2005 to 2007

7 M/s. Varam Bio-Energy Pvt Ltd,

Bhandara, Maharashtra 10 MW Biomass Power Plant 2008 to 2010

8 M/s. Shree Sidhbali Ispat Ltd

Chandrapur, Maharashtra. 20 MW Captive Power Plant 2012 to 2014

9 Radical Bio-Organics Ltd,

Tandur, Telangana

6 MW Biomass Co-gen Power

Plant 2012 to 2013

10 M/s. Basai Steels & Power (P) Ltd

Bellary, Karnataka 20 MW Captive Power Plant 2012 to 2013

Page 7: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

List of O&M Projects Being Executed Presently by APT

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

S No. Name of the Client Project Project Technical Details Tenure of

Contract Fuel TG & Boiler Details

1

M/s. My Home Industries Ltd

CPP-1

Nalgonda, Telangana

15MW

CPP Coal

Br: 70TPH 1No AFBC

Thermax

Tu: 1No HTC

Gen: 1No VA Tech

DCS: FN Smidth

O & M since

Dec 2006

2 M/s. Gopani Iron & Power

(India) Pvt Ltd

Chandrapur, Maharashtra

15MW

CPP

Coal

Dolachar

Br: 1No. CFBC Thermax

Tu: 1No QJPS

Gen: Jinan (JPEF)

DCS: Rockwell

O&M since

April 2009

2

M/s. My Home Industries Ltd

CPP-2

Nalgonda, Telangana

60MW

CPP Coal

Br: 240TPH 1No CFBC

Thermax

Tu: 1No BHEL

Gen: 1No BHEL

DCS: Emerson

O & M since

April 2012

3

M/s. Bhavnagar Biomass Power

Projects Pvt Ltd,

Bhavnagar, Gujarat

10MW

IPP

Cotton stalk

Ground nut

shell &

prosopis

juliflora

Br: 1No Travel Grate

Thermax

Tu: 1No QJPS

Gen: 1No JInan

DCS: ABB

O & M since

April 2012

Page 8: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

S No. Name of the Client Project Project Technical Details Tenure of

Contract Fuel TG & Boiler Details

5 Lokmangal Mauli Industries Ltd

Osmanabad, Maharashtra

30MW

CPP Bagasse

Br: Travel grate 135

TPH, Thermax

Tu: 1No BHEL

Gen: BHEL

DCS: ABB

O&M

since Aug

2013

6

M/s. Amreli Biomass Power

Projects Pvt Ltd,

Amreli, Gujarat.

10MW

IPP

Cotton stalk

Ground nut shell

& prosopis

juliflora

Br: 1No Travel Grate

Thermax

Tu: 1No QJPS

Gen: 1No JInan

DCS: SIEMENS

O & M

since July

2013

7

M/s. Bharat Heavy Electricals

Ltd,

Ramchandrapuram, Telangana

4, 20 &

30TPH

Boilers

Oil / gas O&M since

Feb 2015

Page 9: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

Few of our Key Achievements:

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

• CFBC Boiler 60MW M/s. MHIL, Mellacheruvu (CPP-2) continuous run from 23

June’ 2013 to 11 Sep’ 2013 (80 days).

• CFBC Boiler 60MW M/s. MHIL, Mellacheruvu (CPP-2) generated 62 MW with

103% PLF on 14 & 15 May’ 2013

• 15MW M/s. MHIL, Mellacheruvu (CPP-2) continuous run from 01 Dec’ 2012 to 04

Apr’ 2013 (127 days with 98% PLF)

• CFBC Boiler 20MW M/s. SSIL, Chandrapur continuous run from 08 Nov’ 2012 to

07 Apr’ 2013 (151 days). It can be considered as a record in any CFBC Hot

cyclone type Boiler performance of WUXI make.

• AFBC 15MW M/s. GIPL, Chandrapur continuous run since 07 Jan 2013 to 27 Apr

2013 (110 days) and 04 Aug’ 2013 to till date running towards 150 days

• AFBC 15MW M/s. GIPL, Chandrapur record generation in the months of May

2011, April 2013, Nov & Dec 2013 with 100% PLF.

Page 10: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

10

• Our performance in the O&M servicing projects is quite high particularly

at My Home Industries where we are achieving plant availability and PLF

of above 95 %.

• In our experience, our valued clients have so far been preferring our O&M

team to involve right from the advanced stages of erection, so that O&M

Personnel will become familiar with the equipment under commissioning

and acquire full knowledge of the equipment specifications and standard

operating procedures(SOPs). This would reflect in establishing distinct

performance of O&M both quantitative as well as qualitative.

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

Page 11: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

Additional Service Offered by APT US

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

• Comprehensive services in Operation & Maintenance of Power Plants.

• Execution of EPC Contracts including detailed Engineering & project

Execution.

• Manufacturing & Supply of Balance of Plant.

• Erection & Commissioning of various makes of Turbo Generators.

• Overhauling of Turbine & Generator.

• Manufacture & Supply of Heat Exchangers.

• Manufacture & Supply of Deaerator.

Page 12: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

12

• Design & Development of detailed Isometric Drawing including support

summary as per ASME Code.

• Development of Piping specifications & Bill of materials.

• Engineering, Procurement, Supply, Erection & Commissioning of IBR &

Non-IBR piping Systems.

• Emphasizing for overall plant integration, economization, safety & ease of

operation as per International Standards like HEI, IEC, ASME, etc.

• Well trained & experienced Service Crew who are certified and approved by

IBR Authorities throughout India to execute IBR Works.

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified

Page 13: Operation and Maintenance Presentation · We have handled Boilers of travelling grate, AFBC, CFBC types of CVL, Thermax and TG sets of HTC, BHEL , SIEMENS ... rectifying various problems

13

THANK YOU

APT POWER ENGINEERING LIMITED ISO 9001:2008

Certified