  • Gallo Winery Water Innovation and Energy FacilityOn-Site Operation NoiseNoise-Generating Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    Pumps 81 1.00 3 86 85.8 COMBINED EQUIPMENT (SPL AT 50 FEET) -- -- 3 85.8 85.8

    Modeled Noise Levels at Varying Distances (Includes Hemispherical Spreading and Atmospheric Absorption)Molecular Absorption 0.0007 dBAAnomalous Excess Attenuation 0.000 dBAEquivalent Source-Receiver Height (Hs+Hr)/2 6 feetFTA Ground Attenuation Factor G 0.643 dBA

    Outdoor Leq Outdoor L8Outdoor

    Leq Outdoor L850 86 89 86 89

    3,200 47 50 36 394,200 44 47 32 355,000 42 45 29 32

    Lower Bound: Includes Substantial Ground

    Attenuation

    Sound propagation calcs by FTA Transit Noise and Vibration Impact Assessment. FTA-VA-90-1003-06. May 2006.

    Equipment Type

    Individual Equipment Combined Equipment

    Acoustical measurement in FHWA Roadway Construction Noise Model User’s Guide. FHWA-HEP-05-054. January 2006.

    Distance from Construction Site (feet)

    Upper Bound: Wave Spreading and

    Atmospheric Absorption Only; No Ground

    Attenuation

  • Gallo Winery Water Innovation and Energy FacilityEastside Expansion On-Site Operation NoiseNoise-Generating Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    Presses and Conveyors Systems 75 1.00 1 75 75.0Cooling and Refrigeration Condenser Unit 68 1.00 7 76 76.5 COMBINED EQUIPMENT (SPL AT 50 FEET) -- -- 8 78.8 78.8

    Modeled Noise Levels at Varying Distances (Includes Hemispherical Spreading and Atmospheric Absorption)Molecular Absorption 0.0007 dBAAnomalous Excess Attenuation 0.000 dBAEquivalent Source-Receiver Height (Hs+Hr)/2 6 feetFTA Ground Attenuation Factor G 0.643 dBA

    Outdoor Leq Outdoor L8Outdoor

    Leq Outdoor L850 79 82 79 82

    3,500 39 42 28 312,500 43 46 32 352,500 43 46 32 35

    Sound propagation calcs by FTA Transit Noise and Vibration Impact Assessment. FTA-VA-90-1003-06. May 2006.

    Equipment Type

    Individual Equipment Combined Equipment

    J. C. Brennan & Associates, Inc. 2011. Environmental Noise Assessment, E. & J. Gallo Winery Expansion, Merced County, California. October 18. (Job # 2011-162.) Auburn, CA. Prepared for: ICF International, San Francisco, CA.

    Distance from Construction Site (feet)

    Upper Bound: Wave Spreading and

    Atmospheric Absorption Only; No Ground

    Attenuation

    Lower Bound: Includes Substantial Ground

    Attenuation

  • Gallo Winery Water Innovation and Energy FacilityConstruction Noise Summary

    Phase No. Construction Phase R-1 R-2 R-31 Mobilization 31 27 252 Rough Grading 33 30 273 Footing Excavation for Facility 31 27 254 Trenching, Underground Utility Installation and Backfill (Offsite) 31 27 255 Trenching, Underground Utility Installation and Backfill (Offsite) 31 65 286 Forming and Placement of Rebar and Concrete for Facilities 30 26 247 Structural Steel Erection 32 29 268 Equipment Installation 32 29 269 Installation of Facility Piping, Mechanical, and Electrical 32 29 26

    10 Control Building Finish Work and Furnishings 31 27 2511 Fine Grading 30 26 2412 Site Concrete 29 25 2213 Finish Site Work 24 20 18

    38 34 3238 66 32

    Noise Levels Leq (dBA)

    Maximum Noise Levels with Overlapping Construction PhasesNoise Levels with Overlapping On-Site Construction Phases

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: MobilizationNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Rough GradingNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40 1 82 78.0Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40 1 81 77.0Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Footing Excavation for FacilityNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40 1 81 77.0Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Trenching, Underground Utility Installation and Backfill (Onsite)Noise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40 1 81 77.0Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Trenching, Underground Utility Installation and Backfill (Offsite)Noise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40 1 81 77.0Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Forming and Placement of Rebar and Concrete for FacilitiesNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40 1 79 75.0Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Structural Steel ErectionNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Equipment InstallationNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Installation of Facility Piping, Mechanical, and ElectricalNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Control Building Finish Work and FurnishingsNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Fine GradingNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40 1 82 78.0Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Site ConcreteNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40 1 79 75.0Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40 1 79 75.0Generator 81 0.50Generator (

  • Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Finish Site WorkNoise-Generating Construction Equipment

    SPL Lmax at 50 ft

    Acoustic Usage Factor

    No.of Pieces

    SPL Lmax at 50 ft

    SPL Leq at 50 ft

    All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50Generator (