operational and construction noise...
TRANSCRIPT
-
Appendix D
Operational and Construction Noise Measurements
-
Appendix D
Operational and Construction Noise Measurements
-
Gallo Winery Water Innovation and Energy FacilityOn-Site Operation NoiseNoise-Generating Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
Pumps 81 1.00 3 86 85.8 COMBINED EQUIPMENT (SPL AT 50 FEET) -- -- 3 85.8 85.8
Modeled Noise Levels at Varying Distances (Includes Hemispherical Spreading and Atmospheric Absorption)Molecular Absorption 0.0007 dBAAnomalous Excess Attenuation 0.000 dBAEquivalent Source-Receiver Height (Hs+Hr)/2 6 feetFTA Ground Attenuation Factor G 0.643 dBA
Outdoor Leq Outdoor L8Outdoor
Leq Outdoor L850 86 89 86 89
3,200 47 50 36 394,200 44 47 32 355,000 42 45 29 32
Lower Bound: Includes Substantial Ground
Attenuation
Sound propagation calcs by FTA Transit Noise and Vibration Impact Assessment. FTA-VA-90-1003-06. May 2006.
Equipment Type
Individual Equipment Combined Equipment
Acoustical measurement in FHWA Roadway Construction Noise Model User’s Guide. FHWA-HEP-05-054. January 2006.
Distance from Construction Site (feet)
Upper Bound: Wave Spreading and
Atmospheric Absorption Only; No Ground
Attenuation
-
Gallo Winery Water Innovation and Energy FacilityEastside Expansion On-Site Operation NoiseNoise-Generating Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
Presses and Conveyors Systems 75 1.00 1 75 75.0Cooling and Refrigeration Condenser Unit 68 1.00 7 76 76.5 COMBINED EQUIPMENT (SPL AT 50 FEET) -- -- 8 78.8 78.8
Modeled Noise Levels at Varying Distances (Includes Hemispherical Spreading and Atmospheric Absorption)Molecular Absorption 0.0007 dBAAnomalous Excess Attenuation 0.000 dBAEquivalent Source-Receiver Height (Hs+Hr)/2 6 feetFTA Ground Attenuation Factor G 0.643 dBA
Outdoor Leq Outdoor L8Outdoor
Leq Outdoor L850 79 82 79 82
3,500 39 42 28 312,500 43 46 32 352,500 43 46 32 35
Sound propagation calcs by FTA Transit Noise and Vibration Impact Assessment. FTA-VA-90-1003-06. May 2006.
Equipment Type
Individual Equipment Combined Equipment
J. C. Brennan & Associates, Inc. 2011. Environmental Noise Assessment, E. & J. Gallo Winery Expansion, Merced County, California. October 18. (Job # 2011-162.) Auburn, CA. Prepared for: ICF International, San Francisco, CA.
Distance from Construction Site (feet)
Upper Bound: Wave Spreading and
Atmospheric Absorption Only; No Ground
Attenuation
Lower Bound: Includes Substantial Ground
Attenuation
-
Gallo Winery Water Innovation and Energy FacilityConstruction Noise Summary
Phase No. Construction Phase R-1 R-2 R-31 Mobilization 31 27 252 Rough Grading 33 30 273 Footing Excavation for Facility 31 27 254 Trenching, Underground Utility Installation and Backfill (Offsite) 31 27 255 Trenching, Underground Utility Installation and Backfill (Offsite) 31 65 286 Forming and Placement of Rebar and Concrete for Facilities 30 26 247 Structural Steel Erection 32 29 268 Equipment Installation 32 29 269 Installation of Facility Piping, Mechanical, and Electrical 32 29 26
10 Control Building Finish Work and Furnishings 31 27 2511 Fine Grading 30 26 2412 Site Concrete 29 25 2213 Finish Site Work 24 20 18
38 34 3238 66 32
Noise Levels Leq (dBA)
Maximum Noise Levels with Overlapping Construction PhasesNoise Levels with Overlapping On-Site Construction Phases
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: MobilizationNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Rough GradingNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40 1 82 78.0Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40 1 81 77.0Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Footing Excavation for FacilityNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40 1 81 77.0Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Trenching, Underground Utility Installation and Backfill (Onsite)Noise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40 1 81 77.0Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Trenching, Underground Utility Installation and Backfill (Offsite)Noise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40 1 81 77.0Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Forming and Placement of Rebar and Concrete for FacilitiesNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40 1 79 75.0Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Structural Steel ErectionNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Equipment InstallationNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Installation of Facility Piping, Mechanical, and ElectricalNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50 1 81 78.0Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Control Building Finish Work and FurnishingsNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Fine GradingNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40 1 82 78.0Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40Flat Bed Truck 74 0.40Front End Loader 79 0.40Generator 81 0.50Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Site ConcreteNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40 1 79 75.0Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40 1 79 75.0Generator 81 0.50Generator (
-
Gallo Winery Water Innovation and Energy FacilityConstruction Phase: Finish Site WorkNoise-Generating Construction Equipment
SPL Lmax at 50 ft
Acoustic Usage Factor
No.of Pieces
SPL Lmax at 50 ft
SPL Leq at 50 ft
All Other Equipment > 5 HP 85 0.50Auger Drill Rig 84 0.20Backhoe 78 0.40Bar Bender 80 0.20Blasting 94 0.01Boring Jack Power Unit 83 0.50Chain Saw 84 0.20Clam Shovel (dropping) 87 0.20Compactor (ground) 83 0.20Compressor (air) 78 0.40Concrete Batch Plant 83 0.15Concrete Mixer Truck 79 0.40Concrete Pump Truck 81 0.20Concrete Saw 90 0.20Crane 81 0.16Dozer 82 0.40Drill Rig Truck 79 0.20Drum Mixer 80 0.50Dump Truck 76 0.40 1 76 72.0Excavator 81 0.40Flat Bed Truck 74 0.40 1 74 70.0Front End Loader 79 0.40Generator 81 0.50Generator (