1 Dated: 07/03/2016. OPERATIONAL IMPROVEMENT (MOBILITY): a) Newly constructed Railway Line from Bhind to Etawah was inaugurated by Hon‟ble Chief Minister, Madhya Pradesh Shri Shiv Raj Singh Chauhan, Hon‟ble Cabinet Minister Shri Narendra Singh Tomar and MOSR Shri Manoj Sinha flagging off Passenger Train No.59827/59828 at Bhind Railway Station on 27.02.2016.This will provide an alternate route between Gwalior & Etawah. b) 1.72 km Through Weld Renewal in Bharatpur-Ikran of Agra Fort- Bandikui section has been done by State of Art Mobile Flash Butt Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased by 94m (from 646m to 740m) in ALD Division by shifting UP Home Signal, Cross Over Pt.201 & Pt. 203 Signal (HWH end side). d) Loopline run through facility has been pvodied at Mitawali, Kanchausi, Saraibhupat and Sasni stations of ALD Division. RELIABILITY & SAFETY IMPROVEMENT: a) 120 m Boundary Wall has been constructed by using unserviceable PSC sleeper in Agra-Palwal section. b) Dual detection with SSDAC has been provided between DN IBS Bhandai-Agra Cantt. of AGC Division. CLEANLINESS/PASSENGER SERVICES/AMENITIES: a) With ref. to Railway Board‟s Letter No.2015/ENHM/06/12 dated 29.09.2015, National Cleanliness Campaign under Swachh Bharat Mission is in progress from 28.02.16 to 15.03.2016 over NCR. N.C. RLY UPDATE N.C. RLY UPDATE

Upload: others

Post on 06-Sep-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

1

Dated: 07/03/2016.

OPERATIONAL IMPROVEMENT (MOBILITY):

a) Newly constructed Railway Line from Bhind to Etawah was inaugurated

by Hon‟ble Chief Minister, Madhya Pradesh Shri Shiv Raj Singh

Chauhan, Hon‟ble Cabinet Minister Shri Narendra Singh Tomar and

MOSR Shri Manoj Sinha flagging off Passenger Train No.59827/59828 at

Bhind Railway Station on 27.02.2016.This will provide an alternate route

between Gwalior & Etawah.

b) 1.72 km Through Weld Renewal in Bharatpur-Ikran of Agra Fort-

Bandikui section has been done by State of Art Mobile Flash Butt

Welding Plant.

c) CSR of UP Loop Line of Hirangaon station has been increased by 94m (from 646m to 740m) in ALD Division

by shifting UP Home Signal, Cross Over Pt.201 & Pt. 203 Signal (HWH end side).

d) Loopline run through facility has been pvodied at Mitawali, Kanchausi, Saraibhupat and Sasni stations of ALD

Division.

RELIABILITY & SAFETY IMPROVEMENT:

a) 120 m Boundary Wall has been constructed by using unserviceable PSC

sleeper in Agra-Palwal section.

b) Dual detection with SSDAC has been provided between DN IBS Bhandai-Agra Cantt. of AGC Division.

CLEANLINESS/PASSENGER SERVICES/AMENITIES:

a) With ref. to Railway Board‟s Letter No.2015/ENHM/06/12 dated 29.09.2015, National Cleanliness Campaign

under Swachh Bharat Mission is in progress from 28.02.16 to 15.03.2016 over NCR.

N.C. RLY UPDATE N.C. RLY UPDATE

Page 2: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

2

b) Contract for Mechanized cleaning of Morena, Orai and Lalitpur Stations awarded on 03.03.2016.

c) Rag Picking Day has been organized on 28.02.2016 by AGC Division.

d) UTS-cum-PRS has been commissioned at Sonagir Railway Station of Jhansi Division on 03.03.2016.

e) NIT has been issued for appointment of STBAs (Station Ticket Booking Sewaks) at all Divisions. NIT

Allahabad Division opened on 05.02.2016.

f) Manikpur – Replacement of broken

AC sheets completed.

g) Two new running room constructed on top of existing running room

building at Jhansi.

COMMERCIAL EARNINGS:

a) 8 Fortress checks have been conducted during the week over NCR. Total number of 3552 Passengers travelling

either without or with irregular tickets/unbooked luggage were detected, and Rs.14.45 lakh were realized as

penalty.

b) 4 Bus Raids have been conducted during this week over NCR. 497 cases were detected, fare realized Rs.2.07

lakh.

c) 3 Rakes of Foodgrains with earning of Rs.1.91 crore have been loaded from ETAH in ALD Division and DAA

in JHS Division.

d) 23 Rakes of POL with earnings of Rs.9.16 crore have been loaded from IOC/BAD in AGC Division.

e) 18 Rakes of Cement with earnings of Rs.3.02 crore have been loaded from N=MJAC in ALD & DCPG in

Jhansi Division.

f) 3 Rakes of Fertilizer with earnings of Rs.0.91 crore have been loaded from MKFP in Allahabad Division.

g) 3 Rakes of Ballast with earning of rs.0.66 crore have been loaded from SKGH and CAR in Allahabad Division.

Page 3: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

3

PASSENGER SECURITY:

a) fnukad 28-02-2016 dks m0fu0 uUnyky eh.kk js0lq0c0@>kWlh }kjk

thvkjih@>kWlh ds lkFk jsyos LVs”ku >kWlh ls jsy ;kf=;ksa dk lkeku

pksjh djus okys vkjksih uke gjfoUnj flag fuoklh yqf/k;kuk dks

fxj¶rkj dj thvkjih@>kWlh esa lhvkjihlh ,oa vkbZihlh dh fofHkUu

/kkjkvksa es eqdn~ek iathdr̀ djk;k x;kA

b) fnukad 28-02-2016 dks l0m0fujh0 vkj0ds0flg js0lq0c0 @iksLV

eqjSuk dks jsyos LVs”ku eqjSuk ij ,d 05 o’khZ; cPph ykokfjl voLFkk

es feyh ftlds lEca/k esa djk;s x;s mn~?kks’k.k lqudj cPph dh ekW

js0lq0c0 eqjSuk igqWph rFkk cPph dks mldh ekW dks lqiqnZ fd;k x;kA

-------------------

Dated: 29/02/2016.

OPERATIONAL IMPROVEMENT (MOBILITY):

a) 1.00 km Through Weld Reneal in Bharatpur-Ikran of Agra Fort-Bandikui section has been done by State of Art Mobile Flash Butt Welding Plant.

b) Loop Line run through facility has been provided at Achhalda and Ekdil Stations of ALD Division.

c) CSR of UP Loop Line at Hirangaon Station has been increased by 94m (from 646m to 740m) in ALD Division by shifting of UP Home Signal, Cross Over Pt.No.201 and Pt.No.203.

RELIABILITY & SAFETY IMPROVEMENT:

Page 4: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

4

a) 104 m Boundary Wall has been constructed by using unserviceable PSC sleeper in Agra-Palwal section.

b) Restoration of Train movement after Jaat Andolan:

Jaat Andolan took place during the week. Track was

damaged & blocked in Division.

Quick restoration of track between MTJ-AWR, AGC-BKI

& MTJ-PWL section ensured by working on war footing

by engineering officials.

c) Nadbai Station, which was badly vandalized during reservation agitation on 23.02.2016 (13:40 hrs.) has been restored in record time of almost 42 hrs. on 25.02.2016 (08:30 hrs.).

(i) 04 Nos. Point Machines replaced. (ii) Wiring and Cable Termination in 08 Nos. location boxes done. (iii) 07 Nos. Track Circuits complete equipments replaced. (iv) Restoration of LC-57 and 58 including complete Relay Room Wiring at LC-58.

d) Dual Fuse Monitoring Alarm System has been provided at Majhirai and Bargarh Stations of JHS Division.

e) Terminal Management System has been commissioned at Dabra Station and V-SAT has been installed for providing connectivity to UTS and PRS terminals at Udi station in Jhansi Division.

f) Early steel girders of 1906 of Br. No. 38 (Niranjan Bridge) replaced by PSC slab for 3 lines (Rambag line, Prayag line & Shunting neck in Allahabad yard.)

Page 5: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

5

g) Loco Control Centre Set up in Diesel Locomotive Shed, Jhansi: Inaugurated the new committee room and Loco Control

Centre on 15th February. The locos fitted with REMMLOT

can be monitored from this centre. Preventive checks can be

done based on the data available to improve the reliability of

locos.

h) Inauguration of 2 x 1500 KVA DG Set at JHS WS: Inaugurated the 2x1500 KVA DG sets on 15.02.2015 2x1500 KVA, 11000 volt DG sets were

installed & commissioned on 26.11.15, procured through COFMOW is equipped with

11000 volt, 3 phase Alternators. DG sets are capable of running on full load & on 10%

overload for 1 hr in 12 hrs operation. Specific Fuel consumption of 0.26/KWH and are very

economical to run. Installation of these DG sets increases the generation capacity 6000

KVA and capable of meeting future load increase for the next 10 years.

CLEANLINESS/PASSENGER SERVICES/AMENITIES:

a) Work of combined contract of Mechanized Cleaning started at 3 stations i.e BNDA, CKTD & MBA of JHS division from 22.2.2016.

b) Rag Picking Day has been organized in JHS & ALD stations on 19.2.2016 & on 23.2.2016 respectively.

c) Annual Maintenance Contract for 166 UTS Thin Clients has been awarded to M/s HCL services Ltd. for AMC of UTS Thin clients installed at all Division over NCR.

d) Construction of 01 No. FOB at Chheoki station has been completed & inaugurated by Hon'ble MP Shri Shyama Charan Gupta for passengers.

e) Renovation of Canteen in Diesel Locomotive Shed, Jhansi Renovated Staff Canteen was inaugurated on 15th

February. New furniture has been provided. The floor has

been renovated with tiles.

f) MoU has been signed with CRIS and Railway for supply and installation of ATVMs. Advance

Page 6: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

6

30% payment has been made to CRIS for supply of additional 70nos. of ATVMs (total 147 ATVMs) with other related equipment.

INNOVATIONS:

a) Newly developed working model of ‘H-Type Coupler’ & ‘FIAT BOGIE’ at STC/JHS: Inaugurated the newly developed “FIAT Bogie Working Model with WSP Features”, “H-type

Coupler Working Model” & “Newly Erected Trolley-Shed” in the premises of STC/JHS.

Working Models will enable the trainees to properly understand the working of these items.

Working model of H-Type

Coupler

Working model of FIAT Bogie

b) Inauguration of Portal Wheel Lathe at JHS WS This machine is first among the indigenously developed

Portal Wheel Lathe with proven out productivity of 120

wheel sets per day. This plant will help in keeping the

outturn of the shop at the optimum level and also

keeping the reliability of shop on much higher level. This

machine was proposed in M&P Programme 2012-13,

received at JHSW on 31.12.15 and commissioned

successfully on 16.02.2016.

COMMERCIAL EARNINGS:

a) 04 Fortress checks have been conducted during the week over NCR. Total number of 1871 passengers traveling either without or with irregular tickets/un-booked luggage was detected, and Rs. 7.43 Lakh were realized from them.

b) 01 Bus Raids have been conducted during this week over NCR. 99 cases were detected, fare realized Rs. 0.31 lakh.

c) 1 military special has been booked ex MTJ to JNP during this period (on 19.02.16) with an earning Rs.71.55 Lakhs.

d) GWL west side cycle/ scooter parking contract has been awarded on quotation basis on 25.02.16 @ 2.70 Lakhs monthly license fee.

Page 7: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

7

e) During the period total 25 rakes of POL with earning Rs. 9.45 Crore have been loaded from IOC/BAD in Agra division.

f) During the period total 20 rakes of Cement with earning Rs. 3.33 Crore have been loaded from MJAC in ALD & DCPG in Jhansi Divisions.

g) During the period total 03 rakes of Fertilizer with earning Rs. 0.77 Crore have been loaded from MKFP in Allahabad Division.

h) During the period total 01 rakes of Ballast with earning Rs. 0.20 Crore have been loaded from CAR in Allahabad Division.

i) During the period total 01 rakes of DOC with earning Rs. 0.77 Crore has been loaded from CPC in Allahabad Division.

-------------------

Dated: 22/02/2016.

OPERATIONAL IMPROVEMENT (MOBILITY):

a) 1.75 km Through Weld Renewal in Bharatpur-Ikran of Agra Fort-Bandikui section has been done by State of Art Mobile Flash Butt Welding Plant.

b) Loop line run through facility has been provided at Bharthna station of ALD Division.

c) Time delay has been reduced from 120 second to 60 second for taking off Calling On Signal at Bharthna station of ALD Division.

d) BH-CC between Somna-Kulwa(3rd line) is closed & BPAC provided between Kulwa-Somna.

e) CSR of shunting neck at Kuberpur station has been increased by 24m (from 693m to 717m) in AGC Division by shifting Pt.No.204 and Shunt Signal No.104 of long siding.

Level Crossing:

a) 01 No. Manned LC No. 81C at Km-1268/15-17 between Barhan-Chamrola in Tundla-Ghaziabad section by ROB & 01 No. Unmanned LC No. 55C at Km-1275/6-7 between Bhongaon-Mirhakur in Shikohabad-Farrukhabad section by RUB has been closed.

b) Sliding boom has been commissioned at LC Gate No.129 (Parichha-Chirgaon section) of JHS Division.

N.C. RLY UPDATE N.C. RLY UPDATE N.C. RLY UPDATE N.C. RLY UPDATE N.C. RLY UPDATE N.C. RLY UPDATE N.C. RLY UPDATE N.C. RLY UPDATE

Page 8: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

8

RELIABILITY & SAFETY IMPROVEMENT:

a) Trial for reconditioning of wheel burns and scabbed rail by Robotic Translamatic welding conducted in presence of RDSO Representatives on 16 and 17th Feb‟16 on JHS-CNB section at Mustara Yard main line km 1136/6-8.

b) Two automatic banner flags have been provided by departmental resources at manned level crossing No. 9 & 10 in Agra division.

c) Control room in diesel shed at JHS renovated and same was inaugurated during annual inspection of Workshop on 15 Feb 2016.

d) 118 m Boundary Wall has been constructed by using unserviceable PSC sleeper in Agra-Palwal section.

e) Dual Fuse Monitoring Alarm system with standby fuses has been provided at Bichpuri station of AGC Division, Shankargarh and Lohgara stations of JHS Division.

f) Dual detection with analog axle counter has been provided on girder bridge at Agra Fort station between Jamuna Bridge-Agra Fort section main line of AGC Division.

g) Dual detection has been provided on UP Loop Line at Jhinjak station of ALD Division.

Page 9: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

9

CLEANLINESS/PASSENGER SERVICES/AMENITIES:

a) Cleanliness drives under “Sardar Patel United Clean India” are being launched.

b) Cleanliness of A-1, A & other category stations and trains are being organized by nominating officers of the divisions. Special drives for littering have been launched in all the divisions.

c) 01 JTBS has been allotted for Belatal (BTX) on 28.10.15.

d) Canteen in diesel shed at JHS recently renovated and same was inaugurated by GM NCR during annual inspection of workshop on 15 Feb 2016.

e) A meeting was conducted with Hon‟ble MPs in jurisdiction of Agra Division on 28.10.15 in AGRA.

f) Kwar Navratri Mela at BDL is being organized from 13.10.15 to 27.10.15 following arrangements made for conducting the mela successfully.

05 UTS windows at Mela Ticket Ghar, operation of 02 shift of PRS counter; “May I Help You” Booth at circulating area.

Provided 04 additional Catering stalls for Mela period (02 stalls at circulating area & 02 stalls at PF-1(DLI/E & HWH/E).

Stoppage of additional 10 pairs of trains, and augmentation of 02 GS coaches in Train no. 53345/53346 Chopan-Allahabad pass., Train no. 14369/14370 Triveni Exp. and 14210/14209 Lucknow-Vindhyachal Intercity Exp. from 13.10.15 to 23.10.15.

Deployment of additional staff (21 TEs, 10 BCs & 01 ERC) for round the clock manning of station gate, enquiry, May I Help you booth, UTS & PRS counters.

g) Escalator on PF 2/3 at AGC was inaugurated on 28.10.15 by Hon‟ble Minister of state for „Human Resource Development‟ Government of India Shri Ram Shanker Katheria.

COMMERCIAL EARNINGS:

a) 03 Fortress checks have been conducted during the week over NCR. Total number of 1639 passengers traveling either without or with irregular tickets/ un-booked luggage was detected, and Rs.6.86 Lakhs were realized from them.

Page 10: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

10

b) 01 3AC and 01 AC-2 cum AC-3 coach were attached in train no. 11107 on 24.10.15 and 25.10.15 respectively amount realized Rs. 0.44 Lakh.

c) Total 07 rakes of Food-grains with earning Rs. 2.32 Crore have been loaded from GWL, DAA & MRA in Jhansi Division and HDL in Agra Division.

d) Total 22 rakes of POL with earning Rs. 7.21 Crore have been loaded from IOC/BAD in Agra Division.

e) During the period, total 22 rakes of Cement with earnings Rs. 3.80 crore have been loaded from MJAC in ALD & DCPG in Jhansi division.

f) During this period, total 01 rake of DOC with earning Rs. 0.45 Crore have been loaded from MRA in Jhansi Division.

g) Agra Division has issued allotment letter to the lease holders of 04 SLR comptts., 01 each in train nos. 12178, 13238, 13240, & 59356. Leasing work of 01 leased SLR comptt. has also started by lease holder of train no. 59356 from 28.10.2015 Ex MTJ to RTM.

h) During surprise checks of Asstt. Guard cabin of train no. 13008 on 26.10.15 at AGC, under charges collected Rs. 0.61 Lakh.

i) Over loading of 01 leased SLR comptt. of train no. 12276 Ex. NDLS to ALD was checked on 29.10.2015 & penalty recovered Rs. 0.32 lakh.

j) 01 unauthorized vendor was detected during the period & fine recovered Rs. 2,000/-.

HUMAN RESOURCES, TECHNOLOGY & SKILL DEVELOPMENT:

A seminar on “Distributed Acoustic Sensing System” was conducted under the aegis of

IRSTE, Allahabad Chapter. GM NCR presided over the function. PHODs of other

departments also participated in the seminar. M/s Frauschergave a presentation showing

how existing OFC of Indian Railways can be used for detecting trespassing, thefts, train

movements etc.

It was decided to have one pilot project in CAR-MGS section to detect trespassing and theft

of material by CSC/RPF.

-------------------

Dated: 15/02/2016. I. OPERATIONAL IMPROVEMENT (MOBILITY):

a) 2.040 km Through Weld Renewal in Bharatpur-Ikran of

Agra Fort-Bandikui section has been done by State of

The Art Mobile Flash Butt Welding Plant.

b) Work of extension of CSR in DN Loop at Daud Khan Yard has been completed on 07.02.16.

Page 11: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

11

c) Khurja Electronic Interlocking of 256 routes replacing two Lever Frames of 42 & 72 levers of

vintage 1963 and involving massive Yard Remodeling was commissioned on 14.02.2016 for

improving operational requirement, safety in train operation & passenger amenities at the station.

This EI was commissioned under disconnection memo of only 180” having least repercussion on

traffic in one of the busiest route of Aligarh-Ghaziabad section of Indian Railway.

In yard remodeling which is spread in 4.5 Km, 48 new points inserted, 11 points removed having

total new 73 points. For yard flexibility and to ensure safety in train operation, number of signals

have increased from 33 to 103 and track circuits from 24 to 129. Besides these, following

enhanced operational facilities have been provided:-

1. New PF on Line No. 9 have been commissioned.

2. Existing PF lines 1, 2, 3 & 4 extended.

3. New UP main 3rd

line alongwith removal of permanent speed restriction of 20 kmph.

4. Simultaneous reception and dispatch facilities on DN main as well as common loop line.

5. Dispatch facilities from common loop goods lines to 3rd

line.

6. UP loop line converted into common loop.

7. Extended loop lines in both UP and DN direction for

long haul trains.

8. New engine

stabling line and

tower wagon

siding.

VDU

EI Racks

II. PASSENGER SERVICES/CLEANLINESS/AMENITIES:

a) Anti littering drive was organized in ALD division. Total 570 cases detected & Rs.

0.57 lakh realized.

b) Renovation of Zonal office of Scout & Guide at Subedarganj has been done.

c) One WGSC2AC coach has been augmented in train No. 12180/79 (AGC-LJN Exp.) w.e.f.

02.02.2016 to 31.03.16 on temporary basis.

III. RELIABILITY & SAFETY IMPROVEMENT:

Page 12: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

12

a) 110 m Boundary Wall has been constructed by using

unserviceable PSC sleeper in Agra-Palwal section.

b) Redundancy in system design of 2 Nos. of track sections have been commissioned at Jasra and

Madraha stations of JHS Division.

c) Area Control Board for close monitoring and planning of trans movement of trains between

Karchana-Saiyad Sarawan section has been commissioned in Control office of ALD Division.

d) A new 26 Coach Length Washing Pit has been commissioned on 15.02.2016 at a cost of Rs.7

Crore (PH-42 DF-3). The work was sanctioned in works programme 2011-12. The pit is as per

standard CAMTEC drawing with provision of proper illumination for under gear examination,

drainage and standard catwalks with commissioning of this pit, coach maintenance capacity at

JHS has gone up.

IV. INNOVATION:

Working Model of FIAT Bogie:

STC/JHS is a pioneer centre which developed a working model of FIAT Bogie used in LHB

coaches. STC/JHS brought a condemned bogie frame of

FIAT Bogie from Jagadhari workshop and got it

assembled with the help of unserviceable fittings & wheel

sets and it is developed as real model of FIAT Bogie.

This FIAT BOGIE is developed as working model by

connecting it with Air compressor, SCTR, Dump Valves,

Sensors, Red-Green Brake-Jam Indicator, Different

relays/Switches, Phonic wheel, Brake Disc, Brake

cylinder, ACP arrangement, Step down transformer &

WSP device with Micro Processor. FIAT Bogie model

with these working facilities is the first model of its kind over Indian Railway. Trainees will be

benefited by getting live demonstration of FIAT Bogie braking application and releasing.

V. COMMERCIAL EARNINGS:

a) 03 Fortress checks have been conducted during the week over NCR. Total number of 1432

passengers traveling either without or with irregular tickets/un-booked luggage was detected, and

Rs. 4.99 Lakh were realized from them.

b) 04 Bus Raids have been conducted during this week over AGC Division in NCR. 498 cases were

detected, fare realized Rs. 2.39 lakh.

c) 05 Special trains have been operated on 08.02.2016 & 02 special trains have been operated on

09.02.2016 from ALD station on the occasion of Mauni Amavasya to clear the extra rush of

Magh Mela 2016.

d) Frequent checks were carried out to nab ticket less/ irregular travel. Total 219 passengers were

detected and realized Rs. 0.77 Lakh.

e) During the period total 29 rakes of POL with earning Rs. 11.75 Crore have been loaded from

IOC/BAD in Agra division.

Page 13: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

13

f) During the period total 25 rakes of Cement with earning Rs. 3.81 Crore have been loaded from

MJAC in ALD & DCPG in Jhansi Division.

g) During the period total 07 rakes of Fertilizer with earning Rs. 1.04 Crore have been loaded from

MKFP in Allahabad Division.

h) During the period total 14 rakes of Ballast with earning Rs. 0.66 Crore have been loaded from

CPC, SKGH & CAR in Allahabad Division.

------------------- Dated: 08/02/2016. III. OPERATIONAL IMPROVEMENT (MOBILITY):

d) 1.830 km Through Weld Renewal in Bharatpur-Ikran of

Agra Fort-Bandikui secion has been done by state of Art

Mobile Flash Butt Welding Plant.

e) Work of extension of CSR in UP loop at Duad Khan Yard has been completed on 02.02.16.

f) Panel Interlocking with Std.II (R) has been commissioned at

Badausa station alongwith one additional new loop line in JHS

Division.

g) Tokenless block instrument has been commissioned in Badausa-Atarra, Badausa-Bharatkup section of

JHS Division replacing Neales‟ Ball token Instrument.

II. PASSENGER SERVICES/CLEANLINESS/AMENITIES:

a) Renovation of VIP Room at Platform No.3 of Mirzapur

has been completed.

Page 14: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

14

b) One WGSC2AC coach has been augmented in train No. 12180/79 (AGC-LJN Exp.) w.e.f.

02.02.2016 to 31.03.16 on temporary basis.

VI. RELIABILITY & SAFETY IMPROVEMENT:

a) Encroachment by Rubber factory at Billochpura has been removed with the help of DM/Agra.

b) Work of Bituminous road carpeting in 340 mtr in length (1000 sqm) Colony No-3 & 1 at

Subedarganj has been done.

c) IPS, Datalogger and Solar Panel have also been provided at Badausa station in JHS Division.

d) Power Operated Lifting Barriers have been provided at LC Gate No. 480 (Badausa) in JHS Division by

replacing mechanically operated barrier. Sliding Booms have been commissioned at LC Gate No. 315

(Raibha) and LC Gate No.489 (Bhandai) of AGC Division.

e) In connection with ISS work, 09 Nos. cameras have been made functional at Allahabad station

IV. COMMERCIAL EARNINGS:

a) 04 Fortress checks have been conducted during the week over NCR. Total number of 1367

passengers traveling either without or with irregular tickets/un-booked luggage was detected, and Rs.

4.79 Lakh were realized from them.

b) Cycle/scooter stand contract awarded at Idgah station for 03 months at platform no. 1 side @

Rs1.06 Lakh and platform no. 2 side @ Rs. 1.51 Lakh.

c) During the period total 03 rakes of Foodgrains with earning Rs 0.64 Crore have been loaded from

DAA in Jhansi division.

d) During the period total 29 rakes of POL with earning Rs. 10.47 Crore have been loaded from

IOC/BAD in Agra division.

e) During the period total 17 rakes of Cement with earning Rs. 2.94 Crore have been loaded from

MJAC in ALD & DCPG in Jhansi Division.

f) During the period total 05 rakes of Fertilizer with earning Rs. 0.86 Crore have been loaded from

MKFP in Allahabad Division.

g) During the period total 03 rakes of Ballast with earning Rs. 0.51Crore have been loaded from

SKGH & CAR in Allahabad Division.

Page 15: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

15

VII. SECURITY:

d- fnukad 01-02-2016 m0fu0 vfer eh.kk@js0lq0c >kWlh dks jsyos LVs”ku

>kWlh ij ,d ekufld fof{kIr O;fDRk uke unhe tks viuh iq=h Qjkg

mez 3 o’kZ ds lkFk Hkksiky ls fnuakd 30-01-15 ls ykirk gks x;k Fkk

feyk ftls mlds HkkbZ eksgEen ukflj fuoklh Hkksiky ,oa iRuh uxek dks

lqiqnZ fd;k x;kA

[k- fnukad 01-02-2016 dks mi fujh{kd uanyky eh.kk js0lq0c0@iksLV >kWlh

dks jsyos LVs”ku >kWlh ds Mh dsfcu ds ikl ls ,d ykokfjl cSx feyk

ftlesa gkbZLdwy ,oa b.Vj ds gfj;k.kk ds f”k{kk izek.k i=] ewy fuokl]

tkfr] tUe izek.k i=] diM+s rFkk 1000 :i;s feysA ftls fnukad 02-02-

2016 dks ;k=h dks lqiqnZ fd;k x;kA

--------------------

Dated: 01/02/2016.

IV. OPERATIONAL IMPROVEMENT (MOBILITY):

a) 1.540 km Through Weld Renewal in Ikran-Bharatpur of Agra Fort-Bandikui section has been done by state of Art Mobile Flash Butt Welding Plant.

b) DFCCIL connectivity has been commissioned at

Daudkhan Yard of ALD Division. Loop line

runthrough facility has been provided both in Up and

Dn loop line of Daudkhan station in ALD Division.

CSR of UP Loop Line at Daudkhan station has been

increased by 59m(from 689m to 748m) in ALD

Division.

II. PASSENGER SERVICES/CLEANLINESS/AMENITIES:

c) Cleanliness drives w.e.f. 07.01.16 to 26.01.16, organized over NCR.

d) Mechanized Cleaning contract at Kanpur station started working from 24.1.2016.

e) Letter of Allotment for 01 (GMU) catering unit of DER has been issued.

f) Letter of Allotment for JTBS at RRH & GOY has been issued on 29.01.2016 in ALD division.

g) Testing of PRS Ticket generation at Manjhanpur Post Office has been done successfully on 28.01.2016.

Page 16: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

16

VIII. RELIABILITY & SAFETY IMPROVEMENT:

a) 115 m Boundary Wall has been constructed by using unserviceable PSC sleeper in Agra-Palwal section.

b) To improve safety, UP Gate signal of LC-490 (Agra-Dhaulpur section) has been shifted from RHS to LHS.

c) Sliding Booms have been commissioned at LC Gate No. 311 (Agasod) of JHS Division

and LC-18 (Achnera) of AGC Division.

d) Dual Fuse Monitoring Alarm system has been provided at Kataiyadandi, Dabhaura and

Panhai stations of JHS Division.

IV. COMMERCIAL EARNINGS:

a) 05 Fortress checks have been conducted during the week over NCR. Total number of 1884 passengers traveling either without or with irregular tickets/un-booked luggage was detected, and Rs.7.23 Lakh was realized from them.

b) 01 Bus Raid has been conducted during this week over AGC Division in NCR. 193 cases were detected, fare realized Rs.0.75 lakh.

c) 01 Ambush check has been conducted during this week over Jhansi division in NCR. 121 cases were detected, fare realized Rs.0.43 lakh.

d) During the period total 03 rakes of Foodgrains with earning Rs 1.61 Crore have been loaded from DBA in Jhansi Division & HDL in Agra division.

e) During the period total 29 rakes of POL with earning Rs. 9.65 Crore have been loaded from IOC/BAD in Agra division.

f) During the period total 23 rakes of Cement with earning Rs. 3.53 Crore have been loaded from MJAC in ALD & DCPG in Jhansi Division.

Page 17: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

17

g) During the period total 05 rakes of Fertilizer with earning Rs. 0.77 Crore have been loaded from MKFP in Allahabad Division.

h) During the period total 02 rakes of Ballast with earning Rs. 0.42 Crore have been loaded from SKGH & CAR in Allahabad Division.

i) Opening of a new private siding namely New Bhaupur by Dedicated Freight Corridor Corporation of India Limited (DFCCIL) siding served by Maitha Railway station for handling Goods traffic. Co-user permission has been granted to DFCCIL for transportation of RMC.

--------------------

Dated: 25/01/2016.

V. OPERATIONAL IMPROVEMENT (MOBILITY):

c) Speed has been raised from 80 kmph to 100 kmph in 3rd line between Chata-Kosi Kalan-Hodal section of Agra-Palwal during this week.

d) 1.12 km Through Weld Renewal in Helak-

Bharatpur of Agra Fort-Bandikui section has

been done by State of Art Mobile Flahs Butt Welding Plant

e) In the course of remodeling of Chunar Yard, 07 No. 1 in 8.5 Turnouts and 1

Trap have been renewed.

II. PASSENGER SERVICES/CLEANLINESS/AMENITIES:

h) Construction of 01 No. FOB at Phaphund has been completed.

i) As per order of Hon‟ble GM a cleanliness drive has started w.e.f. 07.01.16 to

26.01.16 over NCR.

j) Rag picking day was observed over NCR on 18.01.16. For effectiveness of the exercise, footplate inspections of different sections were conducted by the

sectional CCIs and deficiencies noted were removed.

Page 18: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

18

k) To ensure cleanliness at Station and in terms of Commercial Circular No. 76/12, frequent announcement were made for passenger awareness and

posters were displayed. 256 persons were detected and a fine of Rs. 27,600/- realized in AGC division.

IX. RELIABILITY & SAFETY IMPROVEMENT:

e) 105 m Boundary Wall has been constructed by using unserviceable PSC Sleeper in Agra-Palwal section.

IV. COMMERCIAL EARNINGS:

a) Earning to the tune of Rs. 2.25 cr. has been made through way leave

permission cases.

b) 01 Fortress checks have been conducted during the week over NCR. Total number of 500 passengers traveling either without or with irregular tickets/un-

booked luggage were detected, and Rs.1.92 Lakh were realized from them.

c) 02 Bus Raids have been conducted during this week over ALD Division in

NCR. 230 cases were detected, fare realized Rs.0.79 lakh.

d) 02 Ambush check have been conducted during this week over Jhansi division in NCR. 543 cases were detected, fare realized Rs.1.94 lakh.

e) To clear extra rush of waiting list passengers, 4 extra coaches were attached during this period and amount earned Rs. 1.5 lakh.

f) During the period total 01 rake of Food-grains with earning Rs 0.66 Crore has been loaded from HDL Agra division.

g) During the period total 32 rakes of POL with earning Rs. 12.16 Crore have

been loaded from IOC/BAD in Agra division.

h) During the period total 26 rakes of Cement with earning Rs. 4.00 Crore have been loaded from MJAC in ALD & DCPG in Jhansi Division.

i) During the period total 03 rakes of Fertilizer with earning Rs. 0.51 Crore have been loaded from MKFP in Allahabad Division.

j) During the period total 03 rakes of Ballast with earning Rs. 0.52 Crore have been loaded from SKGH, CAR & LUSA in Allahabad Division. V. SECURITY:

d- fnukad 17-01-2016 dks dkW0 xEHkhj flag js0lq0c0@iksLV ekfudiqj dks jsyos LVs”ku

Page 19: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

19

ekfudiqj ij ,d 16 o’khZ; yM+dh uke “kdqaryk nsoh iq=h “;ke yky fuoklh cnkSlk

?kcjkbZ voLFkk es feyh iwNrkN djus ij crk;k fd eS xyr xkM+h es cSBdj ekfudiqj vk

x;h gwW eq>s ?kj tkuk gSA ckn yM+dh dks mlds firk dks lqiqnZ fd;k x;k A

[k- fnukad 21-01-2016 dks dkW0 lanhi jk; ,oa dkW0 lathou jk; js0lq0c0@dkuiqj }kjk

thvkjih@dkuiqj ds lkFk jsyos LVs”ku dkuiqj ls ,d vkjksih vCnqy d;we fuoklh dkuiqj

dks 50 xzke u”khyk ikWoMj ds lkFk fxj¶rkj fd;k x;k ftlds fo:} thvkjih dkuiqj esa

,uMhih,l ,DV ds rgr ekeyk iathd`r fd;k x;kA

VI. HUMAN RESOURCE:

A workshop with Chief Parcel Supervisors/Staff of major Parcel handling

stations of all the divisions was on 22.01.16 in Head Quarter, which was

presided by G.M. During the course of workshop issues related with over carry

of Parcels, efforts for increasing Parcel earning and use of HHT for

loading/unloading of Parcel were discussed.

--------------------

Dated: 18/01/2016. VI. OPERATIONAL IMPROVEMENT (MOBILITY):

a) 1.70 km Through weld renewal in Helak-Bharatpur of Agra Fort- Bandikui section has been done by state of Art Mobile Flash Butt Welding Plant.

b) Loop line run through facility has been provided at Rooma and Chakeri in ALD Division.

c) CSR of UP Loop Line at Sarai Bhupat station has been increased from 696 m to 715 m by shifting of point in ALD Division.

d) 08 Nos. of Fixed Cellular Telephones provided at all stations in Chunar-Chopan section of ALD Division.

II. PASSENGER SERVICES/CLEANLINESS/AMENITIES:

Page 20: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

20

For convenience of MAGH MELA pilgrims, following works have been done:-

a) 04 Nos. TVs installed at Sangam for Train Timing Displays of Allahabad, Rambagh and Prayag stations and 02 Nos. for Public Information etc.

b) 01 No. each UTS/PRS and enquiry counter has started working at Sangam, Allahabad and Naini.

c) 13 Railway and BSNL phones made available for communication at Sangam.

d) Additional 25 watt VHF set made available at Sangam, Allahabad and Naini.

e) As directed by GM, a cleanliness drive has started w.e.f. 07.01.16 to 26.01.16 over

NCR.

X. RELIABILITY & SAFETY IMPROVEMENT:

a) 115 m Boundary Wall has been constructed by using unserviceable PSC sleeper in Agra –Palwal section.

IV. COMMERCIAL EARNINGS:

a) 05 Fortress checks have been conducted during the week over NCR. Total number of 1750 passengers traveling either without or with irregular tickets/un-booked luggage were detected, and Rs.7.42 Lakh were realized from them.

b) Frequent checks were carried out to nab Ticket less/irregular travel. Total 633 passengers were detected. Out of which 633 passengers paid railway dues of Rs. 2.72 Lakh.

c) 01 military special has been booked ex MTJ to NGCM during this period (on 06.01.16) with an earning Rs. 56.24 Lakh.

d) UTSs have been commissioned at SHDT (on 04.01.16) and FAB, HAB (on 07.01.16) in AGC-ETW section (newly constructed).

e) 02 Bus Raid has been conducted during this week over NCR. 264 cases were detected, fare realized Rs.0.99 lakh.

f) JHS-RRM contract has been awarded in favour of M/s Hotal Giltz Jaipur and earning realized Rs. 1.05 Crore.

g) Two LWSCZAC coach has been augmented in train No. 12033-12034 (CNB-NDLS Shatabdi Exp.) w.e.f. 07.01.2016 on permanent basis.

Page 21: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

21

h) During the period total 19 rakes of POL with earning Rs 6.77 Crore have been loaded from IOC/BAD in Agra division.

i) During the period total 21 rakes of Cement with earning Rs. 3.39 Crore have been loaded from MJAC in ALD & DCPG in Jhansi Division.

j) During the period total 04 rakes of Fertilizer with earning Rs. 0.60 Crore have been loaded from MKFP in Allahabad Division.

k) During the period total 02 rakes of Ballast with earning Rs. 0.31 Crore has been loaded from SKGH & CAR in Allahabad Division.

l) During the period total 01 rakes of DOC with earning Rs. 0.72 Crore has been loaded from CPC in Allahabad division.

V. OTHERS:

A Seminar under ‘Skill India’ was organized on 12.01.2016 under the ageis of IRSTE to

develop skills of NCR S&T staff on following:-

1. Electronic Interlocking System:- PC Based Backup, FAT Simulator, Application & Interface Logic Tools.

2. VOIP Based Train Control & Communication System for Train Operation.

--------------------

Dated: 28/12/2015.

VII. OPERATIONAL IMPROVEMENT (MOBILITY):

a) Flagging off of DMU train between Agra-Etawah (newly constructed Bhandai-Udi section) by Hon‟ble MOSR Shri Manoj Sinha on 24.12.15 at Bateshwar Halt. This line will provide an alternative path between Etawah & Agra and will be useful in decongesting the A Route of Allahabad Division between Etawah & Tundla and Branch Line between Tundla & Agra Fort.

Page 22: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

22

b) Multi Aspect Colour Light Signalling has been commissioned at Ichauli station of JHS Division by replacing Semaphore Signalling.

c) Integrated Power Supply has been provided at Ichauli station of JHS Division.

d) Sliding boom has been provided at LC Gate No.447 in Sank-Morena section of JHS

Division. e) To improve visibility, Signal No. 126 of GMC station has been shifted in ALD Division.

f) TMS telecom work has been completed at Malanpur in JHS Division.

g) Dual Fuse Monitoring Alarm system has been provided at Chirgaon, Nandkhas and Eric stations of JHS Division.

h) 13 Nos.of Shunt LED provided in place of lamp in Panki station of ALD Division.

i) Following works have been completed in Harpalpur station in Jhansi-Mahoba section:-

Regrading of yard i.e. from 1 in 150 to 1 in 400 have been done by removing two spring points & lifting of track by BCM.

Extension of Platform No. 1 by 156.4 m. Extension of 1st loop by 127m to make fit for 24

coaches. Extension of CSR of main line by 124 m. Extension of two Goods siding by 207 m & 135

m respectively.

j) 2.04 km Through weld renewal in Helak- Nandbai of Agra Fort- Bandikui section has been done by state of Art Mobile Flash Butt Welding Plant.

k) Loop line run through facility has been provided at Sujatpur and Siratho stations of ALD Division.

VIII. RELIABILITY & SAFETY IMPROVEMENT:

a) Replacement of 1 No. 52 Kg. ordinary switches done by 60 kg. Thick web switches. 01 No. in Baad Yard (DN Road). 220mm Throw Point Machines with clamp lock have been provided at Baad (Pt.108B) by replacing IRS Point Machines in connection with 160 kmph high speed in AGC Division.

Page 23: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

23

b) 102 m Boundary wall has been constructed by using unserviceable PSC sleeper in Agra-Palwal section.

--------------------

Dated: 21/12/2015.

IX. OPERATIONAL IMPROVEMENT (MOBILITY):

a) 0.99 km Through weld renewal in Helak- Nandbai of Agra Fort- Bandikui section has been done by state of Art Mobile Flash Butt Welding Plant.

b) Work of extension of UP loop at Bhartana station of Kanpur- Tundla section has been completed. Bharthana DN Loop Line CSR has been increased by 18.5 m (from 698.5m to 717m) by shifting SH-119, 121, PT-298A/B & glued joint in ALD Division.

c) At Harpalpur, UP Loop Line CSR has been increased by 126 m (from 474 m to 600m) by shifting Point Nos. 6 and 8 towards MKP end in JHS Division.

d) 220mm Throw Point Machines with clamp lock have been provided at Bad (Pt.108A) and Chhata station (Pt.205B) in connection with 160 kmph high speed in AGC Division.

II. PASSENGER SERVICES/CLEANLINESS/AMENITIES:

a) 05 Fortress checks have been conducted during the week over NCR. Total number of 3297 passengers traveling either without or with irregular tickets/un-booked luggage was detected, and Rs.13.05 Lakh was realized from them.

b) Frequent checks were carried out to nab Ticket less/Irregular travel. Total 330 passengers were detected and realized Rs. 1.39 Lakh.

c) Refund of reserve tickets after closing of PRS offices has started w.e.f. 11.12.2015 at AF & RKM UTS counters.

d) Rag picking day was observed in JHS & AGC divisions on 14.12.2015. Officers and staff were deputed for making the day successful.

e) To ensure cleanliness at Station and in terms of Commercial Circular no. 76/12, frequent announcement were made for passenger awareness and posters were displayed. 353 persons were detected for littering and a fine of Rs. 33,300/- realized.

f) One GS coach augmented in train No. 12162 (AGC-LTT Exp.) w.e.f. 19.12.2015 on permanent basis.

XI. RELIABILITY & SAFETY IMPROVEMENT:

N.C. RLY UPDATE

Page 24: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

24

a) Replacement of 2 nos. 52 kg. Ordinary switches done by

60 kg. Thick web switches. 01 No. Thick web switch in Baad (DN Road) & 01 No. in Chhata (DN Road).

b) 96 m Boundary Wall has been constructed by using unserviceable PSC sleeper in Agra –Palwal section.

c) Sliding boom has been provided at 3 Gates:- Gate No.80 C, 80 AC and 83 Spl. in ALD Division.

d) To improve visibility, Signal Nos. 43, 61, 63, 75 of GMC and UP Starter Signal No.17 at Bhaupur have been shifted in ALD Division.

e) In Cheoki-Karchana and Karchana-Bheerpur sections of ALD Division, separate fuse

for each OFF aspect signal lightening circuit has been provided at all Relay Huts.

f) Dual Fuse Monitoring Alarm system has been provided at Moth station in JHS Division.

IV. COMMERCIAL EARNINGS:

a) During the period total 03 rakes of Food grains with earnings Rs 0.98 crore have been loaded from DAA in JHS division.

b) During the period total 20 rakes of POL with earning Rs 7.31 crore have been loaded from IOC/BAD in Agra division.

c) During the period total 22 rakes of Cement with earning Rs. 3.48 crore have been loaded from MJAC in ALD & DCPG in Jhansi Division.

d) During the period total 05 rakes of Fertilizer with earning Rs. 0.91 crore have been

loaded from MKFP in Allahabad Division.

e) During the period total 03 rakes of Ballast with earning Rs. 0.61 crore have been loaded from SKGH & CAR in Allahabad Division.

f) Notification of opening of the Udaipura Railway Station of Jhansi Division has been

extended for all inward & outward goods traffic except POL & Container traffic up to 16.01.2016.

V. SECURITY:

Page 25: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

25

fnukad 16-12-2015 dks mi fujh{kd vpZuk js0lq0c0@iksLV dkuiqj dks LVs”ku

dkuiqj ds IysVQkeZ uEcj 01 ij ,d 11 o’khZ; ukckfyd cPpk] uke ckcw iq=

fot; fuoklh Hk:p Fkkuk ykycktkj ftyk Hk:p ykokfjl gkyr esa feyk ftls

pkbYM gsYi ykbu dks lqiqnZ fd;k x;kA

--------------------

Dated: 16/11/2015.

X. OPERATIONAL IMPROVEMENT (MOBILITY):

Work of extension of Up & Dn loop at Birohi Station of Allahabad-Mughalsarai section completed. Will help in giving precedences.

Run through facility via loop line has been provided at FTP and BMU in ALD Division and at all the 9 stations in Mathura-Alwar section of AGC Division.

Work of closure of Level Crossing No. 34-A of Chunar-Chopan Section of Allahabad division has been completed.

CSR extended at following 4 stations in ALD Division:- 1. At CHK, UP Main Line. 2. At SHW, UP & DN Loop Line. 3. At JJK, UP Loop Line. 4. At SRO, UP Loop Line.

Aspect of the Distant Signal has been changed from Green to Double Yellow for trains

being received on main line at all the 9 stations in Mathura-Alwar section of AGC Division by doing modifications in EI to comply with Amendment Slip No. 35 in GSR dtd. 31.03.2014 to improve mobility for through running.

XI. PASSENGER SERVICES/AMENITIES:

Page 26: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

26

To prevent entry of cattle in platform area, barricading at ends of platform has been completed for all platforms at Jhansi station.

XII. RELIABILITY & SAFETY IMPROVEMENT: Block working between Churk

and Agory has been made reliable by transferring the block circuit from BSNL owned overhead alignment to newly laid 6 quad cable. With this, there is no circuit which is working on overhead alignment in N.C.Rly.

Problem of less illumination/lux level has been observed in locomotive. Electric loco Shed, Kanpur has provided 04 beam head light in loco no-22225 during IOH schedule for better focus illumination to loco pilot.

DN Home Signal & DN Advance Starter Signal are shifted at BDL in ALD Division to improve visibility.

Dual Detection has been provided at BHA Advance to IBS Advance in BHA-AGC section of AGC Division.

Modification has been done in EI at all the 9 stations in Mathura-Alwar section of AGC Division for clearance of Advance Starter Signal for first train when BPAC is in preparatory mode for first failure.

1.32 km Through Weld Renewal in Nadbai-Helak of Agra Fort-Bandikui section has been done using State of Art Mobile Flash Butt Welding Plant.

XIII. INFRASTRUCTURE:

1.5 Km Boundary wall has been constructed by using unserviceable PSC sleeper in Agra-Palwal section.

Page 27: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

27

Work of Construction of RPF barrack at Chitrakootdham Karwi station has been completed.

Dedicated Fright Corridor Corporation of India Limited (DFCCIL) siding New Bhadhan is

permitted for Co-user facilities.

XIV.COMMERCIAL EARNINGS:

04 Fortress checks have been conducted during the week over NCR. Total number of 2075 passengers traveling either without or with irregular tickets/un-booked luggage were detected, and Rs.8.66 Lakhs were realized from them.

During the period total 06 rakes of Food-grains with earining Rs 1.63 crore have been loaded from DBA, DAA & MRA in Jhansi division.

During the period total 25 rakes of POL with earning Rs. 8.09 crore have been loaded from IOC/BAD in Agra division.

During the period total 14 rakes of Cement with earning Rs. 2.20 crore have been loaded from MJAC in ALD & DCPG in Jhansi Divisions.

XV. SECURITY:

fnukad 06-11-2015 dks l0m0fujh0 ,l0ds0 flag

js0lq0c0@iksLV dkuiqj ,oa thvkjih@dkuiqj ds mi

fujh{kd ftrsUnz flag }kjk jsyos LVs”ku dkuiqj dh xLr

ds nkSjku u;s iqy ds ikl ls ,d lafnX/k O;fDr uke

ftrsUnz flag fuoklh >qXxh >ksiM+h jsyos dkyksuh ykgkSjh

xsV ubZ fnYyh dks fxj¶rkj fd;k x;k ftldh ryk”kh

ysus ij fiV~Bw cSx ls 08 c.My ,oa Vªkyh cSx ls 12

c.My dqy 20 c.My xkWtk vuqekfur dher

4]00000@& :i;s cjken gqvkA ftlds fo:} thvkjih@dkuiqj esa eq0v0la0 397@2015

vUrxZr /kkjk 18@20 ,uMhih,l ,DV iathd`r fd;k x;kA QksVksxzkQ lkFk layXu gSA

--------------------

Page 28: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

28

Dated: 9/11/2015.

XVI. OPERATIONAL IMPROVEMENT (MOBILITY):

Speed restriction of 60 kmph on the Bridge No. 25 in Shikohabad-Farrukhabad on account of low

level of bridge girders has been relaxed to normal after raising of bridge girders by providing stools of 36 cms. & ballasting, packing of approach track.

2.0 km Boundary Wall has been constructed by

using unserviceable PSC sleeper in Agra-Palwal

section.

Panel interlocking has been commissioned at Orchha station on 04.11.15 in

JHS Division.

Tokenless Block working has also been commissioned in JHS Division between JHS-OR.

UP Loop Line extended from 692 m to 706.4 m by shifting of UP Loop Starter uptp Glued Joint at JJK in ALD Division.

Indication of Chippiyana Buzurg Adv. Starter Track Circuit provided at Dadri West Cabin for early closure of Level Crossing Gate 147 so as to avoid detention

of trains owing to heavy rush at the Gate. Earlier it was provided from Maripat Advance Starter Track Circuit.

Page 29: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

29

XVII. RELIABILITY IMPROVEMENT. Replacement of 2 Nos. 52 kg ordinary switches

done by 60 kg Thick Web Switches. 1 No. Thick Web Switch in Runukta (Dn Road) & 1 No. in

Mathura (Dn Road).

First Thick Web Switch has been commissioned in JHS Division on Point No.102 B at Khajaraha station.

27 Nos. of damaged expansion joints

of road surface on Bridge No. 30 (Rai-cum-Road Bridge over river Yamuna) have been replaced.

Before After

3.0 km Through Weld Renewal in Agra Fort-Bandikui section has been done by State of Art Mobile Flash Welding Plant (Agra division).

Dual Fuse Monitoring System has been provided at Malasa on 02.11.15 in JHS Division.

Provision of 01 standby SSDAC at Bridge portion on DN Line between TDL-HNG in ALD Division.

GR1 and GR2 modification has been done at Khajaraha station to address the problem of signal bobbing.

XVIII. PASSENGER SERVICES, AMENITIES & COMMERCIAL EARNINGS:

New MEMU Service between Kanpur-Phaphund was inaugurated on 07.11.2015 by Hon‟ble MoSR Shri Manoj Sinha. First run of this service ex Phaphund was flagged off by Hon‟ble MP Shri Devendra Singh Bhole.

40 stainless steel benches have been provided at JHS station on 01-11-15 to

facilitate the passengers by fund provided from Hon‟ble MP Sushree Uma Bharti.

03 V Ps (02 Ex AGC on 31-10-15 and 01 Ex AF on 01-11-15) were loaded and additional earning Rs 12.53 Lacs achieved through these VPs.

09 Fortress checks have been conducted during the week over NCR. Total number of 3460 passengers traveling either without or with irregular tickets/ un-booked luggage were detected, and Rs.14.24 Lakhs were realized from them.

Page 30: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

30

01 coach has been booked ex AGC during this period (on 30-10-15) with earnings Rs 1.36 lacs.

Total 07 rakes of Food-grains with earning Rs. 2.73 Crore have been loaded from DBA, DAA & MRA in Jhansi Division and Etah in ALD Division.

Total 26 rakes of POL with earning Rs. 8.80 Crore have been loaded from

IOC/BAD in Agra Division.

During the period, total 13 rakes of Cement with earnings Rs 2.37 crore have been loaded from MJAC in ALD & DCPG in Jhansi division.

Letter for award of tea stall contract at Datia station has been issued on 31-10-

15.

06 unauthorized vendors were detected during the period & fine recovered Rs. 6,000/-.

XIX. SECURITY:

fnukad 31-10-15 dks bykgkckn iksLV ds gs0dka0 v;ks/;k ikBd ,oa

gejkg LVkQ dks xkM+h la0 12562 Mk0 Lora=rk lsukuh ,Dl0] ubZ

fnYyh ls bykgkckn rd LdksfVZax fM;wVh ds nkSjku tc xkM+h ubZ

fnYyh ih,Q ua0 03 ls bykgkckn ds fy;s pyus okyh Fkh mlh

nkSjku ,d yM+dk mez yxHkx 10 & 12 o’kZ tks ykokfjl :i esa

xkM+h ds vUnj HkVdrs gq, feyk iwN & rkN djus ij mlus viuk

uke foosd dqekj flag iq= /kuat; flag fuoklh eqlsiqj Fkkuk MksMhxat]

ftyk Nijk fcgkj crk;k vkSj vius ekW cki ls fcNM+uk crk;kA yM+ds }kjk crk;s x;s eksckbZy uEcj

09934866383 ij yM+ds ds firk /kuat; dks lwpuk nh x;hA mDr lwpuk ij /kuat; flag }kjk Fkkuk

MksMhxat Nijk ds m0fu0@flfoy iqfyl fcgkj ckyd`’.k flag dks lwpuk nh x;h rks mDr m0fu0 o

gejkg LVkQ js0lq0c0 iksLV@ bykgkckn mifLFkr gq;sA ckn muds }kjk crk;k x;k fd mDRk yM+dk

tks fnukad 28-10-2015 ls xk;c gS mlds firk }kjk fyf[kr rgjhj Fkkuk MksMhxat ftyk Nijk fcgkj] esa

nsdj eq0v0la0 106@15 /kkjk 363 vkbZihlh ds rgr vigj.k dk eqdn~ek iathdr̀ djk;k x;k gS rFkk

mDr ekeys dh tkWp esjs }kjk dh tk jgh gSA ckn fyf[kr rgjhj feyus ds ckn fujh{kd@bykgkckn

}kjk cPps dks flfoy iqfyl Fkkuk MksMhxat ds mi fujh{kd ckyd’̀.k dks yM+ds dks mlds firk dh

ekStwnxh esa lqiqnZ fd;k x;kA QksVksxzkQ lkFk layXu gSA

--------------------

Dated: 2/11/2015.

XX. OPERATIONAL IMPROVEMENT (MOBILITY):

Construction of approach road on LHS/ RUB at unmanned

LC No 10 C & 14 C in SKB-FKD have been done during the

week.

Page 31: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

31

02 No. Unmanned Level Crossing (L.C. No. 10C & 14C in

Shikohabad-Farrukhabad section) have been closed.

Loopline run-through facility has

been provided at Kalpi on 27.10.2015 in Jhansi Division and at Manauri, Faizullahpur, Kunwar,

Katoghan, Khaga, Sath Naraini, Karbigwan, Aung, Bindki Road, Kurasti Kalan, Ramwa &

Bidanpur Stations of Allahabad Division.

CSR has been increased by shifting starters/glued joints at following stations in Allahabad

Division:

1. SWYN DN Loop Line from

705m to 719m.

2. MNJ DN loop Line from 705m

to 715m.

3. MNJ UP Loop Line from 695m

to 705.4m.

XXI. PASSENGER AMENITIES & COMMERCIAL EARNINGS:

Loading:-

Total loading 133 Rakes Oct. 2015 Monthly best in F.Y. 2015-16 earlier best was 125 Rakes

in April 2015

POL loading 105 Rakes Oct. 2015 Monthly best in F.Y. 2015-16 earlier best was 101 Rakes

in April 2015

Girders of FOB at Kiraoli & Rupbas stations in Idgah-Bayana

section has been launched during the week.

Inauguration of Escalator on Platform No. 2/3 at Agra Cantt

station by Hon‟ble Prof. (Dr.) Ram Shankar Katheria,

Minister of State for Human Resource Development, on

28.10.2015.

03 Fortress checks have been conducted during the week over NCR. Total number of 1639

passengers traveling either without or with irregular tickets/ un-booked luggage was detected, and

Rs.6.86 Lakhs were realized from them.

01 3AC and 01 AC-2 cum AC-3 coach was attached in train no. 11107 on 24.10.15 and 25.10.15

respectively amount realized Rs. 0.44 Lakh.

Page 32: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

32

Total 07 rakes of Food-grains with earning Rs. 2.32 Crore have been loaded from GWL, DAA &

MRA in Jhansi Division and HDL in Agra Division.

Total 22 rakes of POL with earning Rs. 7.21 Crore have been loaded from IOC/BAD in Agra

Division.

During the period, total 22 rakes of Cement with earnings Rs. 3.80 crore have been loaded from

MJAC in ALD & DCPG in Jhansi division.

During this period, total 01 rake of DOC with earning Rs. 0.45 Crore have been loaded from

MRA in Jhansi Division.

Agra Division has issued allotment letter to the lease holders of 04 SLR comptts., 01 each in train

nos. 12178, 13238, 13240, & 59356. Leasing work of 01 leased SLR comptt. has also started by

lease holder of train no. 59356 from 28.10.2015 Ex MTJ to RTM.

During surprise checks of Asstt. Guard cabin of train no. 13008 on 26.10.15 at AGC, under

charges collected Rs. 0.61 Lakh.

Over loading of 01 leased SLR comptt. of train no. 12276 Ex. NDLS to ALD was checked on

29.10.2015 & penalty recovered Rs. 0.32 lakh.

III. SWACH BHARAT MISSION/CLEANLINESS:

Cleanliness drives were organized at Agra Cantt and Mathura

stations on 31.10.2015, in association with Nirankari

Charitable Foundation, as part of Swachh Rail Swachh Bharat

mission.

Cleanliness drives under “Sardar Patel United Clean India” are being launched. Cleanliness of A-

1, A & other category stations and trains are being organized by nominating officers of the

divisions. Special drives for littering have been launched in all the divisions.

Second phase of cleanliness drive was ended. In this drive, emphasis was laid for

cleanliness of different offices, depots, pit lines, sheds etc.

Volunteers of Nirankari Sant Mission participated in cleaning of Allahabad and Kanpur

Stations premises on 31.108.2015 as a part of involving NGOs in „Swachh Bharat Abhiyan‟ going on in

Railways.

IV. GENERAL:

A meeting was organized with Hon‟ble Members of

Parliament of Agra Division jurisdiction on 28.10.2015,

which was attended by General Manager of N. C. Railway

along with PHODs/CHODs of NCR and DRM, besides other

officials of Agra Division. The effort was aimed to invite

suggestions for improving the services and to discuss local

problems and issues of public importance.

Vigilance Awareness Week:

Vigilance Awareness Week was observed on the Division from 26.10.2015 to 31.10.2015.

During the week long events, Commissioner, Agra was invited to address officers and staff

Page 33: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

33

of Agra Division, on issues of good governance and eradication of mal-practices.

Besides the staff and officers of Railways, functions were organized in schools and colleges

of Agra, Baad and Mathura, to educate students on issues of corruption and ways to fights

against it, by way of debates, lectures etc.

On the occasion of birth anniversay of Sardar Vallabhbhai Patel, 31st October, 2015 was declared

to be observed as Rashtriya Ekta Diwas (Natinal Unity Day). On this occasion, pledge to preserve

and strengthen unity, integrity and security of our nation was administered to officers and staff of

Agra Divison on 30.10.2015.

A run for unity was also organized, involving sportsmen, staff and officers. A march past by

scouts and guides was also part of the event.

V. SECURITY:

--------------------

Dated: 26/10/2015.

OPERATIONAL IMPROVEMENT (MOBILITY):

Extension of CSR in Dn loop at Birohe Yard in Mughalsarai-Allahabad section has been

completed.

105 m RCC boundary wall at Chauphathka (Allahabad) has been constructed for Preventing

Trespassing & Encroachment.

Construction of washable apron at Platform No. 5 Mathura Jn.

Completed and commissioned during the week.

Page 34: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

34

Replacement of 3 Nos. 52 kg ordinary switches done by 60

kg Thick Web Switches. 1 No. Thick Web Switches in

Ajahai (Dn Road), 1 No. in Mathura (Dn Road) & 1 No. in

Runukta (Up Road) for improved Train Operation.

In Mughalsarai-Allahabad section, between Bheerpur-

Karchana stations road surface at Level crossing No. 29 B

has been improved by providing FRP blocks. This will

provide a durable & better road surface for road vehicles.

SWACH BHARAT MISSION/CLEANLINESS:

Cleanliness drives under “Sardar Patel United Clean India” has been launched. Cleanliness of A-1 &

A category stations are being organized by nominating officers of the divisions.

INNOVATION/RELIABILITY IMPROVEMENT:

Directed maintenance has been carried out at CHLR, HK, KL, stations and LC-69, LC-8 and LC-

10 in IDH-BKI section in AGC Division, at PRE, CAR, BH-K, NYN, ALD, SYWN, JJK, PTX,

TDL, CMR and DER stations of ALD Division and at Kabrai, Orcha, Banmore, Kotra, Link Jn.,

Kataiyadandi and Atarra stations of JHS Division.

Byculla make Analog Axle Counter has been provided for dual detection of UP IBS in DHO-

MIA section in AGC Division. Dual fuse alarm system has been provided at Ait on 22.10.15 in

JHS Division Modified LEDs have been provided at Bhua (06 Nos. ), Dabora (02 Nos.) and

Kotra (02 Nos.) in JHS Division.

Telecom circuit transferred in 6 Quad cable in Paricha-Paricha Thermal station section in JHS

Division. Similarly, overhead cable of Coach Guidance System at Orai Platform No.1 transferred

on underground cable on 22.10.15 in JHS Division.

Traction Machine Shed, Kanpur has designed and erected a material handling lift along with a

trolley in the limited space for transporting the coil between ground and first floors.

Solar lights at gate no. 158 between Erich Road-Parauna in JHS-CNB section of JHS div have

been put right by replacing old batteries and CFLs.

Timer switches have been provided in 06 no high mast towers of GWL station. & 02 no street

light circuit of officers colony JHS.

IOH of coach no. 96729/SLR & 94353/GSCN have been done and OVP also tested in JHS

division.

IOH of 07 nos. TL Coaches were carried out at ALD & CNB depot of ALD div

PASSENGER SERVICES & COMMERCIAL EARNINGS:

05 Fortress checks have been conducted during the week over NCR. Total number of 1822

passengers traveling either without or with irregular tickets/ un-booked luggage was detected, and

Rs.7.78 Lakhs were realized from them.

Notification issued for a new Private Siding namely, New Bhadan by Dedicated Freight

Page 35: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

35

Corridor Corporation of India Limited (DFCCIL), served by Bhadan Station between ETW-SKB

section over ALD division has been opened on temporary basis for handling Inward Goods traffic

in respect for RMC booked for DFCCIL for a period of 03 months i.e. 19.01.2016.

During 17th

October to 23rd

October 2015, total 07 rakes of Food-grains with earnings Rs.1.42

crore have been loaded from GWL, DAA & MRA in Jhansi division and HDL in Agra division.

During above period, total 21 rakes of POL with earnings Rs. 7.73 crore have been loaded from

IOC/BAAD in Agra division.

During above period, total 17 rakes of Cement with earnings Rs. 2.63 crore have been loaded

from MJAC in ALD & DCPG in Jhansi division.

Contract for leasing of SLRs for 3 years has been awarded in Train Nos. 12178, 13238 &

13240 and an earning of Rs.63.45 lakh per year achieved.

Kwar Navratri Mela at Vindhyachal is being organized from 13.10.15 to 27.10.15 following

arrangements made for conducting the mela successfully.

05 UTS windows at Mela Ticket Ghar, operation of 02 shift of PRS counter; “May I Help

You” Booth at circulating area.

Provided 04 additional Catering stalls for Mela period (02 stalls at circulating area & 02 stalls

at PF-1(DLI/E & HWH/E).

Stoppage of additional 10 pairs of trains, and augmentation of 02 GS coaches in Train no.

53345/53346 Chopan-Allahabad pass., Train no. 14369/14370 Triveni Exp. and 14210/14209

Lucknow-Vindhyachal Intercity Exp. from 13.10.15 to 23.10.15.

Deployment of additional staff (21 TEs, 10 BCs & 01 ERC) for round the clock manning of

station gate, enquiry, May I Help you booth, UTS & PRS counters.

01 Military Special has been booked ex MTJ to DHM (Dadhal Inam, W.Rly) on 21.10.2015

with earning Rs. 27.13 lakh.

----------------

Dated: 19/10/2015.

OPERATIONAL IMPROVEMENT (MOBILITY):

UP & DN Loop Line extension work done at Birohe on AllahabadDivision.

Tokenless Block Instrument has been provided replacing Neales Token Block Instrument on

16.10.2015 in Banda-Khairar section on JHS Division.

EI has been commissioned at Agra Junction Cabin in connection with connectivity of Agra Cant.

With Bayana and Bandikui Line on 18.10.2015.

Mechanical Lever Frame of Agra City has been replaced with Electronic Interlocking on

16.10.2015. With this Agra Division has no Lever Frames on Main Line.

Page 36: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

36

02 no. ROB in Mughalsarai-Allahabad i.e between

Jeonathpur-Aharaura Rd. at km 685/21-23 and between

Agori Khas-Chopan at km 144/5-6 being done in deposit

work has been commissioned.

Replacement of 4 Nos. 52 kg ordinary switches done by 60

kg Thick Web Switches. 1 No. Thick Web Switches in

Sholaka (Up Road) & 3 No. in Mathura (Dn Road).

5 Nos. ordinary SEJ replaced by improved SEJ (60 kg) in

Agra-Palwal section. This is one of the requirement for

Gatiman Express.

Boxes for LHS at Level Crossing No. 43 in Mathura-

Alwar section has been launched (Agra division).

2.0 km Through Weld Renewal in Agra Fort-Bandikui

section has been done by State of Art Mobile Flash Butt

Welding Plant (Agra division).

TWS (Thick Web Switch provided on MTJ (Point 102 „B‟) in connection with 160 kmph speed

in AGC Division for improving Line Capacity.

New PRS location opened at Talbehat Cantt. in Jhansi Division.

RELIABILITY IMPROVEMENT:

Page 37: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

37

To improve reliability of CTF/REV, a user friendly

contact force measuring jig has been developed by

ELS/CNB which has helped in accurate setting of contact

force between fixed and mobile contacts and hence

reduced flashing between the contacts substantially.

Multilayered Loco Roof stacking stands have been

fabricated in-house at ELS/CNB for better housekeeping

and optimum utilisation of shop floor space.

IOH of coach no. 007470 NCGS has been done and OVP also tested in JHS division.

IOH of 01 no. AC Coaches & 07 nos. TL Coaches were carried out at Allahabad & Kanpur depot of

ALD div.

Timer switch have been provided in 02 nos. street light circuit of substation no 1 JHS stand

substation 16 JHS West in JHS division.

SWACH BHARAT MISSION/CLEANLINESS:

Zig Zig barricading provided at Lalitpur PRS to prevent

Cows & ensure cleanliness.

INFRASTRUCTURE DEVELOPMENT:

Electrification of L-Xing gate no. 131 between Parexcha-CGN section has been completed by

providing SEB‟s supply.

PASSENGER SERVICES & COMMERCIAL EARNINGS:

4 Nos. CCTV cameras provided at CPC/Malgodam in ALD Division, to keep a tracker on external

interference.

06 Fortress checks have been conducted during the week over NCR. 1691 passengers traveling

either without or with irregular tickets/ un-booked luggage were detected, and Rs. 6.35 Lakhs

were realized from them.

Kwar Navratri Mela at BDL is being organized from 13.10.15 to 27.10.15 following

arrangements made for conducting the mela successfully.

05 UTS windows at Mela Ticket Ghar, operation of 02 shift of PRS counter; “May I Help

You” Booth at circulating area.

Page 38: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

38

Provided 04 additional Catering stall for Mela period (02 stall at circulating area & 02 stall at

PF-1(DLI/E & HWH/E).

Stoppage of additional 10 pairs of trains, and augmentation of 02 GS coaches in Train no.

53345/53346 Chopan-Allahabad pass., Train no. 14369/14370 Triveni Exp. and 14210/14209

Lucknow- Vindhyachal Intercity Exp. from 13.10.15 to 23.10.15.

Deployment of additional staff (21 TE, 10 BC & 01 ERC) for round the clock manning of

station gate, enquiry, May I Help you booth, UTS & PRS counters.

Total 07 rakes of Foodgrain with earning Rs. 2.10 Crore have been loaded from Gwalior, Dabra,

Datia & Morena in Jhansi Division and Hodal in Agra Division.

Total 27 rakes of POL with earning Rs. 8.87 Crore have been loaded from IOC/BAD in Agra

Division.

During 10th

October to 16th

October 2015, total 17 rakes of Cement with earning Rs. 2.47 Crore

have been loaded from MJAC in Allahabad & DCPG in Jhansi division.

02 SLR leased Comptt. of train no. 14218 were checked on 11/10/15 by HQ officials and total

amount of Rs. 0.22 lakh was recovered as penalty and other due charges of overloading.

Parking contract has been awarded at JHS station for 03 years on 14.10.15 on yearly L/Fee Rs.

82.01 Lacs.

One 1st AC cum 3

rd AC coach has been augmented in train no. 12447 U.P. S. K. Exp. ex.

Manikpur on 10.10.15 and additional amount realized Rs. 0.16 Lakh.

One Non Rail Head PRS has been installed at Talbehat Cantt. area (TMLT) on 13.10.15.

--------------------

Dated: 12/10/2015.

OPERATIONAL IMPROVEMENT (MOBILITY):

In Dingwai-Banda section of Jhansi Division, Tokenless Block Instrument has been provided in

place of Neales Ball Token Block Instrument to improve Train Running & Line Capacity. With

this, complete Manikpur-Banda section is provided with Tokenless Block Instrument.

Birohi Up Loop Line extended with Up Loop Line CSR of 725.5 metres.

RUB in lieu of Level Crossing No. 479 in between Atarra-

Badausa on Jhansi-Manikpur section has been completed in all

respect.

Replacement of 52 kg ordinary switches by 4 Nos. Thick Web

Switches in Kosikalan (Dn Road) & 1 No. in Runukta (Dn

Road) completed during this week.

Page 39: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

39

Rehabilitation of Girder bridge No. 160 A (1 x 6.1 m) for line

No. 1 & 2 Agra Fort station completed during this week by

replacing corroded plate girders.

4.21 km Through Weld Renewal in Idgah-Bayana section has been done by State of Art Mobile

Flash Butt Welding Plant (Agra divison).

At Nandkhas station in Jhansi Division, loop line run through facility has been provided on

07.10.15. Also provided at Athsarai Station in Allahabad Division.

Level Crossing:

Level Crossing 32-C between Athsarai-Kunwar has been Interlocked and Sliding Boom provided

on 06.10.2015.

RELIABILITY IMPROVEMENT:

UTS/ATA has been transferred on Railway OFC channel i.e. Orai-Ata in Jhansi Division.

Dual fuse alarm system has been provided at Bhua on 03.10.15 & Ata on 05.10.15 in Jhansi

Division. Byculla make Analog Axle-Counter has been provided for dual detection of DN IBS in

Dhaulpur-Mania section.

Old and failure prone RE cable has been replaced with 6 quad cable in Dhaura-Mohasa (8.55 Km.)

of Jhansi Division.

IOH of 01 no. AC Coaches & 06 nos. TL Coaches were carried out at Allahabad & Kanpur depot of

Allahabad division. Also, 11 TL coaches were jointly checked with C&W.

10 Nos. OVPs tested by OVP testing kit. Total Cumulative 347 nos. OVP's have been tested in

Allahabad div.

2.159 km TWR in Nadbai-Helak section has been completed during this week.

1.759 km TRR (P) i.e. 1.274 km in Kosi Kalan-Hodal DN Line & 0.485 km in JJ yard DN have

been completed during this week.

04 nos. TWS in Kosi Kalan Yard DN Road) i.e. point no. 109-A during this week.

06 nos. ordinary point machine with ground connections have been replaced with thick web point

at Runkuta (Pt-109 ;A;), Mathura Jn. (Pt. -244 „A‟, 245 „A‟), Kosi Kalan (Pt.-298 „B‟, 207 „B‟)

and Sholaka (Pt.-205 „B‟) in connection with 160 kmph speed.

SWACH BHARAT MISSION/CLEANLINESS:

Hon‟ble MP Bharatpur Shri Bahadur Singh Koli

participated in Swachh Bharat Mission at Nadbai station on

02.10.2015.

A pledge was taken for cleanliness in DRM Office on

01.10.2015.

Page 40: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

40

Walk-a-thon was organized from Agra Cantt. Station to

Idgah on 02.10.2015 for cleanliness awareness.

On 02.10.2015 Shramdan was performed by “SANT

NIRANKARI MANDAL”, cleaned station and station

area of Mathura Jn., Agra Cantt. & Mandawar Mahwa

Road station.

Seminar on cleanliness was organized on 08.10.2015.

Cleanliness drive was continued in different offices, depots, pit lines, sheds etc. on Allahabad

Division.

Nukkad Natak on Cleanliness and safety were organized on 10th

& 11th

Oct. at Etah, Barhan, Jaleser

and Etawah stations.

Slogans and Poster making competitions were organized at ETC/Kanpur to spread awareness about

the cleanliness in trains and station premises.

INFRASTRUCTURE DEVELOPMENT:

Electrification of newly constructed ISS room at Kanpur Central Railway station has been

completed.

Timer switches have been provided in 02 nos. street light circuit and substation near diesel tank of

JHS east and 01 no. high mast tower near pulia no.9 of JHS station.

PASSENGER SERVICES & COMMERCIAL EARNINGS:

In addition to clearance of parcel through regular vans by regular trains, total 02 VP

ex. AGC (on 04.10.2015) was loaded and additional earning of Rs. 193003/-

Page 41: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

41

achieved through these VPs.

1 fortress check has been conducted on 06.10.2015 at MTJ. A total of 543 cases of

irregular/ ticketless passengers were detected and revenue amounting to Rs.

206495/- is released.

Frequent checks were carried out to nab Ticketless/ Irregular travel. Total 713

passengers were det4ected. Out of which 713 passengers paid railway dues of Rs.

266740/-.

SECURITY:

fnukad 03-10-2015 dks l0m0fu0 ,l0ds0flag gejkg dkW0 jkts”k

;kno o dkW0 egrkc [kkWu ds LVs”ku ,fj;k xLr ds nkSjku

ih0,Q0ua0 04@05 lqjax ds ikl th0vkj0ih0 dkuiqj ds

,l,lvkbZ lat; dqekj frokjh gejkg LVkQ ds lkFk la;qDr psfdax

ds nkSjku IysVQkeZ la0 04@05 use cksMZ ds ikl ,d O;fDr “kuh

mQZ igkMh iq= eqUuk] fu0&dPph >ksiMh QsFkQqyxat]

Fkkuk&jsycktkj] ftyk&dkuiqj uxj ds le; 05%30 cts idM+k

ftlds ikl ls 90 xzke u”khyk ikmMj Mk;tkike cjken gqvkA

vfHk;qDr mijksDr ds fo:) th0vkj0ih0 dkuiqj lsUVªy ij eq0v0la0 1363@15 vUrxZr /kkjk 21@22

,uMhih,l ,DV cuke “kuh mQZ igkMh fnukad 03-10-15 dkss iathdr̀ fd;k x;k gSA ekeys dh foospuk m0fu0

lanhi dqekj jk; }kjk dh tk jgh gSaA

--------------------

Dated: 05/10/2015.

I. Meeting of General Manager with Hon‟ble Members of

Parliament has been accomplished successfully on

30.09.2015 at Allahabad.

II. SAFETY & OPERATIONAL IMPROVEMENT (MOBILITY):

02 Nos. Permanent Speed Restriction (01 in Up main line in Palwal-Agra section & 01 in

Bayana-Idgah section of Agra division) have been removed/relaxed.

Loop line run-through facility has been provided at all stations in Mathura-Palwal section in

Agra Division and at Erich on 02.10.2015 in Jhansi Division.

Page 42: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

42

Overlap release time has been reduced from 2” to 1” at all the stations in Mathura-Palwala

section in AGC Division to facilitate faster movement of EMU trains.

08 Nos. ordinary SEJ replaced by improved SEJ at Mathura-Palwal section. This is one of the

requirement for Gatiman Express.

Foot Over Bridge at Mandawar station in Agra division has been completed & commissioned.

Removed 67 year old encroachment from circulating area

(9 nos. shops area – 250 sqm) at Lalitpur.

On 30.09.2015 a long haul train has been originated for the first time in Agra Division which

completed a total run of 396 km. from BAAD (BAD) station to Agasod (AGD) in 08:40 hrs. On

01.10.2015 another long haul train has been originated ex- BAD.

02 nos. ordinary point machines with ground connections have been replaced with Thick web

point at KSV yard (Pt.- 298A & Pt- 296B) in connection with 160 kmph speed.

III. PASSENGER SERVICES & COMMERCIAL EARNINGS:

Patra Halt was opened for Passengers on 28.09.2015.

During 26th

September to 1st Oct., 2015, total 3 rakes of Foodgrain with earning of Rs.1.76 crore

have been loaded from CPC in Allahabad Division and Lalitpur, Dabra & Datia in Jhansi

Division.

05 Fortress checks have been conducted during the week over NCR. 3574 passengers

travelling either without or with irregular tickets/unbooked luggages were detected and Rs.12.41

lakhs were realized from them.

To clear extra rush of waitlisted passengers, 7 extra coaches were attached during this period

and amount earned Rs.2.49 lakh.

In addition to clearance of Parcel through Regular Vans by Regular Trains, total 2 additional VPs

ex Agra Cantt. (1 each on 26.09.15 & 27.09.15) were loaded and additional earning of Rs.1.87

lakh achieved. 5 SLR Leased Comptts & 1 Asstt. Guard Cabin of 5 trains have been checked

and total amount of Rs.2.17 lakh was recovered as penalty and other due charges.

UTS cum PRS started at Nadbai on 28.09.2015.

Applications called for allotment of JTBS at Shankargarh & Khajuraho have been disposed and

informal letter issued to applicants in this regard.

At Central station, Kanpur, by blocking all the ways, a raid was conducted at large level in which Rs. 3

lakh was charged as fine from the without ticket holder and the persons who were spreading litter in the

station premises.

IV. SWACH BHARAT MISSION:

On 02.10.2015, Swachch Bharat Abhiyan was started in ALD Division in big way and

Swachchta pledge was administered to the officer and staff at all the stations and offices.

Hon‟ble MPs, MLAs, Officers and staff voluntarily took part in the cleanliness drive. Banners,

hoarding, posters were displayed on prominent locations at all the stations. Musical jingles and

slogans were played to spread awareness about the cleanliness amongst the passengers and staff.

Sant Nirankari Samagam, Scout and Guides etc voluntarily participated in this Swachch Bharat

Campaign. Walk-a-thon was also organized.

Page 43: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

43

V. RELIABILITY IMPROVEMENT:

Back Up Trains Detection through Axle Counters has been commissioned from Dailwara to

Lalitpur UP IBS with Universal Axle Counter on 02.10.2015 in Jhansi Division.

GR1 & GR2 circuit modification has been done at Erich to prevent bobbing of signals in Jhansi

Division.

VI. INFRASTRUCTURE & SKILL DEVELOPMENT:

Two days workshop on Electronic Interlocking was

conducted at NCR HQ under “Skill NCR Mission” of

the NCR. More than 100 officers and supervisors of the

three Divisions and HQ participated in the workshop

which has been conducted for the first time in Indian

Railway. Electronic Interlocking Technology Groups

have been formed in each of the three Divisions and HQ

to further carry out this work.

Mahila Sashaktikaran Workshop’ was organized on 28.09.2015 at ALD. In this connection need for

awareness of Mahila Self defence and the availing of scheme floated by the Central Government for

immediate help was emphasized.

VII. LEVEL CROSSING:

02 unmanned Level Crossing (L.C. No. 91 & 110 in Mathura – Alwar section) have been closed.

Boxes for LHS at Level Crossing No. 79 in Mathura –

Alwar section has been launched (Agra division).

VIII. SECURITY:

fnukad 28-09-15 dks efgyk m0fu0 vpZuk o e0dka0 osoh ;kno

js0lq0c0 iksLV dkuiqj lsUVªy dks IysVQkeZ xLr ds nkSjku nks

yMfd;ka uke mikluk iq=h&fnus”k pUnz ik.Ms; mez 15 o’kZ

fuoklh&vktkn uxj vkbZVhvkbZ jksM Fkkuk&CkUUkknsoh

ftyk&vyhx<+ m0iz0 o ik;y iq=h Lo0 jk/ks”;ke ;ksxh mez 15

o’kZ fuoklh edku la0&357 uankuxj Fkkuk&rhuiqfy;k

ftyk&bUnkSj ¼e0iz0½ LVs”ku ifjlj esa lafnX/k voLFkk esa

ykokfjl feyh ftUgsa Hkh ykdj izxfr lsok laLFkku dh lfpo

dYiuk flag o dkmUlyj mesjk csxe dks fyf[kr esa lqiqnZ fd;k x;kA

-----------------

Page 44: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

44

Dated: 28/09/2015.

IX. SAFETY & OPERATIONAL IMPROVEMENT (MOBILITY):

Allahabad Division achieved best ever inter change of 305 trains on 27.09.2015.

Previous best was 304 on 31.08.2015. High wagon throughput of 15045 was achieved on 27.09.2015

which is second best ever. Previous best was 15111 wagons on 31.08.2015.

CSR of UP Loop Line of Manauri station in Allahabad Division has been increased from 695m to

719m after shifting Loop Line Starter and Shunt Signal on 26.09.15. At Garmau (JHS Division),

loop line run through facility has been provided on 24.09.15. At Birlanagar, Anantpeth, Dabra &

Garmau stations in Jhansi Division, GR1 & GR2 circuit modification has been done to prevent

bobbing of signals.

1.18 km Through Weld Renewal in Idgah – Bandikui section has been done by State of Art Mobile,

Flash Butt Welding Plant. (Agra division). 24 Nos. ordinary SEJ replaced by improved SEJ at

Mathura-Palwal section. This is one of the requirement for Gatiman Express. Replacement of 52 kg

Page 45: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

45

switches by insertion of 2 No. Thick Web Switches in Raja Ki Mandi (Up & Dn Road) completed

during this week.

After completion of pre NI & NI works at Idgah station of

Agra division, yard remodeling has been completed to

handle additional trains. Additional Platform No.4 has also

been added with Second Entry.

During the period from 19.09.2015 to 25.09.2015 following trains have been worked on Agra

Division:-

1) Pragati Trains - 10 nos.

2) Crack Trains - 18 nos.

3) Rocket Trains – 25 nos.

X. CLEANLINESS

In view of National Cleanliness Campaign under “Swachh

Bharat Mission” an intensive campaign for “Swachh Bharat

Mission” (SBM) was started at Agra Cantt., Agra Fort &

Mathura Jn. Railway Station on 26.09.2015 by Agra Division.

XI. COMMERCIAL EARNINGS:

During surprise check leased RSLR of Train No. 13008 was checked on 25.09.2015 at AF

and under charges collected Rs. 1,20,239/- for excess weight and penalty.

Fortress checks- 02 fortress check (on 21.09.2015 at Dholpur & 23.09.2015 at Mathura

Jn) + 01 bus raid (on 22.09.2015 at Kosi Kalan) has been conducted during the period. A

total of 1099 cases (873 in fortress + 226 bus raid) of irregular/ticketless passengers were

detected and revenue amounting to Rs. 4,04,905/- is released.

Frequent checks were carried out to nab ticketless/ irregular travel. Total 1007 passengers

were detected. Out of which 1007 passengers paid railway dues of Rs. 3,97,035/-

In addition to clearance of parcel through regular vans by regular trains, total 01 VP was

loaded nd additional earning of Rs. 1,03,736/- achieved through these VP.

Four fortress check with 2644 persons caught and penalty realized Rs. 14,36,305/- in Allahabad Divn.

XII. RELIABILITY IMPROVEMENT:

Page 46: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

46

Dual detection has been commissioned at Dailwara-Lalitpur UP IB

between IB to LAR on 23.09.15 in JHS Division.

It is observed that uncoupling rod of CBC coupler of locomotive

generally gets damaged during cattle run over. Problem in

uncoupling operation of CBC, at the time when locomotives is

placed at platform, is reported. In many CRO cases, coupler

operating rod gets bent or damaged & results in breakage of levers

& rotary lock. Many times, the locomotives become in-operable

with these damages.

For CRO protection for operating handle damages & to facilitate

CBC coupler opening from any side of the locomotive; Electric

loco Shed, Kanpur carried out conversion of CBC uncoupling

arrangement from bottom operated to top operated with both side

handle as an action plan for CRO cases.

Structural changes in loco cab‟s front body is carried out and fitted

with this double sided operating rods so that the handles are

positioned behind the buffers & operating rod is at a safe height.

IOH of 02 no. AC Coaches & 07 nos. TL Coaches carried out at Allahabad & Kanpur depot of ALD

div. 07 TL coaches were jointly checked with C&W at Allahabad & Kanpur depot in ALD div. 05

Nos. OVPs tested by OVP testing kit. Total Cumulative 332 nos. OVP's have been tested in ALD

div.

XIII. INFRASTRUCTURE DEVELOPMENT:

Solar light at gate no. 223 in Kanpur- Jhansi section, S-10 & 12 in Khairar Jn-Bhimsen section and

LC gate no. 445 in Gwalior section have been put right in working condition by replacing old

batteries and defective CFLs in Jhansi div. Electrification of Gate no. 457 through solar Light in

Gwalior-Agra Cantt section in Jhansi div has been done.

New/Additional DG set of 160 KVA has been installed in Surajkund substation at Allahabad. One

additional 500 KVA transformer has been commissioned in Company Bagh substation at Tundla to

cater the forthcoming load of CTC at Allahabad division.

05 Nos. TL coaches arrived from AMV/GKPS workshop after POH in ALD div. The coaches have

been tested and commissioned in various train services.

One 17.5HP pump has been provided at RCC pump house feeding water to Gwalior station & East

colony Gwalior in Jhansi division.

XIV. LEVEL CROSSING:

Boxes for LHS at Level Crossing No. 61 Brij Nagar-Govindgarh section at km 1465/8-9

has been launched. (Agra division).

XV. SECURITY:

fnukad 20-09-2015 dks mi fujh{kd vpZuk@js0lq0c0 iksLV dkuiqj lsUVªy dks nkSjkus x”r IysVQkeZ ua0

06@07 gkoM+k lkbZM ,d ykokfjl yM+dh ?kwerh gqbZ feyhA ftls js0lq0c0 iksLV dkuiqj lsUVªy ij ykdj

iwNrkN dh x;h rks viuk uke jhek iq=h Lo0 eueksgu] mez 15 o’kZ] fuoklh ijlk] Fkkuk fl)kFkZ uxj

Unmodified operating handle

Modified operating handle

Page 47: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

47

¼m0iz0½ crk;hA ?kj NksM+us dk dksbZ larks’ktud mRrj ugha ns ldhA bl ij mls pkbZYM ykbZu dkuiqj dh

lnL; fjpk frokjh o xkSjo lpku dks lqiqnZ fd;k x;Ka

fnukad 22-09-2015 dks m0fu0 foosd dqekj pkS/kjh@js0lq0c0 iksLV dkuiqj lsUVªy gejkg LVkQ ds lkFk

x”r ds nkSjku IysVQkeZ ij Hkh[k ekaxrs gq, pkj cPps feys ftUgs js0lq0c0 iksLV dkuiqj lsUVªy ij ykdj

iwNrkN dh x;h rks viuk uke dze”k% 1- ve:y tksxh iq= lyhe] mez 11 o’kZ] fuoklh xzke ukjhcjh

ck/kiqj] Fkkuk f”koyh] ftyk dkuiqj] 2- eqds”k iq= lyhe mez 11 o’kZ irk mijksDr] 3- jkts”k dqekj iq=

nsoukjk;.k mez 15 o’kZ] fuoklh Mksou cxhpk] Fkkuk dkSvkiqj] ftyk uoknk o 4- th”kku iq= eqUuk mez 15

o’kZ] fu0 ckdjxat] Fkkuk ckdjxat] ftyk Qrsgiqj crk;sA dz0la0 01 ls 03 rd pkbYM ykbZu lqHkk’k

fpYMªsu lkslkbVh] dkuiqj ds lnL; fnus”k dqekj dks ,oa dz0la0 04 dks pkbZYM ykbZu lkFkh jsy izkstsDV ds

lnL; dhfrZ xqIrk dks lqiqnZ fd;k x;k A

--------------------

Dated: 21/09/2015.

OPERATIONAL IMPROVEMENT (MOBILITY):

PSR of 100 KMPH due to non transition curve No-8,7 & 6 having reverse curve and no space for

transition length in between curves in DN line CAR YD at

Location from 705/20 to 704/20 has been relaxed to

maximum permissible speed on 18.09.15 after realignment of

curves.

Line No.7 has been interlocked at IDH

station on 19.09.15 in AGC Division for opening 2nd

entry.

Page 48: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

48

At Subedarganj station (ALD Division), common loop line No.1 starter has been

shifted toward Allahabad end and CSR has been increased from 663 mtr. to 673 mtr. on 16.09.15.

1.10 km Through Weld Renewal in IDH – BXN & 2.291 km in IDH – BKI

section has been done by State of Art Mobile, Flash Butt Welding Plant. (Agra division).

23 Nos. ordinary SEJ replaced by improved SEJ at MTJ-PWL section. This is

one of the requirement for Gatiman Express.

Laying of one no. Thick Web Switch in point no. 295 B (UP) & 201 A (DN) at

Runkata . (Agra division).

07 Nos. Turnouts on wooden sleepers have been replaced with concrete

sleepers in Allahabad division.

Barricading with gates provided at the ends

of platforms No. 4 & 5 at Jhansi (island PF) to prevent

cows/cattles entering platform area.

Multi-Aspect Colour Light Signalling has been commissioned at Ghatampur

replacing old semaphore signaling on 14.09.15 in JHS Division.

In Ghatampur-Patara road section, Tokenless Diado Block Instrument has been

provided in place of Neale‟s Block Instrument on 15.09.15 in JHS Division.

At Morena & Sonagir stations in JHS Division, GR1 & GR2 circuit modification

has been done to prevent bobbing of signals on 17.09.15 and 11.09.15 respectively.

At Orai (JHS Division), loop line run through facility has been provided on 19.09.15.

Level Crossing:

One Busy Manned Level Crossing No. 35 B in Naini-Allahabad section of

Mughalsarai-Allahabad closed after obtaining CRS sanction.

De-shafting & Re-shafting of rotors of three phase traction motors type 6FRA 6068.

Re-shafting of Rotors of Traction Motor Type 6FRA6068 has

been started at Traction Motor Shop 9TMS), Kanpur. Re-shafting

cost will be low in comparison re-shafting done by OEM. This

shall be resulted in improved availability of Locomotive.

Page 49: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

49

13 Nos. OVPs tested by OVP testing kit. Total Cumulative 327 nos. OVP's have been tested in ALD

div.

INFRASTRUCTURE IMPROVEMENT:

Wheel shop (G-1 Section) of Electric loco Shed, Kanpur has

been provided with “solar pipe day light” for illumination

improvement and energy conservation, utilizing solar light,

for its day shift working.

Total 27 nos. solar pipe day lights have been installed in

wheel shop. As a result, there is improvement of lux level

from earlier average 50 to 60 lumens level (at machine

working level) to 100 lumens. Estimated load saving of

approx. 7 KW during day shift, equivalent to approx. 70 units

consumption per day (10 hrs Day light duration) is achieved.

Average saving with solar day light of wheel shop is expected to be Rs 1.25 lacs per annum.

Solar lights at gate no. 215, 220 & 221 have been put right by replacing old batteries and CFLs in

JHS div.

Timer switch has been provided in high mast tower in 06 no high mast towers of GWL station. & 02

no street light circuit of officers colony JHS.

Electrification of newly constructed gate lodge at LC gate no. 120/C of ALD division has been done.

STAFF WELFARE

Provision of street light has been made in Railway colony Dagmagpur of ALD division by erecting

20 nos. electric poles with fittings of 150 watt HPSV.

Electrification of 31 no. Type-1 Spl Railway quarters has been completed at Dagmagpur by taking

connection from UPPCL.

Rewiring work of 06 nos. type II Railway quarters at MRPR station of JHS division has been

completed.

PASSENGER AMENITY

Defective UPS of 2 KVA capacity has been replaced with new one at BTKP station in JHS division

for reliability of standby power supply to UTS.

-----------

Dated: 14/09/2015.

SAFETY & OPERATIONAL IMPROVEMENT (MOBILITY):

Automatic Block Signalling (ABS) was commissioned on 12.09.15 in Dagmagpur-Chunar Section of

Allahabad Division. With this, the line capacity works of ABS have been completed on Allahabad-

Mughalsarai Section upto the last Block Hut K. Terminals/Yards improvements will further improve

operations.

On Khurand-Dingwai section, Tokenless Podanur Block Instrument has been provided in place of Neale's

Block Token Instrument on 11.09.15 in JHS Division.

Page 50: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

50

11 Conventional SEJs were replaced by Improved SEJ on Mathura-Palwal section, which meets one

of the requirements for running of Gatiman Express. In addition, Thick Web Switch on point no.

107 A (UP) at Runkata (Agra division) has been inserted.

1.48 kms Through Weld Renewal on Idgah – Bayana Section and 1.32 kms on Idgah-Bandukui

Section has been completed using State of Art Mobile, Flash Butt Welding Plant.

3 Turnouts on Wooden Sleepers were replaced with Concrete

Sleepers Layout by T-28 machine in Jhansi Yard to improve

level of Safety.

At Mustara, Loop Line Run Through facility has been provided on Jhansi Division.

Level Crossing:

Gate-123, in between DAP-CAR, interlocked on 12.09.15 in Allahabad Division.

L-Xing Gate no. 32/A between Saraibhopat-Jaswant Nagar in Allahabad Divisionv & 392 between

KTRA-DBA in JHS division have been illuminated through AT supply.

L-Xing gate No. 393 between Kotra-Dabra has been energized by Solar supply in Jhansi division.

Sliding boom commissioned at following L-Xing Gates in ALD Division:-

(i) Gate – 123 C (Dagmagpur-Chunar)

(ii) Gate – 26 C (Ekdil-Etawah)

(iii) Gate – 31 C (SaraibhopatB – Etawah)

LHS in replacement of Level Crossing No. 52 AB in Yamuna

Bridge-Tundla section has been completed in all respect

(approach road, shed & retaining wall) at Level Crossing has

been closed.

Page 51: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

51

As a part of Improvement of Passenger Amenities, Main

porch of Gwalior station (Jhansi division) improved by

providing coloured paver blocks.

RELIABILITY IMPROVEMENT:

Datalogger (RTU) provided on 12.09.15 at Gate – 71 C (PMPR –SSL) in Allahabad Division.

Dual detection has been commissioned at Sandalpur-Antri with Universal axle counter (Byculla) DN

direction in parallel to BPAC (SSDAC) on 07.09.15 in JHS division.

Old and failure prone RE cable has been replaced with 6 quad cable in Antri-Sandalpr section (6 Km.) of

Jhansi Division.

Prevention of Failure of Interconnecting Leads of Main Poles of stator of EMU TM by securing

them through clamps during repair at Traction Machine Shed, Kanpur for better reliability and

availability of EMU.

Challenge:

Majority of EMU Stators are received for repairing on account of melting, flashing & parting of

interconnector cable joints between main pole coils.

Challenge was to introduce support in square shape stator for four pole traction motors.

Gravity of Problem:

Approximately 70% EMU Stators are received for repairing on account of melting, flashing &

parting of interconnector cable joints between main pole coils.

Sharp bend found in coil lead and length of interconnector cable joint is more due to EMU stator

square design and four pole construction.

Inter connector cables are not supported anywhere in EMU stators.

During EMU/MEMU running vibration causes cracks on sharp edges of inter connecting cable

and unsupported portion of inter connector cable, subsequently leads to melting, flashing &

parting of interconnector cable.

Action Taken

Clamp designed to support main pole interconnecting cable on stator frame below

interconnecting cable joints.

These clamps are welded in stator frame and taped through insulating tape.

Epoxy spacer block is provided between clamp & lead connecting strip.

Connector lead strip is firmly supported with clamp and lead spacers.

Advantages :

Lead parting failure will be minimized due to vibration during EMU running.

Increased reliability and availability of locomotives.

Reduction in the cost of maintenance of Electric Locomotives.

Page 52: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

52

IOH of 03 no. AC Coaches & 07 nos. TL Coaches were carried out at ALD & CNB depot of ALD

div.

14 TL coaches were jointly checked with C&W at Allahabad & Kanpur depot in Allahabad div.

15 Nos. OVPs tested by OVP testing kit. Total Cumulative 314 nos. OVP's have been tested in

Allahabad div.

INFRASTRUCTURE DEVELOPMENT:

Solar light at gate no. 224, 229, 223, 2237, 405, 418, 428, 429 & 427 have been put right by

replacing old batteries and CFLs in Jhansi Division.

Timer switch has been provided in high mast tower near VIP gate at Gwalior station at Jhansi

Division.

01 nos. 200 Amps. Control panels have been provided for Agasod station at Jhandi division.

Redressing work of LT cable have been done at circulating area of Chitrakut Dham Karvi station

at Jhansi Division.

50 Nos. bulb of 110 volts have been provided at loco pit line at Diesel shed/Jhansi.

In line enhance policy of provision of standby air conditioners, 06 additional window type AC

units along with 05 timers have been installed in Central Control at NCR Headquarters.

34 no. façade light provided at Agra Cantt Railway station..

Defective UPS of 2 KVA capacity has been replaced at Mahoba station in Jhansi division for

reliability of standby power supply to UTS.

--------------------

Dated: 07/09/2015.

OPERATIONAL IMPROVEMENT (MOBILITY):

General:

1. Highest ever inter change of 304 trains achieved on 31.08.2015 on Allahabad Division.

Earlier best was 297 on 30.08.15. Highest ever throughput was 15111 wagons on 31.08.15 on

Allahabad Division. Earlier best was 14599 wagons on 06.01.15. Highest no. of trains made over to

Bhimsen from GMC of Allahabad Division was 17 on 06.09.2015. Previous best was 16 trains on

25.12.2010.

CLAMP

Page 53: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

53

2. Allahabad Division successfully managed to run 70 diverted trains in four days due to

NI at Palwal in NR.

3. Allahabad City Station (Ram Bagh)/N.E.R. Yard Display

Indications have been provided at Allahabad RRI on 05.09.2015.

4. Sarai Bhupat DN Loop Line CSR has been increased to 715 m on 05.09.15.

5. Tokenless Block Instrument has been provided between Khurand and Atara stations in JHS Division on

04.09.15.

6. Loop line run-through facility has been provided at Lalitpur, Matatila, Mohasa, Moth and Udaypura.

With this loop line run through facility on entire main line section of JHS Division has been provided.

7. At Vrindaban Road & Ajhai station of Agra Division, timer of overlap release has been changed from

120 sec. to 60 sec. to facilitate faster movement in yard & avoid detention.

8. 02 nos. TWS point machines with ground connection have been replaced at Runkuta (Pt. 107B) and

Rundhi station (Pt. 295B) of Agra Division in connection with 160 kmph speed.

9. 1.54 km Through Weld Renewal in Idgah-Bayana section, 1.26 km n Idgah-Bandikui section & 2.87

km in JHS-MKP section has been done by State of Art Mobile Flash Butt Welding Plant.

10. The girder of Br. No. 25 has been raised by 36cm by providing

special design stools as per requirement, in a traffic block of

3.5 hours. There was a speed restriction of 60KMPH on this

bridge on account of low level of bridge. Now the speed

restriction will be removed after ballasting, lifting & packing of

approach track.

11. Three fortress check with 816 persons caught and penalty realized Rs. 3,31,140/- on Allahabad

Division. 03 nos. fortress check has been conducted during the period on Agra Division. A total of

2014 cases of irregular/ ticketless passengers were detected and revenue amounting to Rs. 7,62,610/- is

released. Frequent checks were carried out to nab ticketless/ irregular travel on Agra Division. Total

162 passengers were detected. Out of which 162 passengers paid railway dues of Rs. 50,580/-.

12. After taking Ramgarh/TSS in service in Mathura-Alwar section since April 2015 there was continuous

penalty in energy bill due to low power factor. It was due to less electrical load in Mathura-Alwar

section. A study was done regarding load pattern and capacity of shunt capacitor bank was modified. It

resulted in increase in power factor from 0.30 to 056.

Page 54: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

54

13. 6 Nos. 60 kg ordinary SEJ replaced by improved SEJ at

Mathura-Palwal section. This is one of the requirement for

Gatiman Express.

Level Crossing:

1. In Tundla-Ghaziabad section between Daud Khan-

Aligarh Jn. stations road surface at Level Crossing No-

106B & 107C has been improved by providing FRP

blocks. This will provide a durable and better road

surface for road vehicles.

2. LHS in replacement of Level Crossing No. 52 in Idgah-

Bayana section has been completed in all respect

(approach road, shed & retaining wall) and Level

Crossing has been closed.

RELIABILITY IMPROVEMENT:

1. In order to prevent breakage of failure prone EPDM/EVA/BHEL insulators, 10 nos. such insulators have

been replaced.

2. Correct procedure of application of appropriate number and

weights of balance weights at appropriate locations in Electric

Loco TM armatures before carrying out repair/rewinding at

Traction Machine Shed, Kanpur.

Total weight of balance weight is now lying within 250-

300 gram which minimised the possibility of balancing

weight uprooting.

Balancing weight uprooting are reduced on line.

Ovality and MTBT will remain under prescribed limit as welding of balance weights on disc spring

has been stopped strictly now.

Increased reliability and availability of locomotives.

3. Dual fuse and alarm system has been provided at Orai and Pokhrayan stations in JHS division on

03.09.15.

4. Dual detection has been provided on UP Line for BPAC between Antri and Sandalpur on 05.09.15.

5. Airtel (CUG) mobile access in Tundla Control office has been markedly improved with the provision of

Repeater resulting in much better coordination.

CLEANLINESS:

1. To ensure cleanliness at station and in terms of Commercial Circular No. 76/2012, frequent announcement

were made for passenger awareness and posters were displayed. 152 persons were detected and a fine of

Rs. 16300/- released.

Page 55: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

55

INFRASTRUCTURE DEVELOPMENT:

1. Laying of one No. Thick Web Switch in point No. 102B (DN)

at Runkata (Agra division).

2. 07 Nos. TL coaches arrived from AMV/GKPS workshop after

POH in Allahabad division. The coaches have been tested and commissioned in various train services.

3. 02 nos. 200 Amps. Control panels have been provided for Baad TRD Colony and on PF No.2 at Matatila

station in Jhansi division.

4. Defective batteries of UPS of Bahilpurwa station in Jhansi division has been replaced and put right in

working condition.

5. Defective UPS of 1 KVA capacity has been replaced at Paman station in Jhansi division for reliability of

standby power supply to UTS.

SECURITY:-

1- fnukad 03-09-2015 dks js-lq-c- dkuiqj lsaVªy iksLV }kjk

th0,l0oh0,e0 vLirky] dkuiqj ds rRok/kku esa

jDrnku f”kfoj yxkdj jDrnku fd;k x;kA mDr

jDrnku dk;Zdze esa 24 cy lnL;ksa us jDrnku fd;k

rFkk fujh{kd@js0lq0c0 iksLV fQjkst+kckn }kjk ,uthvks

fpjkx lkslk;Vh ds lg;ksx ls ;k=h lqj{kk tkx#drk

vfHk;ku pyk;k x;k rFkk thvkjih] vkjih,Q ,oa fpjkx

lfefr ds lnL;ksa ds lkFk xks’Bh dk vk;kstu fd;k A

2- fnukad 03-09-2015 dks js-lq-c- iksLV vNusjk iksLV }kjk

;kf=;ks ds lkeku dh pksjh ,oa tgj[kqjkuh ds lEc/k esa

tkx:d djus gsrq vfHk;ku pyk;k x;k] ftlesa iEiysV]

cSuj] ykmMgsyj dh enn ls ;kf=;ksa tkx:d fd;k x;k

,oa vkjih,Q gsYi ykbu ua0 182 dk izpkj izlkj dj

iEiysV pLik ,oa forfjr fd;s x;sA

SAFETY:

1. Dumper working very close to track in Chunar-Chopan Section of Allahabad Division was involved

in side rubbing and infringing with coaches. Dumper has been seized and legal action is being taken

by the RPF against the driver.

2. Train Dacoit Virmanad of Aligarh Junction was arrested and in his possession HTC mobile (value

Rs. 25,000/-), knife and cash was recovered from him.

--------------------

Page 56: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

56

Dated: 31/08/2015.

OPERATIONAL IMPROVEMENT (MOBILITY):

General:

1. Highest ever Inter Change of 297 trains achieved on 30.08.2015 on Allahabad Division. Earlier best

was 295 on 01.02.2015. Second highest Throughput of 14488 wagons was achieved on 30.08.2015

on Allahabad Division. The highest ever figure being 14599 on 06.01.2015. Interchange ¼BXN

Page 57: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

57

Point)- 29 Train (T/O 14 + M/O 15) was on 24.08.2015, which is best ever in F.Y. 2015-16 on Agra

Division.

2. NCR has launched a drive to check and send BOXN HL rakes working Twin Pipe from power

plants. Out of total 33 such rakes received at power plants Dadri and Paricha in last one month ,17

were received single pipe even though the twin pipe system was available and working. These

rakes were sent twin pipe working to improve throughput and performance.

3. Control and Block Working in Mahoba-Kulpahar block section (22 km) of Jhansi-Banda section

has been transferred on newly laid 6 quad cable. With this, the control and block working on entire

Jhansi-Banda section has been brought on reliable 6 quad cable thereby doing away with erratic

working on BSNL owned overhead alignment.

4. Control Working has been commissioned in Chunar-Chopan section(100 km) on 26.08.2015

resulting in much better coordinated train operation in the section.

5. Signaling Logic: Improved at Mathura station, timer of overlap release has been changed from 120

sec. to 60 sec. to facilitate faster movement in yard & avoid detention. Automatic Route Release

facility has been provided at Dadri West Cabin on 27.08.2015. Run through facility via loop line at

Sarsaul-Prempur has been commissioned on 24.08.2015.

6. Starters have been shifted at the foot of the glued joint in Sarsaul and Prempur, as per Railway

Board‟s guidelines on 24.08.2015 to improve CSR.

7. RRI/CNB route cancellation timer has been reduced to one minute from two minutes earlier w.e.f.

27.08.2015.RRI/ALD route cancellation timer has been reduced to one minute w.e.f. 24.08.15.

8. EMU 64903 first passenger carrying train ran in the Chata - Hodal 3rd line on 22.08.2015 after CRS

sanction.

9. At Agra Cantt. OHE of Main Line separated from the Yard. At Mathura Goods Shed 3 infringing

masts removed & OHE made fit for extension of Goods Shed.

10. 4. nos. ordinary SEJs replaced by improved SEJ (60 kg.) at

MTJ-PWL section of Agra division. This is a desirable

requirement for high speed train operation.

11. 04 Fortress Checks have been conducted during the week over NCR. 1282 Passengers Traveling

either without or with irregular tickets/ un-booked luggage were detected, and Rs. 4.89 Lakh was

realized. Four(04) bus raids have been done in this period in

ALD division and (01) one in JHS division out of which, 297

persons were detected and fine realized Rs 1.15 lacs.

Level Crossing:

Page 58: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

58

4 No. unmanned level crossing i.e. LC No. 80, 81, 82, 86 in MTJ-AWR section & 2 No. manned

level crossing i.e. LC No. 35 in IDH-BKI & LC No. 500 in AGA-BLGJ have been closed during the

week.

Level Crossing Gate No.71 between Sarsaul-Prempur has been interlocked on 24.08.2015. This will

enhance safety.

Level Crossing Gate no.133 /C has been illuminated through AT supply on ALD division.

RELIABILITY IMPROVEMENT:

Red Die Penetrant Test (RDPT)

of Rotor clamp (Head Hub) of Hitachi Traction Motors started at Traction Machine Shed, Kanpur

for early detection of crack leading to better reliability and availability of Electric locomotives.

CLEANLINESS:

Mass tree plantation carried out in JHS West colony in presence

of DRM Shri S.K.Agarwal & other divisional officers on dt.

20.08.2015 at Jhansi. 60,000 Number of trees planted in Jhansi

division on 20.08.2015. Total 4,10,161 trees have been planted in

NCR upto August 2015 in 2015-16.

13 nos encroachments have been removed from traffic colony

Allahabad. (Allahabad division)

INNOVATIONS:

Two automatic banner flag has been provided by

departmental resources at manned level crossing No. 224 &

368 in Jhansi division.

Page 59: OPERATIONAL IMPROVEMENT (MOBILITY)ncr.indianrailways.gov.in/uploads/files/1459246373429-Archieve.pdf · Welding Plant. c) CSR of UP Loop Line of Hirangaon station has been increased

59

1.6 Km Through Weld Renewal in JHS-MKP section, 2.8

km in IDH-BXN & 1.34 km in IDH-BKI section has been

done by state of Art Mobile Flash Butt Welding plant.

INFRASTRUCTURE DEVELOPMENT:

As a part of improvement of passenger amenities, Platform

surface of PF No. 4 at Gwalior station (Jhansi division)

improved by providing kota stone flooring.

SAFETY:

On 26.08.15 ALP Sri Surendra Kumar, HQ/JHS, during under-frame inspection of loco no.

31414/KIR Spl at PF No. 1 of JHS station, observed petrol oil leakage from nozzle in tank wagon

no. 2 & 3 from engine. He immediately informed the same to his Loco Pilot & TLC/JHS. Further,

the train was shunted in new yard & attended by TXR staff. Thus, a serious mishap was averted due

to alertness of crew.

--------------------