Using Digital Safety Files for
FM and Asset Life Cycle
(Post-Handover)
Title
Safety File – Building Information
Paper based Safety File
Paper mess Electronic Paper mess
Digital Project Delivery does not mean dumping everything onto a CD…….
Soft Copy ??
WE TRANSFORM FILES INTO A DIGITAL ASSET
CENTRALISED. ACCESSIBLE.DISCONNECTED. DISPARATE.
Digital Safety File
Provides complete building reference library including:-
Complete Asset Register
Schedule of Warranties
Instant access to all O&Ms, Tech Data Sheets, Commissioning & Testing
Online, Stand Alone or on Local Area Network
Building Owners use our solution to reduce costs and improve their Building Management
Schedule of All Maintenance
Life Cycle Asset Management Functions
Digital Safety File
Owner Needs
Facilities Management Data
Typically not BIM experienced
Working on many cases on a daily basis
May be still paper based
May be outsourced
Understanding the needs of the Maintenance Team
Who will use the data?
What documents and data do they need?
What Maintenance Software / Systems do they use?
What format do they want the data in?
What devices will they use?
Engage with the Maintenance Team
BIMForum presentation in Nov 2012 –FM experience in Sandia National Labs.
Main facility is Albuquerque, New Mexico. 689 buildings on 13,740 acres 10,000 people
O&M Needs - Sandia
Steve Fattor
Data delivered at the end of construction is often incomplete. Why?
FM did not tell the contractor what he wanted
Installation contractor does not understand the needs for servicing and maintaining the equipment he installed
Can take 6 months+ to manually load into CMMS
FM begins at Project Handover ?
FM want to get in early and start to Asset Tag equipment – or agree on the asset tagging and let the installing contractor do that before handover
FM know how to operate and maintain standard common equipment but need special training and lots more information on new technology
“The biggest chill that goes up my spine is when I learn that one of our buildings just won an Architectural Award or just got LEED Certification”
Steve Fattor
FM begins at Project Handover ?
Follow up study by Sandia Laboratories
Looking for O&M information to fulfill Work Orders
€3.5 per sq.m. each year (cost to Owners for 60% of work orders)
The cost of poor information
O&M Teams spend 20% of their time in Asset Information Systems
5% of company turnover saved by efficient information management
1 – 5% savings with user friendly “front end” IT systems
The cost of poor information
Information is an Asset
Asset Information has to answer many different kinds of questions
Relational DatabaseIFC File
Digital Safety File
Structured Data
Uniclass Table Structure
Linked Data – Not Duplicated
Structured & Linked Data
To pay a lot of money to have data available is of no benefit to FM unless that data is useful …..
Steve Fattor, Sandia
Data Overload
COBie(Construction Operations Building Information Exchange)
COBie is an OUTPUT and not a Tool or an App
“Subset of BS ISO 16739 IFC documented as a buildingSMART model view definition (MVD) which includes operational information” (BS 1192-4:2014)
Put simply, COBie is selected data from the wider data available in an IFC file but without the physical geometry of the model
IFC stands for Industry Foundation Classes and is an open structured data format managed by buildingSMART
COBie is designed as a “one-way street”
COBie is an exchange format
COBie
What do Owners want?
COBie System Tab
COBie Type Tab
COBie Component Tab
The colours indicate the following:
Yellow = a required fieldGreen = optional fieldOrange = reference to other or pick listPurple = external referenceGreen = if specified requiredGrey = secondary info if required
COBie is an exchange format
CMMS System
Clear Asset Naming
Revit
Revit
Employer Information Requirements
EIR – Employers Information Requirements
An EIR should define WHAT information is wanted and WHEN that information needs to be delivered
Operating and Maintenance Information and ProceduresProduct Data SheetsCommissioning ResultsAs Built DrawingsWarranties
Performance DataU ValueFire Rating
Building operator should have a representative on the BIM team
EIR – Employers Information Requirements
LOD / LOI
LOD / LOI requirements change
Use Case
ALL DOCUMENTS IN ONE PLACE
Digital Safety File
SEARCH ENGINE
Digital Safety File
Digital Safety File
FULL ASSET REGISTER / DATABASE
Digital Safety File
WARRANTIES & GUARANTIES
MAINTENANCE
Digital Safety File
LIFE CYCLE ASSET MANAGEMENT
Digital Safety File
CRM of all SUPPLIERS and
MANUFACTURERS
Digital Safety File
Space Planning
Operation and Maintenance
Save 2-3 weeks in sale process
Cost of €60,000 due to lack of documentation
Show service history Prove ownership
Ready for Sale
Life Cycle Asset Management
Analysis
Raw output
Risk based
Asset renewal
Investment
Balancing budgets
Balancing risk
Scoping projects
Making decisions
Digital Safety File
QR Codes
Can Contain “static” Information ▪ Contact information▪ Maintenance information ▪ Links to other information ▪ No need for phone / data connection
Use Examples:▪ Asset information▪ Colour of paint on wall▪ Safety instructions▪ MSDS/COSHH reference codes
DFM Live
BIM
Building Information Modelling
or
Building Information Management
UK BIM Alliance
Digital Safety File
CDE for Owners and FM Team
Finding Information
Finding information to fix the boiler
3D Viewers
Augmented Reality
UK BIM Alliance – Going Digital Report
DFM Live
DFM Live
DFM Live
Service Plan and Records
DFM Live
DFM Live
DFM Live
Bobby GallagherManaging Director - DFM Systems
What information to export from the 3D model
What export format is needed for the FM System
Asset Names verses 3D Model component names
Digital Safety File
THIS IS WHAT A BUILDING OWNER
GETS ON PROJECT CLOSE OUT WITH
COBie AS THE DELIVERABLE
Easy to Access? Easy to Search? Accurate? Up-to-date?
COBie vs Digital Safety File