National Test and Evaluation UV Conference Brief RDML Stephen S. Voetsch February 2008 UNCLASSIFIED Operational Test and Evaluation Force Operational Test and Evaluation Force

Upload: vuongkhuong

Post on 03-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

National Test and Evaluation UV Conference BriefRDML Stephen S. Voetsch

February 2008UNCLASSIFIED

Operational Test and Evaluation ForceOperational Test and Evaluation Force

Pax River

New RiverChina Lake

NorfolkQuantico

•• •

Who we are• Overview• Mission Based Test Design• Integrated Test• Open Architecture

• Unmanned Vehicles • History – Present – Future

• OPTEVFOR Role in Capabilities & Requirements

• Discussion

COMOPTEVFORCOMOPTEVFOR

2

Portfolio

3

11338%

7016%

10836%

COTF Headquarters Total: 296(Does not include approx 135 Program Funded Contractors)

* 5 Man-yearsWorkforce

*

As of 01DEC2007

Budget

$11.1M

$40.2M

FY07: $51.3M

COMMANDERRDML Voetsch

Deputy and Chief of Staff

CAPT Stahl

Executive Director Mr. Whitehead

CMC CMDCM Gray

40Undersea Warfare

60 C4I

70 SurfaceWarfare

90Special

Programs50

Air Warfare

80Expeditionary

Warfare

PolicyTraining

Joint ProgramsTechnical Support

CNA

SECDEF

DOT&EUSD (AT&L)

SECNAV

CNO OPNAV N091

COMOPTEVFOR

ASN(RD&A)

PEOsSYSCOMs

Note: Dotted line = coordination

Portfolio

4

Undersea WarfareARC-IVA Class ESM SystemMK48 ADCAPSSGN ClassVA ClassISISPhotonics Mast

Air WarfareEA-18G GrowlerFA-18 ATFLIRAESAFA-18E/F H4EAH-1W Helo Night Targeting

SystemAIM-9XImproved Extended Echo

Ranging SystemIDECMJMPSJSOW-CV-22VH-71H-1 UpgradeJSFSLAM ERJDAMUSQ-113EA-6BCVN-21JPATSAARGM

C4IERPTactical/MobileNGENMaritime Domain AwarenessSEWIPGCCS-MWideband Global SATCOMCSELJICO support SystemNet Centric Enterprise

Services

Surface WarfareAegis Ballistic Missile DefenseUSCG Multi-Mission Coastal HeloSSDSCECEvolved Sea SparrowCIWS Block 1BDDG 1000LPD-17Rolling Airframe MissileTomahawkDDG 51LCSSPY-1DT-AKELHA-6

Expeditionary WarfareJBPDSJCADJEODJSAMSRDRSSea Eagle ACTDJWARNJoint Effects Model

Program list not all inclusive

Navy Initiatives

The Navy’s Provider Enterprise (T&E Board of Directors)

T&E Cycle Time Reduction

Mission Based Test Design

Integrated Testing

5

Single Process Owner

“The need for a T&E capability that is synchronized with product procurement across the spectrum is critical to support the Navy’s future war fighting needs. As part of the enterprise integration of T&E there is a need for a single Navy T&E process owner. An additional dimension is the need for a more effective and efficient business model in the relationship between government and industry, the desire to achieve synergism, and produce a “win-win” situation for both entities.”

COMOPTEVFOR “Streamline T&E” Report to CNO July 2005

6

T&E Board of Directors

ASN(RDA)

HONORABLE Mr Thackrah (acting)

ASN(RDA)

HONORABLE Mr Thackrah (acting)

OPNAV N091DoN T&E EXEC

ONRRADM LANDAY

OPNAV N091DoN T&E EXEC

ONRRADM LANDAY

COMOPTEVFORRDML VOETSCH

COMOPTEVFORRDML VOETSCH

CHIEF OF NAVAL OPERATIONSADM ROUGHHEAD

CHIEF OF NAVAL OPERATIONSADM ROUGHHEAD

VICE CHIEF OF NAVAL OPERATIONS

ADM WALSH

VICE CHIEF OF NAVAL OPERATIONS

ADM WALSH

T&E Board of Directors

T&E Board of Directors

Co-Chair Co-Chair

PEOFORUM

PEOFORUM

RADM Landay N091 RDML Voetsch COMOPTEVFOR RADM Moffitt N43 VADM Sullivan NAVSEA VADM Venlet NAVAIRRDML Bauchmann SPAWAR Ms Margret Harrell SES FFC Program Executive Office

7

Mission Based Test DesignMission Based Test Design

Define Tasks

Establish Conditions

Determine Measures of Success

Develop Factorial Design

Create Vignettes

Develop Detailed Procedures

Identify Resources

OT Framework TEMP and TEST PLAN

UJTL, CONOPS, METL

8

Deployment

X Months

Developmental Test Cycle

Operational Test Cycle

Future T&E CyclesFuture T&E Cycles

9

Integrated TestIntegrated Test

CT

DT

OT

ITEarly

ID o

f

reso

urce

sReduced program

risk

Elimination of

redundant testing

Early OT Testers

Involvement

Sha

red

Test

R

esou

rces

MBTD Testing

(tied to NMETL)

10

Integrated Test

“Integrated testing is the collaborativeplanning and collaborative execution of test phases and events to provide data in support of independent analysis, evaluation and reporting by all stakeholders particularly the developmental (both contractor when appropriate and government) and operational test communities.”