Optimizing PLC Network Performance and Management Location / Country : Chile Product Solutions: F3426 High-powered industrial WCDMA cellular terminal deice Project Introduction  ! raditional "eld-#us net wor$s wer e% and some still ar e% isolated automation s&stems which re'uire e(tensie local monitoring and routine on-site maintenance) !o increase productiit& and reduce operating costs% man& manu*acturers and plant operators hae deplo&ed industrial +thernet to conerge remotel& isolated "eld-#us s&stems *or centrali,ed control and monitoring)Man& adanced industrial automation s&stems hae deplo&ed gatewa&s to ecientl& #ridge "eld-#us ./0 deices to +thernet #ased 1Cs% switches to connect 1Cs and CADA terminals at remote control centers% to reduce operating costs and improe production ecienc& o* e(panding) System e!uirements High per*ormance ensures high networ$ capa#ilit& eamless site-to-center communications 5 748 +thernet port *or 1C connection) "our#"ait$ Solution Deplo&ing a smart and relia#le industrial control s&stem re'uires an optimi,ed industrial networ$ design to help ensure a high-per*ormance% ecient% and 9e(i#le plat*orm *or dail& operation) Four-Faith proides a selection o* networ$ing products *or optimi,ation o* 1C networ$ per*ormance and management% including industrial +thernet 3/4 gatewa&s designed speci"call& *or +ther;et/.1% 10F.;+!% and Mod#us !C1 applications) Four-Faith s industrial +thernet routers o<er industr&-leading redundanc& => 2?s recoer& time@% *ast #ooting capa#ilit& => min start-up time@% *ull status parameters% and 9e(i#le topolog& to ensure high networ$ relia#ilit&% aaila#ilit&% managea#ilit&% and 9e(i#ilit& o* industrial control s&stems) Four- Faith s industrial +thernet gatewa&s are eas&-to-con"gure *or 'uic$ integration o* legac& "eld deices to control networ$s% and eas&-to-maintain *or rapid monitoring and trou#leshoot ing o* "eld-#us communication s)

Upload: cocofourfaith

Post on 13-Apr-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Optimizing PLC Network Performance and Management .doc

7/25/2019 Optimizing PLC Network Performance and Management .doc

http://slidepdf.com/reader/full/optimizing-plc-network-performance-and-management-doc 1/4

Optimizing PLC Network Performance and Management

Location / Country : Chile

Product Solutions:

F3426

High-powered industrial WCDMA cellular terminal deice

Project Introduction

 !raditional "eld-#us networ$s were% and some still are% isolated

automation s&stems which re'uire e(tensie local monitoring and

routine on-site maintenance) !o increase productiit& and reduce

operating costs% man& manu*acturers and plant operators hae

deplo&ed industrial +thernet to conerge remotel& isolated "eld-#us

s&stems *or centrali,ed control and monitoring)Man& adanced

industrial automation s&stems hae deplo&ed gatewa&s to ecientl&

#ridge "eld-#us ./0 deices to +thernet #ased 1Cs% switches to

connect 1Cs and CADA terminals at remote control centers% to

reduce operating costs and improe production ecienc& o*

e(panding)

System e!uirements

High per*ormance ensures high networ$ capa#ilit&

eamless site-to-center communications5

748 +thernet port *or 1C connection)

"our#"ait$ Solution

Deplo&ing a smart and relia#le industrial control s&stem re'uires an optimi,ed

industrial networ$ design to help ensure a high-per*ormance% ecient% and

9e(i#le plat*orm *or dail& operation) Four-Faith proides a selection o*

networ$ing products *or optimi,ation o* 1C networ$ per*ormance and

management% including industrial +thernet 3/4 gatewa&s designed

speci"call& *or +ther;et/.1% 10F.;+!% and Mod#us !C1 applications)

Four-Faith’s industrial +thernet routers o<er industr&-leading redundanc& =>

2?s recoer& time@% *ast #ooting capa#ilit& => min start-up time@% *ull status

parameters% and 9e(i#le topolog& to ensure high networ$ relia#ilit&%

aaila#ilit&% managea#ilit&% and 9e(i#ilit& o* industrial control s&stems) Four-

Faith’s industrial +thernet gatewa&s are eas&-to-con"gure *or 'uic$

integration o* legac& "eld deices to control networ$s% and eas&-to-maintain

*or rapid monitoring and trou#leshooting o* "eld-#us communications)

Page 2: Optimizing PLC Network Performance and Management .doc

7/25/2019 Optimizing PLC Network Performance and Management .doc

http://slidepdf.com/reader/full/optimizing-plc-network-performance-and-management-doc 2/4

 

Page 3: Optimizing PLC Network Performance and Management .doc

7/25/2019 Optimizing PLC Network Performance and Management .doc

http://slidepdf.com/reader/full/optimizing-plc-network-performance-and-management-doc 3/4

 !he topolog& is as #elow:

Page 4: Optimizing PLC Network Performance and Management .doc

7/25/2019 Optimizing PLC Network Performance and Management .doc

http://slidepdf.com/reader/full/optimizing-plc-network-performance-and-management-doc 4/4

%$y "our#"ait$

&ig$#'(aila)ility %ireless Control1roides data trans*er *unction #& pu#lic cellular networ$%

Ma(imum securit& transmission in real-time)

Monitoring and emote Access)

"our#"ait$ *ene+ts

Wide 0perating !emperature: -38B8EC% applica#le to most o* interiew

site)

ow consumption: 28B2?mAG2DC while wor$ing% B3?mAG2DC

when stand#&)

upport online trigger in a ariet& o* wa&s% including M%ring and data)

Housing: iron% proiding .13? protection).ngress protection is important *or

application enironments where contaminants and high humidit& can cause

deice mal*unction and een *ailures)

More wireless connections *or remote transmission% please isit http://en.four-