ffict{qrce Government of Tripura O/o the Principal Chief Conservatoi of Forests & HoFF, Tripura D.O. No.F. 22(2)lTerritorial/F or-2018- 1 9/P-[ V 5 V]- I 3 Dated 5April,Z02r Dear DFOs, You have been apprised vide Memorandum No.F.ll (2)/A&P/For-2021/Misc./5638 6-421 dated, 25.03.2021 about the importance of submitting replies to Parliament/Assembly Questions after due checking at various levels, most importantly atyour level. 2. For providing correct and up-to-date information, duly checked at various levels, comprehensive information can be maintained in form of a "Forest District at a Glance" and "Forest Sub-Division at a Glance". You will also recall that during the Departmental Meeting held on 17'h'18tr November, 2020, the importance of preparation oi such compilation has been adequately conveyed to you and reminded in subsequent Departmental Meetings held with you and review of your office inspection reports. 3. To facilitate a comprehensive write up, a framework for "Forest Sub-Division at a Glance" is enclosed which should be fitled up and finalised within the next meeting/review by District Forest Officers in Districts. The "Forest District at a Glance" is to abstract Sub-Oivision wise information from the Sub-Divisional write-ups. Other information of interest can be added by the DFOs also. With best wishes. Yours sincerely, Enclo: As above ( To, The District Forest Officer, North/Unakoti/Dhalai/I(howai/We st/S epahij alalGomati/S outh. Copy to:- 1. The PS to the PCCF & HoFF, Tripura, Agartala for kind information. 2. Dr. A.M.Kanfade, APCCF, cEo & pD, Tripura JICA project. 3, Shri R.K.Samal, APCCF (APR). 4. Shri P.L.Agrawal, APCCF, Director, NCE. 5. Shd V.G.Jenner, CCF, Protection. 6. Shri Shailendra Singh, CCF, p&D. 7. Shd Angshuman Dey, CCF, WP & Survey. 8. Shri C.L.Das, CCF, Vigilance &Legal. Amit Shukla Chief Conservator of Forests. Territorial [email protected] A.-*-- r^#s"HtB >-{''t tz (Amit Shukla)

Upload: others

Post on 19-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: or-2018- 1 V]- I 5April,Z02r

ffict{qrce

Government of TripuraO/o the Principal Chief Conservatoi of Forests & HoFF,

Tripura

D.O. No.F. 22(2)lTerritorial/F or-2018- 1 9/P-[ V 5 V]- I 3Dated 5April,Z02r

Dear DFOs,

You have been apprised vide Memorandum No.F.ll (2)/A&P/For-2021/Misc./5638 6-421dated, 25.03.2021 about the importance of submitting replies to Parliament/Assembly Questionsafter due checking at various levels, most importantly atyour level.

2. For providing correct and up-to-date information, duly checked at various levels,comprehensive information can be maintained in form of a "Forest District at a Glance" and"Forest Sub-Division at a Glance". You will also recall that during the Departmental Meetingheld on 17'h'18tr November, 2020, the importance of preparation oi such compilation has beenadequately conveyed to you and reminded in subsequent Departmental Meetings held with youand review of your office inspection reports.

3. To facilitate a comprehensive write up, a framework for "Forest Sub-Division at aGlance" is enclosed which should be fitled up and finalised within the next meeting/review byDistrict Forest Officers in Districts. The "Forest District at a Glance" is to abstract Sub-Oivisionwise information from the Sub-Divisional write-ups. Other information of interest can be addedby the DFOs also.

With best wishes.

Yours sincerely,

Enclo: As above

(

To,The District Forest Officer,North/Unakoti/Dhalai/I(howai/We st/S epahij alalGomati/S outh.

Copy to:-1. The PS to the PCCF & HoFF, Tripura, Agartala for kind information.2. Dr. A.M.Kanfade, APCCF, cEo & pD, Tripura JICA project.3, Shri R.K.Samal, APCCF (APR).4. Shri P.L.Agrawal, APCCF, Director, NCE.5. Shd V.G.Jenner, CCF, Protection.6. Shri Shailendra Singh, CCF, p&D.7. Shd Angshuman Dey, CCF, WP & Survey.8. Shri C.L.Das, CCF, Vigilance &Legal.

Amit ShuklaChief Conservator of [email protected]

A.-*--r^#s"HtB

>-{''t tz(Amit Shukla)

Page 2: or-2018- 1 V]- I 5April,Z02r

1

____ Forest Sub-Division

Hq at _______

24/05/2021

Page 3: or-2018- 1 V]- I 5April,Z02r

2

Index

1. General Information: ...................................................................................... 3

2. Recorded Forest Area, Forest Cover and rights under RoFR Act ..................... 4

3. Field offices & protection units ...................................................................... 6

4. Departmental infrastructure .......................................................................... 7

5. Protection (ORs, vehicle/sawmill seizure, timber, court cases, forest fire) ..... 8

6. Wildlife and Ecotourism ............................................................................... 10

7. State Plan fund receipt and utilization ......................................................... 10

8. Plantations ................................................................................................... 11

9. Nurseries & Position of Nursery stock .......................................................... 12

10. Mandays Generation ................................................................................. 13

11. Joint Forest Management (JFM) ................................................................ 13

12. Smriti Van .................................................................................................. 14

13. Revenue- Year wise position ...................................................................... 14

14. Action Plan under CAMPA, NAP, FCA ......................................................... 15

15. Other items ................................................................................................ 15

Page 4: or-2018- 1 V]- I 5April,Z02r

3

________ FOREST SUB-DIVISION

1. General Information:

a) Jurisdiction of _______ Forest Sub-Division

i. Headquarters : ___________ ii. Location : North latitudes 24º-6´-24º-28´ and

East Longitudes 91º-55´-92 º-13´ iii. Geographical Area : ________ Sq. km iv. Civil Sub Division : _____________

v. Boundary : North _________ South _________ East _________ West _________

vi. Rivers :

b) Administrative map of Forest Sub-Division

Page 5: or-2018- 1 V]- I 5April,Z02r

4

c) Major Forest Types :

i) Cachar Tropical semi evergreen forests : 1/2B/C2 ii) Moist Mixed Deciduous Forests : 1/3/3C/C3 iii) Low Alluvial Savanna Wood Land : 1/3/3C/EI/ISI iv) Moist Mixed deciduous forests dry Bamboo : 1/3C/EI/2SI v) Secondary Moist Bamboo : 1/2/2B/2BI

d) Prominent High points in the Sub-Division

Name of peak/ high point

Elevation (in metres)

Location

e) Economic infrastructure

i) Railway: Approx ___ Km length (Stations at ____________) ii) Length of NH: ______ ; Length of District Roads:______; Length of Rural Roads:__________ iii) Market:Main market: _______________________

Other Market: _____________________

2. Recorded Forest Area, Forest Cover and rights under RoFR Act

a) Recorded Forest Area

Sub- Division Geographical area

Forest Area

RF PRF UGF Total

b) Names and areas of Reserve Forests/ Proposed Reserve Forests:

SN. Name of Reserve Forests (RF)

Area (Sq. km)

Date & No. of notification Covering the following Range

1.

2.

3.

4.

Total

RF

55%

PRF

45% RF

PRF

Page 6: or-2018- 1 V]- I 5April,Z02r

5

c) Range and Beat wise forest area and RoFR rights

Sl. No.

Name of Range

Name Of Beat

RF PRF UGF Total recorded area

No. of individual Forest Rights given

Area of individual Forest Rights

No. of Community Forest Rights

Area of Community Forest Rights given

Remarks

d) Forest cover map

Page 7: or-2018- 1 V]- I 5April,Z02r

6

3. Field offices & protection units

Sub- Division

Ranges Beat/ SF Centre/ WBIE Protection Grand total of offices

Territorial (Non-ADC)

ADC

SF Territorial (Non-ADC)

ADC SFC WBIE Total SFPU Ch. Post

Total

a) Range & Beat Offices/field offices along with staff strength

SN Name of Range

SFPU Name of the Beat/ SF Centre/ Drop Gate / WBIE

Status of land on which HQ is existing

Date of last inspection

Staff strength Remarks regarding requirement / surplus deployment of staff

FR Fr HFG FG MCW FFW PL

Total

b) Position of Ministerial staff

SN. Category of staff No. of staff Sections assigned Remarks regarding requirement / surplus deployment of staff

1 OS

2 Head Clerk

3 Accountant

4 PA

5 UDC

6 LDC

Total

c) Support staff

SN. Category of staff No. of staff Remarks regarding requirement / surplus deployment of staff

1 Driver

2 Dakwala / Peon

3 G.O.

4 NG

5 CCACC

Total

Page 8: or-2018- 1 V]- I 5April,Z02r

7

d) Stationing of protection units

SN. Name of Protection Units with Headquarters

Remarks

1. 1 RO, 33 FGs For mobility- 2commander Jeeps fitted with wireless, Arms- 34 nos. SLR (Cover entire Sub-Division and supplement efforts in ____________ Division also)

2

4. Departmental infrastructure a) Existing constructions

Indicate type of Construction (SDFO/RO/BO/BO cum Qtr/FG twin Qtr/FG Barrack /Other)

Whether Pucca or half wall

Year of construction

Scheme Occupied by Remarks regarding construction

b) Fencing/Boundary

Location Type (Brick wall, Chain link, barbed wire, etc

Year of installation Remarks

c) e-Infrastructure

Sl No

Description Functional numbers

Non-Functional numbers

Total Remarks

1 Desktop Computers

2 Laptops

3 GIS Workstations

4 High end GIS PDAs with touch screen

5 Handheld GPS data collectors( Garmin etc)

6 Tribhuvan GPS Devices

7 Flatbed Scanners

8 Automatic data feed scanners

9 Printer

10 3-in-1 Print Scan Copy machines

11 Wireless sets

12 Offices including SDFO/WLW/ Range/Beat with SWAN internet connection

13 Offices having Wi-Fi connection including SDFO/WLW/ Range/Beat

Page 9: or-2018- 1 V]- I 5April,Z02r

8

Sl No

Description Functional numbers

Non-Functional numbers

Total Remarks

14 CCTV systems in offices including SDFO/WLW/ Range/Beat

5. Protection (ORs, vehicle/sawmill seizure, timber, court cases, forest

fire) a) Offence reports drawn (year wise)

Year Offence reports drawn on Cases compounded departmentally

No. of court cases Illegal

felling Encroachment Others Total

2018-19

2019-20

2020-21

2021-22

b) Seizure of vehicles and illegal sawmills

Year Seizure of illegal sawmills Seizure of vehicles

No of illegal sawmill seized

No of cases against illegal sawmill

Status of cases

No of Vehicles seized

No of cases against vehicle seizure

Status of cases

2018-19

2019-20

2020-21

2021-22

c) Information on Forest Fire incidents

Year No. of forest Fires reported

Area affected (in ha.)

Cause of forest fire

Estimated financial loss (in lakhs)

Death of Human & Wildlife due to forest fire, if any

2018-19

2019-20

2020-21

2021-22

d) Departmentally Operated Timber- receipt and disposal

Year Quantity of Dep’t. Operated timber in stock during the year (cum)

Quantity of Dep’t. Operated timber disposed during the year (cum)

Round Firewood Round Firewood

2018-19

2019-20

2020-21

2021-22

Page 10: or-2018- 1 V]- I 5April,Z02r

9

e) Seized Timber- receipt and disposal

Year Quantity of seized timber in stock during the year (cum)

Total seized timber disposed during the year (cum)

Round Sawn Round Sawn

2018-19

2019-20

2020-21

2021-22

f) Timber availability/demand/balance during the previous qtr for the purpose of

export

Timber availability (Cum)

Timber demand (Cum) Total Qty. of timber

Dept. operated

Seized Jote land

Total Govt. Dept.

Timber trader/ Furniture /cabinet shops

Personal Use (up to 2 cum)

Disposed through Tender/ auction

Total Deficit (in cum)

Surplus (in cum)

g) Removal of forest produce other than wood

Year Bamboo Sand Stone Thatch Gandhuki Cane Others (with details)

Qty. (Nos.)

Value (in lakhs)

Qty. (cum)

Value (in lakhs)

Qty. (Per Vehicle)

Value (in lakhs)

Qty. (Bundle)

Value (in lakhs)

Qty. (Kg.)

Value (in lakhs)

Qty. (Nos.)

Value (in lakhs)

Qty. Value (in lakhs)

2018-19

2019-20

2020-21

2021-22

h) Status of pending court cases in Forest Department under the District: -

Sl. No.

District Sub-Division

Case No & Year

Name of the Court/ Tribunal

Name of Parties

Stage of Cases

Result Remarks Next date of Hearing

i) List of Cases where Judgment and decrees has been passed under the District: -

Sl.

No

District Sub

Division

Case No Petitioner Respondent Judgment/Or

der with date

Decrees

passed if

any

Whether

complied or

not

Remarks

Page 11: or-2018- 1 V]- I 5April,Z02r

10

j) List of Cases related to WLW, Establishment Section, Timber Section, P&D &

Vigilance Section of FHQ: -

Sl. No.

District Sub-Division

Case No

Case Summary

Court Name

Petitioner Respondent Status of Case

At which Stage

Action taken

Remarks

6. Wildlife and Ecotourism

a) Protected area: Management and status

Wildlife Sanctuary /National

Park

Area (Km²)

Status of final

notification

Status of eco-

sensitive zone

Status of Management

Plan

Status of notification of Critical Wildlife Habitat

Number of

visitors

eco-tourism facility,

EDC involvement

Any other

remarks

b) Nature Trail

Range Beat Location Length (Kms)

Existing/ Proposed?

Existing features

Persons/ students visited

Action Plan for improvement of Nature Trail

Remarks

c) Eco Parks

Name of Eco Park

Major Attractions

Revenue (in Rs lakhs) No. of visitors Action Plan for current year

Remarks

2018-19

2019-20

2020-21

2021-22

2018-19

2019-20

2020-21

2021-22

7. State Plan fund receipt and utilization Year Head of

Account Amount allocated (in Rs. Lakhs)

Amount utilized (in Rs. Lakhs)

Physical progress (in brief)

Remarks

2018-19

2019-20

2020-21

2021-22

Page 12: or-2018- 1 V]- I 5April,Z02r

11

8. Plantations

a) Block plantations (Target and achievements)

( Area in ha)

Name of Range, Year and Scheme

ANR AR Mixed plt. MFP & med

value

Herbs & shrubs

Silvipasture Total

Bamboo Misc Bamboo Misc (with species

name)

_ Range

2018-19 (scheme 1)

(scheme 2)

2019-20

2020-21

2021-22

Range sub-total

Sub-Division total

b) Non- RBPT Roadside plantations ( Target and achievements)

Year Range Beat Scheme Length of plantation (Km)

Location

2018-19

2019-20

2020-21

2021-22

Range sub-total

Sub-Division total

c) RBPT plantations

Year Range Beat Stretch (Name of road & land marks/km of NH)

Plantation length

No of Blocks

No of beneficiaries

Remarks

d) Riverside plantations (Target and achievements)

Year Range Beat Scheme Length of plantation (Km)

Location

2018-19

2019-20

2020-21

Target for 2021-22

Range sub-total

Sub-Division total

Page 13: or-2018- 1 V]- I 5April,Z02r

12

e) Railside plantations (Target and achievements)

Year Range Beat Scheme Length of plantation (Km)

Location

2018-19

2019-20

2020-21

Target for 2021-22

Sub-total for Range

Total for Sub-Division

9. Nurseries & Position of Nursery stock a) Nurseries

Range Beat Location Name of I/C Approx area (Ha)

No of Bamboo seedlings

No of Misc seedlings

Remarks

b) Polybag nursery for misc species

District Sub-Division/WLS

Scheme Target Achievement Stock of previous year

Total stock

Plantable stock available for this year

Stock utilization (out of col. 8) Plantable stock for next year

Remarks

Stock used during this year

Surplus stock disbursed free for plantation on Govt. land

Surplus stock sold Rs. 1/- to individual land owners

1 2 3 4 5 6 7 8 9 10 11 12 13

c) Polybag nursery for bamboo species (status as on date)

District Sub-Division/WLS

Scheme Target Achievement

Stock of previous year

Total stock

Plantable stock available for this year

Stock utilization (out of col. 8) Plantable stock for next year plantation

Remarks

Stock used during this year

Surplus stock disbursed free for plantation on Govt. land

Surplus stock sold Rs. 1/- to individual land owners

1 2 3 4 5 6 7 8 9 10 11 12 13

d) DCPN nursery

Year

Scheme Target Achievement No of families involved

Economic benefits Utilization of raised seedlings

Remarks

2018-19

2019-20

2020-21

2021-22

Page 14: or-2018- 1 V]- I 5April,Z02r

13

10. Mandays Generation Year Mandays generated

2018-19

2019-20

2020-21

2021-22

11. Joint Forest Management (JFM)

a) JFM Committees constituted till date, area and beneficiaries (area in ha)

Range Beat Name of JFMC

Year of formation

No of families Project area (Ha)

Name of President

Name of Member Secretary

Date of GBM

Date of EBM

Scheme (JICA-I/ FDA/ SCATFoRM/ IGDC) (If multiple then mention year of coverage also)

Remarks

SC ST Gen OBC

b) Grams/ ADC villages and coverage under Forestry activity/ JFMC

SN

Range Beat Name of Gram/ ADC Village

Approximate Forest Area (Ha)

Name of JFMC / EDC constituted

Activities during current FY (2021-22)-(eg. Name of Vanmitra, installation of signboard regarding ownership of forests, Pltn, nursery, pisciculture activities, etc.)

1

2

.....

Total over Beat

Total over Range

c) Forest Development Agency – Fund receipt and utilization

(all amounts in Rs. Lakhs)

Year Scheme Opening Balance

Fund received

Interest accrued

Total available for the year

Utilization Physical progress in brief

Amount for which UC submitted

Balance lying with JFMCs

2018-19

2019-20

2020-21

2021-22

Page 15: or-2018- 1 V]- I 5April,Z02r

14

d) Pisciculture for livelihood

Block Input Output Details of tech technical persons of Fishery Department with mobile no

ID of water body

Area (Ha)

Name of SHG managing the water body

Fingerlings released

Const. Cost (in Rs)

Maint. Cost (in Rs.)

Liming kg/cost

Feed kg/cost

Own Consum- ption (kg)

Sale of Fish (kg)

Selling rate (in Rs.)

Total earning (in Rs.) No Cost Kg. Cost Kg. Cost

e) Other livelihood generation activities for JFMCs

Activity Fund utilized from Revolving fund

No. of Business Plans

No. of SHG/ individual involved in the activity

Remarks

f) Status of ABS fund

Year

ABS fund collected (Rs.) Amount transferred

(in Rs.)

Remarks 2% for BMCs 1% for TBB

BMC TBB Name of Bio resource (Not a normally traded

commodity)

Name of BMC

Amount Amount

2018-19

2019-20

2020-21

2021-22

12. Smriti Van Range Beat Location Existing/

Proposed? Action Plan for improvement of Smriti Van

Planting done through e-Smriti Van

Amount collected against e-Smriti Van

Planting done free of cost

Remarks

13. Revenue- Year wise position Rs. in lakhs

SN Head of account 2018-19 2019-20 2020-21 2021-22

1 101-Sale of Timber from govt. land

2 102-Social & Farm Forestry

3 103-Environmental Forestry

4 104- sale of saplings

5 111-Zoological Park

6 112-Public Garden

7 800-Other Miscellaneous Receipts (Fees/Fines/ etc.)

8 118- Receipt from RTI Act

Total:-

Page 16: or-2018- 1 V]- I 5April,Z02r

15

14. Action Plan under CAMPA, NAP, FCA Activity CAMPA SCATFORM/

IGDC NAP MGNREGA CSS Others

Target Outlay in Rs. lakhs

Target Outlay in Rs. lakhs

Target Outlay in Rs. lakhs

Target Outlay in Rs. lakhs

Target Outlay in Rs. lakhs

Target Outlay in Rs. lakhs

Block Plantation (Ha)

Linear Plantation (Km)

Nursery (no. of seedlings)

Number of checkdams

Barbed wire fencing (Km)

Chain link fencing (Km)

Constructions of Qtr/offices (No.)

Awareness Workshops (No.)

Vanmitra (No.)

Fire watchers (No.)

Vehicle procurement (No.)

Others

Total

15. Other items

*************