oracle construction and engineering gbu - · pdf filein scheduling now available on the oracle...

32

Upload: trinhnhi

Post on 10-Mar-2018

223 views

Category:

Documents


4 download

TRANSCRIPT

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Safe Harbor Statement

The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.

Oracle Confidential –

Restricted for OPN Partner Education Use Only 2

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

CPM Conference 2017

Scheduling is BACK baby Oracle Construction and Engineering GBU

Garrett E. HarleyDirector, E&C Strategy

Oracle Confidential –

Restricted for OPN Partner Education Use Only 3

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Agenda

• Market Update

• Building Industry Solutions• Innovation – What’s NEW

• Value & Benefits

Oracle Confidential –

Restricted for OPN Partner Education Use Only 4Copyright © 2016,

Oracle and/or its affiliates. All rights reserved.  |

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Market Update

Oracle Confidential –

Restricted for OPN Partner Education Use Only 5

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Spending up $212 Trillion on E&C by 2030

Source: Oxford Economics Global  Construction 2030

6

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Supporting ALL E&C Use Cases

Oracle Confidential –

Restricted for OPN Partner Education Use Only

Commercial Building TypesHealthcareEducationOffice BuildingsGovt. BuildingsHigh Tech RetailHospitalitySports & EntertainmentMulti‐Unit Residential

Infrastructure Building TypesAirportsRoad & BridgeTelecomWater & Waste WaterUtilities 

OwnersGeneral Contractors

SubcontractorsSuppliers

212 Trillion

expected growth by 2030

Industrial Building TypesOil & GasIndustrial Mfg ETOAerospace & Defense

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Building Industry Solutions

Oracle Confidential –

Restricted for OPN Partner Education Use Only 8

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Engineering & ConstructionPlan, Build & Operate the World’s Infrastructure

Engineering & ConstructionPlan, Build & Operate the World’s Infrastructure

E&C Purpose Built Solutions

Lead to Contract 

Win the right work with 

the right customers at 

the right margin

Lead to Contract 

Win the right work with 

the right customers at 

the right margin

Project & ConstructionExecution Cloud

Increase delivery effectiveness & project 

outcomes 

Project & ConstructionExecution Cloud

Increase delivery effectiveness & project 

outcomes 

Lean 

Construction  

Cloud

Tightly 

coupled lean 

delivery. 

Predictability 

of workflow 

& team 

commitment

s

Lean 

Construction  

Cloud

Tightly 

coupled lean 

delivery. 

Predictability 

of workflow 

& team 

commitment

s

BIM 

Enabled 

Estimation 

Visualization 

& quantity 

take off. 

Parametric 

intelligence 

& smart 

assembly

BIM 

Enabled 

Estimation 

Visualization 

& quantity 

take off. 

Parametric 

intelligence 

& smart 

assembly

NEC3 

Contract 

Management 

Cloud

•International 

contract 

standards & 

pre‐

configured 

support

NEC3 

Contract 

Management 

Cloud

•International 

contract 

standards & 

pre‐

configured 

support

Contract 

Management 

Cloud 

Pre‐

configured 

Contract 

Management 

solution

Contract 

Management 

Cloud 

Pre‐

configured 

Contract 

Management 

solution

Digital Handover

Rich Client Experience andprovide living  handover document 

for a project soft landing

Digital Handover

Rich Client Experience andprovide living  handover document 

for a project soft landing

Planning & Scheduling

Cloud

•The most trusted name in scheduling now available on the Oracle Cloud

Planning & Scheduling

Cloud

•The most trusted name in scheduling now available on the Oracle Cloud

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Innovation – What’s NEW

Oracle Confidential –

Restricted for OPN Partner Education Use Only 10

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Scheduling has evolved over time…

Oracle Confidential –

Restricted for OPN Partner Education Use Only

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

The History of Critical Path Method (CPM) Scheduling

The critical path method (CPM) is a project modeling technique developed in the late 

1950s by Morgan R. Walker of DuPont

and James E. Kelley Jr. of Remington Rand.[2]

Kelley 

and Walker related their memories of the development of CPM in 1989.[3]

Kelley 

attributed the term "critical path" to the developers of the Program Evaluation and 

Review Technique

which was developed at about the same time by Booz Allen Hamilton

and the U.S. Navy.[4]

The precursors of what came to be known as Critical Path were 

developed and put into practice by DuPont between 1940 and 1943 and contributed to 

the success of the Manhattan Project.[5]

CPM is commonly used with all forms of projects, including construction, aerospace and 

defense, software development, research projects, product development, engineering, 

and plant maintenance, among others. Any project with interdependent activities can 

apply this method of mathematical analysis. The term is generally applied to any approach 

used to analyze a project network logic diagram.

Oracle Confidential –

Restricted for OPN Partner Education Use Only

Source: https://en.wikipedia.org/wiki/Critical_path_method

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

CPM’s evolution

into the modern age of computing

Oracle Confidential –

Restricted for OPN Partner Education Use Only

Roots of CPM: DuPont 

in the early the 1940’s 

leverages methods to 

aid in delivery of the 

Manhattan Project 

In the 1950’s, Morgan 

Walker & James Kelly 

Jr. formalize CPM 

method  

Through the early 

1980’s, creating 

schedules required a 

mini or mainframe 

computer or you drew 

out the network by 

hand  

Primavera releases its 

first versions of CPM 

tools for Windows in 

the mid 1990’s and 

secures a dominant 

position in the 

computing age  

Back to the Future: 

The 21st

Century 

enters the 

“Enterprise”

era, 

Cloud computing, Big 

Data & Business 

AnalyticsSource: http://www.mosaicprojects.com.au/PDF_Papers/P042_History%20of%20Scheduing.pdf

May 1983 Joel 

Koppelman, Dick Faris 

& Les Seskin, found 

Primavera, based on 

the “mainstream”

DOS 

Operating System 

Today’s typical 

CPM Schedule is 

25X larger than it 

was in 1985

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

The dawn of Lean

Oracle Confidential –

Restricted for OPN Partner Education Use Only

Roots of CPM: DuPont 

in the early the 1940’s 

leverages methods to 

aid in delivery of the 

Manhattan Project 

In the 1950’s, Morgan 

Walker & James Kelly 

Jr. formalize CPM 

method  

Through the early 

1980’s, creating 

schedules required a 

mini or mainframe 

computer or you drew 

out the network by 

hand  

May 1983 Joel 

Koppelman, Dick Faris 

& Les Seskin, found 

Primavera, based on 

the “mainstream”

DOS 

Operating System 

Primavera releases its 

first versions of CPM 

tools for Windows in 

the mid 1990’s and 

secures a dominant 

position in the 

computing age  

Back to the Future: 

The 21st

Century 

enters the 

“Enterprise”

era, 

Cloud computing, Big 

Data & Business 

AnalyticsSource: Director Industry Strategy for E&C, Garrett E. Harley

Lean Construction 

Roots take hold

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

The History of Lean Construction

Confidential – Oracle Internal/Restricted/Highly Restricted 15

Lean construction

is a combination of operational research and 

practical development in design and construction with an adaption of 

lean manufacturing

principles and practices to the end‐to‐end design 

and construction process. Unlike manufacturing, construction is a 

project‐based production process. Lean construction is concerned with 

the alignment and holistic pursuit of concurrent and continuous 

improvements in all dimensions of the built and natural environment: 

design, construction, activation, maintenance, salvaging, and recycling 

(Abdelhamid 2007, Abdelhamid et al. 2008). This approach tries to 

manage and improve construction processes with minimum cost and 

maximum value by considering customer needs (Koskela et al. 2002[1]).The term lean construction

was coined by the International Group for 

Lean Construction

in its first meeting in 1993 (Gleeson et al. 2007). 

Construction

in Lean Construction

refers to the entire industry and not 

the phase during which construction takes place. Thus, Lean 

Construction is for owners, architects, designers, engineering, 

constructors, suppliers & end users.

Source: https://en.wikipedia.org/wiki/Lean_construction

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Lean’s evolution

into the modern age of computingLauri Koskela 

challenges 

Construction 

Management 

community about 

time‐cost‐quality 

trade‐off model in 

1992 

International Group 

for Lean Construction 

formed in 1993

Ballard & Howell 

analysis of project 

plan failures uncovers 

that only 50% of 

weekly work plan 

tasks are completed 

by the end of the 

planning week, 1994  

Koskela argues 

mismatch between 

conceptual and 

observable production 

models. Develops new 

production paradigm 

based on Toyota 

Production System, 

2000

Koskela & Howell 

present new 

production 

management theory 

around planning, 

execution & control 

paradigm, 2002  

Forward thinking E&C 

companies begin to 

leverage computer 

aided Lean tools, Mid 

2000’s

Source: https://en.wikipedia.org/wiki/Lean_construction

Mark Jenkins, Director Product Strategy 

blends Lean with CPM at DPR Construction

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  | Confidential – Oracle Internal/Restricted/Highly Restricted 17

• For years this image well described the 

reality between “scheduling camps”

as 

traditional CPM advocates held firmly to 

the opinion that its means and methods 

were the “right way”

to build and 

maintain a proper schedule. While Lean 

advocates planted just as firmly their 

position that CPM networks were never 

intended to manage the level of detail 

that a Lean schedule targeted to properly 

execute the fields production work. 

Blending

CPM & Lean Methods

Our view on the matter: Why not BOTH!!!

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  | Oracle Confidential – Highly Restricted 18

CPM Scheduler

Subcontractor Foreman(LastPlanner®)

Subcontractor Foreman(LastPlanner®)

Project Executive Owner

Subcontractor Foreman(LastPlanner®)

Extending Value

GC Foreman(LastPlanner®)

Superintendent

Copyright © 2014 Oracle and/or its affiliates. All rights reserved.  |

Oracle Prime 

19

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Integrated CPM

& Lean

Scheduling Processes

Orac

le 20

DefinePhaseswithWBS

Monitor 

PerformanceLastPlanners®

breakdown 

Activitiesinto smaller

Tasks

Define 

Activities, 

Durations, 

Relationships

LastPlanners 

Commit toDue Dates, 

Complete 

Tasks

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Work Breakdown Structure

Confidential – Oracle Internal

Create the “Big Picture”

schedule by organizing project into manageable 

phases using the WBS (Work Breakdown Structure)

Easily model the project schedule. The WBS defines project phases and creates a framework that effectively represents the overall plan.

Simple to Create

Leverage Templates

Indent/Outdent

Cut/Copy/Paste

Grid or Gantt

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Activities, Durations, Relationships

Confidential – Oracle Internal

Create logical relationships between Activities in the CPM network

Traditional CPM scheduling defines activities, durations and relationships. This determines the critical path, project duration, and project completion date.

Add Activities Define Durations

Sequence Activities using

Relationships

Connect Activities between

WBS elements to reflect

transitions between phases Calculate the schedule

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

LastPlanners®

Breakdown Activities

Confidential – Oracle Internal

LastPlanners®

breakdown Activities, identify Tasks durations, sequences & 

due dates in facilitated production meetings

LastPlanners® breakdown Activities into smaller Tasks, collaboratively plan their due dates, and commit to complete them as planned.

The Hopper‐

Unplanned Tasks‐

Activity Optional‐

Collapse/Expand

Tasks get durations, 

sequences, and due dates

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

LastPlanners®

Commit & Complete

Confidential – Oracle Internal

The LastPlanners®

commit to Due Dates on the Planning Board, complete 

when done, and re‐commit if not completed

The planning board is where field disciplines commit to Task due dates. Each field discipline has a different Task color assignment on the Planning Board.

Digital Planning Board vs.

Trailer Wall Planned Tasks Committed Tasks  Completed Tasks Overdue Tasks Reference Activities Collapse/Expand

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Monitor Performance

Confidential – Oracle Internal

Monitor Planned Percent Complete (PPC) & Reasons for missed 

commitments per Lean Construction Institute’s best practices (17.2)

With the field executing, it’s now about capturing completions. If commitments are missed, reason codes are assigned, and new commitments are made. Tasks alert the CPM network for incompatible dates or status.

Project PPC

Company PPC

(Inherited Colors)

Reasons for Missed

Commitments One Time Frame, All Charts

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Value & Benefits

Oracle Confidential –

Restricted for OPN Partner Education Use Only 26

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Coordination

Reduce the need for larger, 

complex master 

schedules which were 

never intended to micro‐

manage the level of detail 

required for field 

execution teams. Placing 

the right coordination 

tool in the hands of the 

right stakeholder 

eliminates costly re‐work, 

drives accountability and 

reduces risk.  

Commitment Community

The benefits of our solution

Oracle Confidential –

Restricted for OPN Partner Education Use Only 27

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Coordination

Reduce the need for larger, 

complex master 

schedules which were 

never intended to micro‐

manage the level of detail 

required for field 

execution teams. Placing 

the right coordination 

tool in the hands of the 

right stakeholder 

eliminates costly re‐work, 

drives accountability and 

reduces risk.  

Commitment

Blending CPM and Lean 

methods drives 

performance right down 

to the workface based on 

commitments of field 

disciplines. Flexible Task 

sequences focus on short 

interval timelines that 

inform the master 

schedule activity network, 

giving a comprehensive 

view of overall 

performance. 

Community

The benefits of our solution

Oracle Confidential –

Restricted for OPN Partner Education Use Only 28

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  |

Coordination

Reduce the need for larger, 

complex master 

schedules which were 

never intended to micro‐

manage the level of detail 

required for field 

execution teams. Placing 

the right coordination 

tool in the hands of the 

right stakeholder 

eliminates costly re‐work, 

drives accountability and 

reduces risk.  

Commitment

Blending CPM and Lean 

methods drives 

performance right down 

to the workface based on 

commitments of field 

disciplines. Flexible Task 

sequences focus on short 

interval timelines that 

inform the master 

schedule activity network, 

giving a comprehensive 

view of overall 

performance.

Community

Aligning stakeholder 

incentives with shared 

knowledge and common 

goals creates a unique 

and differentiated 

offering in the market 

where the best of CPM 

and Lean means and 

methods are truly 

blended to drive 

community engagement 

and successful business 

outcomes. 

The benefits of our solution

Oracle Confidential –

Restricted for OPN Partner Education Use Only 29

Copyright © 2016 Oracle and/or its affiliates. All rights reserved.  | Oracle Confidential – Highly Restricted 30

We blend the proven methods of CPM

and 

Lean

into a single solution for engineering and 

construction projects, programs and 

enterprises.

Scheduling is BACK…

Copyright © 2016, Oracle and/or its affiliates. All rights reserved.  | Oracle Confidential –

Restricted for OPN Partner Education Use Only 31