Presentation Outline
Program Overview
Coordination
Capital Planning
Codes
Implementation
Program Overview
Metro Orlando tops the list of most dangerous areas to walk in 2014.
Program Overview
Orange County Pedestrian/Bicycle Crashes
Jan. 1, 2006-Feb. 1, 2015
4,968 total crashes
4,083 injuries (82%)
256 fatalities (5%)
Source: Signal Four Analytics Crash Database, Accessed February 2, 2015.
1,574 crashes in the dark (32%)
750 crashes from
aggressive/distracted driving (15%)
348 crashes from drugs/alcohol (7%)
Program Overview
Coordinate Existing County Activities
Public Works ADA Compliance Initiative/Transition Plan
Road Safety Audits/Safety Studies
Roadway Lighting Program
School/Pedestrian Safety Projects
Community Traffic Safety Team
Best Foot Forward and MetroPlan Orlando
funding and coordination
Coordination
Existing Programs/Agencies
Safety Studies done by Orange County Public Schools (OCPS)
Public Outreach done by Best Foot Forward
Crosswalk enforcement and education in schools handled by Best Foot Forward, OC Sheriff’s Office, OCPS
Program Overview
Coordination
Codes Capital
Planning
New Program Activities
Coordination
New Program Activities
Expand current efforts with new County planning and engineering activities
Jointly pursue training and grant opportunities
Work with Best Foot Forward, Orange County Public Schools, MetroPlan Orlando, FDOT, cities
Coordination
New Program Activities
Logo and outreach materials
(English, Spanish, Haitian Creole)
Media outreach/Orange TV
Website/Mobile application
Outreach at County community
meetings/events
Coordination
Mayor Jacobs’ Initiatives
Sustainability Plan focus on pedestrian safety and livability
Mayors’ Challenge focus on safety, biking /walking data collection, and education
Coordination
Mayor Jacobs’ Initiatives
INVEST in Our Home for Life commitment to pedestrian safety projects
Funding for crossings, intersections, other needs
Walk Ride Thrive! Program helps identify needs
Capital Planning
Collect Data
Evaluate
Data
Select
Corridors Select Counter-
measures Implement
Monitor Effectiveness
and
Benefit-Cost
Ratio
Capital Planning
Road Safety Audits (RSAs) and Studies
Detailed area/corridor studies
Identify safety improvements with community input
County RSA completed: Northwest, Bithlo/Christmas, Waterford Lakes, Texas-Americana
Capital Planning
Safety Project Highlights
UCF Area, Pine Hills, and Oak Ridge Preliminary
Engineering projects underway or planned
Rectangular Rapid Flashing Beacon
(RRFB) installations
International Drive Walkability Analysis
Capital Planning
New Program Activities
“Safety CIP” to fund identified safety projects
– Add safety enhancements to standard engineering plans
– New safety features for new/widened roadways
Biking/walking data collection
Budget
FY 2015—2016
• Pedestrian/Bicycle Safety Action Plan $25,000
• Pedestrian/Bicycle Data Collection $15,000
• Pine Hills Road Preliminary Engineering $300,000
• UCF Area Preliminary Engineering $357,000
• Oak Ridge Road Preliminary Engineering $300,000
Budget
FY 2016—2017
• Pine Hills Road Final Engineering $500,000
• Oak Ridge Road Final Engineering $500,000
• UCF Area Final Engineering $500,000
FY 2017—2018
• Pine Hills Road Construction $1,200,000
• Oak Ridge Road Construction $1,200,000
FY 2018—2019
• UCF Area Construction $3,500,000 Note: Preliminary estimates
Codes
Ch. 38 (Zoning Code) pedestrian/bicycle site development standards updated in 2013
Comprehensive Plan policies
ADA Compliance Initiative code updates
Forthcoming Sustainable Land Development Code project
Existing County Activities
Codes
Pedestrian and Bicycle Safety Action Plan
Complete Streets Policy and Manual coordinated with FDOT/MetroPlan Orlando
Pedestrian related code changes
– Site development standards (ex. driveway markings)
– Student housing/pedestrian-oriented land uses
– ADA and access management
Add New Program Activities
Implementation
Implementation
RSA, planning, and coordination already underway
Outreach materials/multimedia in development now
Communications Plan in place with Communications Division
BCC work session in August
Program Summary
Implementation
“Safety CIP” and new Safety coordinator in FY 15-16
Pedestrian/Bicycle Safety Action Plan in FY 15-16
Coordination with US DOT Mayor’s Challenge through March 2016