Page 1: OSHA demolition

OCCUPATIONAL SAFETYAND

HEALTH

LECTURER NORNAWAR LAILI BT NORDIN

HANI AMIERA ABD HALIM 06DSB11F2044SITI AMIRAH BT ABDUL RAZAK 06DSB11F2036

NURUL AIN BINTI ABDUL RAHIM 06DSB11F2047

Page 2: OSHA demolition

OBJECTIVE

To explain about the list of utilities on worksite and safety procedures during disconnecting utilities.

Explaining the safety measures during preparatory work and locate catch platform.

To explain safe method of disposing debris and safety measures taken during site clearing.

Page 3: OSHA demolition

UTILITIES ON WORKSITE

• Electric

• Gas

• Water

• Steam

• Sewer

Page 4: OSHA demolition

LOCKOUT / TAGOUT

Notify all affected employees that a lockout or tagout system is going to be utilized and the Reason.

If the machine or equipment is operating, shut it down by the normal stopping procedure.

Operate the switch, valve, or other energy isolating device(s) so that the equipment is isolated from its energy source(s).

Lockout/tagout device application.

1

2

3

4

Page 5: OSHA demolition

SAFETY PROCEDURES DURING DISCONNECTING UTILITIES

LOCKOUT / TAGOUT

Locks shall be affixed in a manner that will hold the energy isolating devices in a safe or off position.

All potentially hazardous stored or residual energy shall be relieved, disconnected, restrained or otherwise rendered safe.

5

6

Page 6: OSHA demolition

What is demolition works?

• ‘Demolition work’ means to demolish or dismantle a structure or part of a structure that is load-bearing or otherwise related to the physical integrity of the structure

Page 7: OSHA demolition

Before the demolition operations begin:• Adequate inspection should be made by designated person.

• If necessary to prevent danger, unstable parts of structure should be made secure

• All utilities should be effectively disconnected or shut off at or outside the property line.

Page 8: OSHA demolition

• The danger zone around of the structure should be adequately fenced off or warning sign posted.

• Before the demolition work, the structure should be free from any toxic or hazardous substances.

Page 9: OSHA demolition

• Where applicable metal scaffold enclosed with peripheral nettings should be erected around the building or structure to be demolished.

Page 10: OSHA demolition

Before demolition work is carried out, ensure that these materials are removed:

• Glass in doors, windows, etc.

• Loose objects

• Projecting parts

• Explosive inflammable, toxic and harmful substances.

Page 11: OSHA demolition

The American National Standards Institute (ANSI) in its ANSI A10.6-1983– states:

"No employee shall be permitted in any area that can be adversely affected

when demolition operations are being performed. Only those employees

necessary for the performance of the operations shall be permitted in

these areas."

Page 12: OSHA demolition

CATCH PLATFORM FOR DEMOLITION OPERATIONS

Page 13: OSHA demolition

• Such catch platform shall be maintained not more than 6 metres below from which the exterior walls are being removed.

• Catch platform shall not be used for storage

of materials or be used as working

platforms or walkways.

Page 14: OSHA demolition

• During the demolition of the exterior walls of a structure originally more than 12.2 metres high, catch platforms shall be provided along the exterior, faces of such wall, where necessary, to prevent injury to the public.

• Such platform shall be designed by a Professional Engineer and certified for safety prior to erection and use.

Page 15: OSHA demolition

Use of explosives

Page 16: OSHA demolition

Use of explosives

• In the controlled demolition industry, building implosion is the

strategic placing of explosive material and timing of its

detonation so that a structure collapses on itself in a matter of

seconds, minimizing the physical damage to its immediate

surroundings.

• Building implosion (which reduces to seconds a process which

could take months or years to achieve by other methods)

typically occurs in urban areas and often involves large landmark

structures.

Page 17: OSHA demolition
Page 18: OSHA demolition

DEMOLITION OF GLENCAIRN TOWER

Page 19: OSHA demolition
Page 20: OSHA demolition
Page 21: OSHA demolition
Page 23: OSHA demolition

SAFE METHOD OF DISPOSING DEBRIBS

Debris shall be handled and disposed off by amethod, which will not endanger workers and publicsafety and health. (Reg. 22(1), Building OperationsAnd Works Of Engineering Construction (Safety)Regulations, 1986)

Page 24: OSHA demolition

Debris shall not be allowed to accumulate so as to constitute a hazard. (Reg. 22(2), Building Operations And Works Of Engineering Construction (Safety) Regulations, 1986)

Page 25: OSHA demolition

Debris shall be kept sufficiently moist to lay the dust. (Reg. 22(3), Building Operations And Works Of Engineering Construction (Safety) Regulations, 1986)

Page 26: OSHA demolition

SAFETY MEASURES TAKEN DURING SITE CLEARING

• Felling of trees should be done by trained personnelto safeguard public safety and to prevent damage topublic property.

Page 27: OSHA demolition

Where the site is located in the immediate vicinity ofa build-up area, hoarding should be erected withproper and adequate signs to prevent unauthorizedentry.

Page 28: OSHA demolition

Arrangement should be made to preventlandslides, sinkhole and flooding or otherunstable ground condition. These arrangementshould conform to the requirements of relevantauthorities.

Page 29: OSHA demolition

All access and egress roads at the site should be maintained in safe condition.

Page 30: OSHA demolition

Every measure should be taken to suppress any dust generated by the vehicles.

Page 31: OSHA demolition

Care should be taken to protect existingunderground and overhead utilities (if any)especially electric cables to avoid any undueaccident during site clearing work if relocation ofsuch services are not possible.

Page 32: OSHA demolition