our regional economy. whether it’s our highway system,

8
For more information, visit www.mndot.gov/d2/projects MnDOT District 2 multimodal transportation infrastructure is a critical part of our regional economy. Whether it’s our highway system, airports, or rail system — citizens and industry count on us to get them where they need to go safely and reliably. District 2 staff plans, designs, and oversees construction contracts for capital improvements as well as operate and maintain the state highway system. We can be a resource to you as you interface with your constituents on transportation issues. We are looking forward to a successful construction program this year with 20 projects to be completed. Find more information below on projects near you. Sincerely, J.T. Anderson District Engineer, D2 District 2 3920 Highway 2 West, Bemidji, MN 56601 1320 Sunflower Street, Crookston, MN 56716

Upload: others

Post on 02-Feb-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

For more information, visit www.mndot.gov/d2/projects

MnDOT District 2 multimodal transportation infrastructure is a critical part of our regional economy. Whether it’s our highway system, airports, or rail system — citizens and industry count on us to get them where they need to go safely and reliably. District 2 staff plans, designs, and oversees construction contracts for capital improvements as well as operate and maintain the state highway system. We can be a resource to you as you interface with your constituents on transportation issues. We are looking forward to a successful construction program this year with 20 projects to be completed. Find more information below on projects near you. Sincerely, J.T. Anderson District Engineer, D2

District 2 3920 Highway 2 West, Bemidji, MN 56601

1320 Sunflower Street, Crookston, MN 56716

For more information, visit www.mndot.gov/d2/projects

D2 2021 Construction To request a MnDOT document in an alternative format email your request to [email protected]

About the Region

District 2 includes all of Beltrami, Clearwater, Hubbard,

Kittson, Lake of the Woods, Marshall, Norman, Pennington,

Polk, Red Lake and Roseau Counties. As well as portions of

Cass, Koochiching and Mahnomen counties.

• 3,906Lane Miles

• 636Rail Miles

• 356Bridges

• 19Airports

• 6Transit Systems

• 5Roundabouts

• 3Rest Areas

• 1RCI's

For more information, visit www.mndot.gov/d2/projects

D2 2021 Construction 2021 Construction Project Map

For more information, visit www.mndot.gov/d2/projects

D2 2021 Construction D2 Carryover Projects: 1. Hwy 172 (SP 3904-24)

Location: From Hwy 11 in Baudette to

Wheeler’s Point Resort

Description: Resurface Hwy 172 and replace

two culverts between Baudette and Wheeler's

Point. (Permanent pavement markings in 2021).

Cost: $4.7 million

Date: Summer 2021

Impact: Lane closures

Remaining work: Rumble strips, permanent

striping

Project Engineer: Nancy Graham

Website:mndot.gov/d2/projects/2020/hwy172-

baudette

2. Hwy’s 1 & 59 (SP 5701-31)

Location: Thief River Falls

Description: Complete roundabout at Hwy 1

and Hwy 59

Cost: $7.8 million

Date: Summer 2021

Impact: Detour

Remaining work: Complete roundabout,

resurface.

Project Engineer: Andrea Weleski

Website: mndot.gov/d2/projects/2020/hwy1-

roundabouts

3. Hwy 1 (SP 5702-47)

Location: Thief River Falls

Description: Resurface Hwy 1 between Hwy

219 and Pennington CR 18 in Thief River Falls.

Cost: $ 6.5 million

Date: Summer 2021

Impact: Single lane closures

Project Engineer: Andrea Weleski

Website: mndot.gov/d2/projects/2020/hwy1-

resurface

Number of carryover projects: 3

D2 New Projects: 4. Hwy 2 (SP 6001-61, 6019-28)

Location: Hwy 2 East Grand Forks to Fisher

Description: Resurface Hwy 2 westbound lanes

from East Grand Forks to Fisher

Cost: $10.2 million

Date: July- October, 2021

Impact: Lane closures

Project Engineer: Shawn Groven

Website: mndot.gov/ d2/projects/2021/hwy2b-

egf/

5. Hwy 2 (SP 6003-36)

Location: Hwy 9 to Hwy 32 East of Crookston

Description: Resurface Hwy 2 eastbound lanes

from east of Hwy 9 to west of Hwy 32

Date: September-October, 2021

Cost: $1.4 million

Impact: Lane closures

Project Engineer: Andrea Weleski

Website: mndot.gov/d2/projects/hwy2-

resurfacing

6. Hwy 2 (SP 6004-26, 6003-35,

6005-75, 6004-91262B)

Location: Hwy 2 Marcoux to Erskine.

Description: Replace concrete roadway on Hwy

2 eastbound lanes from Hwy 32 (Marcoux) to

1.8 miles west of Erskine, install RCI at Marcoux

corner

Date: May-October, 2021

For more information, visit www.mndot.gov/d2/projects

D2 2021 Construction Cost: $22.2 million

Impact: Lane closures.

Project Engineer: Andrea Weleski

Website: mndot.gov/d2/projects/2021/hwy2-

rci

7. Hwy 2 (SP 0406-67)

Location: Hwy 2 West of Bemidji

Description: Access management

improvements on Hwy 2 between Wilton and

Beltrami CR 9 in Bemidji

Cost: $2.89 million

Date: May-August, 2021

Impact: Lane closures, flaggers, short-term

detour.

Project Engineer: Chad Eklund

Website: mndot.gov/d2/projects/hwy2-bemidji

8. Hwy 2 (SP 1102-72)

Location: Hwy 2 from Cass CR 91 to Old

Housing Dr. NE, Bena.

Description: Construct multi-use trail along

Hwy 2 between Cass CR 91 and Old Housing Rd

near Bena. (Led by LLBO)

Date: Summer 2021

Cost: $2.9 million

Impact: None

Project Engineer: Matt Conner (LLBO)

Website: mndot.gov/d2/projects/hwy-2/

9. Hwy 2 (SP 1101-25, 2912-21)

Location: West of Cass Lake

Description: Resurface Hwy 2 east of Hubbard

CR 46 to Hwy 371 in Cass Lake

Date: July-September, 2021

Cost: $2.9 million

Impact: Lane closures, short term detour.

Project Engineer: Chad Eklund

Website: mndot.gov/d2/projects/hwy2-

resurface

10. Hwy 2 (SP 1101-26)

Location: Hwy 2 west of Cass Lake.

Description: Construct pedestrian/bike trail

along north side of Hwy 2 between Cass CR 75

and Cemetery Rd west of Cass Lake (Led by

LLBO.)

Date: June-November, 2021

Cost: $712,000

Impact: None

Project Engineer: Matt Conner (LLBO)

Website: mndot.gov/d2/projects/hwy2-trail

11. Hwy 2 (SP 1102-69)

Location: Hwy 2 from Cass CR 206 (east of Cass

Lake) to Cass CR 10

Description: Resurface Hwy 2 from Cass CR 206

to Cass CR 10 east of Cass Lake

Date: July-August, 2021

Cost: $2.1 million

Impact: Lane closures

Project Engineer: Nancy Graham

Website: mndot.gov/d2/projects/hwy2casslake

12. Hwy 59 (SP 6008-17)

Location: Hwy 59 Winger to Erskine

Description: Resurface Hwy 59 from Winger to

Erskine and improve pedestrian crossings in

Winger

Date: May-July, 2021

Cost: $2.64 million

Impact: Detour

Project Engineer: Josh Benolken

Website: mndot.gov/d2/projects/hwy59-

winger

For more information, visit www.mndot.gov/d2/projects

D2 2021 Construction

13. Hwy 64 (SP 2913-12)

Location: Hwy 64 north of Akeley

Description: Install larger culvert at Eleventh

Crow Wing Lake on Hwy 64 north of Akeley

Date: August-October, 2021

Cost: $1.3 million

Impact: Detour

Project Engineer: Nancy Graham

Website: mndot.gov/d2/projects/hwy64

14. Hwy 72 (SP 3905-09)

Location: Hwy 72 Baudette (International

Bridge)

Description: Replace International Bridge over

the Rainy River (Removal of old bridge to take

place in 2021)

Date: Summer 2021

Cost: $39.3 million (this total cost is split equally between Minnesota and Ontario) Impact: None.

Project Engineer: Paul Konickson

Website: mndot.gov/d2/projects/Baudette-

bridge

15. Hwy 200 (SP 1106-15)

Location: Hwy 200 from Hwy 371 near Walker

to Hwy 84

Description: Resurface Hwy 200 between Hwy

371 and Hwy 84, and replace 2 culverts at

Cedar Creek and Bag Creek

Date: May-October, 2021

Cost: $10.6 million

Impact: Lane closures, temporary detour

Project Engineer: Nancy Graham

Website:

mndot.gov/d2/projects/2021/hwy200-walker

16. Hwy 200 (SP 1504-15

1504-15006A)

Location: Hwy 200 from Roy Lake to Zerkel

Description: Resurface Hwy 200 from

Mahnomen/Clearwater County line (Roy Lake)

to Hwy 92 (Zerkel)

Date: July-September, 2021

Cost: $4.67 million

Impact: Detour

Project Engineer: Chad Eklund

Website: mndot.gov/d2/projects/hwy200-

mahnomen-clearwater

17. Hwy’s 11, 89, 9, 32 (SP 3902-26, 6807-21,

5410-25, 6805-22)

Location: D2

Description: Repair 4 bridges: Hwy 9 bridge

over Marsh River south of Ada, Hwy 11 bridge

over Silver Creek east of Baudette, Hwy 32

bridge south of Greenbush, Hwy 89 bridge over

Roseau River northwest of Roseau.

Date: May-September, 2021

Cost: $1.9 million

Impact: Lane closures

Project Engineer: Shawn Groven

Website: mndot.gov/d2/projects/bridges/

18. Hwy 999 (SP 8822-244)

Location: Hwy’s 9, 92, 220, 313

Description: Bituminous Seal Coat:

• Hwy 9- Ada to Hwy 2

• Hwy 92 Brooks to 2 miles east

of Trail

• Hwy 220 Hwy 1 to Hwy 11

• Hwy 317- Hwy 220 to Red River

Date: August, 2021

For more information, visit www.mndot.gov/d2/projects

D2 2021 Construction Cost: $2.3 million Impact: Lane closures

Project Engineer: Shawn Groven

19. Hwy 999 (SP 8822-234)

Location: Districtwide

Description: Install new lighting at various

locations.

Date: June-August, 2021

Cost: $448,000

Impact: None

Project Engineer: Luke Johanneck

20. Hwy 999 (SP 8822-231)

Location: Districtwide

Description: Culvert lining replacement

Date: Summer 2021

Cost: $500,000

Impact: None.

Project Engineer: Josh Benolken

Total number of projects: 20

Reduced Conflict Intersections What are they?

Reduced Conflict Intersections are intersections that decrease fatalities and injuries caused by broadside crashes on four-lane divided highways. In some parts of the country, RCIs are sometimes referred to as J-turns or RCUTs.

Why do they work?

A typical four-lane divided highway intersection has 42 possible vehicle conflict points. RCI's reduce conflict points to as few as 18. With an RCI, drivers from the side street only have to be concerned with one direction of traffic on the highway at a time. You don’t need to wait for a gap in both directions to cross a major road. Traditional four-lane divided highway intersections have an elevated risk of severe right-angle crashes (commonly called “T-bone” crashes), especially for drivers attempting to cross all four lanes of traffic or turn left. At a traditional intersection, motorists from the side street need to look in both directions to cross a four-lane divided highway. Left turns require the same level of attention. http://www.dot.state.mn.us/roadwork/rci/

For more information, visit www.mndot.gov/d2/projects

D2 2021 Construction