MnDOT District 2 multimodal transportation infrastructure is a critical part of our regional economy. Whether it’s our highway system, airports, or rail system — citizens and industry count on us to get them where they need to go safely and reliably. District 2 staff plans, designs, and oversees construction contracts for capital improvements as well as operate and maintain the state highway system. We can be a resource to you as you interface with your constituents on transportation issues. We are looking forward to a successful construction program this year with 20 projects to be completed. Find more information below on projects near you. Sincerely, J.T. Anderson District Engineer, D2
District 2 3920 Highway 2 West, Bemidji, MN 56601
1320 Sunflower Street, Crookston, MN 56716
For more information, visit www.mndot.gov/d2/projects
D2 2021 Construction To request a MnDOT document in an alternative format email your request to [email protected]
About the Region
District 2 includes all of Beltrami, Clearwater, Hubbard,
Kittson, Lake of the Woods, Marshall, Norman, Pennington,
Polk, Red Lake and Roseau Counties. As well as portions of
Cass, Koochiching and Mahnomen counties.
• 3,906Lane Miles
• 636Rail Miles
• 356Bridges
• 19Airports
• 6Transit Systems
• 5Roundabouts
• 3Rest Areas
• 1RCI's
For more information, visit www.mndot.gov/d2/projects
D2 2021 Construction 2021 Construction Project Map
For more information, visit www.mndot.gov/d2/projects
D2 2021 Construction D2 Carryover Projects: 1. Hwy 172 (SP 3904-24)
Location: From Hwy 11 in Baudette to
Wheeler’s Point Resort
Description: Resurface Hwy 172 and replace
two culverts between Baudette and Wheeler's
Point. (Permanent pavement markings in 2021).
Cost: $4.7 million
Date: Summer 2021
Impact: Lane closures
Remaining work: Rumble strips, permanent
striping
Project Engineer: Nancy Graham
Website:mndot.gov/d2/projects/2020/hwy172-
baudette
2. Hwy’s 1 & 59 (SP 5701-31)
Location: Thief River Falls
Description: Complete roundabout at Hwy 1
and Hwy 59
Cost: $7.8 million
Date: Summer 2021
Impact: Detour
Remaining work: Complete roundabout,
resurface.
Project Engineer: Andrea Weleski
Website: mndot.gov/d2/projects/2020/hwy1-
roundabouts
3. Hwy 1 (SP 5702-47)
Location: Thief River Falls
Description: Resurface Hwy 1 between Hwy
219 and Pennington CR 18 in Thief River Falls.
Cost: $ 6.5 million
Date: Summer 2021
Impact: Single lane closures
Project Engineer: Andrea Weleski
Website: mndot.gov/d2/projects/2020/hwy1-
resurface
Number of carryover projects: 3
D2 New Projects: 4. Hwy 2 (SP 6001-61, 6019-28)
Location: Hwy 2 East Grand Forks to Fisher
Description: Resurface Hwy 2 westbound lanes
from East Grand Forks to Fisher
Cost: $10.2 million
Date: July- October, 2021
Impact: Lane closures
Project Engineer: Shawn Groven
Website: mndot.gov/ d2/projects/2021/hwy2b-
egf/
5. Hwy 2 (SP 6003-36)
Location: Hwy 9 to Hwy 32 East of Crookston
Description: Resurface Hwy 2 eastbound lanes
from east of Hwy 9 to west of Hwy 32
Date: September-October, 2021
Cost: $1.4 million
Impact: Lane closures
Project Engineer: Andrea Weleski
Website: mndot.gov/d2/projects/hwy2-
resurfacing
6. Hwy 2 (SP 6004-26, 6003-35,
6005-75, 6004-91262B)
Location: Hwy 2 Marcoux to Erskine.
Description: Replace concrete roadway on Hwy
2 eastbound lanes from Hwy 32 (Marcoux) to
1.8 miles west of Erskine, install RCI at Marcoux
corner
Date: May-October, 2021
For more information, visit www.mndot.gov/d2/projects
D2 2021 Construction Cost: $22.2 million
Impact: Lane closures.
Project Engineer: Andrea Weleski
Website: mndot.gov/d2/projects/2021/hwy2-
rci
7. Hwy 2 (SP 0406-67)
Location: Hwy 2 West of Bemidji
Description: Access management
improvements on Hwy 2 between Wilton and
Beltrami CR 9 in Bemidji
Cost: $2.89 million
Date: May-August, 2021
Impact: Lane closures, flaggers, short-term
detour.
Project Engineer: Chad Eklund
Website: mndot.gov/d2/projects/hwy2-bemidji
8. Hwy 2 (SP 1102-72)
Location: Hwy 2 from Cass CR 91 to Old
Housing Dr. NE, Bena.
Description: Construct multi-use trail along
Hwy 2 between Cass CR 91 and Old Housing Rd
near Bena. (Led by LLBO)
Date: Summer 2021
Cost: $2.9 million
Impact: None
Project Engineer: Matt Conner (LLBO)
Website: mndot.gov/d2/projects/hwy-2/
9. Hwy 2 (SP 1101-25, 2912-21)
Location: West of Cass Lake
Description: Resurface Hwy 2 east of Hubbard
CR 46 to Hwy 371 in Cass Lake
Date: July-September, 2021
Cost: $2.9 million
Impact: Lane closures, short term detour.
Project Engineer: Chad Eklund
Website: mndot.gov/d2/projects/hwy2-
resurface
10. Hwy 2 (SP 1101-26)
Location: Hwy 2 west of Cass Lake.
Description: Construct pedestrian/bike trail
along north side of Hwy 2 between Cass CR 75
and Cemetery Rd west of Cass Lake (Led by
LLBO.)
Date: June-November, 2021
Cost: $712,000
Impact: None
Project Engineer: Matt Conner (LLBO)
Website: mndot.gov/d2/projects/hwy2-trail
11. Hwy 2 (SP 1102-69)
Location: Hwy 2 from Cass CR 206 (east of Cass
Lake) to Cass CR 10
Description: Resurface Hwy 2 from Cass CR 206
to Cass CR 10 east of Cass Lake
Date: July-August, 2021
Cost: $2.1 million
Impact: Lane closures
Project Engineer: Nancy Graham
Website: mndot.gov/d2/projects/hwy2casslake
12. Hwy 59 (SP 6008-17)
Location: Hwy 59 Winger to Erskine
Description: Resurface Hwy 59 from Winger to
Erskine and improve pedestrian crossings in
Winger
Date: May-July, 2021
Cost: $2.64 million
Impact: Detour
Project Engineer: Josh Benolken
Website: mndot.gov/d2/projects/hwy59-
winger
For more information, visit www.mndot.gov/d2/projects
D2 2021 Construction
13. Hwy 64 (SP 2913-12)
Location: Hwy 64 north of Akeley
Description: Install larger culvert at Eleventh
Crow Wing Lake on Hwy 64 north of Akeley
Date: August-October, 2021
Cost: $1.3 million
Impact: Detour
Project Engineer: Nancy Graham
Website: mndot.gov/d2/projects/hwy64
14. Hwy 72 (SP 3905-09)
Location: Hwy 72 Baudette (International
Bridge)
Description: Replace International Bridge over
the Rainy River (Removal of old bridge to take
place in 2021)
Date: Summer 2021
Cost: $39.3 million (this total cost is split equally between Minnesota and Ontario) Impact: None.
Project Engineer: Paul Konickson
Website: mndot.gov/d2/projects/Baudette-
bridge
15. Hwy 200 (SP 1106-15)
Location: Hwy 200 from Hwy 371 near Walker
to Hwy 84
Description: Resurface Hwy 200 between Hwy
371 and Hwy 84, and replace 2 culverts at
Cedar Creek and Bag Creek
Date: May-October, 2021
Cost: $10.6 million
Impact: Lane closures, temporary detour
Project Engineer: Nancy Graham
Website:
mndot.gov/d2/projects/2021/hwy200-walker
16. Hwy 200 (SP 1504-15
1504-15006A)
Location: Hwy 200 from Roy Lake to Zerkel
Description: Resurface Hwy 200 from
Mahnomen/Clearwater County line (Roy Lake)
to Hwy 92 (Zerkel)
Date: July-September, 2021
Cost: $4.67 million
Impact: Detour
Project Engineer: Chad Eklund
Website: mndot.gov/d2/projects/hwy200-
mahnomen-clearwater
17. Hwy’s 11, 89, 9, 32 (SP 3902-26, 6807-21,
5410-25, 6805-22)
Location: D2
Description: Repair 4 bridges: Hwy 9 bridge
over Marsh River south of Ada, Hwy 11 bridge
over Silver Creek east of Baudette, Hwy 32
bridge south of Greenbush, Hwy 89 bridge over
Roseau River northwest of Roseau.
Date: May-September, 2021
Cost: $1.9 million
Impact: Lane closures
Project Engineer: Shawn Groven
Website: mndot.gov/d2/projects/bridges/
18. Hwy 999 (SP 8822-244)
Location: Hwy’s 9, 92, 220, 313
Description: Bituminous Seal Coat:
• Hwy 9- Ada to Hwy 2
• Hwy 92 Brooks to 2 miles east
of Trail
• Hwy 220 Hwy 1 to Hwy 11
• Hwy 317- Hwy 220 to Red River
Date: August, 2021
For more information, visit www.mndot.gov/d2/projects
D2 2021 Construction Cost: $2.3 million Impact: Lane closures
Project Engineer: Shawn Groven
19. Hwy 999 (SP 8822-234)
Location: Districtwide
Description: Install new lighting at various
locations.
Date: June-August, 2021
Cost: $448,000
Impact: None
Project Engineer: Luke Johanneck
20. Hwy 999 (SP 8822-231)
Location: Districtwide
Description: Culvert lining replacement
Date: Summer 2021
Cost: $500,000
Impact: None.
Project Engineer: Josh Benolken
Total number of projects: 20
Reduced Conflict Intersections What are they?
Reduced Conflict Intersections are intersections that decrease fatalities and injuries caused by broadside crashes on four-lane divided highways. In some parts of the country, RCIs are sometimes referred to as J-turns or RCUTs.
Why do they work?
A typical four-lane divided highway intersection has 42 possible vehicle conflict points. RCI's reduce conflict points to as few as 18. With an RCI, drivers from the side street only have to be concerned with one direction of traffic on the highway at a time. You don’t need to wait for a gap in both directions to cross a major road. Traditional four-lane divided highway intersections have an elevated risk of severe right-angle crashes (commonly called “T-bone” crashes), especially for drivers attempting to cross all four lanes of traffic or turn left. At a traditional intersection, motorists from the side street need to look in both directions to cross a four-lane divided highway. Left turns require the same level of attention. http://www.dot.state.mn.us/roadwork/rci/
For more information, visit www.mndot.gov/d2/projects
D2 2021 Construction