Page 1: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesOur Selected Works

ʻʻActions speak louder than voice

Our philosophy is what you do is more important than what you say. So,

let’s talk to our customers.

Gizil Enerji

Page 2: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

RefineriesOur Selected Works

Gizil Enerji

Page 3: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesTank Construction Project in Karbala Refinery

Challenge

Solution

• Project Planning

• Contract Management

• Project Controlling

• Site Management Activities

• QA/ QC Activities

• HSE Activities

• Project Procurement Activities

• Project Reporting

• Technical Drawings

• All Engineering Activities

• Other All Relevant Works

• The aim of the project is to provide all engineering, procurement and

construction management (EPCM) services for Construction of 42

Storage Tank Project Karbala Refinery, Iraq.

Short project information:

Customer: Arca Metal

Location: Karbala, Iraq

Start: July, 2015

Finish: Ongoing

Gizil Enerji

Page 4: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesTupras Izmir Demin Water Tanks and Transfer Lines

Challenge

Solution

• Basic and Detailed Engineering

• Prepare data sheets

• Develop material requisition forms

• Procurement of all electrical and instrumentation equipment

• Installation supervision

• Test and commissioning

• All relevant technical drawings

• Other all relevant works

• The aim of the project is engineering, material supply and test/

commissioning activities of electrical and automation scope of the

project.

Short project information:

Customer: Ada Endüstri

Location: Izmir, Turkey

Start: October, 2015

Finish: Ongoing

Gizil Enerji

Page 5: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesTupras Petrocoke Storage Conveyor Line Project

Challenge

Solution

• Procurement of all electrical and instrumentation equipment

• Design and assembly of exproof electrical panel

• Prepare data sheets

• Material requisition forms

• Cable routings and projects

• Electrical panel one line diagram

• Cable lists

• Cable section calculations

• All relevant technical drawings

• Other all relevant works

• The aim of the project is making of the petrocoke storage conveyor line

which will transport petrocoke as the output of Resid Upgrading Project

(RUP).

Short project information:

Customer: Intra Danismanlik

Location: Kocaeli, Turkey

Start: August, 2014

Finish: May, 2015

Gizil Enerji

Page 6: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesTupras Petrocoke Storage Dust Control System

Challenge

Solution

• Procurement of all electrical and instrumentation equipment

• Design and assembly of exproof electrical panels

• Prepare data sheets

• Material requisition forms

• Electrical panel one line diagram

• Cable lists

• Cable section calculations

• All relevant technical drawings

• Other all relevant works

• The aim of the project is designing and assembly of exproof electrical

panels in dast control system of petrocoke storage in Resid Upgrading

Project (RUP).

Short project information:

Customer: Enveks

Location: Ankara, Turkey

Start: July, 2014

Finish: March, 2015

Gizil Enerji

Page 7: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesTupras Izmir Refinery Resid Upgrading Storage Tanks

Challenge

Solution

• Generate electrical one-line diagram

• Preparation of electrical grounding project

• Prepare data sheets of MCC panels

• Calculations of cable sections

• Develop cable list

• Lighting projects

• Instrument data sheets

• Instrument list

• Logic diagrams

• Procurement supervision

• The aim of the project is making of the storage tanks which will feed fuel

oil to the Resid Upgrading Project (RUP).

Short project information:

Customer: Dema Makine

Location: Izmir, Turkey

Start: 2014

Finish: 2014

Gizil Enerji

Page 8: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesTupras Izmir RUP Charge Tanks

Challenge

Solution

• Relevant special pipe hangers are manufactured and delivered to the

customer site on time. One of the competitive advantages is best price

philosophy. This is the first order intake of NCD Group products in

Tupras Refinery as a result of being a part of listed vendor list.

• Special pipe support delivery for RUP Charge Tanks in Tupras Izmir

Refinery

Short project information:

Customer: Tüpraş

Location: İzmir

Start: December, 2014

Finish: February, 2015

Gizil Enerji

Page 9: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesTurkmenbashi Refinery LPG Treatment Project

Challenge

Solution

• Develop project pilot plan

• Prepare civil and steel projects

• Pressure vessels and heat exchangers calculations

• Isometrical drawings

• Stress analysis

• Generate electrical and instrumentation projects

• Develop material requisition forms

• Coordinate procurement activities

• Commissioning supervision

• Other all relevant works

• The aim of the Project is treatment of LPG gas which is output of coker

unit from H2S. Basic engineering is owned by Axens as LPG Treatment

Basic Engineering package.

Short project information:

Customer: Lotus Enerji

Location: Turkmenbashi, Turkmenistan

Start: 2014

Finish: Ongoing

Gizil Enerji

Page 10: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesTurkmenbashi Refinery TDSP Project

Challenge

Solution

• Controlling and approval of the documents prepared by Foster Wheeler

• All engineering activities out of Foster Wheeler scope

• Procurement activities

• Supplier relationship management

• The aim of the projects is to add a new DCU (Delayed Coker Unit), SDA

(Solvent Deasphalting Unit) and auxiliary services to the existing plant.

Short project information:

Customer: Lotus Enerji

Location: Turkmenbashi, Turkmenistan

Start: 2013

Finish: Ongoing

Gizil Enerji

Page 11: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

Tank FarmsOur Selected Works

Gizil Enerji

Page 12: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesMKE Barutsan Seveso II Project - P&IDs and PFDs

Challange

Çözüm

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• All lines in the context of Seveso studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of MKE Barutsan Elmadağ

Plant in the context of SEVESO II compliance works

Short project information:

Customer: Armada Danışmanlık

Location: Ankara, Turkey

Start: March, 2016

Finish: Ongoing

Gizil Enerji

Page 13: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesAkım Tek Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• All oil, LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Akım Tek

Ankara Güvercinlik Plant in the context of SEVESO II compliance works

Short project information:

Customer: Armada Danışmanlık

Location: Ankara, Turkey

Start: February, 2016

Finish: Ongoing

Gizil Enerji

Page 14: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesLikit Kimya Exproof Tanks Turnkey Project

Challenge

Solution

• Inspection of as-is stituation

• Definition and classification of hazordous zone areas

• Engineering calculations and selection of suitable products

• Prepare data sheets

• Material requisition forms

• Develop cable list

• Lighting projects

• Installation on site

• Commissioning and startup activities

• The aim of the project is transforming of the tank dykes in Likit Kimya

Tekirdağ plant into exproof with the suitable mechanical, electrical and

automation products.

Short project information:

Customer: Likit Kimya

Location: Tekirdağ, Turkey

Start: February, 2016

Finish: Ongoing

Gizil Enerji

Page 15: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesLikit Kimya Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• All process, hydraulic, fire fighting and utility lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Likit Kimya

Tekirdağ plant in the context of SEVESO II compliance works

Short project information:

Customer: Likit Kimya

Location: Tekirdağ, Turkey

Start: February, 2015

Finish: Ongoing

Gizil Enerji

Page 16: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesAkça Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Akça Gaz’s

plants in the context of SEVESO II compliance works

Short project information:

Customer: Mavi Sinerji

Location: Kocaeli-Denizli, Turkey

Start: January, 2016

Finish: Ongoing

Gizil Enerji

Page 17: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesMir Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Mir Gaz

Kırıkkale plant in the context of SEVESO II compliance works

Short project information:

Customer: Mavi Sinerji

Location: Kırıkkale, Turkey

Start: February, 2016

Finish: Ongoing

Gizil Enerji

Page 18: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

Referencesİpragaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• P&ID and PFDs of 19 different sites studied in 3 months

• Steam and water lines addition to the LPG, propane, hydraulic and fire

fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc

• The aim of the project is drawing of P&IDs and PFDs of İpragaz’s 19

plants in the context of SEVESO II compliance works

Short project information:

Customer: Türk Loydu

Location: İstanbul, Turkey

Start: April, 2015

Finish: July, 2015

Gizil Enerji

Page 19: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesHabaş Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• P&ID and PFDs of 6 different sites studied in 2 months

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Habas’s 6 plants

in the context of SEVESO II compliance works

Short project information:

Customer: Habaş

Location: İstanbul, Turkey

Start: August, 2015

Finish: October, 2015

Gizil Enerji

Page 20: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesEr Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of ErGaz’s 8 plants

in the context of SEVESO II compliance works

Short project information:

Customer: Ergaz

Location: Istanbul, Turkey

Start: December, 2015

Finish: Ongoing

Gizil Enerji

Page 21: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesAnt Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Ant Gaz’s plant

in the context of SEVESO II compliance works

Short project information:

Customer: Mavi Sinerji

Location: Antalya, Turkey

Start: December, 2015

Finish: January, 2015

Gizil Enerji

Page 22: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesAnadolu Gaz Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• P&ID and PFDs of 4 different sites studied in 1 month

• All LPG, propane, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Anadolugaz’s 4

plants in the context of SEVESO II compliance works

Short project information:

Customer: Anadolu Gaz

Location: Ankara, Turkey

Start: June, 2015

Finish: August, 2015

Gizil Enerji

Page 23: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

IndustryOur Selected Works

Gizil Enerji

Page 24: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesLafarge Conveyor Automation Project

Challenge

Solution

• Procurement of all electrical and instrumentation equipment

• Prepare data sheets

• Material requisition forms

• Cable routings and projects

• Electrical panel one line diagram

• Cable lists

• Cable section calculations

• All relevant technical drawings

• Other all relevant works

• The aim of the project is automation of cement conveyor line constructed

by Intra Danismanlik

Short project information:

Customer: Intra Danismanlik

Location: France

Start: August, 2015

Finish: Ongoing

Gizil Enerji

Page 25: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesKümaş Seveso II Project - P&IDs and PFDs

Challenge

Solution

• All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• All process, hydraulic and fire fighting lines studied in detail

• All instrumentation critical to HAZOP and SIL studies showed additionally

to mechanical equipment and piping

• Numbering standardization developed and implemented for all relevant

equipment

• Material list developed

• PFD studies prepared with relevant data on; such as temperature, etc.

• The aim of the project is drawing of P&IDs and PFDs of Kümaş Manyezit

Sanayi plant in the context of SEVESO II compliance works

Short project information:

Customer: TMGD A.Ş.

Location: Kütahya, Turkey

Start: March, 2016

Finish: Ongoing

Gizil Enerji

Page 26: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesAksa Akrilik Piping and Instrumentation Diagrams

Challenge

Solution

• All P&IDs are created according to BS EN ISO 10628-1:2015 and BS EN

ISO 10628-2:2012 global standards buy using Autocad Plant 3d

software.

• The aim of the project is revision of some P&IDs in the context of

SEVESO II compliance works

Short project information:

Customer: Proje Dizayn

Location: Yalova, Turkey

Start: 2015

Finish: Finished

Gizil Enerji

Page 27: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesClariant Isometric Drawings

Challenge

Solution

• Site analysis

• Measurement

• Drawing of isometrics using Autocad software

• The aim of the project is drawing of some isometrics

Short project information:

Customer: Aveskon

Location: Kocaeli, Turkey

Start: 2015

Finish: Finished

Gizil Enerji

Page 28: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

Power PlantsOur Selected Works

Gizil Enerji

Page 29: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesGSD AS CCPP in Georgia

Challenge

Solution

• Relevant pipe hangers are manufactured and delivered in very short time

schedule which is only 4 week days.

• The customer is asking for the relevant pipe hangers in very short

delivery time which is critical to the rest of the process

Short project information:

Customer: GSD A.Ş.

Location: Georgia

Start: April, 2015

Finish: May, 2015

Gizil Enerji

Page 30: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ReferencesActions speak louder than voice

ʻʻOur philosophy is what you do is more important than

what you say. So, let’s talk to our customers.

Gizil Enerji

Page 31: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ContactKeep in Touch

ʻʻWe remain at your disposal

Do not hesitate to contact us whenever you need…

Gizil Enerji

Page 32: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

ContactWe remain at your disposal

Address: Esentepe Mah. Milangaz Cad. No:77 A2 Blok

D: 217 34860 Dumankaya Vizyon Plaza, Kartal-İstanbul

Phone: +90 (216) 511 59 43

E-mail: [email protected]

www.gizilenerji.com.tr

Direct Contact:

Esma Gulten Can

E-mail: [email protected]

ʻʻIf you have any support, please feel free to

contact us:

Gizil Enerji

Page 33: Our Selected Works ʻʻ - Gizil Enerji•All P&IDs created according to BS EN ISO 10628-1:2015 and BS EN ISO 10628-2:2012 global standards buy using Autocad Plant 3d software. •All

facebook.com/pages/Gizi

l-Enerji-Sanayi-ve-

Ticaret-Ltd

https://twitter.com/gizilen

erji

https://plus.google.com/

11672741188569387772

3/about

https://tr.linkedin.com/c

ompany/gizil-enerji-

sanayi-ve-ticaret-ltd-ti

www.gizilenerji.com.tr GO

Follow Us!We are on the line!

Gizil Enerji