over six decades of pipelining · over six decades of pipelining. july 1983. pipeline agreements...

2
May 1980 Hon. Marc Lalonde delivers “Canada’s Energy Efficiency” keynote at PLCAC Convenon ushering in the Naonal Energy Program (NEP) era April 1954 Pipe Line Contractors Associaon Founded in Edmonton AB at the Macdonald Hotel January 1969 Formaon of Canadian Pipeline Advisory Council April 1978 Parliament creates Northern Pipeline Agency, the federal regulator of the Alaska Highway Gas Pipeline in Canada Over Six Decades of Pipelining July 1983 Pipeline Agreements for Canada split into Mainline and Distribuon Agreements November 1959 Parliament creates Naonal Energy Board January 1966 Health benefits introduced into UA Pipeline Agreement for Canada September 1962 Alberta Oil and Gas Conservaon Board approves Great Canadian Oil Sands project June 1970 Alberta Gas Trunk Line announces plans for Mackenzie Valley gas pipeline Alberta Gas Trunk Line was later renamed Nova, an Alberta Corporaon and merged with TransCanada in 1998 September 1974 Foothills Pipe Lines Ltd. founded to construct Canadian poron of Alaska Natural Gas System Foothills Pipe Lines Ltd. is now a subsidiary of TransCanada October 1980 September 1984 PLCAC office moves from Vancouver BC to Mississauga ON May 1981 PLCAC members experience the one and only legal labour strike in their 6 decade history 1977 Alyeska Pipeline completes construcon of its Trans Alaska Pipeline System January 1974 Cal Callahan Memorial Bursary established to financially assist students with post-secondary studies 1957 TransCanada PipeLine begins construcon on a natural gas pipeline across Canada June 1956 Construcon of TransCanada PipeLine is granted by Canadian Parliament February 1961 BC government approves an applicaon by Westcoast Transmission for a $30 million pipeline through the Brish Columbia interior 1981 Foothills Pipe Lines Ltd. begins transporng natural gas from central Alberta to the US border February 1955 First Annual Convenon is held at Empress Hotel in Victoria BC November 1954 Pembina Pipeline system is constructed to transport crude oil from the Pembina field near Drayton Valley AB to Edmonton AB Under the direcon of Prime Minister Pierre Trudeau, the federal government introduces the Naonal Energy Program (NEP) April 1969 First PLCAC Newsleer is published April 1968 PLCAC is incorporated as a federal corporaon February 1958 First pipeline construcon safety manual is created April 1978 Highest aendance ever recorded (571) at PLCAC convenon held at the Bayshore Inn, Vancouver BC April 1978 Highest aendance ever recorded (571) at PLCAC convenon held at the Bayshore Inn, Vancouver BC April 1978 Highest aendance ever recorded (571) at PLCAC convenon held at the Bayshore Inn, Vancouver BC April 1978 Highest aendance ever recorded (571) at PLCAC convenon held at the Bayshore Inn, Vancouver BC 1954 1960 1965 1970 1975 1980 1985

Upload: others

Post on 20-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Over Six Decades of Pipelining · Over Six Decades of Pipelining. July 1983. Pipeline Agreements for Canada split . into Mainline and Distribution Agreements. November 1959. Parliament

May 1980 Hon. Marc Lalonde

delivers “Canada’s Energy Efficiency” keynote at

PLCAC Convention ushering in the National Energy

Program (NEP) era

April 1954Pipe Line Contractors Association Founded in

Edmonton AB at the Macdonald Hotel

January 1969Formation of

Canadian Pipeline Advisory Council

April 1978Parliament creates Northern Pipeline

Agency, the federal regulator

of the Alaska Highway Gas

Pipeline in Canada

Over Six Decades of Pipelining

July 1983Pipeline Agreements

for Canada split into Mainline

and Distribution Agreements

November 1959Parliament

creates National Energy Board

January 1966Health benefits introduced into

UA Pipeline Agreement for

Canada

September 1962

Alberta Oil and Gas Conservation Board

approves Great Canadian Oil Sands

project

June 1970Alberta Gas Trunk Line

announces plans for Mackenzie Valley gas pipeline

Alberta Gas Trunk Line was later renamed Nova, an Alberta Corporation and merged with

TransCanada in 1998

September 1974Foothills Pipe Lines Ltd. founded to construct Canadian portion of Alaska Natural Gas

System

Foothills Pipe Lines Ltd. is now a subsidiary of

TransCanada

October 1980

September 1984PLCAC office moves from Vancouver BC to Mississauga ON

May 1981PLCAC members

experience the one and only legal labour strike in

their 6 decade history

1977Alyeska Pipeline completes

construction of its Trans Alaska Pipeline System

January 1974Cal Callahan

Memorial Bursaryestablished to

financially assist students with

post-secondary studies

1957TransCanada PipeLine begins construction on a natural gas pipeline

across Canada

June 1956Construction

of TransCanada PipeLine is granted

by Canadian Parliament

February 1961BC government approves

an application by Westcoast Transmission for a $30 million pipeline through the British

Columbia interior

1981Foothills Pipe Lines Ltd.

begins transporting natural gas from central Alberta to

the US border

February 1955

First Annual Convention is held at Empress Hotel

in Victoria BC

November 1954Pembina Pipeline system is

constructed to transport crude oil from the Pembina field near

Drayton Valley AB to Edmonton AB

Under the direction of Prime Minister Pierre Trudeau, the federal government introduces the National Energy Program (NEP)

April 1969First PLCAC Newsletter

is published

April 1968PLCAC is incorporated

as a federal corporation

February 1958

First pipeline construction

safety manual is created

April 1978Highest attendance ever recorded (571) at PLCAC convention held at the Bayshore

Inn, Vancouver BC

April 1978Highest attendance ever recorded (571) at PLCAC convention held at the Bayshore

Inn, Vancouver BC

April 1978Highest attendance ever recorded (571) at PLCAC convention held at the Bayshore

Inn, Vancouver BC

April 1978Highest attendance ever recorded (571) at PLCAC convention held at the Bayshore

Inn, Vancouver BC

19541960

19651970

19751980

1985

Page 2: Over Six Decades of Pipelining · Over Six Decades of Pipelining. July 1983. Pipeline Agreements for Canada split . into Mainline and Distribution Agreements. November 1959. Parliament

May 2001Northern Pipeline

Projects Inc. is created to engage local residents

with future pipeline projects in Northern

Canada

September 1990

The only ‘wildcat’ strike of

significance by the UA

shuts down all mainline

projects across Canada

May 1999Construction begins on the Maritimes &

Northeast gas pipeline

June 1999PLCAC’s “Professional

Leadership Development

Program” is introduced

February 1993

Safety video “Being Your Best” first edition

is released

March 2007

Since its founding in 1954, the Pipe Line Contractors Association of Canada has been a continuous leader in helping ensure the safety and integrity of Canada’s pipeline infrastructure.

March 2011Mackenzie Valley pipeline is finally granted federal

cabinet approvalover 35 years after

being first proposed

February 2011TransCanada Pipelines Ltd. begins transporting crude oil on Keystone pipeline from Alberta to Oklahoma

October 2013PLCAC expands the Student

Bursary Program to financially assist more post-secondary students of employees of

association members

June 2013

April 2014PLCAC turns 60!

PLCAC goes on-line at www. pipeline.ca

February 2001

January 1995Jack Cressey Future Leader

Award is established to recognise employees who

have not yet attained executive status and have

developed leadership qualities of significance to

their company

The mandatory Pipeline

Construction Safety Training (PCST) is developed by

PLCAC and other stakeholders and administered by

Buildforce Canada

July 1998PLCAC office moves from

Mississauga ON to Oakville ON

July 2008 Edmonton &February 2009 Toronto

PLCAC’s “Professional Leadership

Development Program”, coordinated by PLCAC,

runs in Western Canada and Eastern Canada

April 2010Wayne McArthur Memorial Award

established recognizing a student that demonstrates hard work, dedication and

leadership within the community

April 2010 Enbridge Alberta Clipper Pipeline

becomes operational

January 2009 Pipeline Workforce Attraction Project was established to bring information

regarding the four pipeline craft labour and skilled trade roles to

potential future pipeline workers

January 1996Newsletter is renamed “Canadian Pipeliner”, the voice of Canada’s pipeline supply and

service industry

The Safety Guide undergoes a complete overhaul keeping current with industry while continuing to be provided to every worker on every pipeline job

December 2013

1990-1991 Gas pipeline laid to Sunshine Coast

and Vancouver Island from mainland

May 2016 PLCAC responds to the historic Ft. McMurray fire and raises over $580,000 in funds and services for the victims.

July 2016

PLCAC records busiest year on record with over 10.3

million person hours worked

May 2012PLCAC and the four pipeline craft unions

develop a memorandum of understanding to construct the Enbridge Northern

Gateway pipeline and pumping stations 240300

360

0

60

120

180 420

480

540

600

IN

TE

RN

AT

ION

AL

U

NIO

N OF OPER

AT

ING

EN

GIN

E

ERS

OR

GA

NIZ

ED DEC. 7, 18

96

LA

BO

R OMNIA V

IN

CIT

PLCAC and the four pipeline craft unions sign a memorandum

of understanding with TransCanada to construct the Energy East Pipeline

19901995

20002005

20102015