    Port Authority -Development EngineeringPre-Contr

    Item Project Description ' (bjective )asks

    1 208 *+ Remove old unused condensing unit

    .+ Install ne/ condensing to serve second floor

    2 129

    Rehabilitation of a!i"ational Aid# in the $in"#ton %arbour Pro&ure'ent of (arine )e&* +ar"e

    Pro&ure'ent of teel Pile

    n!ite tender# for &on#tru&tion and repair of bea&on #t

    /on#tru&tion and Repair

    3 26 3C) - 4round Improvement at Reclamation *rea R! Placement of e5isting fill 6P7ase I+

    Placement of imported fill 6P7ase II+

    0onitoring

    Project8

    P* 9: *ir-conditioning ;pgrade - 4round and Second

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    2/13

    Port Authority -Development EngineeringPre-Contra

    Item Project Description ' (bjective )asksProject8

    3C) - 4round Improvement at Reclamation *rea R! cont?d Drains and Surc7arge 6P7ase III+

    28 Customs *ccommodation at 3C) .ert7 !! Ware7ouse Wall and

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    3/13

    Port Authority -Development EngineeringPre-Contract

    Item Project Description ' (bjective )asksProject8

    Customs *ccommodation at 3C) .ert7 !! Ware7ouse *P0)'

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    4/13

    Port Authority -Development EngineeringPre-Con

    Item Project Description ' (bjective )asksProject8

    8 0.

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    5/13

    Port Authority -Development EngineeringPre-C

    Item Project Description ' (bjective )asksProject8

    13 *+ Design of t7e structure

    +Preparation of +ill of Guantitie#

    1 0ontego .ay and ;se - 2EW S;.DI@ISI(2 Design

    Construction

    1 *+

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    6/13

    Port Authority -Development EngineeringPre-Contract

    PRBJ

    PR-/BRA

    PRBJ

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    7/13

    Port Authority -Development EngineeringPre-Contract W

    C

    PRBJ/

    PRBJ/

    PRBJ/

    PRBJ/

    PRBJ/

    PRBJ/

    PRBJ/

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    8/13

    Port Authority -Development EngineeringPre-Contract Wee

    fo

    Comm

    PRBJ/

    PRBJ/

    PRBJ/

    o /h

    U ha# &o''en&ed o&&upan&y of the4uip'ent by he (in#try of %ealth pe#ub#tantially &o'plete ith telephone/onne&tion of the re#t roo'# re'ain alon" ith or*# for the pha#e /u#to'

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    9/13

    Port Authority -Development EngineeringPre-Contrac

    PRBJ

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    10/13

    Port Authority -Development EngineeringPre-Contract

    PR-/BRA

    P%A

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    11/13

    Item )asks

    1 *+.+

    C+ 1-)e&-06

    2

    31-(ay-0

    6

    811-Au"-06

    911-Au"-06

    1011-Au"-06

    11

    Project8

    ProjectDescrip

    tion '(bjecti

    ve

    )asksSc7edu

    ledComple

    tionDate6s+

    (riginalProject

    CompletionDate

    RevisedProject

    Completion Date

    3C) -(ldStoresRenovat3C) -StraddleCarrier

    Works73C) -E5it4ate3C) -Entrance 4ate(ldRail/ay.uildingPort*ntonio0arina -Port*ntonio

    0arinaPort*ntonio0arina(c7oRios )-Pier

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    12/13

    ender &an&elled due to the preli'inary e#ti'ated &o#t a# far in e5&e## of the bud"et

  • 7/25/2019 Overall Pre-contract Report 2008-6-13

    13/13

    Comments