Col-CC History
Columbus Operations Columbus Control Centre
An Overview to Columbus Operations
Reinhold EwaldESA Astronaut
Columbus Control CentreOberpfaffenhofen near Munich
Col-CC History
Columbus Operations Columbus Control Centre
Dr. J. Kehr
Deutsches Zentrum für Luft- und Raumfahrt e.V.
DLR
Historical milestonesCol-CC
Decisive Events
1987 Challenger Accident Co-orbiting Platforms cancelled (ESA MinCouncil The Hague)1988 Start of Manned Spaceflight Control Centre (MSCC) construction (advanced contribution)1992 Hermes and MTFF cancelled (ESA MinCouncil Munich) 1993 USSR dissolved and MoU with Russia “Freedom” survives with 216:215 in US Congress German Spacelab D-2 Mission, MSCC qualification1994 Size of Columbus module reduced to half (6m) NASA approves “bulkhead” approach for partners 1995 COF and ATV officially approved for ISS (ESA MinCouncil Toulouse) 1998 After 20 Ph-B studies: Col-CC DDI contract to DLR Launch of the first ISS module (Zarya)2003 Columbia accident2004 Col-CC “Inauguration””
Col-CC History
Columbus Operations Columbus Control Centre
Artists impression – the only available image for long years
Col-CC History
Columbus Operations Columbus Control Centre
SOLAR 3 Instruments
EuTEF 9 Experiments
FluidphysicsBiology
EuropeanTransportCarrier
PhysiologyModules
MSGMicrogra-vity ScienceGlovebox
NASA Experiment
FacilitiesEuropeanDrawerRack
PCDFCrystal Growth
HRFHumanPhysiologyRackFacilities
Col-CC History
Columbus Operations Columbus Control Centre
Col-CC started operations of the Columbus module
in February 2008 and performs the following tasks:
• Controls Columbus around the clock: 24 hours per day, 7 days per week
• Performs communications to the on-board crew for activities performed in the Columbus module
• Controls stowage in Columbus• Coordinates operations with Mission
Control Centre Houston and Huntsville• Plans all activities performed in
Columbus• Performs payload coordination with
USOCs (User Support and Operations Centres) distributed throughout Europe
• Col-CC is supported by engineering teams at Col-CC, Bremen and Turino and by ground system operations
Col-CC History
Columbus Operations Columbus Control Centre
After successful mating and leak check
Col-CC • supported commanding of Columbus
into Berthed Survival Mode • performed Columbus final activation• provided support to the on-board crew
for Columbus and rack outfitting • started commissioning of system and
payloads• supported activation of external
payloads EuTEF and SOLAR
STS 122 1EFebruary 2008
Col-CC History
Columbus Operations Columbus Control Centre
Col-CC • controls the Columbus on-board systems to provide a safe and
comfortable environment for the crew and to provide necessary support for the ESA and NASA payload facilities
• This is achieved by monitoring and configuring, by remote command, the following subsystems: – Power System– Environmental Control and Life Support System
• Air conditioning (oxygen)• Temperature control for cabin• Humidity regulation• Shell heaters
– Thermal System• Water loop, water pump to cool equipment and racks
– Data Management System– System to Payload interfaces
• Col-CC performs preventive system maintenance• Supports repair and replacement of system components
Col-CC History
Columbus Operations Columbus Control Centre
Col-CC performs Columbus system reconfiguration to support docking / undocking of visiting vehicles
• ATV docking 3 Apr 08, undocking 5 Sep 08
• STS 122-12X except 125• Activation of the Japanese modules • Soyuz docking• Progress docking• HTV
Col-CC History
Columbus Operations Columbus Control Centre
• Upgrade of Columbus on-board software to the next revisions (Cycle 11 in 2008, Cycle 12 in Oct 2009) in close cooperation with the crew, engineering teams, and the other MCC
• Supported repair of ESA payloads in Columbus • Supported ESA and NASA payload operations in Columbus
and performed payload monitoring
Col-CC History
Columbus Operations Columbus Control Centre
One year of operations typically results in
• 36500 commands to Columbus
• 2.2 million lines of code
• 213 CHITs
• 41 integrated anomalies• 420 Columbus anomalies
• Col-CC Stand-alone Simulations: 25
• European Simulations: 70
• Simulations with NASA: 50
Col-CC History
Columbus Operations Columbus Control Centre
DMS/Comms
Columbus Flight Director
Command
Systems
Cosmo
Operations Coordinator/Columbus Planner
ESA Mission Director
Eurocom
(EAC)
Col-CC History
Columbus Operations Columbus Control Centre
HoustonTRU, SVF,IGS
MadridCD-MCS, IGS,ViDS, VoCS
TorinoCD-MCS,IGS, ViDS,VoCS
NaplesCD-MCS,HRDP-2,IGS, ViDS.VoCS
Oberpf.CD-MCS, MCS,TQVS, DaSS,DFS, IGS (R&N,WAN), IMS,INFRA-GEN/SAN, TREK/ISP, ViDS,VoCS, OST
ToulouseCD-MCS,ATV, AGCS,DaSS, HRDP-1, IGS, ViDS,VoCS
ZurichCD-MCS,IGS,ViCS,VoCS
CologneCD-MCSTRE, ATV Fac.,StandaloneModels, HRDP,IGS, Mockups,ViCS, VoCSBrussels
CD-MCSIGS, VIDS,VoCS
NoordwijkCD-MCS,HRDP-4,IGS, ViDS,VoCS
TrondheimCD-MCS,IGS, ViDS,VoCS
CopenhagenCD-MCS, IGS,ViDS, VoCS Bremen
CD-MCS, INT-1/INT-2SRF, ETM/RLTF, MCSRef, SDDF, AGCS-Ref,ATV STF Ref, DaSS SADFS, GSS, HRDP-RefIGS, OTRS, SDDF, ViDS,VoCS Moscow
IGS, VoCS,Routers, VSAT
HuntsvilleDaSSDemux,IGS