overview of lick run projectprojectgroundwork.org/.../lick_run_overview_poster...overview of lick...

1
CORA QUEEN CITY GLENWAY QUEBEC TREMONT CSO 5 DUNHAM WAY ERLENE RIDGETOP WAY OAKTREE PL HORTON HARRISON MOELLERING SAFFIN MANDERY BICKEL LEY SUNSET LN RAPID RUN PIKE GUERLEY ROAD CHAMPLAIN HARRISON TILLIE WESTMONT JONTE FORBUS LEHMAN MAYFIELD FAIRBANKS CARSON ROSS RIDLEN MARGARET SCHOEDINGER MINION LATHAM BEECH MANSS FAIRMOUNT JUDSON CARE CENTER TOWER PLACE APARTMENT COMPLEX DUNHAM RECREATION CENTER RAPID RUN PARK FORMER QUEBEC HEIGHTS SCHOOL GLENWAY WOODS ELDER ATHLETIC COMPLEX ROBERTS ACADEMY ST. FRANCIS APARTMENTS FORMER CENTRAL FAIRMOUNT SCHOOL OVERVIEW OF LICK RUN PROJECT Early Success Project SMU Project Lick Run Project Watershed Boundary Detention Feature Pond Storm Sewer Natural Conveyance Sediment and Debris Separator Guerley Road Detention Dam Completed in Summer 2014. Large stormwater detention dam off Guerley Road. This project will help reduce street flooding and CSOs. Harrison Avenue Phase A 1 Completed in Fall 2013. New storm sewers along Harrison Avenue. Coordinated with Cincinnati Department of Transportation & Engineering (CDOTE) road work. A curb- side bumpout planter at Tremont Street was installed in Spring 2014. Sunset Avenue 5 Completed in Spring 2017. New storm sewers along Sunset Avenue, Sunset Lane, Guerley Road and Rapid Run Pike and a new stormwater detention basin. Rapid Run Park 2 Completed in Fall 2014. First green project completed in Lick Run. Bioswale at Rapid Run Park, two small bioretention basins and new storm sewers. MSD partnered with Cincinnati Park Board on this project. Queen City and Cora Avenues Starting this Fall. Restoration of a stream in a ravine behind the Judson Care Center that was enclosed in a combined sewer, retrofit of three existing stormwater detention basins and new storm sewers along Fenton Avenue and at bottom of ravine. Anticipated construction: Fall 2017 - Fall 2018. 3 Harrison Avenue Phase B 4 Completed in Spring 2015. New storm sewers along Harrison Avenue, Moellering Avenue and Beekman Street near the Western Hills Viaduct. White Street 6 Completed in Summer 2017. New storm sewers along White Street and multiple adjacent streets. Wyoming & Minion Avenues 7 Under Construction. New storm sewers along Wyoming Avenue and multiple adjacent streets. Anticipated construction: Spring 2017 - Spring 2018. 1 2 4 9 6 5 8 7 San Antonio Church Permeable pavers and four small bioinfiltration basins (rain gardens) were installed in 2011. St. Francis Court Apartments Two unused parking lots were converted to bioinfiltration basins (rain gardens) in 2010. Immanuel United Church A bioinfiltration basin (rain garden) was installed in 2010. Roberts Academy Retrofit of an existing storm- water detention basin and five new bioinfiltration basins installed in 2014. Early Success Projects A B C D D Urban Waterway Sanitary Sewer A B C Queen City Avenue Phase 1 Completed in Spring 2015. New storm sewers along Queen City Avenue from the Bypass to Sunset Avenue and along Tillie/Champlain. Quebec Road Starting this Fall. New storm sewers along Quebec Road and multiple adjacent streets. Anticipated construction: Fall 2017 - Fall 2018. Quebec Heights Under Construction. Restoration of a stream in Glenway Woods that was enclosed in a combined sewer, retrofit of one existing stormwater detention basin and new storm sewers. Partnering with Cincinnati Parks. Anticipated construction: Spring 2017 - Spring 2018. Starting this Fall. New storm sewers along Queen City Avenue from Sunset Avenue to apartment complex off East Tower Drive. Anticipated construction: Fall 2017 - Fall 2019 (substantially complete per Consent Decree by 12-31-18) Queen City Avenue Phase 2 N Lick Run Greenway Under Construction. Stormwater conveyance system with an urban waterway and underground stormwater conveyance box. Anticipated construction: Summer 2017 - Fall 2019 (substantially complete per Consent Decree by 12-31-18). 8 9 10 11 12 12 10 11

Upload: others

Post on 26-Jul-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OVERVIEW OF LICK RUN PROJECTprojectgroundwork.org/.../Lick_Run_Overview_Poster...OVERVIEW OF LICK RUN PROJECT N Lick Run Greenway Under Construction. Stormwater conveyance system with

CORA

QUEEN CITY

GLENWAY QUEBEC

TREMONT

CSO 5DUNHAM WAY

ERLENE

RIDGETO

P WAY

OAKTREE PL

HORTON

HARRISON

MO

ELLE

RIN

G

SAFF

IN

MA

ND

ERY BICKEL

LEY

SUNSET LN

RAPID RUN PIKE

GUERLEY ROAD

CHAMPLAIN

HARRISON

TILL

IE

WESTMONT

JONTE

FORBUS

LEHMAN

MAYFIELD

FAIR

BAN

KS

CARS

ON

ROSS

RID

LEN

MA

RGA

RET

SCHO

EDIN

GER

MIN

ION

LATHAM

BEEC

H

MA

NSS

FAIRMOUNT

JUDSON CARE

CENTER

TOWER PLACE APARTMENT

COMPLEX

DUNHAM RECREATION

CENTER

RAPID RUN PARK

FORMER QUEBEC HEIGHTS

SCHOOL GLENWAY WOODS

ELDER ATHLETIC COMPLEX

ROBERTS ACADEMY

ST. FRANCIS APARTMENTS

FORMER CENTRAL FAIRMOUNT

SCHOOL

OVERVIEW OF LICK RUN PROJECTEarly Success Project

SMU Project

Lick Run ProjectWatershed Boundary

Detention Feature

Pond Storm Sewer

Natural Conveyance

Sediment and Debris Separator

Guerley Road Detention Dam

Completed in Summer 2014. Large stormwater detention dam off Guerley Road. This project will help reduce street flooding and CSOs.

Harrison Avenue Phase A 1Completed in Fall 2013. New storm sewers along Harrison Avenue. Coordinated with Cincinnati Department of Transportation & Engineering (CDOTE) road work. A curb-side bumpout planter at Tremont Street was installed in Spring 2014.

Sunset Avenue5Completed in Spring 2017. New storm sewers along Sunset Avenue, Sunset Lane, Guerley Road and Rapid Run Pike and a new stormwater detention basin.

Rapid Run Park2Completed in Fall 2014. First green project completed in Lick Run. Bioswale at Rapid Run Park, two small bioretention basins and new storm sewers. MSD partnered with Cincinnati Park Board on this project.

Queen City and Cora AvenuesStarting this Fall. Restoration of a stream in a ravine behind the Judson Care Center that was enclosed in a combined sewer, retrofit of three existing stormwater detention basins and new storm sewers along Fenton Avenue and at bottom of ravine. Anticipated construction: Fall 2017 - Fall 2018.

3 Harrison Avenue Phase B 4Completed in Spring 2015. New storm sewers along Harrison Avenue, Moellering Avenue and Beekman Street near the Western Hills Viaduct.

White Street6Completed in Summer 2017. New storm sewers along White Street and multiple adjacent streets.

Wyoming & Minion Avenues7

Under Construction. New storm sewers along Wyoming Avenue and multiple adjacent streets. Anticipated construction: Spring 2017 - Spring 2018.

1

2

4

9

6

5

8

7

San Antonio Church Permeable pavers and four small bioinfiltration basins (rain gardens) were installed in 2011. St. Francis Court Apartments Two unused parking lots were converted to bioinfiltration basins (rain gardens) in 2010. Immanuel United Church A bioinfiltration basin (rain garden) was installed in 2010.Roberts Academy Retrofit of an existing storm-water detention basin and five new bioinfiltration basins installed in 2014.

Early Success Projects

A

B

C

D

D

Urban Waterway

Sanitary Sewer

A

B

C

Queen City Avenue Phase 1

Completed in Spring 2015. New storm sewers along Queen City Avenue from the Bypass to Sunset Avenue and along Tillie/Champlain.

Quebec Road

Starting this Fall. New storm sewers along Quebec Road and multiple adjacent streets. Anticipated construction: Fall 2017 - Fall 2018.

Quebec HeightsUnder Construction. Restoration of a stream in Glenway Woods that was enclosed in a combined sewer, retrofit of one existing stormwater detention basin and new storm sewers. Partnering with Cincinnati Parks. Anticipated construction: Spring 2017 - Spring 2018.

Starting this Fall. New storm sewers along Queen City Avenue from Sunset Avenue to apartment complex off East Tower Drive. Anticipated construction: Fall 2017 - Fall 2019 (substantially complete per Consent Decree by 12-31-18)

Queen City Avenue Phase 2

N

OVERVIEW OF LICK RUN PROJECT

Lick Run Greenway

Under Construction. Stormwater conveyance system with an urban waterway and underground stormwater conveyance box. Anticipated construction: Summer 2017 - Fall 2019 (substantially complete per Consent Decree by 12-31-18).

8

9101112

12

10

11