overview of melcor activities in ciemat (2012) · european melcor user group, 2013 unit of nuclear...

20
European MELCOR User Group, 2013 Stockholm, May 2 - 3, 2013 Unit of Nuclear Safety Research OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) C. López, M. García, E. Fernández, L.E. Herranz Unit of Nuclear Safety Research CIEMAT, SPAIN

Upload: others

Post on 03-Sep-2019

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

OVERVIEW OF MELCOR ACTIVITIES

IN CIEMAT (2012)

C. López, M. García, E. Fernández, L.E. Herranz

Unit of Nuclear Safety Research

CIEMAT, SPAIN

Page 2: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

Scenarios Addressed

• Plant analysis

Spanish NPP (CSN) MELCOR 2.1

• Fuel degradation in the presence of air

SFP (OECD-SFP project) MELCOR 1.8.6 YV 3084 SFP

BWR:

Spanish NPP (ARTIST-Ext ) MELCOR 2.1

PWR:

BSAF (CSN, OECD project) MELCOR 2.1

Page 3: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

Plant analysis BWR, PWR

1.8.4 1.8.5 1.8.6 2.1���� SNAP���� SNAP

�COR�Converter�COR�Converter

��

Inputs updating:

Automatic conversion to 2.1:

• MELGEN ����

• MELCOR ���� “by hand”

Automatic conversion to 2.1:

• MELGEN ����

• MELCOR ���� “by hand”

Page 4: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

Execution

M2.1.3226 M2.1.4206 M2.1.4803

BWR ���� ���� ����

PWR ���� ���� ����

Post-processing:

PTFread1.76.xla ���� ���� ����

PTFread1.77.xla ���� ���� ����

PTFread *.xlam Not supported (Office 2003)

Page 5: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

• Corruption of files sent by e-mail:

license.request → *.zip

• Post-processing of MELCOR 2.1 case with PTFread1.76:

- water density

Others:

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

0 10 20 30 40

time [hr]

Mas

s [k

g/m

**3]

CVH-RHO.1.200

Output ����Output ����

Page 6: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

1.E-02

1.E+01

1.E+04

1.E+07

1.E+10

1.E+13

0 5 10 15 20time [hr]

Mas

s [k

g]

RN2-DFBBT-22-aRN2-DFBBT-152-aRN2-DFBBT-10-aEstimate DF pool

• Corruption of files sent by e-mail:

license.request → *.zip

• Post-processing of MELCOR 2.1 case with PTFread1.76:

- water density

- Cumulative DF

SRV: FL 362

DC: FL 20

Others:

RN2-DFBBT-3622-a?RN2-DFBBT-202-a?RN2-DFBBT-3622-a?RN2-DFBBT-202-a?

Page 7: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

• Corruption of files sent by e-mail:

license.request → *.zip

• Post-processing of MELCOR 2.1 case with PTFread1.76:

- water density

- Cumulative DF

Others:

?

Page 8: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

THANK YOU FOR YOUR ATTENTION!!

Page 9: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

SBOIC11

SBOnoICSBOICad SBOSVSBOSRVop

IC S-RVs

LOOPIC11

1. BWR: CSN Spanish NPPBWR-Mark I

1400 MWth

Systems analyses:Unit 1 Fukushima-like scenario

Page 10: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

Core &

RPVPCV

ReactorBuilding

Total

COR cells 41 - - 41

CVs 6 3 11 20

FLs 8+5 4+3 15 35

HSs 14 7 25 46

Z1: 0.00

Z2: 0.884

Z3: 2.371

Z4: 3.105

Z5: 3.840

Z6: 4.575

Z7: 4.715

Z8: 5.204

Z9: 6.100

Z10: 6.997

Z11: 7.894

Z12: 8.791

9.185

4

CV 330Bypass

CV 340Core

Channel

CV 320Lower Plenum

BAF

TAF

SRVs

SVs ���� FL (Valve, TF)

Failures

IC ���� CF (Steam Sink)

(Water Source)

1. BWR: CSN

Page 11: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

0

0.1

0.2

0.3

0.4

0.5

0.6

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20time (h)

DW

pre

ssu

re (

MP

a)

SBO_IC11

SBO_ICad

WW vent open

IC Effect SV Effect

Time shift

IC performance → late and slower degradation of fuel.

→ similar Containment evolution

0

0.1

0.2

0.3

0.4

0.5

0.6

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

time (h)D

W P

ress

ure

(M

pa)

SBO_IC11SBO_SV

Steam

Non condensable

DW FailDW Fail + Vent

SV operation → similar fuel degradation.

→ different Containmentevolution.

1. BWR: CSN

Page 12: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

2. BWR: CSN, BSAF ProjectStarting point: previous BWR NPP

• Detailed plant model

COR: 4 x 13

BAF

TAF

COR: 3 x 12

Page 13: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

WW DW

2. BWR: CSN, BSAF Project

Page 14: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

Input development of the 3 NPP→ Excel worksheet

2. BWR: CSN, BSAF Project

Page 15: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

Focus: Implementation of the ARI3SG correlation in MELCOR 2.1:

3. PWR: ARTIST-Ext Project

Scope: -“Near field” deposition (break stage)

-“Dry conditions” (no pool scrubbing)

4

12

12

p

TBStk

StkRe

009.0exp47.0 ⋅

⋅−⋅=η

~20

m

Objective: Aerosol retention in the Secondary Side of a Steam Generator.

ARI3SG

Page 16: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

Scenario:SGTR:

- Double-ended rupture SG.

-SG PORV failed Open.

-Bypass sequence.

3. PWR: ARTIST-Ext Project

Spanish PWR: 2614 MWth3 loops

- Filter implementation

by Control Function

Approach:

ARI3SG

Filter

Page 17: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40Time (h)

cp1_CVH-LIQLEV.300

SG Top

SG BottomTube breach

Top tube bundle

0

2

4

6

8

10

12

14

16

18

20

0

SG

wat

er le

vel (

m)

SG BottomTube breach

3. PWR: ARTIST-Ext Project

Dry

ONGOING ANALYSES

Page 18: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

SFP tests:

• Complete LOCA in SFPools• BWR/PWR fuel assemblies• Zr air oxidation leading to cladding ignition

2 Scenarios modeled:

4. SFP: OECD-SFP Project

• 1x1

• 1x4

1x1:

Page 19: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

SFP-PWR 1X4

GasCirculation

NaturalConvection

ForcedConvection

Measurements

Zero rates (R2)

Materialproperties

Radiationmodeling

Materialemissivities

Viewfactors

Systemproperties

Cp: MgO, SS, Al

ZrO2thickness

Gapthickness

Rackas HS

SS, ZrO2

Arbitraryradiation paths

(NNHTR)CL-1 → RK-1 → CL-2 → RK-2

Gap modelCL inner surf.emissivity set

to zero

FCELRFSSCN

Low values ���� ignition in R1

4. SFP:

Page 20: OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT (2012) · European MELCOR User Group, 2013 Unit of Nuclear Safety Research Stockholm, May 2 - 3, 2013 OVERVIEW OF MELCOR ACTIVITIES IN CIEMAT

European MELCOR User Group, 2013

Stockholm, May 2 - 3, 2013Unit of Nuclear Safety Research

PWR 1x1PWR 1x1 PWR 1x4PWR 1x4

4. SFP: OECD-SFP Project

Center

• The ignition onset time well captured.• Discrepancies on ignition onset location or propagation.• The ignition onset time well captured.• Discrepancies on ignition onset location or propagation.