overview of proposals - east sussex...overview of proposals proposals for the following six schemes...

1
Overview of proposals Proposals for the following six schemes are included in this exhibition and are shown on the map opposite: 1 University (Meads) to Seafront and Town Centre 2 Town Centre to Seafront 3 Seafront – Wish Tower to Fisherman’s Green 4 Town Centre to Hospital 5 Horsey Way Section 1 – Railway Station to Ringwood Road 6 Horsey Way Section 3 – Lottbridge Drove to Langney roundabout KEY Cycle Route 1: University (Meads) to Seafront and Town Centre Cycle Route 2: Town Centre to Seafront Cycle Route 3: Seafront - Wish Tower to Fisherman's Green Refer to Consultation Plans Cycle Route 4: Town Centre to Hospital Cycle Route 5: Horsey Way Section 1 - Railway Station to Ringwood Road Existing Horsey Way Cycle Route Cycle Route 6: Horsey Way Section 3 - Lottbridge Drove to Langney Roundabout. Hospital Railway Station University Wish Tower Pier The Redoubt Fisherman's Green Sovereign Harbour 1 2 3 4 5 6 N Opened October 2013 This map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationary Office © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. 100019601, 2012. 4 5 2 3 1 6

Upload: others

Post on 24-Jan-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Overview of proposals

    Proposals for the following six schemes are included in this exhibition and are shown on the map opposite:

    1 University (Meads) to Seafront and Town Centre

    2 Town Centre to Seafront

    3 Seafront – Wish Tower to Fisherman’s Green

    4 Town Centre to Hospital

    5 Horsey Way Section 1 – Railway Station to Ringwood Road

    6 Horsey Way Section 3 – Lottbridge Drove to Langney roundabout

    KEYCycle Route 1: University (Meads) to Seafront and Town Centre

    Cycle Route 2: Town Centre to Seafront

    Cycle Route 3: Seafront - Wish Tower to Fisherman's Green

    Refer to Consultation Plans

    Cycle Route 4: Town Centre to Hospital

    Cycle Route 5: Horsey Way Section 1 - Railway Station to Ringwood Road

    Existing Horsey Way Cycle Route

    Cycle Route 6: Horsey Way Section 3 - Lottbridge Drove to Langney Roundabout.

    Hospital

    RailwayStation

    University

    Wish Tower

    Pier

    The Redoubt

    Fisherman's Green

    SovereignHarbour

    1

    2

    3

    4

    5

    6N

    Open

    ed Oc

    tober

    2013

    This map is reproduced from Ordnance Survey material withthe permission of Ordnance Survey on behalf of the Controllerof Her Majesty's Stationary Office © Crown copyright.Unauthorised reproduction infringes Crown copyright and maylead to prosecution or civil proceedings. 100019601, 2012.

    4

    5

    23

    1

    6