1

Overview of MEA Power

Distribution System

Dr. Asawin RajakromConstruction Department, Metropolitan electricity Authority

Presentation Outline

• Thailand power system

• MEA organization overview

• MEA Power system overview

• MEA Power system loss

• MEA Power system reliability

• MEA success story

2

Page 2: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

2

3

Thailand Utility Highlight

4

Description EGAT PEA MEA

Area (km2) 513,115 509,923 3,192

Population 64,456,695 56,421,160 8,035,535

Customer 16,599,507 3,194,167

Employee 22,460 28,060 8,121

Demand (MW) 26,121.1 16,748.8 8,383

Page 3: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

3

Thailand Network Facilities

5

DescriptionEGAT PEA MEA

Line1) Sub2) TR3) Line Sub TR Line Sub TR

500kV 3,721.95 10 15,850

230kV 13,393.05 68 44,560 49.54 3 2,400

132kV 8.71 133

115kV 13,279.73 130 14,574 9,214* 463 695.32 233** 20,896

69kV 18.8 870.23

MV(11, 12, 22, 24, 33kV)

296,245 16,058.68 16,980

LV 457,959 25,509.97

300kV (HVDC) 22.99 388

Total 30,639.75 208 75,505 763,418 463 72,110 43,183.74 236 40,276

* All HV transmission lines** 69 & 115 kV

1) cct-km2) No. of substation3) MVA

Thailand Utility Performance

6

DescriptionEGAT PEA MEA

2011 2012 2011 2012 2011 2012Total assets 15,777 16,956 9,645 9,814 4,401 4,700

Total liabilities 6,183 6,613 6,277 6,246 2,409 2,544

Equity 9,594 10,343 3,368 3,567 1,992 2,157

Total revenues 13,284 16,285 10,310 12,323 4,745 5,664

Total expenses 11,634 14,460 9,915 11,848 4,569 5,365

Net profit 1,087 1,339 395 475 176 299

Page 4: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

4

Electricity Consumption by Sector

7

Thailand Generation Installed Capacity

8

Source: EGAT 2011

Page 5: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

5

Thailand Generation Fuel Mix

9

Source: EGAT 2011

MEA Organization Chart

10

Page 6: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

6

MEA Organization Overview

11

Wat

LiabKlongToei

Yan Nawa

Samsen

Bang Khen

LatPhrao

Bang

Kapi

Samut Prakarn

Bang Plee

Min Buri

Lat Krabang

Prawet

Thon Buri

Rat Burana

Bang

Khunthian

Nonta Buri

Bang Yai

Bang Buathong

Metropolitan Electricity Authority District

MEA System Performance

12

Description Unit 2011 2012 2013Population (Thailand) 64,076,033 64,456695 64,785,909

Population (MEA) 8,000,693 8,035,535 8,084,133

Customers 3,115,695 3,194,167 3,281,574

Employees 7,926 8,121

Customer/employee 393 393

Energy Purchase GWh 45,774 49,997 49,627

Energy Sale GWh 44,197 48,244 47,951

Maximum Power MW 7,858 8,383 8,590

Energy Loss % 3.44 3.51 3.31

Load Factor % 66.47 68.92 64.27

Page 7: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

7

MEA Financial Performance

13

Description 2011 2012 2013Total assets 138,641 148,060 165,127

Total liabilities 75,898 80,126 92,228

Equity 62,744 67,935 72,899

Total revenues 149,471 178,412 192,152

Total expenses 143,934 169,005 180,921

Net profit 5,537 9,408 11,234

Unit in Million THB

MEA Power System

14

230/500 kV

Terminal Station

Substation69/115 kV Customer

Power Plant

12/24 kV Customer

12/24 kV

220/380 V Customer

69/115 kV

220/380 V

Page 8: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

8

MEA Power System

15220/380 V

CUSTOMER

GENERATORGENERATOR

69/115 kV

CUSTOMER

12/24 kV

CUSTOMER

1313..8 8 kVkV1313..8 8 kVkV 6969//115 115 kVkV6969//115 115 kVkV 1212//24 24 kVkV1212//24 24 kVkV 220220//380 380 VV220220//380 380 VV230 230 kVkV230 230 kVkV

Tra

nsm

issi

on

Tra

nsm

issi

on

Line

Line

Sub

sta

tion

Sub

sta

tion

Sub

tra

nsm

issi

on

Sub

tra

nsm

issi

on

Line

Line

Term

ina

l S

tatio

nTe

rmin

al

Sta

tion

Dis

trib

utio

n Li

neD

istr

ibut

ion

Line

Se

cond

ary

Se

cond

ary

EGATEGATMEAMEA

MEA Power System

16

MEA MEA MEA MEA 69 69 69 69 kV T/SkV T/SkV T/SkV T/S

MEA MEA MEA MEA 115 115 115 115 kV T/SkV T/SkV T/SkV T/S

MEA MEA MEA MEA 69 69 69 69 & & & & 115 115 115 115 kV T/SkV T/SkV T/SkV T/S

MEA MEA MEA MEA 230 230 230 230 kV T/SkV T/SkV T/SkV T/S

EGAT EGAT EGAT EGAT 500 500 500 500 kV Transmission LineskV Transmission LineskV Transmission LineskV Transmission Lines

EGAT EGAT EGAT EGAT 230 230 230 230 kV Transmission LineskV Transmission LineskV Transmission LineskV Transmission Lines

MEA MEA MEA MEA 230 230 230 230 kV Transmission LineskV Transmission LineskV Transmission LineskV Transmission Lines

EGAT EGAT EGAT EGAT 500 500 500 500 kV StationkV StationkV StationkV Station

South Bangkok

Bangplee

On-nuj

Teparak

Klong Rangsit

Thanontok

Chidlom

Vibhavadi

Klongdan

(Future)

Nongjok

SainoiJangwattana

North Bangkok

South Thonburi

Bangkoknoi

Ratchadapisek

Lardprao

Bangkapi

Sainoi

Nongjok

Page 9: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

9

MEA Power System

17

Description No Capacity (MVA)

Terminal Station 17 18,306

Substation 131 17,690

Switching Station 1 80

Small Power Producer 1 105.88

69, 115kV Customer 84 3,285

Distribution transformer 17,350

MEA Power System

18

Description Length (Circuit km)

230kV Transmission Line 49.54

115kV Sub-transmission Line 746.14

69kV Sub-transmission Line 900.93

12, 24kV Distribution Line 17,478.15

220/380V Low Voltage Line 27,656.33

Page 10: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

10

Power System Losses

19

4.34.19

3.963.82

3.25 3.23

3.41

3.6

3.14

3.46 3.39 3.44 3.51

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

1998 2000 2002 2004 2006 2008 2010 2012 2014

Loss Reduction Program

20

0

5

10

15

20

25

1958 1963 1968 1973 1978 1983 1988 1993 1998 2003

Year

% MEA's total energy losses

1. Conversion from 110 to 220 Volts (1962 – 1970)

4.3 Conversion from 12 kV Primary to 24 kV primary (1977-present)

4.4 Conversion from 69 kV Primary to 115 kV primary (1990-present)

3. Non-technical loss reduction (1963-present)

4.2 Conversion from 220 V, 3-phase 3 wire to 220 / 380 V, 3-phase 4 wire

(1977- 1988)

4.1 Capacitor installation (1964-present)

4. Distribution system improvement program

2. Engineering standard (1963-present)

Page 11: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

11

Power System Reliability

21

Reliability Indices

SAIFI (System Average Interruption Frequency Index)

SAIFI = Σ Total number of Customers Interrupted

Total number of Customers Served

SAIDI (System Average Interruption Duration Index)

SAIDI = Σ Customer Interruption Duration

Total number of Customer Served

MAIFI (Momentary Average Interruption Duration Index)

MAIFI = Σ Total number of Customers Interrupted less than defined time

Total number of Customers Served

Reliability Service Standard

22

Service Area SAIFI (times/cust/year)

SAIDI (minutes/cust/year)

City/Business 2.46 54.86

Industrial 2.63 54.23

Suburb 4.32 100.37

Overall MEA 2.79 62.07

Page 12: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

12

MEA SAIFI

23

2.0191.931

1.869

1.699

2.3882.299

1.865

1.715

1.837

1.831

0

0.5

1

1.5

2

2.5

3

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

MEA SAIDI

24

42.174 42.136

37.101

59.652

50.645

47.055

46.919

58.798

49.448

0

10

20

30

40

50

60

70

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013

Page 13: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

13

Reliability Improvement Measures

25

Stage ActivitiesPlanning construct of additional subtransmission line

conversion of overhead line to underground cable

Design open loop tap-tied configuration

Install line LBS

Maintenance Tree Pruning/Cutting

Line patrol with Thermo-scan or binocular

Clean live line insulation by pressurized water spray

provide outage restoration crews on standby

for 24 hour service

Su

bS

ub

--tra

nsm

issio

n L

ine

str

an

sm

issio

n L

ine

s

Reliability Improvement Measures

26

Stage ActivitiesPlanning Build new substations

Replace metal-clad air insulated switchgears with SF6 gas insulated ones

Install fibre optic network which is far more reliable and accurate than radio signal for SCADA

Design Design double bus for 69 KV& 115 KV GIS and single bus tie for 12 KV & 24 KV GIS

OLTC with oil filter

partition power transformer bank and install fire extinguish system

Maintenance Do periodic test of protection relay and alarm system

power transformer oil filtration

Clean OLTC contact

Measure contact resistance and closing time of circuit breaker of medium voltage switchgear

Su

bsta

tio

ns

Page 14: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

14

Reliability Improvement Measures

27

Stage ActivitiesPlanning Replace bare conductor or partial insulated cable with aerial

spaced cable.

Convert from overhead line to underground cable

Install distribution automation system (DAS)

Design multi-dividing multi-connecting configuration

reduce the length of line

Replace pin type insulator (ANSI class 56-1) with pin-post type

(TISI class 56/57-2)

Maintenance Prune the trees

Line patrol with Thermo-scan Or binocular

Measure transformer load current

Provide outage restoration crews on 24 hour standby services

Insulate live parts to prevent interruption caused by animals. Dis

trib

uti

on

Lin

es

MEA Success Story:

Distribution System Performance

28

With the SAIFI of 1.831 and SAIDI of 49.448 in 2011,

MEA steps towards leading utility of South East Asia.

2.019 1.9311.869

1.699

2.388 2.299

1.865

1.715

1.8371.831

0

0.5

1

1.5

2

2.5

3

2002 2004 2006 2008 2010 2012 2014

42.17442.136

37.101

59.652

50.64547.055

46.919

58.798

49.448

0

10

20

30

40

50

60

70

2002 2004 2006 2008 2010 2012 2014

Page 15: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

15

MEA Success Story: Loss Minimization

With 3.51% system loss in 2011, MEA stands at level

of the lowest loss utility.

29

4.3 4.193.96 3.82

3.25 3.23

3.41

3.6

3.14

3.46 3.39 3.44 3.51

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

1998 2000 2002 2004 2006 2008 2010 2012 2014

MEA Success Story:

Underground System Implementation

With 5 decades experience of

planning, design, installation, operation and maintenance of

underground cable, MEA has excellent knowledge of large

city underground power system implementation.

30

6

5 4

3

2 1

R =0.912 m

Angle = 90 Deg. R =9.12 m

Angle = 15 Deg.

R =18.24 m

Angle = 15 Deg.

50.8 M.

63.5 M.

Page 16: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

16

MEA Success Story:

Gas Insulated Switchgear: GIS

To meet the performance requirement, maintenance costs

and land use minimization, MEA has standardized its HV/MV

switchgear to the GIS.

31

MEA Success Story: SCADA EMS/DMS

With 5 dispatching centers and 18 district control centers, MEA can remotely control and monitor almost every CB, DS in substations and major switches in distribution lines.

32

HV customerHV customerHV customerHV customer

MV customerMV customerMV customerMV customeror MV / LV transformeror MV / LV transformeror MV / LV transformeror MV / LV transformer

EHV customerEHV customerEHV customerEHV customer

Transmission networkTransmission networkTransmission networkTransmission network

SubSubSubSub----transmission networktransmission networktransmission networktransmission network

Primary Primary Primary Primary distribution distribution distribution distribution

systemsystemsystemsystemEMSEMSEMSEMS

DMSDMSDMSDMS

Page 17: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

17

MEA Success Story:

Geographical Information System: GISMore than ten years of GIS implementation, MEA not only provides data and tools for their staff to deal with power system management and its customer services , but also benefits from selling GIS services to external public and private sector.

33

MEA Success Story:1130 Call Center

Anything concerning with ELECTICITY, 1130 can TELL you.

Services are available 24 hours a day, 7 days a week.

34

Page 18: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

18

MEA Success Story:

Consulting and Training Services

• Private sector electrical training

• IPP consultancy services

• Industrial customer reliability improvement

program

• International training programs both in-

house and oversea

• Consultancy services for oversea utilities35

Oversea Utility Takeover Program

• Enugu Electricity Distribution Company, Nigeria

36

Page 19: Overview_of_MEA_Power_Distribution_System-2013.pdf

14/01/58

19

MEA Success Story: More…..

• Robust communication infrastructure

• Concrete pole factory

• ISO 9001:2000

• TIS/OHSAS 18001

• ERP

• And many more ……

37

[email protected]

“T“Thank you!”hank you!”