Owners- How to contract for BIM deliverables and actually get what you
want
Birgitta Foster & Cindy Baldwin
#BIMForumED
Check us out at …….. VDCOtech.com
Intr
od
uct
ion
VirtualDesign
Construction Operations
Owner BIM representative
@BirgittaFoster @CindyWBaldwin
#BIMForumED
OVERVIEWAligning organizational goals with BIM Deliverables
Dictating platform-
specific BIM
deliverables
Keeping your Eye on the
data deliverables
Practical and
achievable BIM
deliverables
“To Do or Not to do”
Record Model
deliverables
OwnersHow to contract for BIM deliverables and
actually get what you want
@BirgittaFoster @CindyWBaldwin
#BIMForumED
Unsatisfactory experience : oRequiring BIM without defining why or how their BIM
deliverables
oResults unsure why they are doing BIM.
Best chance at successoBusiness BIM Uses - Business reasons to use BIM
oNot a one time savings but the ANNUALIZED savings
oContracting for the BIM deliverables you can use
BIM Deliverables andOrganizational goals
@BirgittaFoster @CindyWBaldwin
Expectations
#BIMForumED @BirgittaFoster @CindyWBaldwin
BusinessBIM Uses
ESTA
BLI
SH
Geometry
Data
Schedule
File Formats
CO
NTR
AC
T
BIMPxP
DEV
ELO
P
Deliverable RequirementsContracts
Requirements
CAD PDF
CMMS
Space Mgt
EHS Requirements
2D 3D
Excel
Geometry - MP Spec/LOD Spec/M3
DEF
INE
User Requirements
Data - Facility Data Spec/COBie/LOD Attributes
File Format
Data Schedules
Sheet Views
Naming Conventions
BIM Guidelines
ContractorDesign Team
BIM Uses
CD Package
Software
Submittals
Commissioning
Programming
Equip Schedules
Emergency Mgt
Documents
Commissioning report
Word
Submittals
CD Record
Digital Deliverable Guide
Facility Data Spec
Geometry - MP Spec
File Formats
Contractor deliverables
Design Team Deliverables
Documents
Schedule BIM Uses
Software
#BIMForumED
Assessment based on
1- Current need2- short term need3- long term need
BIM Deliverables andOrganizational goals
@BirgittaFoster @CindyWBaldwin
Business BIM Uses
Begin your BIM roadmap
Start here
#BIMForumED @BirgittaFoster @CindyWBaldwin
Uncover most common organizational “Pain Points”
A pain point
o is a problem, real or perceived.
o creates opportunities for themselves by creating
solutions.
o Solutions create value for everyone.
BIM Deliverables andOrganizational goals
Business Value
#BIMForumED
What data can we get?
@BirgittaFoster @CindyWBaldwin
8
What data do we need?Keeping your Eye on the
data deliverables
#BIMForumED @BirgittaFoster @CindyWBaldwin
9
“KISS” principal : Data we need
Keeping your Eye on the
data deliverables
#BIMForumED
Go beyond COBie withdata deliverables
@BirgittaFoster @CindyWBaldwin
Keeping your Eye on the
data deliverables
#BIMForumED @BirgittaFoster @CindyWBaldwin
Keeping your Eye on the
data deliverables
Reformat the dataforOwner data schedules
EHS check : Equipment Utilities = Room Utilities
Missing FMS System – Data set for upload
#BIMForumED
Pros and Cons
@BirgittaFoster @CindyWBaldwin
Dictating platform-
specific BIM
deliverables
#BIMForumED @BirgittaFoster @CindyWBaldwin
September 2016
Owner ( Year released)Design Software Construction Software 3D viewer IFC requirements Record - Design As-built - GC
Broward County Aviation
Department - BCAD ( 2013)
Neutral- Native & IFC compliant
Acceptable : ArchiCAD; Bentley
Ach V8i, Bentley Building, Revit
Neutral- Native & IFC compliant
Acceptable : ArchiCAD; Bentley
Ach V8i, Bentley Building, Revit
N/A YES - compliant 2x3 for
Record & As builtYES_ Design -Native/IFC YES- Native and IFC
Broward Health - FLA ( 2013) Revit Revit N/AYES - IFC compliance for file
transfer & Solibri checker
YES_ A/S/MEPF Models must reflect as-built
geometry & Data. Native- Navisworks/IFC/RVT
YES_ A/S/MEPF Models;2D PDF; BIM-Native-
Navisworks/RVT/IFC
Denver Airport ( 2013) Revit Revit Navisworks/Revit N/A N/A YES_ Navisworks/Revit Record AS-built
Department of Defense’ Military
Health System - DOD-MHS ( 2011)Neutral- Native- IFC certified Neutral- Native- IFC certified
Navisworks
/Navigator/
Adobe/Google earth
YES - certified 2x3 or better
for Coord view for all
deliverable
N/AYES_Design & Contractor - As-built conditions and
updated parameters
Federal Aviation Administration-
FAA (2012)
Neutral- IFC Compliant -
Arch/Struct: Revit Architecture,
Bentley Architecture(Triforma),
Tekla MEPF Revit MEP, AutoCAD
MEP, Bentley BIM
Neutral- IFC Compliant - Revit
MEP, AutoCAD MEP, Bentley BIM,
CAD-Duct, CAD-Pipe,AutoSprink,
PipeDesigner 3D
Navisworks
/Navigator/
Adobe/Google earth
YES - certified 2x3 or better
for Coord view for all
deliverable
N/A YES -Record models
Florida International Unv (2014) Revit Revit/Navisworks NavisworksYes- at close out for record
keeping and interoperabilityNO_ See as-built
YES_ Design update Arch & Struct through construction/
Contractor MEPF
Massport ( 2015) Revit Revit N/A
YES- IFC file may be required
on some projects for model
quality review at handover
YES_The Record Model is the Design Intent
Model updated to show the as-built locations of
the elements within this model and does not
reflect all As Built components’ geometry. will
contain accurate attribute data on major
equipment and systems for FM. Typically updated
by the Designer from information provided by the
Constructor (digital mark-ups, photography, laser
scans). It may be used by Commissioning
YES_The As-Built Model (.nwd) is submitted to MPA by
the Contractor. The As-Built Model is typically an
Autodesk® Navisworks® file that includes shop models
and drawing information from trades and fabricators
with detail of the as-built conditions. This model may
also include laser scan data. It is used as a detailed
reference document of all as-built conditions, but is not
the basis of FM.
University California San Francisco
Medical Ctr (2015)Revit Revit Navisworks
NO deliverables - Only when
used for coordinationN/A YES- By Contractor Called Record for LOD 500
Univ Southern California (USC)
Design Bid Build (2012)Revit Neutral- Not specified- Native Navisworks
YES -May be required- all
subs have capability to save
into most recent version
YES_ As Constructed YES_ As Constructed - Native
USC GMP Contracts (2012) Revit Revit Navisworks/ Revit N/A YES YES_ Revit or Native
USC PRevitXP (2015) Revit Revit N/A N/A YES- with shared parameters & COBie data YES_ Revit/Native(trade models)
University South Florida- USF
(2015)Revit Revit Navisworks N/A See as-builts
YES_Construction updates by Contractor then sent to
Design team for final As built -Revit/Navisworks
Veterans Administration - VA -
(2010)
Neutral- IFC Compliant -
Arch/Struct: Revit, Bentley BIM,
ArchiCAD, Tekla, Vectorworks;
MEPF: ArchiCAD MEP, Revit,
AutoCAD MEP, Bentley BIM,
Neutral- IFC Compliant - ArchiCAD
MEP, Revit, AutoCAD MEP, Bentley
BIM, CAD-Duct, CAD-Pipe,
AutoSprink, PipeDesigner 3D
N/A
YES_- IFC file format of the
consolidated building
systems models -
Coordination view
YES- Native file format(s) of Design Model -
“Design Intent model” remains current with all
approved bulletins for overall scope. It is NOT
expected that product specific information will be
added to this model.
YES_ Contractor—Native file formats of the final
consolidated as-built Model(s) for building systems used
in the multi-discipline coordination process . The
Model(s) shall be fully coordinated and align with the
Design Model for architecture and structure;
General Services Admin -GSA
Series 8 FM (2012)
Neutral- IFC Compliant - should
create IFCs in compliance with
the coordination view, spatial
program validation view and
COBie
Neutral- IFC Compliant - should
create IFCs in compliance with the
coordination view, spatial program
validation view and COBie
N/A
YES- Design Intent BIMs:
Record BIMs deliverable --
not required for
Construction or Coordination
BIMs
YES_ Native and IFC - represent the final as-
constructed building and components
configuration, including Architectural
Supplemental
Instructions, Change Notices, and field changes
YES_Native and IFC, Editable copy of the Record BIM that
is constantly updated to represent the current
completed state of the building and systems
configuration.
United States Army Corp of
Engineers- USACE ( 2012)Neutral-Revit or AECOsim Neutral-Revit or AECOsim N/A IFC coord view - archive n/a YES -Record models
Birgitta Foster/VDCO Tech 2016
DELIVERABLES
Dictating platform-
specific BIM
deliverables
Reviewed Fifteen (15)Standards
#BIMForumED
Pros oHealthier competition – no software requirements to limit the set of bidders
o The team members work with their own software platforms
oDo not use unfamiliar software
oOr pay a third party to produce the BIMs.
@BirgittaFoster @CindyWBaldwin
Dictating platform-
specific BIM
deliverables
ConsOwners may have
oLess control of the final software selection
oRisk receiving a less desirable platform.
oSupport multiple software platforms
oDifficultly hiring experienced staff in the multiple platforms
oA platform not compatible downstream applications.
#BIMForumED
Record vs As-Built
@BirgittaFoster @CindyWBaldwin
“To Do or Not to do”
Record Model
deliverables
“Record” should be reserved for models being provided by the designers of record.
“As-built” is associated with contractor provided as-installed building models.
#BIMForumED
Wide range Record BIM deliverables
oStrategiesoArch/Struct CD BIMs with Contractor MEPF modelsoDesign intent models to incorporate as-constructed conditions oDesign record models use As-built model elements with
product data
OWNER Example : “Design Intent model” remains current with all approved bulletins for overall scope. It is NOT expected that product specific information will be added to this model.”
oTerminology – mix and matching = confusingoAs-built RecordoRecord As-builtoDesign As-builtoContractor RecordoContractor Record As-built
@BirgittaFoster @CindyWBaldwin
“To Do or Not to do”
Record Model
deliverables
#BIMForumED
ContractorsAs-Built Deliverables
oMost consistent owner BIM requirement.
oNative common deliverable file formats.
oSome cases IFC and Navisworks files.
oHybrid – mix of BIM/3D CAD/2D CAD
oFederated Models- A trend to merge into a single deliverable o limits the number of BIMs the owner ultimately stores,
manages and updates
@BirgittaFoster @CindyWBaldwin
“To Do or Not to do”
Record Model
deliverables
#BIMForumED
Design Teams Deliverable Record BIMs
@BirgittaFoster @CindyWBaldwin
“To Do or Not to do”
Record Model
deliverables
PROS- Provides “record” models of changes
recorded by the Design Team- More accurate starting point for
renovations- Better investment than 2D record drawing
from Contactor redlines- Reuse of Contractor models to capture
undocumented changes
CONS- Perceived risk will come with a price tag- Hard to identify level of effort for each
project- No industry-wide best
practice/guidelines/standards available
#BIMForumED
Ensure practical and achievable
oProven
oBest Practice examples
oResource Model
oValidation Tools
@BirgittaFoster @CindyWBaldwin
Practical and
achievable BIM
deliverables
#BIMForumED
Proven to be achievable
@BirgittaFoster @CindyWBaldwin
Practical and
achievable BIM
deliverables
All required deliverables testedo As acceptable for intended use by End Usero Produced with existing project softwareo Workflows are possible and practical
#BIMForumED @BirgittaFoster @CindyWBaldwin
Practical and
achievable BIM
deliverablesBuilding Systems
YARD SALE!
Best Practice - Example
Use the software to stop before it happens
Set systems with specific color –When placing - wrong color = wrong system
#BIMForumED @BirgittaFoster @CindyWBaldwin
Practical and
achievable BIM
deliverables
Provide a Resource Model
Transfer using INSERT FROM FILE
Transfer as PROJECT INFO
Contains Owner Specific o Data Scheduleso Sheet Viewso Librarieso Shared Parameters
NOT A Model TEMPLATE
#BIMForumED @BirgittaFoster @CindyWBaldwin
Practical and
achievable BIM
deliverables
Automate checking your staff doesn't have time to do thoroughly
“Data Clash detection”
Validation ToolsMore control of your
Data deliverables
Acceptable Manufactures ? Motor voltages?
Building SystemsPipe material correct ?System components assigned – no Yard Sale!Fire dampers in all Fire walls?
AV Equipment at required height ?
#BIMForumED
Record BIMs
@BirgittaFoster @CindyWBaldwin
Practical and
achievable BIM
deliverables
Leverage BIM deliverable software
o“Reverse” Clash detection
o Value-Add approach
“Reverse” Clash
Detection
= off by more than 12 ”
Design Intent Vs
As Constructed
@BirgittaFoster @CindyWBaldwin
#BIMForumED @BirgittaFoster @CindyWBaldwin
Contractor RoutingDesign Intent Routing
Contractor RoutingDesign Intent Routing
CHILLED WATER LINES
CHILLED WATER RISERS
Value Add to update??
#BIMForumED @BirgittaFoster @CindyWBaldwin
Contractor Location Design Intent Location
VAV & Duct
Contractor RoutingDesign Intent Routing
CHILLED WATER LINES
Ductwork
Value Add to update??
#BIMForumED @BirgittaFoster @CindyWBaldwin
Contractor Piping Design Intent Piping
Pumps
DuctworkContractor Routing Design Intent RoutingValue Add to update??
#BIMForumED
Record modeling
oMEANS… contains the same content and level of development as the Design Intent BIMs for Construction Documents.
oDoes NOT Mean…. to contain all the construction details in the trade models.
@BirgittaFoster @CindyWBaldwin
#BIMForumED
Owner example “Rules of thumb”
Design Intent Model updated when Contractor Models are either :
A) Location of element* deviates o 6” or more in any space
o 12” or more in any concealed spaces, mechanical spaces for MEP & other building systems.
o 12” or more by any slab openings, steel members greater than 10” in depth and other major structural elements.
B) Equipment* or system component* has been o Replaced by an owner-approved alternate or
o Added during the construction phase of the project.
*Vague= $$..…must define to what Equipment/system/component
@BirgittaFoster @CindyWBaldwin
#BIMForumED @BirgittaFoster @CindyWBaldwin
BusinessBIM Uses
ESTA
BLI
SH
Geometry
Data
Schedule
File Formats
CO
NTR
AC
T
BIMPxP
DEV
ELO
P
Deliverable RequirementsContracts
Requirements
CAD PDF
CMMS
Space Mgt
EHS Requirements
2D 3D
Excel
Geometry - MP Spec/LOD Spec/M3
DEF
INE
User Requirements
Data - Facility Data Spec/COBie/LOD Attributes
File Format
Data Schedules
Sheet Views
Naming Conventions
BIM Guidelines
ContractorDesign Team
BIM Uses
CD Package
Software
Submittals
Commissioning
Programming
Equip Schedules
Emergency Mgt
Documents
Commissioning report
Word
Submittals
CD Record
Digital Deliverable Guide
Facility Data Spec
Geometry - MP Spec
Best Practices
Contractor deliverables
Design Team Deliverables
Documents
Schedule BIM Uses
Software
Owners –How to contract for BIM
deliverables and actually get what you want
Birgitta Foster Cindy Baldwin
THANK YOU!