PPC 3 rd SEMESTER OPERATIONS (PGDBA) PAGE NO: 1 OF 17 <Join symbiosispgdba2005 in yahoo groups for More> True/False Question: XYZ when combined with FSN analysis helps to classify non-moving items into XN , YN and ZN. Correct Answer: True Your Answer True Multiple Choice Single Answers Question: Forecast is based on:- Correct Answer: Past data Your Answer Competitor's market share Select the Blank Question: Network ________ is defined as any adjustment to the arrow diagram which becomes necessary owing to departure from the project schedule laid down earlier. Correct Answer: Updating Your Answer Design Multiple Choice Single Answers Question: For goods manufactured to stock, following department is expected to periodically undertake replenishment action as stocks are depleted:- Correct Answer: Production Planning Control Your Answer Production Planning Control True/False Question: CPM marks critical activities. Correct Answer: True Your Answer True Select The Blank Question: A shop order may combine more than one ________ requiring identical items. Correct Answer: Work order Your Answer Sales order Multiple Choice Single Answer Question: What are the customer's expectation from the supplier? Correct Answer: Consistent good quality of products Your Answer Consistent good quality of products Select The Blank Question: ________ inventories help to balance company's supply with market demand. Correct Answer: Finished goods Your Answer WIP Select The Blank Question: Short term forecasts are for ________. Correct Answer: Material Planning Your Answer Cash flow management Multiple Choice Single Answer Question: For process planning following is one of the basic document used :- Correct Answer: Operation Layout Your Answer Process Layout Multiple Choice Single Answer Question: Scheduled start of an operation is authorized by issuing a document called :- Correct Answer: Job card Your Answer Route card Multiple Choice Multiple Answer Question: SOS Analysis involves following type of items :- Correct Answer: Seasonal items available only for a limited period. , Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. Your Answer Seasonal items available throughout the year. , Non-seasonal items whose quantity is decided on different considerations. , Machine spare parts Multiple Choice Multiple Answer Question: The basic procedure of assignment technique is designed to solve problems wherein :- Correct Answer: Number of tasks equal to number of facilities. , The objective function is minimization. , There are no restrictions in allocation Your Answer Number of tasks equal to number of facilities. , There are no restrictions in allocation , Cost of machine should be taken into consideration. True/False Question: There are five manufacturing systems. However, many manufacturers combines two or more systems to produce a final product. Correct Answer: True Your Answer True True/False Question: In LOB, the regular progress checks the future effect of any current delays and indicates degree of urgency for corrective action. Correct Answer: True Your Answer True Multiple Choice Multiple Answer Question: 5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The processing times in hours are

Upload: vankhanh

Post on 23-Apr-2018

219 views

Category:

Documents


1 download

TRANSCRIPT

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 1 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

True/FalseQuestion: XYZ when combined with FSN analysis helps to

classify non-moving items into XN , YN and ZN.Correct Answer: TrueYour Answer True

Multiple Choice Single AnswersQuestion: Forecast is based on:-Correct Answer: Past dataYour Answer Competitor's market share

Select the BlankQuestion: Network ________ is defined as any adjustment

to the arrow diagram which becomes necessary owing to departurefrom the project schedule laid down earlier.Correct Answer: UpdatingYour Answer Design

Multiple Choice Single AnswersQuestion: For goods manufactured to stock, following

department is expected to periodically undertake replenishmentaction as stocks are depleted:-Correct Answer: Production Planning ControlYour Answer Production Planning Control

True/FalseQuestion: CPM marks critical activities.Correct Answer: TrueYour Answer True

Select The BlankQuestion: A shop order may combine more than one

________ requiring identical items.Correct Answer: Work orderYour Answer Sales order

Multiple Choice Single AnswerQuestion: What are the customer's expectation from the

supplier?Correct Answer: Consistent good quality of productsYour Answer Consistent good quality of products

Select The BlankQuestion: ________ inventories help to balance company's

supply with market demand.Correct Answer: Finished goodsYour Answer WIP

Select The BlankQuestion: Short term forecasts are for ________.

Correct Answer: Material PlanningYour Answer Cash flow management

Multiple Choice Single AnswerQuestion: For process planning following is one of the basic

document used :-Correct Answer: Operation LayoutYour Answer Process Layout

Multiple Choice Single AnswerQuestion: Scheduled start of an operation is authorized by

issuing a document called :-Correct Answer: Job cardYour Answer Route card

Multiple Choice Multiple AnswerQuestion: SOS Analysis involves following type of items :-Correct Answer: Seasonal items available only for a

limited period. , Seasonal items available throughout the year. ,Non-seasonal items whose quantity is decided on differentconsiderations.

Your Answer Seasonal items available throughout the year. ,Non-seasonal items whose quantity is decided on differentconsiderations. , Machine spare parts

Multiple Choice Multiple AnswerQuestion: The basic procedure of assignment technique is

designed to solve problems wherein :-Correct Answer: Number of tasks equal to number of

facilities. , The objective function is minimization. , There are norestrictions in allocation

Your Answer Number of tasks equal to number of facilities. ,There are no restrictions in allocation , Cost of machine should betaken into consideration.

True/FalseQuestion: There are five manufacturing systems. However,

many manufacturers combines two or more systems to produce afinal product.

Correct Answer: TrueYour Answer True

True/FalseQuestion: In LOB, the regular progress checks the future

effect of any current delays and indicates degree of urgency forcorrective action.

Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: 5 jobs are to be processed on machines M1 and

M2 , first on M1 and then on M2. The processing times in hours are

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 2 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

as follows. Find the sequence for 5 jobs that will minimize totalelapsed time .also find idle time & total elapsed time. JobProcessing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 97 6 3 8 5 10 4Correct Answer: 2-4-3-5-1 , Minimum time 28 hours ,

Idle time = 1 & 2 Hours for M1 & M2 respectively.Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours

for M1 & M2 respectively.

True/FalseQuestion: When shop floor scheduling problem larger than

3 machines arise the analytical solution procedures leading tooptimality are complex and difficult.Correct Answer: TrueYour Answer True

Match The FollowingQuestion: Correct Answer:Your Answer

End piece allowance Material insufficient to produce onepiece Material insufficient to produce one piece

Stock allowance Quantity to meet requirement of sparesExtra material requirement

Machining allowance Extra material requirementMaterial lossin handling

Spoilage allowance Process rejection Quantity to meetrequirement of spares

Select The BlankQuestion: ________ is required for machine set ups as well

as regular production.Correct Answer: Performance standardYour Answer Machine design data

Multiple Choice Single AnswerQuestion: If a product is required within 20 days and the

product can be made available in 10 days, the Critical ratio wouldbe :-Correct Answer: 2Your Answer 0.5

Multiple Choice Single AnswerQuestion: A subcontractor is :-Correct Answer: Another form acting as a supplierYour Answer Manufacturer of specialized products on whom

the buyer is dependent for 100% of requirement of main assembly

Multiple Choice Single Answer

Question: The data regarding maximum run out betweencenters pertains to :-

Correct Answer: Process planningYour Answer Raw material data

True/FalseQuestion: Lead time information is required for

determination of safety stock.Correct Answer: FalseYour Answer True

Select The BlankQuestion: Americans like to use the word 'inventory'

whereas for same context British use the term________.Correct Answer: StockYour Answer Stock

Multiple Choice Multiple AnswerQuestion: SDE analysis is employed by the purchase

department for :-Correct Answer: Contract buying for some of 'easy' items.

, Forward buying of some of 'scarce' items. , Scheduled buying forsome of 'easy' items.

Your Answer Forward buying of some of 'scarce' items. ,Scheduled buying for some of 'easy' items. , Contract buying forsome of 'easy' items.

True/FalseQuestion: Labour efficiency factor is applied after capacity

requirement of equipment is calculated.Correct Answer: FalseYour Answer True

Multiple Choice Multiple AnswerQuestion: PERT terminology uses words like :-Correct Answer: Network diagram , Events , SlackYour Answer Network diagram , Events

True/FalseQuestion: The LOB technique is most appropriate for

assembly operations involving number of distinct components.Correct Answer: TrueYour Answer True

True/FalseQuestion: Transit time for manufactured items should be

considered only when it is insignificant.Correct Answer: FalseYour Answer True

Select The Blank

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 3 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: A progress card normally contains ________squares.Correct Answer: Less than 25Your Answer More than 50

Multiple Choice Multiple AnswerQuestion: Due to the following emergent events, the queue

time has to compensate for the time for which the job has toundergo an extra time :-Correct Answer: Tool breakage , Job split up , Change in

prioritiesYour Answer Tool breakage , Job split up , Store inventory

Multiple Choice Single AnswerQuestion: One of the following is not an task of progressing

:-Correct Answer: Ensuring supply of material and issue of

documents to manufacturing shopsYour Answer Expediting to rush up remaining operations of the

delays jobs

Multiple Choice Single AnswerQuestion: Production output in night shift is :-Correct Answer: Less than I shift productionYour Answer More than I shift production

Multiple Choice Multiple AnswerQuestion: The minimum requirements for application

software for line balancing are as follows :-Correct Answer: 1 Ghz processor , 1 Gb hard Disk free

memory , Windows or equivalent operating system.Your Answer 1 Gb hard Disk free memory , Windows or

equivalent operating system.

Multiple Choice Single AnswerQuestion: The work measurement and time study belong to

the following school of management :-Correct Answer: Scientific School of managementYour Answer Functional School of management

Multiple Choice Multiple AnswerQuestion: Before planning subcontracting points to be

considered are :-Correct Answer: Whether overtime can be given , One

more shift can be startedYour Answer Whether overtime can be given , One more shift

can be started , Set up time can be reduced

Multiple Choice Multiple AnswerQuestion: The main requirements of re-order level system

are as follows :-

Correct Answer: Incoming materials and materialsreturned from shop must be deposited in appropriate bins and theirstock cards must be posted for "goods receipt report" and "materialreturn note" for the quantities received physically . , Items shouldbe issued in correct quantities. , The balance on the stock cardsshould be periodically tallied with physical stock.

Your Answer Incoming materials and materials returned fromshop must be deposited in appropriate bins and their stock cardsmust be posted for "goods receipt report" and "material return note"for the quantities received physically . , Items should be issued incorrect quantities. , The balance on the stock cards should beperiodically tallied with physical stock.

Multiple Choice Multiple AnswerQuestion: The following are salient features of the fixed

order quantity system :-Correct Answer: Reorder quantity is always the same

which is usually economic order quantity , The time intervalbetween deliveries varies. , Replenishment action is initiated whenthe stock on hand is just sufficient to meet demand during the leadtime.

Your Answer Reorder quantity is always the same which isusually economic order quantity , The time interval betweendeliveries varies. , Percent cumulative cost of item is taken intoconsideration.

Select The BlankQuestion: ABC company manufactures MS bolts. Given

fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the costof buying is Rs 8 per piece. The firm uses 100000 MS bolts everyyear. Under these circumstances, the firm would take a decision to________.

Correct Answer: Make at homeYour Answer Buy from outside

Multiple Choice Multiple AnswerQuestion: Following difficulties are faced by SDE analysis

:-Correct Answer: More delivery period , Geographical

location of supplier , Reliability of suppliersYour Answer More delivery period , Reliability of suppliers ,

Excise duty

Select The BlankQuestion: For replenishment action for stock items which

are reserved by PPC, the stores work out ________ stock whichequals the stock on hand less stock reserved.

Correct Answer: FreeYour Answer Net

True/FalseQuestion: Route sheets for custom built job is prepared for

each new order received.

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 4 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Correct Answer: TrueYour Answer True

Match The FollowingQuestion: Correct Answer:Your Answer

Order quantity Factor influencing process planningComparealternative processes

Machine capacity chart Dimensional accuracy Generalpurpose machines with special toolings

Mass production Special purpose machines Break even analysis

Standard elemental time data Compare alternative processesFactor influencing process planning

Multiple Choice Multiple AnswerQuestion: Following are some of the common standard

cutting tools :-Correct Answer: Cutting saw , Inserts , ReamersYour Answer Form tool , Inserts , Reamers

Multiple Choice Single AnswerQuestion: The Carrying cost is stated in terms of :-Correct Answer: Per item per yearYour Answer Per order

Select The BlankQuestion: The definitive statement of policy stating when to

procure and how much to procure usually to ensure that the sum ofall costs associated with ________ are minimised is calledInventory policy.Correct Answer: InventoryYour Answer Buying

Select The BlankQuestion: Buying for C quantities should be made in

________ quantities .Correct Answer: LargeYour Answer Medium

Select The BlankQuestion: In the assignment model, the________ is formed

between jobs and machines.Correct Answer: MatrixYour Answer Matrix

Select The BlankQuestion: ________ analysis mainly helps to identify non-

existing items for which store keeps bin cards, wastes computer

memory or wastes computer stationary while preparing storesledger.

Correct Answer: MNG AnalysisYour Answer SOS Analysis

Multiple Choice Single AnswerQuestion: Why customer is called the king?Correct Answer: Customer's orders gives us workYour Answer Gives satisfaction to workers

Multiple Choice Single AnswerQuestion: Negative value of critical ratio :-Correct Answer: Is meaninglessYour Answer Indicates excess of scheduled delivery period

Multiple Choice Multiple AnswerQuestion: The main characteristics of batch production are

:-Correct Answer: Short runs , Skilled labours in specific

trade , Supervisor to posses knowledge of specific processYour Answer Short runs , Skilled labours in specific trade ,

Supervisor to posses knowledge of specific process

True/FalseQuestion: If lead time available is 11days and lead time

required is 10 days, the critical ratio would be 1.10.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: What are the factor affecting decision about

centralized planning system?Correct Answer: Product variety is large , Jobbing and

batch production methods of manufacturing , Work is less repetitiveYour Answer Product variety is large , Jobbing and batch

production methods of manufacturing , Work is less repetitive

True/FalseQuestion: In continuous or process production , only one

product is manufactured.Correct Answer: TrueYour Answer True

True/FalseQuestion: The make-or-buy decision becomes necessary

when the current source of supply is not able to supply the materialin accordance with buyer's quality requirements.

Correct Answer: TrueYour Answer True

True/False

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 5 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: Work measurement function is attached to linemanagement.Correct Answer: FalseYour Answer True

Multiple Choice Single AnswerQuestion: Placement of purchase orders in case of 'A' type

of items is usually :-Correct Answer: FrequentYour Answer Frequent

Match The FollowingQuestion: Correct Answer:Your Answer

Economic order quantity Quantity at which there is neitheroverstocking nor under stocking. Quantity at which there isneither overstocking nor under stocking.

Carrying cost Cost of 'holding' the material in store Costof transportation [carrying] of material

Procurement cost Administrative cost for procurement Costof procurement of material

Inventory cost Sum of carrying and inventory cost Sum ofcarrying and inventory cost

True/FalseQuestion: To solve "n jobs - 3 machines" sequencing

problem, the largest of time of any job on the second machine mustbe smaller than or equal to the smallest time of any job on firstmachine or third machine.Correct Answer: TrueYour Answer False

True/FalseQuestion: Systematic procedures must be set in the

operating functions prior to installation of PPC in the firm.Correct Answer: TrueYour Answer True

Select The BlankQuestion: Time waste is the earliest of all wastes and yet

the________ to correct because it does not litter the floor.Correct Answer: HazardsYour Answer Big hazard

Multiple Choice Single AnswerQuestion: If the annual usage of a material is 1200 units and

the reorder point is at 120 Units, find the lead time.Correct Answer: 4 monthsYour Answer 1.2 Months

Multiple Choice Single AnswerQuestion: Which factor influence plan for meeting seasonal

or occasional increase in demand?Correct Answer: SubcontractingYour Answer Subcontracting

Multiple Choice Single AnswerQuestion: Which of the following is the function of

Production Planning?Correct Answer: Process planning and schedulingYour Answer Progressing

Select The BlankQuestion: Because of uncertainty of activity timings, PERT

acquired a shape of ________ model.Correct Answer: ProbabilisticYour Answer Statistical

True/FalseQuestion: Scientific inventory control system requires to be

followed for machine aid, work aid and inspection aid :-Correct Answer: FalseYour Answer True

True/FalseQuestion: Job schedule is a chart showing work ahead of

each machine with respect to time.Correct Answer: FalseYour Answer True

Match The FollowingQuestion: Correct Answer:Your Answer

Tooling cost Jigs and Fixtures Jigs and Fixtures

Opportunity costsMonitory value sacrificed in rejection Costof giving opportunity to do a business

Incremental cost Vary with decision to make or buy Vary withdecision to make or buy

Labour cost Wages and other benefits Wages and otherbenefits

Multiple Choice Single AnswerQuestion: The goods are manufactured as per customer's

definite order in case of :-Correct Answer: Job productionYour Answer Batch production

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 6 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Multiple Choice Multiple AnswerQuestion: The commonly used network techniques other

than PERT and CPM are as follows :-Correct Answer: MOSS [ Multi Operation Scheduling

System ] , PCS [ Project Control System ] , GERT [ GraphicalEvaluation Review Techniques ]Your Answer MIS [ Management Information Systems ]

Multiple Choice Multiple AnswerQuestion: To minimize total throughout time we are

required to minimize :-Correct Answer: Queuing , Idle time , InventoryYour Answer Queuing , Idle time

Multiple Choice Multiple AnswerQuestion: Following conditions are required to be fulfilled

for processing n jobs through 2 machines :-Correct Answer: The jobs are ready to be processed

before the period under consideration begins . , Transient time tomove a job from one machine to the another is negligible. , Inprocess inventory is allowed.Your Answer The jobs are ready to be processed before the

period under consideration begins . , In process inventory isallowed.

Select The BlankQuestion: An inventory control technique based on selective

approach to stock items is called ________ analysis.Correct Answer: Pareto'sYour Answer Pareto's

Multiple Choice Multiple AnswerQuestion: While communicating to customer on delays in

delivery following information should be given :-Correct Answer: Information on identification of job ,

Reasons for delays , Revised date of deliveryYour Answer Reasons for delays , Revised date of delivery

Select The BlankQuestion: CPM is ________ oriented system.Correct Answer: ActivityYour Answer Activity

Multiple Choice Single AnswerQuestion: One of the following is not consumable tool :-Correct Answer: ArborsYour Answer Arbors

True/FalseQuestion: LOB is a manual planning and scheduling

technique similar in nature to MRP [Material Resource Planning].

Correct Answer: TrueYour Answer False

Select The BlankQuestion: ________ is required when expediting fails to

bring deviated plan to its actual path.Correct Answer: ReplanningYour Answer Replanning

Multiple Choice Multiple AnswerQuestion: The process of contraction or compression

involves extra cost because extra money is required to be spent onfactors such as :-

Correct Answer: Overtime engagement of workforce ,Purchase of additional machinery , Use of better materials

Your Answer Overtime engagement of workforce , Purchase ofadditional machinery , Purchase of stationary of good quality

Multiple Choice Single AnswerQuestion: In job production one single product is

manufactured while a batch of group of products is turned out at atime under a system of :-

Correct Answer: Batch productionYour Answer Process production

Multiple Choice Multiple AnswerQuestion: The 'F' group of GOLF analysis involves

following requirements :-Correct Answer: Search for foreign suppliers , Opening of

letter of credit , Arrangements for shipping and port clearanceYour Answer Search for foreign suppliers

Multiple Choice Single AnswerQuestion: The production system characterized by complex

set of activities that must be performed in a particular order within agiven period and within an estimated expenditure is known as :-

Correct Answer: Project productionYour Answer Project production

Multiple Choice Single AnswerQuestion: Proper Production Planning and Control can

reduce cost in :-Correct Answer: Overtime costYour Answer Overtime cost

Select The BlankQuestion: ________ is the specific instant of time that

marks start and end of activity.Correct Answer: EventYour Answer Event

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 7 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Select The BlankQuestion: Overlapping of operations help to ________

manufacturing time.Correct Answer: ReduceYour Answer Reduce

Multiple Choice Multiple AnswerQuestion: "Difficult" items have following attributes :-Correct Answer: Available indigenously but are not easy

to procure , Items which come from longer distance , Items whichare difficult to manufactureYour Answer Available indigenously but are not easy to

procure , Items which come from longer distance , Items havingcomplex specifications

Multiple Choice Multiple AnswerQuestion: They are type of analytical estimate :-Correct Answer: Moving average , Exponential

smothering , Curve fittingYour Answer Moving average , Curve fitting

Select The BlankQuestion: The performance standard is required by

________ to determine individual machine capacity for the purposeof machine loading and assigning machine hours and man hours .Correct Answer: SchedulerYour Answer Production engineer

Multiple Choice Multiple AnswerQuestion: The network analysis involves following works :-Correct Answer: Obtaining a work breakdown structure to

a set of individual jobs which are arranged in a logical network. ,Estimation of job duration , Scheduling to discover which jobscontrol completion of project and reallocation of resources.Your Answer Obtaining a work breakdown structure to a set of

individual jobs which are arranged in a logical network. ,Estimation of job duration , Scheduling to discover which jobscontrol completion of project and reallocation of resources.

Multiple Choice Single AnswerQuestion: The assembly work content [ Wi ] of the i'th

station having n work stations is given by :-Correct Answer: å Wi from i=1 to nYour Answer å Wi from i=1 to n

Multiple Choice Multiple AnswerQuestion: Essentials of good forecasts are :-Correct Answer: Stability , Fairly accurate , Economical

to generateYour Answer Stability , Fairly accurate , Economical to

generate

True/FalseQuestion: The 'G' group of GOLF analysis involves

moderate delivery time and availability of credit usually in therange of 30 to 60 days.

Correct Answer: TrueYour Answer True

Select The BlankQuestion: ABC company manufactures MS bolts. Given

fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing costwould be Rs ________.

Correct Answer: 6 LacsYour Answer 6 Lacs

LIST OF ATTEMPTED QUESTION:S AND ANSWERS

Multiple Choice Multiple AnswerQuestion: If actual demand far exceeds forecast, it will result

into :-Correct Answer: Better utilization of equipment , Project

margin , Higher material purchaseYour Answer Higher material purchase , Increase in labour

productivity , Better utilization of equipment , Project margin

Select The BlankQuestion: To know the accumulated ________ for a given

machine at a given time Load charts are necessary.Correct Answer: LoadYour Answer Load

Multiple Choice Single AnswerQuestion: LOB technique was developed by US navy in the year

:-Correct Answer: 1958Your Answer 1958

True/FalseQuestion: In continuous or process production , only one product

is manufactured.Correct Answer: TrueYour Answer True

Select The BlankQuestion: ________reflects impact of money tied up in

inventory.Correct Answer: Inventory turnoverYour Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion: Methods for recording actual progress of work for

shop orders are :-Correct Answer: Progress card , Display board , Network

updatingYour Answer Progress card , Display board , Network updating ,

Job card

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 8 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Select The BlankQuestion: A progress card is the most ________ method of

recording of progress of work.Correct Answer: ConvenientYour Answer Convenient

Multiple Choice Multiple AnswerQuestion: Following are some of the common standard cutting

tools :-Correct Answer: Cutting saw , Inserts , ReamersYour Answer Form tool , Cutting saw , Inserts , Reamers

Multiple Choice Multiple AnswerQuestion: Tooling cost comprises the cost of :-Correct Answer: Gigs , Fixtures , Drill bitsYour Answer Gigs , Fixtures , Drill bits , Stationary

Multiple Choice Single AnswerQuestion: The light engineering company has one special

purpose facing & centering machine And one copying lathe. Theforeman has five work orders for processing . The operationSequence is fixed [ each job is first faced and centered and thencopy turned ] . The standard Hours required for each machine toprocess each work order are shown in the following Table :- WorkOrder Processing Time [Hours ] Facing & centering machineCopying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 findsequence to minimize requirements of machine hours.Correct Answer: IV-I-II-V-IIIYour Answer I-II-III-IV-V

Select The BlankQuestion: ________ represents the time that elapses between the

receipt of requirement of job until the job is adopted in theproduction control department.Correct Answer: Order preparation timeYour Answer Queue time

True/FalseQuestion: PERT basically does not demarcate between critical

and non-critical activities.Correct Answer: TrueYour Answer True

Multiple Choice Single AnswerQuestion: The assignment method is also called as :-Correct Answer: Hungarian MethodYour Answer Analytical Method

Multiple Choice Multiple AnswerQuestion: Outside operations cost involves expenses such as :-Correct Answer: Rough blanking , Heat treatment , PlatingYour Answer Heat treatment , Plating , Inventory control , Rough

blanking

Select The BlankQuestion: The correct fitting of orders with capacity

considerably lessens ________ burden of control.Correct Answer: Foreman'sYour Answer Foreman's

Multiple Choice Multiple AnswerQuestion: The 'F' group of GOLF analysis involves following

requirements :-Correct Answer: Search for foreign suppliers , Opening of letter

of credit , Arrangements for shipping and port clearanceYour Answer Search for foreign suppliers , Opening of letter of

credit , Arrangements for shipping and port clearance , Account inforeign bank

Match The FollowingQuestion: Correct Answer: Your Answer

Order quantity Factor influencing process planning Break evenanalysis

Machine capacity chart Dimensional accuracy Dimensionalaccuracy

Mass production Special purpose machines Special purposemachines

Standard elemental time data Compare alternative processes Factorinfluencing process planning

Multiple Choice Multiple AnswerQuestion: The tooling data is prepared in respect of following

measuring instruments :-Correct Answer: Vernier caliper , Micrometer screw gauge ,

Strain gaugeYour Answer Vernier caliper , Micrometer screw gauge , Strain

gauge , Drill bits

Multiple Choice Multiple AnswerQuestion: In replenishment system, the fixed order quantity

system is also called by following names :-Correct Answer: Fixed order system , Min-max system , Re-

order point systemYour Answer Fixed order system , Min-max system , Re-order

point system , Lead time system

Multiple Choice Multiple AnswerQuestion: How you will Judge the failure of production planning

and control department?Correct Answer: Frequent broken delivery promises ,

Underutilization of men, machines , Excessive overtimeYour Answer Frequent broken delivery promises ,

Underutilization of men, machines , Excessive overtime , Bettercoordination with other section

Multiple Choice Single AnswerQuestion: In Cost Vs Quantity plot, the total inventory Cost

curve is :-Correct Answer: ParabolicYour Answer Inverse

True/False

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 9 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: Given stock in hand = 1320 units, safety stock=840units and average daily consumption = 60 units, the lead timeavailable would be 10 hours.Correct Answer: FalseYour Answer True

Multiple Choice Single AnswerQuestion: If the annual usage of a material is 1200 units and the

reorder point is at 120 Units, find the lead time.Correct Answer: 4 monthsYour Answer 4 months

Multiple Choice Single AnswerQuestion: The assignment algorithm was developed by a

Hungarian mathematician named :-Correct Answer: D. KonigYour Answer Charles simony

Multiple Choice Single AnswerQuestion: So far as possible, number of activities should be :-Correct Answer: LimitedYour Answer Limited

True/FalseQuestion: Production Planning and Control makes the supervisor

ineffective.Correct Answer: TrueYour Answer False

Multiple Choice Single AnswerQuestion: Unit of loading and scheduling depends on following

factor :-Correct Answer: Operating cycleYour Answer Unit of capacity

True/FalseQuestion: The 'G' group of GOLF analysis involves moderate

delivery time and availability of credit usually in the range of 30 to60 days.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: Load charts are used for following :-Correct Answer: To know the accumulated load on a given

machine at a given time , Identify periods available for allocation infuture to orders , Matching orders and loadsYour Answer Improving supply of material , To know the

accumulated load on a given machine at a given time , Identifyperiods available for allocation in future to orders , Matching ordersand loads

Select The BlankQuestion: ABC company manufactures MS bolts. Given fixed

cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost wouldbe Rs ________.Correct Answer: 6 LacsYour Answer 6 Lacs

Select The BlankQuestion: An inventory control system in which stock of item is

physically or conceptually divided into ________ bins is calledTwobin system.

Correct Answer: TwoYour Answer Pair

Multiple Choice Multiple AnswerQuestion: They are type of analytical estimate :-Correct Answer: Moving average , Exponential smothering ,

Curve fittingYour Answer Moving average , Exponential smothering , Curve

fitting , Opinion surveys

Multiple Choice Single AnswerQuestion: For goods manufactured to stock, following

department is expected to periodically undertake replenishmentaction as stocks are depleted :-

Correct Answer: Production Planning ControlYour Answer Production

True/FalseQuestion: Random fluctuation is addition of cyclical fluctuation

and seasonal fluctuation.Correct Answer: FalseYour Answer True

True/FalseQuestion: Scientific inventory control system requires to be

followed for machine aid, work aid and inspection aid :-Correct Answer: FalseYour Answer True

Multiple Choice Single AnswerQuestion: Value Analysis conducted in 'C' type of material is

usually :-Correct Answer: MinimumYour Answer Minimum

True/FalseQuestion: Purchase department must keep PPC informed

regarding lead time of different items specially where lead times areextended.

Correct Answer: TrueYour Answer True

True/FalseQuestion: In assignment matrix, it is a must to determine

Jacobean of the determinant.Correct Answer: FalseYour Answer True

Select The BlankQuestion: For replenishment action for stock items which are

reserved by PPC, the stores work out ________ stock which equalsthe stock on hand less stock reserved.

Correct Answer: FreeYour Answer Net

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 10 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Multiple Choice Single AnswerQuestion: What are the customer's expectation from the

supplier?Correct Answer: Consistent good quality of productsYour Answer Consistent good quality of products

Match The FollowingQuestion: Correct Answer: Your Answer

End piece allowance Material insufficient to produce one pieceMaterial insufficient to produce one piece

Stock allowance Quantity to meet requirement of spares Quantity tomeet requirement of spares

Machining allowance Extra material requirement Extra materialrequirement

Spoilage allowance Process rejection Process rejection

Multiple Choice Single AnswerQuestion: Why customer is called the king?Correct Answer: Customer's orders gives us workYour Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion: PPC is expected to have good inter-departmental

relationships to achieve the production targets. Which is the mostimportant factor that shall affect production targets?Correct Answer: Timely availability of material, manpowerYour Answer Timely availability of material, manpower

Select The BlankQuestion: Generally for ________ flow system, Heuristic

method is preferred.Correct Answer: IntermittentYour Answer Continuous

Select The BlankQuestion: In control board________ compartment contains copy

of work orders/shop orders of the item to be processed next on themachine.Correct Answer: MiddleYour Answer Bottom

True/FalseQuestion: Work measurement function is attached to line

management.Correct Answer: FalseYour Answer True

Multiple Choice Multiple AnswerQuestion: The technical feasibility of sales enquiry is carried out

on the following grounds :-Correct Answer: Tools and plants are available , Technical

know how is available , Competent persons are present

Your Answer Tools and plants are available , Technical knowhow is available , Competent persons are present , Cost data of rawmaterial is available.

LIST OF ATTEMPTED QUESTION:S AND ANSWERS

Multiple Choice Multiple AnswerQuestion: Following are the factors which influence tool life

:-Correct Answer: Operators efficiency , Type of tool ,

Material it is required to operate uponYour Answer Operators efficiency , Type of tool , Material it is

required to operate upon

Multiple Choice Single AnswerQuestion: The document which incorporates details of

process planning for a job is called :-Correct Answer: Route SheetYour Answer Route Sheet

Multiple Choice Multiple AnswerQuestion: CPM terminology uses words likeCorrect Answer: Arrow diagram , Nodes , FloatYour Answer Arrow diagram , Nodes

Select The BlankQuestion: Forecasting is function of ________.Correct Answer: Marketing departmentYour Answer Planning in charge

Select The BlankQuestion: Johnsons method of scheduling can be used when

operation sequence involve ________ machines.Correct Answer: TwoYour Answer Two

Select The BlankQuestion: Good quality and ________are the two main

requirements to secure maximum business from a customer.Correct Answer: Competitive ratesYour Answer Competitive rates

Select The BlankQuestion: Sum of queue, transit, order preparation and

manufacturing times is known as ________Correct Answer: Total Lead TimeYour Answer Total Lead Time

True/False

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 11 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: To conduct FSN analysis we require, last date ofreceipt or last date of issue whichever is later and period.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: Overtime can be avoided in many ways and they

are :-Correct Answer: Unrealistic delivery date , Acceptance of

too many rush order , Excessive machine breakdownYour Answer Unrealistic delivery date , Acceptance of too

many rush order , Excessive machine breakdown

Multiple Choice Multiple AnswerQuestion: Material control function embraces a following

techniques :-Correct Answer: Make -or -buy decision , Pareto's

analysis , Replenishment systemYour Answer Make -or -buy decision , Pareto's analysis ,

Replenishment system

True/FalseQuestion: Work measurement is not useful for choosing

between two alternate methods of production.Correct Answer: FalseYour Answer False

Multiple Choice Multiple AnswerQuestion: Process Sheet contains following information :-Correct Answer: Material Specification , Sequence of

operation , Skill of LabourYour Answer Material Specification , Sequence of operation ,

Skill of Labour

True/FalseQuestion: More than one subcontractor should be developed

for each subcontracted operation/Job.Correct Answer: TrueYour Answer True

Select The BlankQuestion: Classification of items on basis of their capital

lock up is called ________ analysis.Correct Answer: XYZYour Answer XYZ

Select The BlankQuestion: Purchase section must keep ________posted on

the progress of purchase orders and expected delays.Correct Answer: P.P.C.Your Answer P.P.C.

Multiple Choice Single AnswerQuestion: Effective Production Planning and Control,

reduce investment in inventories effectively :-Correct Answer: By proper coordination between shop

floor, stores and buying departmentYour Answer By proper coordination between shop floor, stores

and buying department

True/FalseQuestion: Fluctuation due to changes in season are called

cyclical fluctuation.Correct Answer: FalseYour Answer False

True/FalseQuestion: Flexibility and product variety are not inter-

related with each other.Correct Answer: FalseYour Answer True

True/FalseQuestion: Overlapping of operations help to reduce

manufacturing time.Correct Answer: TrueYour Answer True

Select The BlankQuestion: The LOB technique is made more accurate and

fast by using ________.Correct Answer: ComputersYour Answer Reduction techniques

True/FalseQuestion: Overtime is undesirable since it increases

manufacturing cost of the product.Correct Answer: TrueYour Answer False

Multiple Choice Multiple AnswerQuestion: The essential features of batch production are :-Correct Answer: General purpose machines and process

type layout , Manual materials handling , Flexibility of productionschedule

Your Answer General purpose machines and process typelayout , Manual materials handling , Flexibility of productionschedule

Multiple Choice Single AnswerQuestion: The sourcing of vendors in case of 'B' type of

items is :-Correct Answer: Medium

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 12 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Your Answer Few

Multiple Choice Single AnswerQuestion: Dispatcher withdraws required quantity of

material from stores using following document :-Correct Answer: Stores issue orderYour Answer Bill of material

Multiple Choice Multiple AnswerQuestion: In a mass production assembly shop following

work measurement techniques are used :-Correct Answer: Time study , Work sampling ,

Production studyYour Answer Time study , Work sampling , Production study ,

Analytical estimating

Multiple Choice Multiple AnswerQuestion: SDE analysis is based on problems of

procurement namely :-Correct Answer: Non-availability , Scarcity , Longer lead

timeYour Answer Non-availability , Scarcity , Longer lead time

True/FalseQuestion: Line balancing is a simulation technique.Correct Answer: FalseYour Answer False

Multiple Choice Multiple AnswerQuestion: The line of balance is a device for planning and

monitoring progress of :-Correct Answer: Purchase order execution , Project

execution , Targeted programsYour Answer Purchase order execution , Project execution ,

Targeted programs

Select The BlankQuestion: Sales persons decides ________.Correct Answer: Synthetic forecastYour Answer Current sales

True/FalseQuestion: Material control Card is a document for record of

issues of material and receipt of unused material by productionshop.Correct Answer: FalseYour Answer False

Multiple Choice Single AnswerQuestion: Work measurement is limited to measuring :-Correct Answer: Productive & non productive time

Your Answer Only product related activities

Match The FollowingQuestion: Correct Answer:Your Answer

Move order Transport material from and to required workcenters Transport material from and to required work centers

Materials Order Allocation of material required in connection withshop order Allocation of material required in connection withshop order

Work Order Bird's eye view of production programmeBird's eye view of production programme

Production Order Reserve material required in connection withsales order Reserve material required in connection withsales order

Multiple Choice Multiple AnswerQuestion: The software for line balancing should have

following features :-Correct Answer: Easy to operate , Easy to install , Easy to

upgradeYour Answer Easy to operate , Easy to install , Unmanaged

code should be available

Multiple Choice Single AnswerQuestion: Man hours is commonly used unit of

measurement for scheduling purposes in following industry :-Correct Answer: EngineeringYour Answer Engineering

Multiple Choice Multiple AnswerQuestion: Customer plays very important role due to the

following reasons :-Correct Answer: Gives us work , Dividends to share

holders , Gets business from new customersYour Answer Gives us work , Dividends to share holders , Gets

business from new customers

Multiple Choice Single AnswerQuestion: The 4X4 assignment problem involve following

job-machine operations :-Correct Answer: 24Your Answer 24

Multiple Choice Single AnswerQuestion: The best of scientific tools available for

scheduling is :-Correct Answer: CPA [ critical path analysis ]Your Answer Gantt Chart

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 13 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Multiple Choice Multiple AnswerQuestion: Work measurement is responsibility of :-Correct Answer: PPC , Industrial Engineering ,

Production departmentYour Answer PPC , Industrial Engineering

Match The FollowingQuestion: Correct Answer:Your Answer

Long production run Mass and Flow productionMass andFlow production

Complex activities to be performed in a particular order within agive time & estimate. Project production Projectproduction

One or few units manufactured as per customers requirementJobbing Production Jobbing Production

Short production run Batch Production Batch Production

Multiple Choice Single AnswerQuestion: Value Analysis conducted in 'C' type of material

is usually :-Correct Answer: MinimumYour Answer Minimum

Multiple Choice Multiple AnswerQuestion: Some of significant features of HML analysis are

:-Correct Answer: To evolve buying policies to control

purchases , To delegate authorities to different buyers to make pettycash purchases , Not to take consumption into accountYour Answer To evolve buying policies to control purchases ,

To delegate authorities to different buyers to make petty cashpurchases

Multiple Choice Single AnswerQuestion: What is the reasons for poor labour efficiency

attributed by inefficient P.P.C.?Correct Answer: Failure to provide proper tools and

control on work in progress on shop floorYour Answer Failure to provide proper tools and control on

work in progress on shop floor

Multiple Choice Single AnswerQuestion: The administrative expenses towards the

procurement of materials is called :-Correct Answer: Procurement costYour Answer Administrative cost

Multiple Choice Multiple AnswerQuestion: Smoothing performs following activities:-Correct Answer: Reallocation of resources , Improving

utilization of resources , Conducting Heuristic approachYour Answer Reallocation of resources , Improving utilization

of resources , Conducting Heuristic approach

True/FalseQuestion: As per a study on materials management

practices, a typical firm spends almost half of its rupee sales ongoods purchased from vendors.

Correct Answer: TrueYour Answer True

Select The BlankQuestion: Value analysis of ________ class items is usually

inadvisable.Correct Answer: CYour Answer C

True/FalseQuestion: PPC system in the organisation is to be tailor

made.Correct Answer: TrueYour Answer True

LIST OF ATTEMPTED QUESTION:S AND ANSWERS

True/FalseQuestion: Performance benchmarking does not involves

comparison of financial ratios at the aggregate level.Correct Answer: FalseYour Answer False

Multiple Choice Single AnswerQuestion: Setup time includes :-Correct Answer: Internal setup time & External setup timeYour Answer Internal setup time & External setup time

Multiple Choice Single AnswerQuestion: Participants of the groups for quality circles

should be decided by :-Correct Answer: Employees coming together by their own

enthusiasmYour Answer Employees coming together by their own

enthusiasm

Multiple Choice Single Answer

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 14 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: Check sheet are also used as :-Correct Answer: Data gathering & interpretation toolYour Answer Data gathering & interpretation tool

Multiple Choice Single AnswerQuestion: SMED means :-Correct Answer: Single minute exchange of diesYour Answer Single minute exchange of dies

Match The FollowingQuestion: Correct Answer:Your Answer

Productivity performance measurement Turnover employeeCost of quality

Financial performance measurement Sales of the monthsSales of the months

Customer satisfaction measurementCustomer complaints per periodCustomer complaints per period

Staff attitude measurementEmployee satisfaction indexEmployee satisfaction index

Select The BlankQuestion: ________ is an effect due to the muda of defect.Correct Answer: Wear & tear of parts while

disassemblingYour Answer Poor production planning & control

Select The BlankQuestion: If some defective parts are discovered by the

subsequent process they should be returned to the ________ toprevent reoccurrence.Correct Answer: Preceding processYour Answer Return to stores

Multiple Choice Multiple AnswerQuestion: The results oriented efforts of the quality circle

should also include :-Correct Answer: Efforts to avoid the problem

permanently , Ultimate aim of the customers satisfaction , Attackingthe real root causes & all possibilitiesYour Answer Efforts to avoid the problem permanently ,

Publication or advertisement of your contribution , Attacking thereal root causes & all possibilities

Match The FollowingQuestion: Correct Answer:Your Answer

Parato diagram always indicates Magnitude of defectsPhilosophy of 20% of the activity causes 80% of the effect

Parato analysis underlines & operates on Philosophy of "vitalfew:trivial many" Philosophy of "vital few:trivial many"

Parato analysis is technique of identifying vital causes byArranging data according to the descending order of their

frequency of occurrence Arranging data according to thedescending order of their frequency of occurrence

Parato diagram is a Bar graph with height or value drawn byArranging data in descending order Magnitude of defects

Multiple Choice Multiple AnswerQuestion: Few steps in construction in Radar chart are :-Correct Answer: Brainstorming to enlist characteristics

which require to be evaluated & draw the circle & divide it into'slices' equal to number of characteristics , The first slice begins at12 noon. Then draw vertical line & calibrate it equal to the numberof levels required , Draw concentric circles from each gradiationusing 'o' point as centre

Your Answer Brainstorming to enlist characteristics whichrequire to be evaluated & draw the circle & divide it into 'slices'equal to number of characteristics , The first slice begins at 12noon. Then draw vertical line & calibrate it equal to the number oflevels required , Draw concentric circles from each gradiation using'o' point as centre

Select The BlankQuestion: 5 S audit result is discussed in ________ meeting.Correct Answer: MonthlyYour Answer Monthly

True/FalseQuestion: Fishbone analysis is used both in analysis &

planning.Correct Answer: TrueYour Answer False

Multiple Choice Single AnswerQuestion: One Green Belt may head a team of :-Correct Answer: 20 employeesYour Answer 20 employees

Multiple Choice Multiple AnswerQuestion: Role of champions are :-Correct Answer: Approve six sigma projects , Remove

road block in the path of six sigma implementation , Monitorprogress of six sigma projects

Your Answer Monitor progress of six sigma projects , Approvesix sigma projects , Remove road block in the path of six sigmaimplementation

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 15 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Multiple Choice Multiple AnswerQuestion: To draw control charts, sample must be

representative of homogeneous segment of production for which :-Correct Answer: The items of the sample should be from

the same machine setting , The items should be of the same batch ,Items should be made from the same raw material batchYour Answer The items of the sample should be from the same

machine setting , The items should be of the same batch , Itemsshould be made from the same raw material batch

Multiple Choice Single AnswerQuestion: Failure mode and effect analysis (FMEA)

establishCorrect Answer: Process failure and minimize frequencyYour Answer Process failure and minimize frequency

Multiple Choice Multiple AnswerQuestion: What are the steps in deciding the benchmarking

partner?Correct Answer: Decide level of benchmarking , List

down a few prospective candidates of partnership , Collectinformation of short listed partnersYour Answer Decide level of benchmarking , List down a few

prospective candidates of partnership , Collect information of shortlisted partners

Multiple Choice Single AnswerQuestion: One Master Black Belt may head a team of :-Correct Answer: 15-20 Black BeltsYour Answer 15-20 Black Belts

Multiple Choice Single AnswerQuestion: Competitive benchmarking involves identifying

key competitive product, services or processes & comparing withthose of :-Correct Answer: Main competitorYour Answer Main competitor

Multiple Choice Single AnswerQuestion: Implication of Quality problem is:-Correct Answer: Gap in performanceYour Answer Gap in performance

Select The BlankQuestion: Number of defects in an individual component,

like gear, shaft, wheel etc can be monitored through ________ typeof control chart.Correct Answer: c-chartYour Answer c-chart

True/False

Question: Non-availability of files /document in time is aproblem to be addressed by office TPM.

Correct Answer: TrueYour Answer True

Multiple Choice Single AnswerQuestion: Check sheet is easy to use because it is :-Correct Answer: Simplest toolYour Answer Simplest tool

Multiple Choice Single AnswerQuestion: Benchmarking helps to identify the gap between

the current performance of the organization and the :-Correct Answer: Performance of the best organizationYour Answer Performance of the best organization

True/FalseQuestion: Flow chart is pictorial representation of the steps

in production control.Correct Answer: FalseYour Answer True

Multiple Choice Multiple AnswerQuestion: Breakdown problem may be stratified by :-Correct Answer: Sections , Machines , Type of

breakdown (e.g mech. Or electrical)Your Answer Sections , Machines , Type of breakdown (e.g

mech. Or electrical)

Select The BlankQuestion: A control chart to exhibit counted data on number

of defect is called ________.Correct Answer: c-chartYour Answer c-chart

Select The BlankQuestion: Procedure for implementation of TPM consists of

________ numbers of steps.Correct Answer: 12Your Answer 8

Select The BlankQuestion: Capability index Cp = ________Correct Answer: Specification width/process widthYour Answer Specification width/process width

Multiple Choice Single AnswerQuestion: Pareto's analysis underlines & operates

philosophy of :-Correct Answer: Vital few = trivial manyYour Answer Vital few = trivial many

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 16 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

True/FalseQuestion: Kanban signals are required when assembly work,

subassembly work and manufacturing at parts is carried out atdifferent locations.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: To reduce clamping & declamping time,

following actions are desirable :-Correct Answer: Standardize clamping bolts / screws ,

Cut off unnecessary threads , Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off

unnecessary threads , Use quick clamping device

Select The BlankQuestion: Benchmarking allows exchange of ________

between the benchmarking partners.Correct Answer: InformationYour Answer Information

Multiple Choice Multiple AnswerQuestion: TQM can never flourish if the staff are:-Correct Answer: Worried about losing jobs , Afraid of

being reprimanded if there are mistakes , Scared of their bossesYour Answer Worried about losing jobs , Afraid of being

reprimanded if there are mistakes , Scared of their bosses

True/FalseQuestion: In bar graph each bar is of same height.Correct Answer: FalseYour Answer False

Multiple Choice Multiple AnswerQuestion: During SMED implementation, primary study

consists of :-Correct Answer: Equipment analysis , Setup change

analysis , Preparation items (storage place , method) analysisYour Answer Equipment analysis , Setup change analysis ,

Preparation items (storage place , method) analysis

True/FalseQuestion: Daily work management can also be extended to

non manufacturing areas like procurement, QA, HRD etc.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: Types of Poka-Yoke are :-

Correct Answer: Prevention type Poka-Yoke , Detectiontype Poka-Yoke

Your Answer Prevention type Poka-Yoke , Detection typePoka-Yoke

Multiple Choice Single AnswerQuestion: Quality problem solving tool is used to :-Correct Answer: Improve qualityYour Answer Save time

True/FalseQuestion: Along with problem solving tools experience and

judgment is also used.Correct Answer: TrueYour Answer False

Select The BlankQuestion: JIT advocates the philosophy at elimination of

waste from system which occurs due to ________.Correct Answer: Over ProductionYour Answer Over Production

True/FalseQuestion: Without measuring initial performance, target

can't be set.Correct Answer: TrueYour Answer False

Multiple Choice Multiple AnswerQuestion: An erratic patterns falling above & below the

control limits indicates :-Correct Answer: Defect in materials , Frequent adjustment

of machines , Poorly trained operatorsYour Answer Defect in materials , Frequent adjustment of

machines , Poorly trained operators

True/FalseQuestion: Sample size for the construction of p-chart are

larger than X bar-R chart.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: Histogram is an important diagnostic tool.

Analysis of the histogram gives :-Correct Answer: It shows cause which affects the process

, An idea of what is happening to the process , Whether the processis capable of meeting process or not i.e. around correct average &within specific limits

Your Answer An idea of what is happening to the process ,Whether the process is capable of meeting process or not i.e. around

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 17 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

correct average & within specific limits , A bird's eye view of thevariation

Multiple Choice Single AnswerQuestion: Productivity improves by :-Correct Answer: Voluntary participants of everyoneYour Answer Voluntary participants of everyone

Production Planning & Control_8

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/FalseQuestion XYZ when combined with FSN analysis helps to classify

non-moving items into XN , YN and ZN.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion Forecast is based on :-Correct Answer Past dataYour Answer Competitor's market share

Select The BlankQuestion Network ________ is defined as any adjustment to the

arrow diagram which becomes necessary owing to departure from theproject schedule laid down earlier.Correct Answer UpdatingYour Answer Design

Multiple Choice Single AnswerQuestion For goods manufactured to stock, following department

is expected to periodically undertake replenishment action as stocks aredepleted :-Correct Answer Production Planning ControlYour Answer Production Planning Control

True/FalseQuestion CPM marks critical activities.Correct Answer TrueYour Answer True

Select The BlankQuestion A shop order may combine more than one ________

requiring identical items.Page 1

Production Planning & Control_8Correct Answer Work orderYour Answer Sales order

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?Correct Answer Consistent good quality of productsYour Answer Consistent good quality of products

Select The BlankQuestion ________ inventories help to balance company's

supply with market demand.Correct Answer Finished goodsYour Answer WIP

Select The BlankQuestion Short term forecasts are for ________.Correct Answer Material PlanningYour Answer Cash flow management

Multiple Choice Single AnswerQuestion For process planning following is one of the basic

document used :-Correct Answer Operation LayoutYour Answer Process Layout

Multiple Choice Single AnswerQuestion Scheduled start of an operation is authorized by issuing

a document called :-Correct Answer Job cardYour Answer Route card

Multiple Choice Multiple AnswerQuestion SOS Analysis involves following type of items :-Correct Answer Seasonal items available only for a limited period. ,

Seasonal items available throughout the year. , Non-seasonal items whosequantity is decided on different considerations.

Page 2

Production Planning & Control_8Your Answer Seasonal items available throughout the year. ,

Non-seasonal items whose quantity is decided on different considerations. ,Machine spare parts

Multiple Choice Multiple AnswerQuestion The basic procedure of assignment technique is designed

to solve problems wherein :-Correct Answer Number of tasks equal to number of facilities. , The

objective function is minimization. , There are no restrictions in allocationYour Answer Number of tasks equal to number of facilities. , There are

no restrictions in allocation , Cost of machine should be taken intoconsideration.

True/FalseQuestion There are five manufacturing systems. However, many

manufacturers combines two or more systems to produce a final product.Correct Answer TrueYour Answer True

True/FalseQuestion In LOB, the regular progress checks the future effect of

any current delays and indicates degree of urgency for corrective action.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion 5 jobs are to be processed on machines M1 and M2 , first

on M1 and then on M2. The processing times in hours are as follows.Find thesequence for 5 jobs that will minimize total elapsed time .also find idle time &total elapsed time. Job Processing time [ hours ] Machine M1 Machine M2 1 52 2 1 6 8 9 7 6 3 8 5 10 4Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2

Hours for M1 & M2 respectively.Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours for M1

& M2 respectively.

True/FalsePage 3

Production Planning & Control_8Question When shop floor scheduling problem larger than 3

machines arise the analytical solution procedures leading to optimality arecomplex and difficult.Correct Answer TrueYour Answer True

Match The FollowingQuestion Correct Answer Your Answer

End piece allowance Material insufficient to produce one piece Materialinsufficient to produce one piece

Stock allowance Quantity to meet requirement of spares Extramaterial requirement

Machining allowance Extra material requirement Material lossin handling

Spoilage allowance Process rejection Quantity to meet requirement ofspares

Select The BlankQuestion ________ is required for machine set ups as well as

regular production.Correct Answer Performance standardYour Answer Machine design data

Multiple Choice Single AnswerQuestion If a product is required within 20 days and the product

can be made available in 10 days, the Critical ratio would be :-Correct Answer 2Your Answer 0.5

Multiple Choice Single AnswerQuestion A subcontractor is :-Correct Answer Another form acting as a supplierYour Answer Manufacturer of specialized products on whom the

Page 4

Production Planning & Control_8buyer is dependent for 100% of requirement of main assembly

Multiple Choice Single AnswerQuestion The data regarding maximum run out between centers

pertains to :-Correct Answer Process planningYour Answer Raw material data

True/FalseQuestion Lead time information is required for determination of

safety stock.Correct Answer FalseYour Answer True

Select The BlankQuestion Americans like to use the word 'inventory' whereas for

same context British use the term________.Correct Answer StockYour Answer Stock

Multiple Choice Multiple AnswerQuestion SDE analysis is employed by the purchase department

for :-Correct Answer Contract buying for some of 'easy' items. , Forward

buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items.Your Answer Forward buying of some of 'scarce' items. , Scheduled

buying for some of 'easy' items. , Contract buying for some of 'easy' items.

True/FalseQuestion Labour efficiency factor is applied after capacity

requirement of equipment is calculated.Correct Answer FalseYour Answer True

Multiple Choice Multiple AnswerQuestion PERT terminology uses words like :-

Page 5

Production Planning & Control_8Correct Answer Network diagram , Events , SlackYour Answer Network diagram , Events

True/FalseQuestion The LOB technique is most appropriate for assembly

operations involving number of distinct components.Correct Answer TrueYour Answer True

True/FalseQuestion Transit time for manufactured items should be

considered only when it is insignificant.Correct Answer FalseYour Answer True

Select The BlankQuestion A progress card normally contains ________ squares.Correct Answer Less than 25Your Answer More than 50

Multiple Choice Multiple AnswerQuestion Due to the following emergent events, the queue time has

to compensate for the time for which the job has to undergo an extra time :-Correct Answer Tool breakage , Job split up , Change in prioritiesYour Answer Tool breakage , Job split up , Store inventory

Multiple Choice Single AnswerQuestion One of the following is not an task of progressing :-Correct Answer Ensuring supply of material and issue of documents to

manufacturing shopsYour Answer Expediting to rush up remaining operations of the

delays jobs

Multiple Choice Single AnswerQuestion Production output in night shift is :-Correct Answer Less than I shift production

Page 6

Production Planning & Control_8Your Answer More than I shift production

Multiple Choice Multiple AnswerQuestion The minimum requirements for application software for

line balancing are as follows :-Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows

or equivalent operating system.Your Answer 1 Gb hard Disk free memory , Windows or equivalent

operating system.

Multiple Choice Single AnswerQuestion The work measurement and time study belong to the

following school of management :-Correct Answer Scientific School of managementYour Answer Functional School of management

Multiple Choice Multiple AnswerQuestion Before planning subcontracting points to be considered

are :-Correct Answer Whether overtime can be given , One more shift can be

startedYour Answer Whether overtime can be given , One more shift can be

started , Set up time can be reduced

Multiple Choice Multiple AnswerQuestion The main requirements of re-order level system are as

follows :-Correct Answer Incoming materials and materials returned from shop

must be deposited in appropriate bins and their stock cards must be postedfor "goods receipt report" and "material return note" for the quantitiesreceived physically . , Items should be issued in correct quantities. , Thebalance on the stock cards should be periodically tallied with physical stock.Your Answer Incoming materials and materials returned from shop

must be deposited in appropriate bins and their stock cards must be postedfor "goods receipt report" and "material return note" for the quantitiesreceived physically . , Items should be issued in correct quantities. , Thebalance on the stock cards should be periodically tallied with physical stock.

Page 7

Production Planning & Control_8

Multiple Choice Multiple AnswerQuestion The following are salient features of the fixed order

quantity system :-Correct Answer Reorder quantity is always the same which is usually

economic order quantity , The time interval between deliveries varies. ,Replenishment action is initiated when the stock on hand is just sufficient tomeet demand during the lead time.Your Answer Reorder quantity is always the same which is usually

economic order quantity , The time interval between deliveries varies. ,Percent cumulative cost of item is taken into consideration.

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost

Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead costRs 0.5 Lacs. If bough from outside, the cost of buying is Rs 8 per piece. Thefirm uses 100000 MS bolts every year. Under these circumstances, the firmwould take a decision to ________.Correct Answer Make at homeYour Answer Buy from outside

Multiple Choice Multiple AnswerQuestion Following difficulties are faced by SDE analysis :-Correct Answer More delivery period , Geographical location of supplier

, Reliability of suppliersYour Answer More delivery period , Reliability of suppliers , Excise

duty

Select The BlankQuestion For replenishment action for stock items which are

reserved by PPC, the stores work out ________ stock which equals the stockon hand less stock reserved.Correct Answer FreeYour Answer Net

True/FalseQuestion Route sheets for custom built job is prepared for each

new order received.Page 8

Production Planning & Control_8Correct Answer TrueYour Answer True

Match The FollowingQuestion Correct Answer Your Answer

Order quantity Factor influencing process planning Comparealternative processes

Machine capacity chart Dimensional accuracy Generalpurpose machines with special toolings

Mass production Special purpose machines Break even analysis

Standard elemental time data Compare alternative processes Factorinfluencing process planning

Multiple Choice Multiple AnswerQuestion Following are some of the common standard cutting

tools :-Correct Answer Cutting saw , Inserts , ReamersYour Answer Form tool , Inserts , Reamers

Multiple Choice Single AnswerQuestion The Carrying cost is stated in terms of :-Correct Answer Per item per yearYour Answer Per order

Select The BlankQuestion The definitive statement of policy stating when to

procure and how much to procure usually to ensure that the sum of all costsassociated with ________ are minimised is called Inventory policy.Correct Answer InventoryYour Answer Buying

Select The BlankPage 9

Production Planning & Control_8Question Buying for C quantities should be made in ________

quantities .Correct Answer LargeYour Answer Medium

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The BlankQuestion In the assignment model, the________ is formed

between jobs and machines.Correct Answer MatrixYour Answer Matrix

Select The BlankQuestion ________ analysis mainly helps to identify

non-existing items for which store keeps bin cards, wastes computer memoryor wastes computer stationary while preparing stores ledger.Correct Answer MNG AnalysisYour Answer SOS Analysis

Multiple Choice Single AnswerQuestion Why customer is called the king?Correct Answer Customer's orders gives us workYour Answer Gives satisfaction to workers

Multiple Choice Single AnswerQuestion Negative value of critical ratio :-Correct Answer Is meaninglessYour Answer Indicates excess of scheduled delivery period

Multiple Choice Multiple AnswerQuestion The main characteristics of batch production are :-Correct Answer Short runs , Skilled labours in specific trade , Supervisor

to posses knowledge of specific processYour Answer Short runs , Skilled labours in specific trade , Supervisor

to posses knowledge of specific processPage 10

Production Planning & Control_8

True/FalseQuestion If lead time available is 11days and lead time required is

10 days, the critical ratio would be 1.10.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion What are the factor affecting decision about centralized

planning system?Correct Answer Product variety is large , Jobbing and batch production

methods of manufacturing , Work is less repetitiveYour Answer Product variety is large , Jobbing and batch production

methods of manufacturing , Work is less repetitive

True/FalseQuestion In continuous or process production , only one product is

manufactured.Correct Answer TrueYour Answer True

True/FalseQuestion The make-or-buy decision becomes necessary when the

current source of supply is not able to supply the material in accordance withbuyer's quality requirements.Correct Answer TrueYour Answer True

True/FalseQuestion Work measurement function is attached to line

management.Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion Placement of purchase orders in case of 'A' type of items

Page 11

Production Planning & Control_8is usually :-Correct Answer FrequentYour Answer Frequent

Match The FollowingQuestion Correct Answer Your Answer

Economic order quantity Quantity at which there is neitheroverstocking nor under stocking. Quantity at which there is neitheroverstocking nor under stocking.

Carrying cost Cost of 'holding' the material in store Cost oftransportation [carrying] of material

Procurement cost Administrative cost for procurement Cost ofprocurement of material

Inventory cost Sum of carrying and inventory cost Sum ofcarrying and inventory cost

True/FalseQuestion To solve "n jobs - 3 machines" sequencing problem, the

largest of time of any job on the second machine must be smaller than orequal to the smallest time of any job on first machine or third machine.Correct Answer TrueYour Answer False

True/FalseQuestion Systematic procedures must be set in the operating

functions prior to installation of PPC in the firm.Correct Answer TrueYour Answer True

Select The BlankQuestion Time waste is the earliest of all wastes and yet

the________ to correct because it does not litter the floor.Correct Answer Hazards

Page 12

Production Planning & Control_8Your Answer Big hazard

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the

reorder point is at 120 Units, find the lead time.Correct Answer 4 monthsYour Answer 1.2 Months

Multiple Choice Single AnswerQuestion Which factor influence plan for meeting seasonal or

occasional increase in demand?Correct Answer SubcontractingYour Answer Subcontracting

Multiple Choice Single AnswerQuestion Which of the following is the function of Production

Planning?Correct Answer Process planning and schedulingYour Answer Progressing

Select The BlankQuestion Because of uncertainty of activity timings, PERT

acquired a shape of ________ model.Correct Answer ProbabilisticYour Answer Statistical

True/FalseQuestion Scientific inventory control system requires to be

followed for machine aid, work aid and inspection aid :-Correct Answer FalseYour Answer True

True/FalseQuestion Job schedule is a chart showing work ahead of each

machine with respect to time.Correct Answer False

Page 13

Production Planning & Control_8Your Answer True

Match The FollowingQuestion Correct Answer Your Answer

Tooling cost Jigs and Fixtures Jigs and Fixtures

Opportunity costs Monitory value sacrificed in rejection Cost of givingopportunity to do a business

Incremental cost Vary with decision to make or buy Vary withdecision to make or buy

Labour cost Wages and other benefits Wages and otherbenefits

Multiple Choice Single AnswerQuestion The goods are manufactured as per customer's definite

order in case of :-Correct Answer Job productionYour Answer Batch production

Multiple Choice Multiple AnswerQuestion The commonly used network techniques other than

PERT and CPM are as follows :-Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [

Project Control System ] , GERT [ Graphical Evaluation Review Techniques ]Your Answer MIS [ Management Information Systems ]

Multiple Choice Multiple AnswerQuestion To minimize total throughout time we are required to

minimize :-Correct Answer Queuing , Idle time , InventoryYour Answer Queuing , Idle time

Multiple Choice Multiple AnswerPage 14

Production Planning & Control_8Question Following conditions are required to be fulfilled for

processing n jobs through 2 machines :-Correct Answer The jobs are ready to be processed before the period

under consideration begins . , Transient time to move a job from one machineto the another is negligible. , In process inventory is allowed.Your Answer The jobs are ready to be processed before the period

under consideration begins . , In process inventory is allowed.

Select The BlankQuestion An inventory control technique based on selective

approach to stock items is called ________ analysis.Correct Answer Pareto'sYour Answer Pareto's

Multiple Choice Multiple AnswerQuestion While communicating to customer on delays in delivery

following information should be given :-Correct Answer Information on identification of job , Reasons for delays

, Revised date of deliveryYour Answer Reasons for delays , Revised date of delivery

Select The BlankQuestion CPM is ________ oriented system.Correct Answer ActivityYour Answer Activity

Multiple Choice Single AnswerQuestion One of the following is not consumable tool :-Correct Answer ArborsYour Answer Arbors

True/FalseQuestion LOB is a manual planning and scheduling technique

similar in nature to MRP [Material Resource Planning].Correct Answer TrueYour Answer False

Page 15

Production Planning & Control_8

Select The BlankQuestion ________ is required when expediting fails to bring

deviated plan to its actual path.Correct Answer ReplanningYour Answer Replanning

Multiple Choice Multiple AnswerQuestion The process of contraction or compression involves extra

cost because extra money is required to be spent on factors such as :-Correct Answer Overtime engagement of workforce , Purchase of

additional machinery , Use of better materialsYour Answer Overtime engagement of workforce , Purchase of

additional machinery , Purchase of stationary of good quality

Multiple Choice Single AnswerQuestion In job production one single product is manufactured

while a batch of group of products is turned out at a time under a system of :-Correct Answer Batch productionYour Answer Process production

Multiple Choice Multiple AnswerQuestion The 'F' group of GOLF analysis involves following

requirements :-Correct Answer Search for foreign suppliers , Opening of letter of credit ,

Arrangements for shipping and port clearanceYour Answer Search for foreign suppliers

Multiple Choice Single AnswerQuestion The production system characterized by complex set of

activities that must be performed in a particular order within a given periodand within an estimated expenditure is known as :-Correct Answer Project productionYour Answer Project production

Multiple Choice Single AnswerQuestion Proper Production Planning and Control can reduce cost

Page 16

Production Planning & Control_8in :-Correct Answer Overtime costYour Answer Overtime cost

Select The BlankQuestion ________ is the specific instant of time that marks

start and end of activity.Correct Answer EventYour Answer Event

Select The BlankQuestion Overlapping of operations help to ________

manufacturing time.Correct Answer ReduceYour Answer Reduce

Multiple Choice Multiple AnswerQuestion "Difficult" items have following attributes :-Correct Answer Available indigenously but are not easy to procure ,

Items which come from longer distance , Items which are difficult tomanufactureYour Answer Available indigenously but are not easy to procure ,

Items which come from longer distance , Items having complex specifications

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-Correct Answer Moving average , Exponential smothering , Curve fitting

Your Answer Moving average , Curve fitting

Select The BlankQuestion The performance standard is required by ________ to

determine individual machine capacity for the purpose of machine loadingand assigning machine hours and man hours .Correct Answer SchedulerYour Answer Production engineer

Page 17

Production Planning & Control_8

Multiple Choice Multiple AnswerQuestion The network analysis involves following works :-Correct Answer Obtaining a work breakdown structure to a set of

individual jobs which are arranged in a logical network. , Estimation of jobduration , Scheduling to discover which jobs control completion of project andreallocation of resources.Your Answer Obtaining a work breakdown structure to a set of

individual jobs which are arranged in a logical network. , Estimation of jobduration , Scheduling to discover which jobs control completion of project andreallocation of resources.

Multiple Choice Single AnswerQuestion The assembly work content [ Wi ] of the i'th station

having n work stations is given by :-Correct Answer å Wi from i=1 to nYour Answer å Wi from i=1 to n

Multiple Choice Multiple AnswerQuestion Essentials of good forecasts are :-Correct Answer Stability , Fairly accurate , Economical to generateYour Answer Stability , Fairly accurate , Economical to generate

True/FalseQuestion The 'G' group of GOLF analysis involves moderate

delivery time and availability of credit usually in the range of 30 to 60 days.Correct Answer TrueYour Answer True

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost

Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead costRs 0.5 Lacs, the total manufacturing cost would be Rs ________.Correct Answer 6 LacsYour Answer 6 Lacs

LIST OF ATTEMPTED QUESTIONS AND ANSWERSPage 18

Production Planning & Control_8

Multiple Choice Multiple AnswerQuestion If actual demand far exceeds forecast, it will result into :-Correct Answer Better utilization of equipment , Project margin , Higher

material purchaseYour Answer Higher material purchase , Increase in labour productivity ,

Better utilization of equipment , Project margin

Select The BlankQuestion To know the accumulated ________ for a given machine at a

given time Load charts are necessary.Correct Answer LoadYour Answer Load

Multiple Choice Single AnswerQuestion LOB technique was developed by US navy in the year :-Correct Answer 1958Your Answer 1958

True/FalseQuestion In continuous or process production , only one product is

manufactured.Correct Answer TrueYour Answer True

Select The BlankQuestion ________reflects impact of money tied up in inventory.Correct Answer Inventory turnoverYour Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion Methods for recording actual progress of work for shop orders

are :-Correct Answer Progress card , Display board , Network updatingYour Answer Progress card , Display board , Network updating , Job card

Select The BlankQuestion A progress card is the most ________ method of recording of

progress of work.Correct Answer ConvenientYour Answer Convenient

Page 19

Production Planning & Control_8Multiple Choice Multiple AnswerQuestion Following are some of the common standard cutting tools :-Correct Answer Cutting saw , Inserts , ReamersYour Answer Form tool , Cutting saw , Inserts , Reamers

Multiple Choice Multiple AnswerQuestion Tooling cost comprises the cost of :-Correct Answer Gigs , Fixtures , Drill bitsYour Answer Gigs , Fixtures , Drill bits , Stationary

Multiple Choice Single AnswerQuestion The light engineering company has one special purpose facing &

centering machine And one copying lathe. The foreman has five work ordersfor processing . The operation Sequence is fixed [ each job is first faced andcentered and then copy turned ] . The standard Hours required for eachmachine to process each work order are shown in the following Table :- WorkOrder Processing Time [Hours ] Facing & centering machine Copying Lathe I16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimizerequirements of machine hours.Correct Answer IV-I-II-V-IIIYour Answer I-II-III-IV-V

Select The BlankQuestion ________ represents the time that elapses between the receipt of

requirement of job until the job is adopted in the production controldepartment.Correct Answer Order preparation timeYour Answer Queue time

True/FalseQuestion PERT basically does not demarcate between critical and

non-critical activities.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion The assignment method is also called as :-Correct Answer Hungarian MethodYour Answer Analytical Method

Multiple Choice Multiple AnswerQuestion Outside operations cost involves expenses such as :-

Page 20

Production Planning & Control_8Correct Answer Rough blanking , Heat treatment , PlatingYour Answer Heat treatment , Plating , Inventory control , Rough blanking

Select The BlankQuestion The correct fitting of orders with capacity considerably lessens

________ burden of control.Correct Answer Foreman'sYour Answer Foreman's

Multiple Choice Multiple AnswerQuestion The 'F' group of GOLF analysis involves following requirements :-Correct Answer Search for foreign suppliers , Opening of letter of credit ,

Arrangements for shipping and port clearanceYour Answer Search for foreign suppliers , Opening of letter of credit ,

Arrangements for shipping and port clearance , Account in foreign bank

Match The FollowingQuestion Correct Answer Your Answer

Order quantity Factor influencing process planning Break even analysis

Machine capacity chart Dimensional accuracy Dimensional accuracy

Mass production Special purpose machines Special purpose machines

Standard elemental time data Compare alternative processes Factorinfluencing process planning

Multiple Choice Multiple AnswerQuestion The tooling data is prepared in respect of following measuring

instruments :-Correct Answer Vernier caliper , Micrometer screw gauge , Strain gaugeYour Answer Vernier caliper , Micrometer screw gauge , Strain gauge ,

Drill bits

Multiple Choice Multiple AnswerQuestion In replenishment system, the fixed order quantity system is also

called by following names :-Correct Answer Fixed order system , Min-max system , Re-order point

systemPage 21

Production Planning & Control_8Your Answer Fixed order system , Min-max system , Re-order point system

, Lead time system

Multiple Choice Multiple AnswerQuestion How you will Judge the failure of production planning and

control department?Correct Answer Frequent broken delivery promises , Underutilization of

men, machines , Excessive overtimeYour Answer Frequent broken delivery promises , Underutilization of men,

machines , Excessive overtime , Better coordination with other section

Multiple Choice Single AnswerQuestion In Cost Vs Quantity plot, the total inventory Cost curve is :-Correct Answer ParabolicYour Answer Inverse

True/FalseQuestion Given stock in hand = 1320 units, safety stock=840 units and

average daily consumption = 60 units, the lead time available would be 10hours.Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the reorder

point is at 120 Units, find the lead time.Correct Answer 4 monthsYour Answer 4 months

Multiple Choice Single AnswerQuestion The assignment algorithm was developed by a Hungarian

mathematician named :-Correct Answer D. KonigYour Answer Charles simony

Multiple Choice Single AnswerQuestion So far as possible, number of activities should be :-Correct Answer LimitedYour Answer Limited

True/FalseQuestion Production Planning and Control makes the supervisor ineffective.

Page 22

Production Planning & Control_8

Correct Answer TrueYour Answer False

Multiple Choice Single AnswerQuestion Unit of loading and scheduling depends on following factor :-Correct Answer Operating cycleYour Answer Unit of capacity

True/FalseQuestion The 'G' group of GOLF analysis involves moderate delivery time

and availability of credit usually in the range of 30 to 60 days.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Load charts are used for following :-Correct Answer To know the accumulated load on a given machine at a

given time , Identify periods available for allocation in future to orders ,Matching orders and loadsYour Answer Improving supply of material , To know the accumulated load

on a given machine at a given time , Identify periods available for allocationin future to orders , Matching orders and loads

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac,

Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5Lacs, the total manufacturing cost would be Rs ________.Correct Answer 6 LacsYour Answer 6 Lacs

Select The BlankQuestion An inventory control system in which stock of item is physically or

conceptually divided into ________ bins is calledTwo bin system.Correct Answer TwoYour Answer Pair

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-Correct Answer Moving average , Exponential smothering , Curve fittingYour Answer Moving average , Exponential smothering , Curve fitting ,

Opinion surveysPage 23

Production Planning & Control_8

Multiple Choice Single AnswerQuestion For goods manufactured to stock, following department is

expected to periodically undertake replenishment action as stocks aredepleted :-Correct Answer Production Planning ControlYour Answer Production

True/FalseQuestion Random fluctuation is addition of cyclical fluctuation and

seasonal fluctuation.Correct Answer FalseYour Answer True

True/FalseQuestion Scientific inventory control system requires to be followed for

machine aid, work aid and inspection aid :-Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion Value Analysis conducted in 'C' type of material is usually :-Correct Answer MinimumYour Answer Minimum

True/FalseQuestion Purchase department must keep PPC informed regarding lead

time of different items specially where lead times are extended.Correct Answer TrueYour Answer True

True/FalseQuestion In assignment matrix, it is a must to determine Jacobean of the

determinant.Correct Answer FalseYour Answer True

Select The BlankQuestion For replenishment action for stock items which are reserved by

PPC, the stores work out ________ stock which equals the stock on hand lessstock reserved.Correct Answer Free

Page 24

Production Planning & Control_8Your Answer Net

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?Correct Answer Consistent good quality of productsYour Answer Consistent good quality of products

Match The FollowingQuestion Correct Answer Your Answer

End piece allowance Material insufficient to produce one piece Materialinsufficient to produce one piece

Stock allowance Quantity to meet requirement of spares Quantity to meetrequirement of spares

Machining allowance Extra material requirement Extra materialrequirement

Spoilage allowance Process rejection Process rejection

Multiple Choice Single AnswerQuestion Why customer is called the king?Correct Answer Customer's orders gives us workYour Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion PPC is expected to have good inter-departmental relationships to

achieve the production targets. Which is the most important factor that shallaffect production targets?Correct Answer Timely availability of material, manpowerYour Answer Timely availability of material, manpower

Select The BlankQuestion Generally for ________ flow system, Heuristic method is

preferred.Correct Answer IntermittentYour Answer Continuous

Select The BlankQuestion In control board________ compartment contains copy of work

Page 25

Production Planning & Control_8orders/shop orders of the item to be processed next on the machine.Correct Answer MiddleYour Answer Bottom

True/FalseQuestion Work measurement function is attached to line management.Correct Answer FalseYour Answer True

Multiple Choice Multiple AnswerQuestion The technical feasibility of sales enquiry is carried out on the

following grounds :-Correct Answer Tools and plants are available , Technical know how is

available , Competent persons are presentYour Answer Tools and plants are available , Technical know how is

available , Competent persons are present , Cost data of raw material isavailable.

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple AnswerQuestion Following are the factors which influence tool life :-Correct Answer Operators efficiency , Type of tool , Material it is

required to operate uponYour Answer Operators efficiency , Type of tool , Material it is

required to operate upon

Multiple Choice Single AnswerQuestion The document which incorporates details of process

planning for a job is called :-Correct Answer Route SheetYour Answer Route Sheet

Multiple Choice Multiple AnswerQuestion CPM terminology uses words likeCorrect Answer Arrow diagram , Nodes , FloatYour Answer Arrow diagram , Nodes

Page 26

Production Planning & Control_8

Select The BlankQuestion Forecasting is function of ________.Correct Answer Marketing departmentYour Answer Planning in charge

Select The BlankQuestion Johnsons method of scheduling can be used when

operation sequence involve ________ machines.Correct Answer TwoYour Answer Two

Select The BlankQuestion Good quality and ________are the two main

requirements to secure maximum business from a customer.Correct Answer Competitive ratesYour Answer Competitive rates

Select The BlankQuestion Sum of queue, transit, order preparation and

manufacturing times is known as ________Correct Answer Total Lead TimeYour Answer Total Lead Time

True/FalseQuestion To conduct FSN analysis we require, last date of receipt

or last date of issue whichever is later and period.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Overtime can be avoided in many ways and they are :-Correct Answer Unrealistic delivery date , Acceptance of too many rush

order , Excessive machine breakdownYour Answer Unrealistic delivery date , Acceptance of too many rush

order , Excessive machine breakdown

Page 27

Production Planning & Control_8

Multiple Choice Multiple AnswerQuestion Material control function embraces a following

techniques :-Correct Answer Make -or -buy decision , Pareto's analysis ,

Replenishment systemYour Answer Make -or -buy decision , Pareto's analysis ,

Replenishment system

True/FalseQuestion Work measurement is not useful for choosing between

two alternate methods of production.Correct Answer FalseYour Answer False

Multiple Choice Multiple AnswerQuestion Process Sheet contains following information :-Correct Answer Material Specification , Sequence of operation , Skill of

LabourYour Answer Material Specification , Sequence of operation , Skill of

Labour

True/FalseQuestion More than one subcontractor should be developed for

each subcontracted operation/Job.Correct Answer TrueYour Answer True

Select The BlankQuestion Classification of items on basis of their capital lock up is

called ________ analysis.Correct Answer XYZYour Answer XYZ

Select The BlankQuestion Purchase section must keep ________posted on the

progress of purchase orders and expected delays.Page 28

Production Planning & Control_8Correct Answer P.P.C.Your Answer P.P.C.

Multiple Choice Single AnswerQuestion Effective Production Planning and Control, reduce

investment in inventories effectively :-Correct Answer By proper coordination between shop floor, stores and

buying departmentYour Answer By proper coordination between shop floor, stores and

buying department

True/FalseQuestion Fluctuation due to changes in season are called cyclical

fluctuation.Correct Answer FalseYour Answer False

True/FalseQuestion Flexibility and product variety are not inter-related with

each other.Correct Answer FalseYour Answer True

True/FalseQuestion Overlapping of operations help to reduce manufacturing

time.Correct Answer TrueYour Answer True

Select The BlankQuestion The LOB technique is made more accurate and fast by

using ________.Correct Answer ComputersYour Answer Reduction techniques

True/FalsePage 29

Production Planning & Control_8Question Overtime is undesirable since it increases

manufacturing cost of the product.Correct Answer TrueYour Answer False

Multiple Choice Multiple AnswerQuestion The essential features of batch production are :-Correct Answer General purpose machines and process type layout ,

Manual materials handling , Flexibility of production scheduleYour Answer General purpose machines and process type layout ,

Manual materials handling , Flexibility of production schedule

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'B' type of items is :-Correct Answer MediumYour Answer Few

Multiple Choice Single AnswerQuestion Dispatcher withdraws required quantity of material

from stores using following document :-Correct Answer Stores issue orderYour Answer Bill of material

Multiple Choice Multiple AnswerQuestion In a mass production assembly shop following work

measurement techniques are used :-Correct Answer Time study , Work sampling , Production studyYour Answer Time study , Work sampling , Production study ,

Analytical estimating

Multiple Choice Multiple AnswerQuestion SDE analysis is based on problems of procurement

namely :-Correct Answer Non-availability , Scarcity , Longer lead timeYour Answer Non-availability , Scarcity , Longer lead time

Page 30

Production Planning & Control_8True/FalseQuestion Line balancing is a simulation technique.Correct Answer FalseYour Answer False

Multiple Choice Multiple AnswerQuestion The line of balance is a device for planning and

monitoring progress of :-Correct Answer Purchase order execution , Project execution , Targeted

programsYour Answer Purchase order execution , Project execution , Targeted

programs

Select The BlankQuestion Sales persons decides ________.Correct Answer Synthetic forecastYour Answer Current sales

True/FalseQuestion Material control Card is a document for record of issues

of material and receipt of unused material by production shop.Correct Answer FalseYour Answer False

Multiple Choice Single AnswerQuestion Work measurement is limited to measuring :-Correct Answer Productive & non productive timeYour Answer Only product related activities

Match The FollowingQuestion Correct Answer Your Answer

Move order Transport material from and to required work centersTransport material from and to required work centers

Materials Order Allocation of material required in connection with shoporder Allocation of material required in connection with shop order

Page 31

Production Planning & Control_8

Work Order Bird's eye view of production programme Bird's eyeview of production programme

Production Order Reserve material required in connection with sales orderReserve material required in connection with sales order

Multiple Choice Multiple AnswerQuestion The software for line balancing should have following

features :-Correct Answer Easy to operate , Easy to install , Easy to upgradeYour Answer Easy to operate , Easy to install , Unmanaged code

should be available

Multiple Choice Single AnswerQuestion Man hours is commonly used unit of measurement for

scheduling purposes in following industry :-Correct Answer EngineeringYour Answer Engineering

Multiple Choice Multiple AnswerQuestion Customer plays very important role due to the following

reasons :-Correct Answer Gives us work , Dividends to share holders , Gets

business from new customersYour Answer Gives us work , Dividends to share holders , Gets

business from new customers

Multiple Choice Single AnswerQuestion The 4X4 assignment problem involve following

job-machine operations :-Correct Answer 24Your Answer 24

Multiple Choice Single AnswerQuestion The best of scientific tools available for scheduling is :-

Page 32

Production Planning & Control_8Correct Answer CPA [ critical path analysis ]Your Answer Gantt Chart

Multiple Choice Multiple AnswerQuestion Work measurement is responsibility of :-Correct Answer PPC , Industrial Engineering , Production departmentYour Answer PPC , Industrial Engineering

Match The FollowingQuestion Correct Answer Your Answer

Long production run Mass and Flow production Mass and Flowproduction

Complex activities to be performed in a particular order within a give time &estimate. Project production Project production

One or few units manufactured as per customers requirement JobbingProduction Jobbing Production

Short production run Batch Production Batch Production

Multiple Choice Single AnswerQuestion Value Analysis conducted in 'C' type of material is

usually :-Correct Answer MinimumYour Answer Minimum

Multiple Choice Multiple AnswerQuestion Some of significant features of HML analysis are :-Correct Answer To evolve buying policies to control purchases , To

delegate authorities to different buyers to make petty cash purchases , Not totake consumption into accountYour Answer To evolve buying policies to control purchases , To

delegate authorities to different buyers to make petty cash purchases

Page 33

Production Planning & Control_8Multiple Choice Single AnswerQuestion What is the reasons for poor labour efficiency attributed

by inefficient P.P.C.?Correct Answer Failure to provide proper tools and control on work in

progress on shop floorYour Answer Failure to provide proper tools and control on work in

progress on shop floor

Multiple Choice Single AnswerQuestion The administrative expenses towards the procurement

of materials is called :-Correct Answer Procurement costYour Answer Administrative cost

Multiple Choice Multiple AnswerQuestion Smoothing performs following activities:-Correct Answer Reallocation of resources , Improving utilization of

resources , Conducting Heuristic approachYour Answer Reallocation of resources , Improving utilization of

resources , Conducting Heuristic approach

True/FalseQuestion As per a study on materials management practices, a

typical firm spends almost half of its rupee sales on goods purchased fromvendors.Correct Answer TrueYour Answer True

Select The BlankQuestion Value analysis of ________ class items is usually

inadvisable.Correct Answer CYour Answer C

True/FalseQuestion PPC system in the organisation is to be tailor made.Correct Answer True

Page 34

Production Planning & Control_8Your Answer True

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/FalseQuestion Performance benchmarking does not involves

comparison of financial ratios at the aggregate level.Correct Answer FalseYour Answer False

Multiple Choice Single AnswerQuestion Setup time includes :-Correct Answer Internal setup time & External setup timeYour Answer Internal setup time & External setup time

Multiple Choice Single AnswerQuestion Participants of the groups for quality circles should be

decided by :-Correct Answer Employees coming together by their own enthusiasmYour Answer Employees coming together by their own enthusiasm

Multiple Choice Single AnswerQuestion Check sheet are also used as :-Correct Answer Data gathering & interpretation toolYour Answer Data gathering & interpretation tool

Multiple Choice Single AnswerQuestion SMED means :-Correct Answer Single minute exchange of diesYour Answer Single minute exchange of dies

Match The FollowingQuestion Correct Answer Your Answer

Page 35

Production Planning & Control_8Productivity performance measurement Turnover employee Cost ofquality

Financial performance measurement Sales of the months Sales of themonths

Customer satisfaction measurement Customer complaints per periodCustomer complaints per period

Staff attitude measurement Employee satisfaction index Employeesatisfaction index

Select The BlankQuestion ________ is an effect due to the muda of defect.Correct Answer Wear & tear of parts while disassemblingYour Answer Poor production planning & control

Select The BlankQuestion If some defective parts are discovered by the subsequent

process they should be returned to the ________ to prevent reoccurrence.Correct Answer Preceding processYour Answer Return to stores

Multiple Choice Multiple AnswerQuestion The results oriented efforts of the quality circle should

also include :-Correct Answer Efforts to avoid the problem permanently , Ultimate aim

of the customers satisfaction , Attacking the real root causes & all possibilitiesYour Answer Efforts to avoid the problem permanently , Publication

or advertisement of your contribution , Attacking the real root causes & allpossibilities

Match The FollowingQuestion Correct Answer Your Answer

Parato diagram always indicates Magnitude of defects Philosophy of20% of the activity causes 80% of the effect

Page 36

Production Planning & Control_8

Parato analysis underlines & operates on Philosophy of "vital few:trivialmany" Philosophy of "vital few:trivial many"

Parato analysis is technique of identifying vital causes by Arrangingdata according to the descending order of their frequency of occurrenceArranging data according to the descending order of their frequency ofoccurrence

Parato diagram is a Bar graph with height or value drawn by Arrangingdata in descending order Magnitude of defects

Multiple Choice Multiple AnswerQuestion Few steps in construction in Radar chart are :-Correct Answer Brainstorming to enlist characteristics which require to

be evaluated & draw the circle & divide it into 'slices' equal to number ofcharacteristics , The first slice begins at 12 noon. Then draw vertical line &calibrate it equal to the number of levels required , Draw concentric circlesfrom each gradiation using 'o' point as centreYour Answer Brainstorming to enlist characteristics which require to

be evaluated & draw the circle & divide it into 'slices' equal to number ofcharacteristics , The first slice begins at 12 noon. Then draw vertical line &calibrate it equal to the number of levels required , Draw concentric circlesfrom each gradiation using 'o' point as centre

Select The BlankQuestion 5 S audit result is discussed in ________ meeting.Correct Answer MonthlyYour Answer Monthly

True/FalseQuestion Fishbone analysis is used both in analysis & planning.Correct Answer TrueYour Answer False

Multiple Choice Single AnswerQuestion One Green Belt may head a team of :-

Page 37

Production Planning & Control_8Correct Answer 20 employeesYour Answer 20 employees

Multiple Choice Multiple AnswerQuestion Role of champions are :-Correct Answer Approve six sigma projects , Remove road block in the

path of six sigma implementation , Monitor progress of six sigma projectsYour Answer Monitor progress of six sigma projects , Approve six

sigma projects , Remove road block in the path of six sigma implementation

Multiple Choice Multiple AnswerQuestion To draw control charts, sample must be representative

of homogeneous segment of production for which :-Correct Answer The items of the sample should be from the same

machine setting , The items should be of the same batch , Items should bemade from the same raw material batchYour Answer The items of the sample should be from the same

machine setting , The items should be of the same batch , Items should bemade from the same raw material batch

Multiple Choice Single AnswerQuestion Failure mode and effect analysis (FMEA) establishCorrect Answer Process failure and minimize frequencyYour Answer Process failure and minimize frequency

Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking

partner?Correct Answer Decide level of benchmarking , List down a few

prospective candidates of partnership , Collect information of short listedpartnersYour Answer Decide level of benchmarking , List down a few

prospective candidates of partnership , Collect information of short listedpartners

Multiple Choice Single AnswerQuestion One Master Black Belt may head a team of :-

Page 38

Production Planning & Control_8Correct Answer 15-20 Black BeltsYour Answer 15-20 Black Belts

Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key

competitive product, services or processes & comparing with those of :-Correct Answer Main competitorYour Answer Main competitor

Multiple Choice Single AnswerQuestion Implication of Quality problem is:-Correct Answer Gap in performanceYour Answer Gap in performance

Select The BlankQuestion Number of defects in an individual component, like gear,

shaft, wheel etc can be monitored through ________ type of control chart.Correct Answer c-chartYour Answer c-chart

True/FalseQuestion Non-availability of files /document in time is a problem

to be addressed by office TPM.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-Correct Answer Simplest toolYour Answer Simplest tool

Multiple Choice Single AnswerQuestion Benchmarking helps to identify the gap between the

current performance of the organization and the :-Correct Answer Performance of the best organizationYour Answer Performance of the best organization

Page 39

Production Planning & Control_8

True/FalseQuestion Flow chart is pictorial representation of the steps in

production control.Correct Answer FalseYour Answer True

Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-Correct Answer Sections , Machines , Type of breakdown (e.g mech. Or

electrical)Your Answer Sections , Machines , Type of breakdown (e.g mech. Or

electrical)

Select The BlankQuestion A control chart to exhibit counted data on number of

defect is called ________.Correct Answer c-chartYour Answer c-chart

Select The BlankQuestion Procedure for implementation of TPM consists of

________ numbers of steps.Correct Answer 12Your Answer 8

Select The BlankQuestion Capability index Cp = ________Correct Answer Specification width/process widthYour Answer Specification width/process width

Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-Correct Answer Vital few = trivial manyYour Answer Vital few = trivial many

Page 40

Production Planning & Control_8

True/FalseQuestion Kanban signals are required when assembly work,

subassembly work and manufacturing at parts is carried out at differentlocations.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following

actions are desirable :-Correct Answer Standardize clamping bolts / screws , Cut off

unnecessary threads , Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off

unnecessary threads , Use quick clamping device

Select The BlankQuestion Benchmarking allows exchange of ________ between

the benchmarking partners.Correct Answer InformationYour Answer Information

Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-Correct Answer Worried about losing jobs , Afraid of being reprimanded

if there are mistakes , Scared of their bossesYour Answer Worried about losing jobs , Afraid of being reprimanded

if there are mistakes , Scared of their bosses

True/FalseQuestion In bar graph each bar is of same height.Correct Answer FalseYour Answer False

Multiple Choice Multiple AnswerQuestion During SMED implementation, primary study consists

of :-Page 41

Production Planning & Control_8Correct Answer Equipment analysis , Setup change analysis ,

Preparation items (storage place , method) analysisYour Answer Equipment analysis , Setup change analysis ,

Preparation items (storage place , method) analysis

True/FalseQuestion Daily work management can also be extended to non

manufacturing areas like procurement, QA, HRD etc.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-Correct Answer Prevention type Poka-Yoke , Detection type Poka-YokeYour Answer Prevention type Poka-Yoke , Detection type Poka-Yoke

Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-Correct Answer Improve qualityYour Answer Save time

True/FalseQuestion Along with problem solving tools experience and

judgment is also used.Correct Answer TrueYour Answer False

Select The BlankQuestion JIT advocates the philosophy at elimination of waste

from system which occurs due to ________.Correct Answer Over ProductionYour Answer Over Production

True/FalseQuestion Without measuring initial performance, target can't be

set.Page 42

Production Planning & Control_8Correct Answer TrueYour Answer False

Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control

limits indicates :-Correct Answer Defect in materials , Frequent adjustment of machines ,

Poorly trained operatorsYour Answer Defect in materials , Frequent adjustment of machines ,

Poorly trained operators

True/FalseQuestion Sample size for the construction of p-chart are larger

than X bar-R chart.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of

the histogram gives :-Correct Answer It shows cause which affects the process , An idea of

what is happening to the process , Whether the process is capable of meetingprocess or not i.e. around correct average & within specific limitsYour Answer An idea of what is happening to the process , Whether

the process is capable of meeting process or not i.e. around correct average &within specific limits , A bird's eye view of the variation

Multiple Choice Single AnswerQuestion Productivity improves by :-Correct Answer Voluntary participants of everyoneYour Answer Voluntary participants of everyone

N

Page 43

3rd Sem Operations – Production Planning and Control 1

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single AnswerQuestion The activities such as preparation of estimates of tools, gauges, measuring instruments,

follow up with tool room, periodic replenishment are grouped under :-Correct Answer Tool controls

Your Answer Tool controls

Multiple Choice Single AnswerQuestion Break light is essential for an automobile from safety point of view. However, the vehicle

can be driven even in absence of break light. Thus break light can be categorized as :-Correct Answer Essential

Your Answer Essential

Multiple Choice Single AnswerQuestion Given a decision for designing a line layout, major problem is subdividing a work so that

smooth flow can result. The subdivision process is called :-Correct Answer Line balancing

Your Answer Line of balance

True/FalseQuestion As per a study on materials management practices, a typical firm spends almost half of its

rupee sales on goods purchased from vendors.Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?

Correct Answer Consistent good quality of products

Your Answer Consistent good quality of products

Select The BlankQuestion Labour efficiency depends upon ________

Correct Answer Training and experience

Your Answer Training and experience

Match The FollowingQuestion Correct Answer Your Answer

Work element Smallest portion of work identifiedduring the breakdown analysis ofthe job.

Smallest portion of work identifiedduring the breakdown analysis ofthe job.

Production line Arrangement of workstationswhere each workman performs a

Arrangement of workstations whereeach workman performs a pre-

3rd Sem Operations – Production Planning and Control 2

pre-determined task on anincomplete unit which passesdown the line of subsequent unituntil it is finished.

determined task on an incompleteunit which passes down the line ofsubsequent unit until it is finished.

Work Station Assigned location, zone, place orstage in assembly wheredesignated work is performed onpart component of product.

Assigned location, zone, place orstage in assembly wheredesignated work is performed onpart component of product.

Station work content Time required to perform thedesignated amount of work at agiven work station and is obtainedby adding up time of workelements allotted to the workstation.

Time required to perform thedesignated amount of work at agiven work station and is obtainedby adding up time of work elementsallotted to the work station.

Multiple Choice Single AnswerQuestion Effective Production Planning and Control, reduce investment in inventories effectively :-

Correct Answer By proper coordination between shop floor, stores and buying department

Your Answer By proper coordination between shop floor, stores and buying department

Select The BlankQuestion In the assignment model, the________ is formed between jobs and machines.

Correct Answer Matrix

Your Answer Matrix

True/FalseQuestion To solve "n jobs - 2 machines " sequencing problem, all jobs require same sequence of

operations. Each job must be processed first on machine A and then on machine B in afixed sequence AB.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion Let us suppose that activity P & Q can not start until activity R& S are completed.

Activities P &Q are therefore :-Correct Answer Succeeding

Your Answer Preceding

Multiple Choice Multiple AnswerQuestion What is meant by production control?

Correct Answer Control is seeing that the requirements are made available at the right place and rightquantities , Reporting back the progress to the production planning , Control involvessuggesting action when the jobs is falling behind schedule

Your Answer Control is seeing that the requirements are made available at the right place and rightquantities , Reporting back the progress to the production planning , Control involvessuggesting action when the jobs is falling behind schedule

3rd Sem Operations – Production Planning and Control 3

Multiple Choice Multiple AnswerQuestion The software for CPA would require the following parameters:-

Correct Answer Algorithms , Program code , Database

Your Answer Algorithms , Program code , Database

Multiple Choice Single AnswerQuestion The assignment method is also called as :-

Correct Answer Hungarian Method

Your Answer Hungarian Method

True/FalseQuestion A buyer has little or no control over a lead time.

Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Why customer is called the king?

Correct Answer Customer's orders gives us work

Your Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion What is the reasons for poor labour efficiency attributed by inefficient P.P.C.?

Correct Answer Failure to provide proper tools and control on work in progress on shop floor

Your Answer Failure to provide proper tools and control on work in progress on shop floor

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'C' type of items is :-

Correct Answer Few

Your Answer Few

Multiple Choice Multiple AnswerQuestion The features of program plan are as follows :-

Correct Answer Each row of activities is associated with one component of final assembly. , Finalcompletion date is zero , Time scale runs from right to left

Your Answer Time scale runs from right to left , Program plan is prepared in form of mathematicalmodel. , Final completion date is zero

Multiple Choice Multiple AnswerQuestion Failure to identify accumulated load on a given machine at a given time and identify

periods available for allocation of future orders leads to

3rd Sem Operations – Production Planning and Control 4

Correct Answer Delays in delivery , High overtime payment , Broken promises

Your Answer Delays in delivery , High overtime payment , Higher rejections/rework

True/FalseQuestion A manufacturing firm in the present days have virtually no control on their profits

Correct Answer False

Your Answer True

Multiple Choice Multiple AnswerQuestion Customer plays very important role due to the following reasons :-

Correct Answer Gives us work , Dividends to share holders , Gets business from new customers

Your Answer Gives us work , Dividends to share holders , Gets business from new customers , Set thewheel of our production rolling

True/FalseQuestion If customers orders often get completed ahead of the schedule, it is a sign of good

scheduling.Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Proper Production Planning and Control can reduce cost in :-

Correct Answer Overtime cost

Your Answer Overtime cost

Multiple Choice Multiple AnswerQuestion Subcontracting department works under :-

Correct Answer Planning , Purchase , Production

Your Answer Planning , Purchase , Production

Select The BlankQuestion Given total work content as 370 and maximum allowable cycle time to be 90 seconds, the

theoretical number of work stations would be ________.Correct Answer 4.11

Your Answer 4.11

Select The BlankQuestion Orders with ________ slack time remaining per operation are run first.

Correct Answer Shortest

Your Answer Shortest

3rd Sem Operations – Production Planning and Control 5

Multiple Choice Single AnswerQuestion If total lead time of certain item is 30 days and lead time of operations completed is 6

days, the lead time required [ LTR ] would be :-Correct Answer 24

Your Answer 24

Select The BlankQuestion The performance standard is required by ________ to determine individual machine

capacity for the purpose of machine loading and assigning machine hours and man hours.

Correct Answer Scheduler

Your Answer Industrial engineer

Select The BlankQuestion At each ________, work is performed on a product either by adding parts or by

completing assembly operations.Correct Answer Work station

Your Answer Work station

Multiple Choice Single AnswerQuestion Detachable ticket, after filling in required information is :-

Correct Answer Placed in a tray/box

Your Answer Placed in a tray/box

True/FalseQuestion PERT finds applications where resources [ men, materials and money ] are always made

available as and when required.Correct Answer True

Your Answer True

Select The BlankQuestion Rational figure on utilization index can be obtained by carrying out ________ study.

Correct Answer Work- sampling

Your Answer Work- sampling

True/FalseQuestion EOQ is that quantity at which price paid by buyer is minimum.

Correct Answer False

Your Answer True

Multiple Choice Single Answer

3rd Sem Operations – Production Planning and Control 6

Question Keeping available time per day constant, if the desired production rate per day is to bedoubled ,cycle time will be reduced by :-

Correct Answer 0.5

Your Answer 0.5

Multiple Choice Multiple AnswerQuestion To prepare load chart following job related information should be collected :-

Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand

Your Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand

Select The BlankQuestion Job production requires ________ capital investment.

Correct Answer Lowest

Your Answer Largest

Multiple Choice Multiple AnswerQuestion The main characteristics of mass and flow production are :-

Correct Answer Continuous flow of material , Low skilled labour , Easy supervision

Your Answer Continuous flow of material , Low skilled labour , Easy supervision

Select The BlankQuestion ________ represents productive time of the job.

Correct Answer Manufacturing time

Your Answer Manufacturing time

Multiple Choice Multiple AnswerQuestion CPM terminology uses words like

Correct Answer Arrow diagram , Nodes , Float

Your Answer Arrow diagram , Nodes , Float

Multiple Choice Single AnswerQuestion The Follow up required for early delivery in case of 'B' types of items is usually :-

Correct Answer Periodic

Your Answer Periodic

Match The FollowingQuestion Correct Answer Your Answer

3rd Sem Operations – Production Planning and Control 7

Job splitting Dividing job in more than one lot Dividing job in more than one lot

Change in priority Shift equipment/workmen todelayed jobs

Shift equipment/workmen todelayed jobs

Alternate routing Processing on costlier machine Running jobs on one machinesequentially

Overlapping Running jobs simultaneously onmore than one machine

Running jobs simultaneously onmore than one machine

Multiple Choice Single AnswerQuestion The event is graphically represented by :-

Correct Answer Circle

Your Answer Circle

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'B' type of items is :-

Correct Answer Medium

Your Answer Medium

Select The BlankQuestion ________ analysis is based on consumption figures of an item.

Correct Answer FSN

Your Answer ABC

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of different items

specially where lead times are extended.Correct Answer True

Your Answer True

True/FalseQuestion More than one subcontractor should be developed for each subcontracted operation/Job.

Correct Answer True

Your Answer True

2nd Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple AnswerQuestion If actual demand far exceeds forecast, it will result into :-Correct Answer Better utilization of equipment , Project margin , Higher material

purchase

3rd Sem Operations – Production Planning and Control 8

Your Answer Higher material purchase , Increase in labour productivity , Betterutilization of equipment , Project margin

Select The BlankQuestion To know the accumulated ________ for a given machine at a given time

Load charts are necessary.Correct Answer LoadYour Answer Load

Multiple Choice Single AnswerQuestion LOB technique was developed by US navy in the year :-Correct Answer 1958Your Answer 1958

True/FalseQuestion In continuous or process production , only one product is manufactured.Correct Answer TrueYour Answer True

Select The BlankQuestion ________reflects impact of money tied up in inventory.Correct Answer Inventory turnoverYour Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion Methods for recording actual progress of work for shop orders are :-Correct Answer Progress card , Display board , Network updatingYour Answer Progress card , Display board , Network updating , Job card

Select The BlankQuestion A progress card is the most ________ method of recording of progress

of work.Correct Answer ConvenientYour Answer Convenient

Multiple Choice Multiple AnswerQuestion Following are some of the common standard cutting tools :-Correct Answer Cutting saw , Inserts , ReamersYour Answer Form tool , Cutting saw , Inserts , Reamers

Multiple Choice Multiple AnswerQuestion Tooling cost comprises the cost of :-Correct Answer Gigs , Fixtures , Drill bitsYour Answer Gigs , Fixtures , Drill bits , Stationary

Multiple Choice Single AnswerQuestion The light engineering company has one special purpose facing &

centering machine And one copying lathe. The foreman has five work orders forprocessing . The operation Sequence is fixed [ each job is first faced and centeredand then copy turned ] . The standard Hours required for each machine to processeach work order are shown in the following Table :- Work Order Processing Time[Hours ] Facing & centering machine Copying Lathe I 16 40 II 30 60 III 20 6 IV 1516 V 25 12 find sequence to minimize requirements of machine hours.

Correct Answer IV-I-II-V-IIIYour Answer I-II-III-IV-V

Select The BlankQuestion ________ represents the time that elapses between the receipt of

requirement of job until the job is adopted in the production control department.

3rd Sem Operations – Production Planning and Control 9

Correct Answer Order preparation timeYour Answer Queue time

True/FalseQuestion PERT basically does not demarcate between critical and non-critical

activities.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion The assignment method is also called as :-Correct Answer Hungarian MethodYour Answer Analytical Method

Multiple Choice Multiple AnswerQuestion Outside operations cost involves expenses such as :-Correct Answer Rough blanking , Heat treatment , PlatingYour Answer Heat treatment , Plating , Inventory control , Rough blanking

Select The BlankQuestion The correct fitting of orders with capacity considerably lessens ________

burden of control.Correct Answer Foreman'sYour Answer Foreman's

Multiple Choice Multiple AnswerQuestion The 'F' group of GOLF analysis involves following requirements :-Correct Answer Search for foreign suppliers , Opening of letter of credit ,

Arrangements for shipping and port clearanceYour Answer Search for foreign suppliers , Opening of letter of credit ,

Arrangements for shipping and port clearance , Account in foreign bank

Match The FollowingQuestion Correct Answer Your Answer

Order quantity Factor influencing process planning Break even analysis

Machine capacity chart Dimensional accuracy Dimensional accuracy

Mass production Special purpose machines Special purpose machines

Standard elemental time data Compare alternative processes Factor influencingprocess planning

Multiple Choice Multiple AnswerQuestion The tooling data is prepared in respect of following measuring

instruments :-Correct Answer Vernier caliper , Micrometer screw gauge , Strain gaugeYour Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits

Multiple Choice Multiple AnswerQuestion In replenishment system, the fixed order quantity system is also called

by following names :-Correct Answer Fixed order system , Min-max system , Re-order point systemYour Answer Fixed order system , Min-max system , Re-order point system , Lead

time system

Multiple Choice Multiple Answer

3rd Sem Operations – Production Planning and Control 10

Question How you will Judge the failure of production planning and controldepartment?

Correct Answer Frequent broken delivery promises , Underutilization of men,machines , Excessive overtime

Your Answer Frequent broken delivery promises , Underutilization of men,machines , Excessive overtime , Better coordination with other section

Multiple Choice Single AnswerQuestion In Cost Vs Quantity plot, the total inventory Cost curve is :-Correct Answer ParabolicYour Answer Inverse

True/FalseQuestion Given stock in hand = 1320 units, safety stock=840 units and average

daily consumption = 60 units, the lead time available would be 10 hours.Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the reorder point is

at 120 Units, find the lead time.Correct Answer 4 monthsYour Answer 4 months

Multiple Choice Single AnswerQuestion The assignment algorithm was developed by a Hungarian mathematician

named :-Correct Answer D. KonigYour Answer Charles simony

Multiple Choice Single AnswerQuestion So far as possible, number of activities should be :-Correct Answer LimitedYour Answer Limited

True/FalseQuestion Production Planning and Control makes the supervisor ineffective.Correct Answer TrueYour Answer False

Multiple Choice Single AnswerQuestion Unit of loading and scheduling depends on following factor :-Correct Answer Operating cycleYour Answer Unit of capacity

True/FalseQuestion The 'G' group of GOLF analysis involves moderate delivery time and

availability of credit usually in the range of 30 to 60 days.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Load charts are used for following :-Correct Answer To know the accumulated load on a given machine at a given time

, Identify periods available for allocation in future to orders , Matching orders andloads

Your Answer Improving supply of material , To know the accumulated load on agiven machine at a given time , Identify periods available for allocation in future toorders , Matching orders and loads

3rd Sem Operations – Production Planning and Control 11

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac,

Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, thetotal manufacturing cost would be Rs ________.

Correct Answer 6 LacsYour Answer 6 Lacs

Select The BlankQuestion An inventory control system in which stock of item is physically or

conceptually divided into ________ bins is calledTwo bin system.Correct Answer TwoYour Answer Pair

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-Correct Answer Moving average , Exponential smothering , Curve fittingYour Answer Moving average , Exponential smothering , Curve fitting , Opinion

surveys

Multiple Choice Single AnswerQuestion For goods manufactured to stock, following department is expected to

periodically undertake replenishment action as stocks are depleted :-Correct Answer Production Planning ControlYour Answer Production

True/FalseQuestion Random fluctuation is addition of cyclical fluctuation and seasonal

fluctuation.Correct Answer FalseYour Answer True

True/FalseQuestion Scientific inventory control system requires to be followed for machine

aid, work aid and inspection aid :-Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion Value Analysis conducted in 'C' type of material is usually :-Correct Answer MinimumYour Answer Minimum

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of

different items specially where lead times are extended.Correct Answer TrueYour Answer True

True/FalseQuestion In assignment matrix, it is a must to determine Jacobean of the

determinant.Correct Answer FalseYour Answer True

Select The BlankQuestion For replenishment action for stock items which are reserved by PPC, the

stores work out ________ stock which equals the stock on hand less stock reserved.Correct Answer Free

3rd Sem Operations – Production Planning and Control 12

Your Answer Net

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?Correct Answer Consistent good quality of productsYour Answer Consistent good quality of products

Match The FollowingQuestion Correct Answer Your Answer

End piece allowance Material insufficient to produce one piece Material insufficient toproduce one piece

Stock allowance Quantity to meet requirement of spares Quantity to meetrequirement of spares

Machining allowance Extra material requirement Extra material requirement

Spoilage allowance Process rejection Process rejection

Multiple Choice Single AnswerQuestion Why customer is called the king?Correct Answer Customer's orders gives us workYour Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion PPC is expected to have good inter-departmental relationships to achieve

the production targets. Which is the most important factor that shall affectproduction targets?

Correct Answer Timely availability of material, manpowerYour Answer Timely availability of material, manpower

Select The BlankQuestion Generally for ________ flow system, Heuristic method is preferred.Correct Answer IntermittentYour Answer Continuous

Select The BlankQuestion In control board________ compartment contains copy of work

orders/shop orders of the item to be processed next on the machine.Correct Answer MiddleYour Answer Bottom

True/FalseQuestion Work measurement function is attached to line management.Correct Answer FalseYour Answer True

Multiple Choice Multiple AnswerQuestion The technical feasibility of sales enquiry is carried out on the following

grounds :-Correct Answer Tools and plants are available , Technical know how is available ,

Competent persons are presentYour Answer Tools and plants are available , Technical know how is available ,

Competent persons are present , Cost data of raw material is available.

3rd Copy

3rd Sem Operations – Production Planning and Control 13

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single AnswerQuestion Which is the most appropriate type of alliance which the new companies often

overestimate?Correct Answer Joint-venture

Your Answer Joint-venture

True/FalseQuestion The financial structure is not one of the five channels of corporate governance.

Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion The different types of motivators would be

Correct Answer Positive , External , Financial

Your Answer Positive , Financial

Multiple Choice Multiple AnswerQuestion The different components of EQ would be

Correct Answer Self-awareness , Emotional management , empathy

Your Answer Self-awareness , Emotional management , empathy

Multiple Choice Multiple AnswerQuestion Most Indian business houses go for restructuring exercise, through,

Correct Answer Demerger , Merger , Takeover

Your Answer Competitor , Merger , Takeover

Multiple Choice Single AnswerQuestion What is that the consultant must be able to recognise about the client's future needs ?

Correct Answer Vision

Your Answer Vision

Multiple Choice Single AnswerQuestion Which among the following is a component of planning ?

Correct Answer Rules

Your Answer Rules

Multiple Choice Multiple Answer

3rd Sem Operations – Production Planning and Control 14

Question The external environmental factors that influence management are

Correct Answer Economic , Political , Technological

Your Answer Economic , Political

Multiple Choice Single AnswerQuestion Who said, “Management is the creation and maintenance of internal environment in an

enterprise, where individuals working in groups can perform efficiently and effectivelytowards the attainment of gr

Correct Answer Koontz & O ‘Donell

Your Answer Koontz & O ‘Donell

Select The BlankQuestion The service sector has expanded because of the virtual stagnation of the________sector.

Correct Answer agricultural

Your Answer agricultural

True/FalseQuestion Professional management signifies separation of ownership and management.

Correct Answer True

Your Answer False

Multiple Choice Multiple AnswerQuestion The functions of the board of directors are

Correct Answer succession planning , establishing performance standards , determination of board policies

Your Answer succession planning , establishing performance standards , determination of board policies

Select The BlankQuestion A rule governing Indian companies states that policy holder's funds must be________only

in India.Correct Answer invested

Your Answer invested

Multiple Choice Multiple AnswerQuestion Any morale improvement programme of management must embrace the following rules.

Correct Answer Respect individual , Be fair and just , Encourage initiative

Your Answer Respect individual , Be fair and just , Encourage initiative

True/FalseQuestion W.Edward Deming introduced quality control in Japan.

3rd Sem Operations – Production Planning and Control 15

Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion EQ is born largely in the neurotransmitters if the brains limbic system that governs

Correct Answer drives , impulses , feelings

Your Answer impulses , feelings , drives

Multiple Choice Single AnswerQuestion There are six methods of giving orders, like mutual effort, open order, volunteers the other

three areCorrect Answer Command, power, suggestion

Your Answer Command, request, suggestion

Select The BlankQuestion Services need efficient________, transport roads and power just as much as industry and

agriculture.Correct Answer telecom

Your Answer system

True/FalseQuestion Management consultants do not assist implementation.

Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion Features of direction would be

Correct Answer Pervasive function , Communication , Continuous process

Your Answer Pervasive function , Communication , Continuous process

Select The BlankQuestion ________ says you are the product of your past and you are bound by past activities.

Correct Answer Law of destiny

Your Answer Law of destiny

True/FalseQuestion Morale is the sum total of various physical qualities.

Correct Answer False

Your Answer False

3rd Sem Operations – Production Planning and Control 16

Multiple Choice Single AnswerQuestion The philosophy of Vedanta is compared to which animal in the dream of the person, who

wakes the dreamer and makes you realise your self discovered reality.Correct Answer Lion

Your Answer Lion

Multiple Choice Single AnswerQuestion Who said, “Management is a multiple organ that manages a business, manages a manager

and manages workers and work”?Correct Answer Peter Drucker

Your Answer Peter Drucker

Multiple Choice Single AnswerQuestion One of the internal environment factors that influences management is

Correct Answer Place

Your Answer Place

Select The BlankQuestion Latest approach signifies organization has a part of ________ system.

Correct Answer Social

Your Answer Social

Multiple Choice Single AnswerQuestion Which among the following is a general management challenge in the insurance sector?

Correct Answer Training

Your Answer Training

True/FalseQuestion Learning organizations should imitate a task force.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion If SBU's are formed, managers tend to be closer to

Correct Answer customers

Your Answer customers

Match The Following

3rd Sem Operations – Production Planning and Control 17

Question Correct Answer Your Answer

Organization as a structure ofauthority

This is created out of responsibilityand accountability structure

This is created out of responsibilityand accountability structure

Organization as an establishment This is regarded as the physicalaspect of an enterprise

This is regarded as the physicalaspect of an enterprise

Organization as a corporate citizen This is regarded as the socialaspect of an organization

This is regarded as the socialaspect of an organization

Organization as a relationship This is more related with the formaland informal relationships

This is more related with the formaland informal relationships

Select The BlankQuestion The statement "We sell for Less" is deliberately ambiguous, it raises the question; 'Less

than what', this is called as, ________ to communication.Correct Answer Semantic barrier

Your Answer Semantic barrier

Select The BlankQuestion Events are occurrences designed for ________ interests.

Correct Answer marketing

Your Answer marketing

Select The BlankQuestion One of the earlier users of this strategic business unit was ________.

Correct Answer General Electrical Co.

Your Answer General Electrical Co.

True/FalseQuestion Vision without mission is incomplete and mission without vision is meaningless.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion Who said, “Management is management of Men, Money, Machinery Materials and

Information?”Correct Answer Anonymous

Your Answer Anonymous

Multiple Choice Multiple AnswerQuestion Organizing is defined in different ways, viz.

Correct Answer Process , Relationship , Corporate citizen

Your Answer Process , Relationship , Corporate citizen

3rd Sem Operations – Production Planning and Control 18

Match The FollowingQuestion Correct Answer Your Answer

W.Edward Deming Introduced quality control in Japan Introduced quality control in Japan

Henry Fayol Referred to as 'The father ofmodern management theory'

Referred to as 'The father of modernmanagement theory'

Federick W.Taylor Referred to as 'The father ofscientific management'

Referred to as 'The father ofscientific management'

Vilfredo Pareto Referred to as 'The father of thesocial systems approach' toorganization and management

Referred to as 'The father of thesocial systems approach' toorganization and management

True/FalseQuestion Focus on savings and high bargaining interests of the consumer is an obstacle in retail

development in India.Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion Limitation of control are

Correct Answer external factors , fixing of responsibility , variation and its causes

Your Answer external factors , fixing of responsibility , variation and its causes

Multiple Choice Single AnswerQuestion How many forces of competition are there according to Michael E. Porter?

Correct Answer Five

Your Answer Five

Multiple Choice Multiple AnswerQuestion Multiple Choice Multiple Response

Correct Answer Loyalty , Devotion

Your Answer Loyalty , Devotion

Multiple Choice Single AnswerQuestion What is essential for the management to get things done in the organization?

Correct Answer Delegation

Your Answer Delegation

True/FalseQuestion The larger the organisation, the more easier is the control process with respect to overall

results.

3rd Sem Operations – Production Planning and Control 19

Correct Answer False

Your Answer False

True/FalseQuestion Ethics of statute tries to explore the traits which help the person to lead a life that is

satisfying from an ethical point of view.Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion What articulates the long-term goals of an enterprise ?

Correct Answer Vission Statement

Your Answer Vission Statement

Select The BlankQuestion Control, like other elements of management process has to be ________ and not an

emergency operationCorrect Answer continuous

Your Answer corrective

Multiple Choice Single AnswerQuestion Which is the technique where the completion of all tasks is checked in the order planned in

the time scheduled is known asCorrect Answer Critical path method

Your Answer Critical path method

4th CopyLIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/FalseQuestion Gita has nothing to do with leadership in management

Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion Future of Insurance sector would be

Correct Answer new players taking over the market , improved customer service , strong hold ofnationalized players

Your Answer new players taking over the market , improved customer service , strong hold ofnationalized players

Multiple Choice Multiple AnswerQuestion Key ethical principles include the following:

3rd Sem Operations – Production Planning and Control 20

Correct Answer Caring and compassion , Being fair and open minded , Fulfilling commitments

Your Answer Caring and compassion , Being fair and open minded , Fulfilling commitments

Multiple Choice Single AnswerQuestion What is that which poses a major problem to the organizers of events?

Correct Answer Taxes

Your Answer Taxes

Multiple Choice Single AnswerQuestion One of the internal environmental factors that influences management is

Correct Answer place

Your Answer place

Match The FollowingQuestion Correct Answer Your Answer

Company's checklist beforemaking a call to the consultant

Never give up control and lookup to consultants as God

Never give up control and look upto consultants as God

Need of consultants Consultants are responsible forproviding information to thoseindividuals who fail to respond tochanges in outside environment

Consultants are responsible forproviding information to thoseindividuals who fail to respond tochanges in outside environment

Role of consultants Conduct diagnosis to redefineproblem

Conduct diagnosis to redefineproblem

Rule for becoming successfulconsultant

Evolve abundant negotiatingskills, be adaptable and flexible

Evolve abundant negotiatingskills, be adaptable and flexible

Select The BlankQuestion Management as a discipline is the function of________.

Correct Answer creativity

Your Answer creativity

Multiple Choice Single AnswerQuestion Name the type of the supervisor who takes care of the number being produced

today.Correct Answer Speed Boss

Your Answer Speed Boss

True/FalseQuestion Posture' and Observance' are not included under the 'yogic' exercises

Correct Answer False

Your Answer False

3rd Sem Operations – Production Planning and Control 21

Multiple Choice Multiple AnswerQuestion Under principle of effective communication what should be fully understood by all

concerned.Correct Answer tasks , policies , responsibilities

Your Answer tasks , policies , responsibilities

Multiple Choice Multiple AnswerQuestion Under McKinsey's 7 S model, the soft S's are:

Correct Answer Style , Staff , Skills

Your Answer Style , Staff , Skills

True/FalseQuestion Communication in industry is a phase both of organisation and moral building.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion The person who does not limit the interactions and decisions just to logical

approach, but continuously encourages his team members to think non-logically isCorrect Answer Leader

Your Answer Mediator

True/FalseQuestion Before 1990, Global players were allowed to enter and operate in Indian Market.

Correct Answer False

Your Answer False

Multiple Choice Single AnswerQuestion One of the external environment factors that influences Management is

Correct Answer Legal

Your Answer Legal

Multiple Choice Single AnswerQuestion A business unit must meet specific criteria, if it wants to be called an SBU. These are

Correct Answer Definable group of competitors

Your Answer Definable group of competitors

True/FalseQuestion Programme should not be closely integrated with objectives but to be developed

3rd Sem Operations – Production Planning and Control 22

from year to year.

Correct Answer False

Your Answer False

Match The FollowingQuestion Correct Answer Your Answer

Philosophy of scientificmanagement

Development of each man to hiscapacity and ability

Development of each man to hiscapacity and ability

Six industrial activities Technical, commercial, financial,accounting, securitymanagement

Technical, commercial, financial,accounting, security management

Five management functions Planning, organizing,commanding, co-ordination,control

Planning, organizing,commanding, co-ordination,control

Four supervisors atimplementation department

Gang boss, speed boss, repairboss, inspector

Gang boss, speed boss, repairboss, inspector

Select The BlankQuestion Direction is a ________ function performed by all the managers at all levels of the

organisation.Correct Answer managerial

Your Answer managerial

Multiple Choice Multiple AnswerQuestion Ethical concepts include:

Correct Answer Ethical subjectivism , Consequentialism , Ethics of Virtue

Your Answer Ethical subjectivism , Consequentialism , Ethics of Virtue

Select The BlankQuestion The process of control is complete only when the organisation take ________ action.

Correct Answer corrective

Your Answer corrective

Multiple Choice Single AnswerQuestion What is the reason that Indian Business houses were not able to take courageous

decisions.Correct Answer stagger or stumbling self-confidence

Your Answer stagger or stumbling self-confidence

Multiple Choice Single AnswerQuestion Management is

Correct Answer Creative

3rd Sem Operations – Production Planning and Control 23

Your Answer Creative

Multiple Choice Single AnswerQuestion In which type of equilibrium, the man is compared to a cone resting on its base

Correct Answer Perfect equilibrium

Your Answer Perfect equilibrium

True/FalseQuestion A strategy is a ploy or a past course of action.

Correct Answer False

Your Answer False

Select The BlankQuestion Brands are associated with lifestyles and people's________.

Correct Answer aspirations

Your Answer aspirations

Multiple Choice Multiple AnswerQuestion The factors measuring the morale of the workers and ascertain whether it is

increasing or diminishing can be listed asCorrect Answer Grievances , Absenteeism , No. of accidents

Your Answer Absenteeism , Grievances

True/FalseQuestion An organization consists of individuals in which their formal roles and structural

positions bring them closer.Correct Answer True

Your Answer True

Select The BlankQuestion Planning, organizing and controlling demand effective ________ at all stages if they

are to be successful.Correct Answer decision making

Your Answer decision making

Multiple Choice Single AnswerQuestion Name the industrial activity where 'Buying, selling and exchanging takes place'.

Correct Answer Commercial

Your Answer Commercial

3rd Sem Operations – Production Planning and Control 24

Multiple Choice Multiple AnswerQuestion The general management challenges faced by the service sector are

Correct Answer Communicating the concept , Differentiating factors , Revenue model

Your Answer Communicating the concept , Differentiating factors , Revenue model

True/FalseQuestion Every manager in an organisation gives direction to his subordinates as a superior

and receives direction as subordinate from his superior.Correct Answer True

Your Answer True

Select The BlankQuestion A superior should always establish a ________ control so that his subordinates

report to him periodically.Correct Answer Feedback

Your Answer Feedback

Select The BlankQuestion Span of control is also referred to as the span of ________.

Correct Answer Supervision

Your Answer Supervision

Select The BlankQuestion Actuary is one who specializes in the________of insurance.

Correct Answer mathematics

Your Answer mathematics

Select The BlankQuestion ________ is the reason for the rising importance of empathy for business leaders.

Correct Answer Globalisation

Your Answer Globalisation

Select The BlankQuestion Different rates are levied by different states for ________ tax.

Correct Answer entertainment

Your Answer entertainment

Multiple Choice Multiple AnswerQuestion Functional authority works only when,

3rd Sem Operations – Production Planning and Control 25

Correct Answer Assignment is clarified , The subordinates are allowed to participate , Feedbackcontrol is established

Your Answer Assignment is clarified , The subordinates are allowed to participate , Feedbackcontrol is established

Select The BlankQuestion ________ provide all types of help required to make the business more efficient and

profitable.Correct Answer Consultants

Your Answer Consultants

True/FalseQuestion Business families have started spending more on research and development.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion State the barriers to delegation of authority?

Correct Answer Over-confidence

Your Answer Over-confidence

Multiple Choice Single AnswerQuestion "The structure of consumer demand in India is like an iceberg". What is the rationale

behind this statement?Correct Answer we see only parts of ready potential on the surface

Your Answer we see only parts of consumers on the surface

True/FalseQuestion Direction initiates at the bottom level in the organisation and follows to top through

the hierarchy.Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion The potential external opportunities faced by an organization are

Correct Answer additional customer groups , faster market groups , falling trade barriers

Your Answer additional customer groups , faster market groups , falling trade barriers

Multiple Choice Multiple AnswerQuestion Advantages of delegation of authority would be:

Correct Answer Prompt decision making , Opportunity to subordinates to grow and develop ,Satisfaction to subordinates in terms of recognition

3rd Sem Operations – Production Planning and Control 26

Your Answer Prompt decision making , Opportunity to subordinates to grow and develop ,Satisfaction to subordinates in terms of recognition

Multiple Choice Multiple AnswerQuestion Certain important motivational techniques are

Correct Answer Monetary incentives , Job-based techniques , MBO techniques

Your Answer Security technique , Monetary incentives , Job-based techniques

Multiple Choice Multiple AnswerQuestion What type of skills does management require?

Correct Answer conceptual , human relations , technical

Your Answer conceptual , human relations , technical

5th Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/FalseQuestion XYZ when combined with FSN analysis helps to classify non-moving items into XN , YN

and ZN.Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion Forecast is based on :-

Correct Answer Past data

Your Answer Competitor's market share

Select The BlankQuestion Network ________ is defined as any adjustment to the arrow diagram which becomes

necessary owing to departure from the project schedule laid down earlier.Correct Answer Updating

Your Answer Design

Multiple Choice Single AnswerQuestion For goods manufactured to stock, following department is expected to periodically

undertake replenishment action as stocks are depleted :-Correct Answer Production Planning Control

Your Answer Production Planning Control

True/FalseQuestion CPM marks critical activities.

3rd Sem Operations – Production Planning and Control 27

Correct Answer True

Your Answer True

Select The BlankQuestion A shop order may combine more than one ________ requiring identical items.

Correct Answer Work order

Your Answer Sales order

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?

Correct Answer Consistent good quality of products

Your Answer Consistent good quality of products

Select The BlankQuestion ________ inventories help to balance company's supply with market demand.

Correct Answer Finished goods

Your Answer WIP

Select The BlankQuestion Short term forecasts are for ________.

Correct Answer Material Planning

Your Answer Cash flow management

Multiple Choice Single AnswerQuestion For process planning following is one of the basic document used :-

Correct Answer Operation Layout

Your Answer Process Layout

Multiple Choice Single AnswerQuestion Scheduled start of an operation is authorized by issuing a document called :-

Correct Answer Job card

Your Answer Route card

Multiple Choice Multiple AnswerQuestion SOS Analysis involves following type of items :-

Correct Answer Seasonal items available only for a limited period. , Seasonal items available throughoutthe year. , Non-seasonal items whose quantity is decided on different considerations.

Your Answer Seasonal items available throughout the year. , Non-seasonal items whose quantity isdecided on different considerations. , Machine spare parts

3rd Sem Operations – Production Planning and Control 28

Multiple Choice Multiple AnswerQuestion The basic procedure of assignment technique is designed to solve problems wherein :-

Correct Answer Number of tasks equal to number of facilities. , The objective function is minimization. ,There are no restrictions in allocation

Your Answer Number of tasks equal to number of facilities. , There are no restrictions in allocation , Costof machine should be taken into consideration.

True/FalseQuestion There are five manufacturing systems. However, many manufacturers combines two or

more systems to produce a final product.Correct Answer True

Your Answer True

True/FalseQuestion In LOB, the regular progress checks the future effect of any current delays and indicates

degree of urgency for corrective action.Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion 5 jobs are to be processed on machines M1 and M2 , first on M1 and then on M2. The

processing times in hours are as follows.Find the sequence for 5 jobs that will minimizetotal elapsed time .also find idle time & total elapsed time. Job Processing time [ hours ]Machine M1 Machine M2 1 5 2 2 1 6 8 9 7 6 3 8 5 10 4

Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively.

Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2 respectively.

True/FalseQuestion When shop floor scheduling problem larger than 3 machines arise the analytical solution

procedures leading to optimality are complex and difficult.Correct Answer True

Your Answer True

Match The FollowingQuestion Correct Answer Your Answer

End piece allowance Material insufficient to produce onepiece

Material insufficient to produce onepiece

Stock allowance Quantity to meet requirement ofspares

Extra material requirement

Machining allowance Extra material requirement Material loss in handling

Spoilage allowance Process rejection Quantity to meet requirement ofspares

Select The Blank

3rd Sem Operations – Production Planning and Control 29

Question ________ is required for machine set ups as well as regular production.

Correct Answer Performance standard

Your Answer Machine design data

Multiple Choice Single AnswerQuestion If a product is required within 20 days and the product can be made available in 10 days,

the Critical ratio would be :-Correct Answer 2

Your Answer 0.5

Multiple Choice Single AnswerQuestion A subcontractor is :-

Correct Answer Another form acting as a supplier

Your Answer Manufacturer of specialized products on whom the buyer is dependent for 100% ofrequirement of main assembly

Multiple Choice Single AnswerQuestion The data regarding maximum run out between centers pertains to :-

Correct Answer Process planning

Your Answer Raw material data

True/FalseQuestion Lead time information is required for determination of safety stock.

Correct Answer False

Your Answer True

Select The BlankQuestion Americans like to use the word 'inventory' whereas for same context British use the

term________.Correct Answer Stock

Your Answer Stock

Multiple Choice Multiple AnswerQuestion SDE analysis is employed by the purchase department for :-

Correct Answer Contract buying for some of 'easy' items. , Forward buying of some of 'scarce' items. ,Scheduled buying for some of 'easy' items.

Your Answer Forward buying of some of 'scarce' items. , Scheduled buying for some of 'easy' items. ,Contract buying for some of 'easy' items.

True/FalseQuestion Labour efficiency factor is applied after capacity requirement of equipment is calculated.

Correct Answer False

3rd Sem Operations – Production Planning and Control 30

Your Answer True

Multiple Choice Multiple AnswerQuestion PERT terminology uses words like :-

Correct Answer Network diagram , Events , Slack

Your Answer Network diagram , Events

True/FalseQuestion The LOB technique is most appropriate for assembly operations involving number of

distinct components.Correct Answer True

Your Answer True

True/FalseQuestion Transit time for manufactured items should be considered only when it is insignificant.

Correct Answer False

Your Answer True

Select The BlankQuestion A progress card normally contains ________ squares.

Correct Answer Less than 25

Your Answer More than 50

Multiple Choice Multiple AnswerQuestion Due to the following emergent events, the queue time has to compensate for the time for

which the job has to undergo an extra time :-Correct Answer Tool breakage , Job split up , Change in priorities

Your Answer Tool breakage , Job split up , Store inventory

Multiple Choice Single AnswerQuestion One of the following is not an task of progressing :-

Correct Answer Ensuring supply of material and issue of documents to manufacturing shops

Your Answer Expediting to rush up remaining operations of the delays jobs

Multiple Choice Single AnswerQuestion Production output in night shift is :-

Correct Answer Less than I shift production

Your Answer More than I shift production

Multiple Choice Multiple Answer

3rd Sem Operations – Production Planning and Control 31

Question The minimum requirements for application software for line balancing are as follows :-

Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or equivalent operating system.

Your Answer 1 Gb hard Disk free memory , Windows or equivalent operating system.

Multiple Choice Single AnswerQuestion The work measurement and time study belong to the following school of management :-

Correct Answer Scientific School of management

Your Answer Functional School of management

Multiple Choice Multiple AnswerQuestion Before planning subcontracting points to be considered are :-

Correct Answer Whether overtime can be given , One more shift can be started

Your Answer Whether overtime can be given , One more shift can be started , Set up time can bereduced

Multiple Choice Multiple AnswerQuestion The main requirements of re-order level system are as follows :-

Correct Answer Incoming materials and materials returned from shop must be deposited in appropriate binsand their stock cards must be posted for "goods receipt report" and "material return note"for the quantities received physically . , Items should be issued in correct quantities. , Thebalance on the stock cards should be periodically tallied with physical stock.

Your Answer Incoming materials and materials returned from shop must be deposited in appropriate binsand their stock cards must be posted for "goods receipt report" and "material return note"for the quantities received physically . , Items should be issued in correct quantities. , Thebalance on the stock cards should be periodically tallied with physical stock.

Multiple Choice Multiple AnswerQuestion The following are salient features of the fixed order quantity system :-

Correct Answer Reorder quantity is always the same which is usually economic order quantity , The timeinterval between deliveries varies. , Replenishment action is initiated when the stock onhand is just sufficient to meet demand during the lead time.

Your Answer Reorder quantity is always the same which is usually economic order quantity , The timeinterval between deliveries varies. , Percent cumulative cost of item is taken intoconsideration.

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs,

Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the cost ofbuying is Rs 8 per piece. The firm uses 100000 MS bolts every year. Under thesecircumstances, the firm would take a decision to ________.

Correct Answer Make at home

Your Answer Buy from outside

Multiple Choice Multiple AnswerQuestion Following difficulties are faced by SDE analysis :-

3rd Sem Operations – Production Planning and Control 32

Correct Answer More delivery period , Geographical location of supplier , Reliability of suppliers

Your Answer More delivery period , Reliability of suppliers , Excise duty

Select The BlankQuestion For replenishment action for stock items which are reserved by PPC, the stores work out

________ stock which equals the stock on hand less stock reserved.Correct Answer Free

Your Answer Net

True/FalseQuestion Route sheets for custom built job is prepared for each new order received.

Correct Answer True

Your Answer True

Match The FollowingQuestion Correct Answer Your Answer

Order quantity Factor influencing processplanning

Compare alternative processes

Machine capacity chart Dimensional accuracy General purpose machines withspecial toolings

Mass production Special purpose machines Break even analysis

Standard elemental time data Compare alternative processes Factor influencing process planning

Multiple Choice Multiple AnswerQuestion Following are some of the common standard cutting tools :-

Correct Answer Cutting saw , Inserts , Reamers

Your Answer Form tool , Inserts , Reamers

Multiple Choice Single AnswerQuestion The Carrying cost is stated in terms of :-

Correct Answer Per item per year

Your Answer Per order

Select The BlankQuestion The definitive statement of policy stating when to procure and how much to procure usually

to ensure that the sum of all costs associated with ________ are minimised is calledInventory policy.

Correct Answer Inventory

Your Answer Buying

3rd Sem Operations – Production Planning and Control 33

Select The BlankQuestion Buying for C quantities should be made in ________ quantities .

Correct Answer Large

Your Answer Medium

6th Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The BlankQuestion In the assignment model, the________ is formed between jobs and machines.

Correct Answer Matrix

Your Answer Matrix

Select The BlankQuestion ________ analysis mainly helps to identify non-existing items for which store keeps bin

cards, wastes computer memory or wastes computer stationary while preparing storesledger.

Correct Answer MNG Analysis

Your Answer SOS Analysis

Multiple Choice Single AnswerQuestion Why customer is called the king?

Correct Answer Customer's orders gives us work

Your Answer Gives satisfaction to workers

Multiple Choice Single AnswerQuestion Negative value of critical ratio :-

Correct Answer Is meaningless

Your Answer Indicates excess of scheduled delivery period

Multiple Choice Multiple AnswerQuestion The main characteristics of batch production are :-

Correct Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specificprocess

Your Answer Short runs , Skilled labours in specific trade , Supervisor to posses knowledge of specificprocess

True/FalseQuestion If lead time available is 11days and lead time required is 10 days, the critical ratio would be

1.10.Correct Answer True

3rd Sem Operations – Production Planning and Control 34

Your Answer True

Multiple Choice Multiple AnswerQuestion What are the factor affecting decision about centralized planning system?

Correct Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work isless repetitive

Your Answer Product variety is large , Jobbing and batch production methods of manufacturing , Work isless repetitive

True/FalseQuestion In continuous or process production , only one product is manufactured.

Correct Answer True

Your Answer True

True/FalseQuestion The make-or-buy decision becomes necessary when the current source of supply is not able

to supply the material in accordance with buyer's quality requirements.Correct Answer True

Your Answer True

True/FalseQuestion Work measurement function is attached to line management.

Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Placement of purchase orders in case of 'A' type of items is usually :-

Correct Answer Frequent

Your Answer Frequent

Match The FollowingQuestion Correct Answer Your Answer

Economic order quantity Quantity at which there is neitheroverstocking nor under stocking.

Quantity at which there is neitheroverstocking nor under stocking.

Carrying cost Cost of 'holding' the material instore

Cost of transportation [carrying] ofmaterial

Procurement cost Administrative cost for procurement Cost of procurement of material

Inventory cost Sum of carrying and inventory cost Sum of carrying and inventory cost

True/FalseQuestion To solve "n jobs - 3 machines" sequencing problem, the largest of time of any job on the

second machine must be smaller than or equal to the smallest time of any job on first

3rd Sem Operations – Production Planning and Control 35

machine or third machine.

Correct Answer True

Your Answer False

True/FalseQuestion Systematic procedures must be set in the operating functions prior to installation of PPC in

the firm.Correct Answer True

Your Answer True

Select The BlankQuestion Time waste is the earliest of all wastes and yet the________ to correct because it does not

litter the floor.Correct Answer Hazards

Your Answer Big hazard

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the reorder point is at 120 Units, find the

lead time.Correct Answer 4 months

Your Answer 1.2 Months

Multiple Choice Single AnswerQuestion Which factor influence plan for meeting seasonal or occasional increase in demand?

Correct Answer Subcontracting

Your Answer Subcontracting

Multiple Choice Single AnswerQuestion Which of the following is the function of Production Planning?

Correct Answer Process planning and scheduling

Your Answer Progressing

Select The BlankQuestion Because of uncertainty of activity timings, PERT acquired a shape of ________ model.

Correct Answer Probabilistic

Your Answer Statistical

True/FalseQuestion Scientific inventory control system requires to be followed for machine aid, work aid and

inspection aid :-Correct Answer False

3rd Sem Operations – Production Planning and Control 36

Your Answer True

True/FalseQuestion Job schedule is a chart showing work ahead of each machine with respect to time.

Correct Answer False

Your Answer True

Match The FollowingQuestion Correct Answer Your Answer

Tooling cost Jigs and Fixtures Jigs and Fixtures

Opportunity costs Monitory value sacrificed inrejection

Cost of giving opportunity to do abusiness

Incremental cost Vary with decision to make or buy Vary with decision to make or buy

Labour cost Wages and other benefits Wages and other benefits

Multiple Choice Single AnswerQuestion The goods are manufactured as per customer's definite order in case of :-

Correct Answer Job production

Your Answer Batch production

Multiple Choice Multiple AnswerQuestion The commonly used network techniques other than PERT and CPM are as follows :-

Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project Control System ] , GERT [Graphical Evaluation Review Techniques ]

Your Answer MIS [ Management Information Systems ]

Multiple Choice Multiple AnswerQuestion To minimize total throughout time we are required to minimize :-

Correct Answer Queuing , Idle time , Inventory

Your Answer Queuing , Idle time

Multiple Choice Multiple AnswerQuestion Following conditions are required to be fulfilled for processing n jobs through 2 machines :-

Correct Answer The jobs are ready to be processed before the period under consideration begins . ,Transient time to move a job from one machine to the another is negligible. , In processinventory is allowed.

Your Answer The jobs are ready to be processed before the period under consideration begins . , Inprocess inventory is allowed.

Select The Blank

3rd Sem Operations – Production Planning and Control 37

Question An inventory control technique based on selective approach to stock items is called________ analysis.

Correct Answer Pareto's

Your Answer Pareto's

Multiple Choice Multiple AnswerQuestion While communicating to customer on delays in delivery following information should be given

:-Correct Answer Information on identification of job , Reasons for delays , Revised date of delivery

Your Answer Reasons for delays , Revised date of delivery

Select The BlankQuestion CPM is ________ oriented system.

Correct Answer Activity

Your Answer Activity

Multiple Choice Single AnswerQuestion One of the following is not consumable tool :-

Correct Answer Arbors

Your Answer Arbors

True/FalseQuestion LOB is a manual planning and scheduling technique similar in nature to MRP [Material

Resource Planning].Correct Answer True

Your Answer False

Select The BlankQuestion ________ is required when expediting fails to bring deviated plan to its actual path.

Correct Answer Replanning

Your Answer Replanning

Multiple Choice Multiple AnswerQuestion The process of contraction or compression involves extra cost because extra money is

required to be spent on factors such as :-Correct Answer Overtime engagement of workforce , Purchase of additional machinery , Use of better

materialsYour Answer Overtime engagement of workforce , Purchase of additional machinery , Purchase of

stationary of good quality

Multiple Choice Single AnswerQuestion In job production one single product is manufactured while a batch of group of products is

turned out at a time under a system of :-

3rd Sem Operations – Production Planning and Control 38

Correct Answer Batch production

Your Answer Process production

Multiple Choice Multiple AnswerQuestion The 'F' group of GOLF analysis involves following requirements :-

Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for shipping and portclearance

Your Answer Search for foreign suppliers

Multiple Choice Single AnswerQuestion The production system characterized by complex set of activities that must be performed in a

particular order within a given period and within an estimated expenditure is known as :-Correct Answer Project production

Your Answer Project production

Multiple Choice Single AnswerQuestion Proper Production Planning and Control can reduce cost in :-

Correct Answer Overtime cost

Your Answer Overtime cost

Select The BlankQuestion ________ is the specific instant of time that marks start and end of activity.

Correct Answer Event

Your Answer Event

Select The BlankQuestion Overlapping of operations help to ________ manufacturing time.

Correct Answer Reduce

Your Answer Reduce

Multiple Choice Multiple AnswerQuestion "Difficult" items have following attributes :-

Correct Answer Available indigenously but are not easy to procure , Items which come from longer distance ,Items which are difficult to manufacture

Your Answer Available indigenously but are not easy to procure , Items which come from longer distance ,Items having complex specifications

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-

Correct Answer Moving average , Exponential smothering , Curve fitting

Your Answer Moving average , Curve fitting

3rd Sem Operations – Production Planning and Control 39

Select The BlankQuestion The performance standard is required by ________ to determine individual machine capacity

for the purpose of machine loading and assigning machine hours and man hours .Correct Answer Scheduler

Your Answer Production engineer

Multiple Choice Multiple AnswerQuestion The network analysis involves following works :-

Correct Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in alogical network. , Estimation of job duration , Scheduling to discover which jobs controlcompletion of project and reallocation of resources.

Your Answer Obtaining a work breakdown structure to a set of individual jobs which are arranged in alogical network. , Estimation of job duration , Scheduling to discover which jobs controlcompletion of project and reallocation of resources.

Multiple Choice Single AnswerQuestion The assembly work content [ Wi ] of the i'th station having n work stations is given by :-

Correct Answer å Wi from i=1 to n

Your Answer å Wi from i=1 to n

Multiple Choice Multiple AnswerQuestion Essentials of good forecasts are :-

Correct Answer Stability , Fairly accurate , Economical to generate

Your Answer Stability , Fairly accurate , Economical to generate

True/FalseQuestion The 'G' group of GOLF analysis involves moderate delivery time and availability of credit

usually in the range of 30 to 60 days.Correct Answer True

Your Answer True

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs,

Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost wouldbe Rs ________.

Correct Answer 6 Lacs

Your Answer 6 Lacs

7th Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer

3rd Sem Operations – Production Planning and Control 40

Question Following are the factors which influence tool life :-

Correct Answer Operators efficiency , Type of tool , Material it is required to operate upon

Your Answer Operators efficiency , Type of tool , Material it is required to operate upon

Multiple Choice Single AnswerQuestion The document which incorporates details of process planning for a job is called :-

Correct Answer Route Sheet

Your Answer Route Sheet

Multiple Choice Multiple AnswerQuestion CPM terminology uses words like

Correct Answer Arrow diagram , Nodes , Float

Your Answer Arrow diagram , Nodes

Select The BlankQuestion Forecasting is function of ________.

Correct Answer Marketing department

Your Answer Planning in charge

Select The BlankQuestion Johnsons method of scheduling can be used when operation sequence involve

________ machines.Correct Answer Two

Your Answer Two

Select The BlankQuestion Good quality and ________are the two main requirements to secure maximum

business from a customer.Correct Answer Competitive rates

Your Answer Competitive rates

Select The BlankQuestion Sum of queue, transit, order preparation and manufacturing times is known as

________Correct Answer Total Lead Time

Your Answer Total Lead Time

True/FalseQuestion To conduct FSN analysis we require, last date of receipt or last date of issue

whichever is later and period.Correct Answer True

3rd Sem Operations – Production Planning and Control 41

Your Answer True

Multiple Choice Multiple AnswerQuestion Overtime can be avoided in many ways and they are :-

Correct Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machinebreakdown

Your Answer Unrealistic delivery date , Acceptance of too many rush order , Excessive machinebreakdown

Multiple Choice Multiple AnswerQuestion Material control function embraces a following techniques :-

Correct Answer Make -or -buy decision , Pareto's analysis , Replenishment system

Your Answer Make -or -buy decision , Pareto's analysis , Replenishment system

True/FalseQuestion Work measurement is not useful for choosing between two alternate methods of

production.Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion Process Sheet contains following information :-

Correct Answer Material Specification , Sequence of operation , Skill of Labour

Your Answer Material Specification , Sequence of operation , Skill of Labour

True/FalseQuestion More than one subcontractor should be developed for each subcontracted

operation/Job.Correct Answer True

Your Answer True

Select The BlankQuestion Classification of items on basis of their capital lock up is called ________ analysis.

Correct Answer XYZ

Your Answer XYZ

Select The BlankQuestion Purchase section must keep ________posted on the progress of purchase orders

and expected delays.Correct Answer P.P.C.

Your Answer P.P.C.

3rd Sem Operations – Production Planning and Control 42

Multiple Choice Single AnswerQuestion Effective Production Planning and Control, reduce investment in inventories

effectively :-Correct Answer By proper coordination between shop floor, stores and buying department

Your Answer By proper coordination between shop floor, stores and buying department

True/FalseQuestion Fluctuation due to changes in season are called cyclical fluctuation.

Correct Answer False

Your Answer False

True/FalseQuestion Flexibility and product variety are not inter-related with each other.

Correct Answer False

Your Answer True

True/FalseQuestion Overlapping of operations help to reduce manufacturing time.

Correct Answer True

Your Answer True

Select The BlankQuestion The LOB technique is made more accurate and fast by using ________.

Correct Answer Computers

Your Answer Reduction techniques

True/FalseQuestion Overtime is undesirable since it increases manufacturing cost of the product.

Correct Answer True

Your Answer False

Multiple Choice Multiple AnswerQuestion The essential features of batch production are :-

Correct Answer General purpose machines and process type layout , Manual materials handling ,Flexibility of production schedule

Your Answer General purpose machines and process type layout , Manual materials handling ,Flexibility of production schedule

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'B' type of items is :-

3rd Sem Operations – Production Planning and Control 43

Correct Answer Medium

Your Answer Few

Multiple Choice Single AnswerQuestion Dispatcher withdraws required quantity of material from stores using following

document :-Correct Answer Stores issue order

Your Answer Bill of material

Multiple Choice Multiple AnswerQuestion In a mass production assembly shop following work measurement techniques are

used :-Correct Answer Time study , Work sampling , Production study

Your Answer Time study , Work sampling , Production study , Analytical estimating

Multiple Choice Multiple AnswerQuestion SDE analysis is based on problems of procurement namely :-

Correct Answer Non-availability , Scarcity , Longer lead time

Your Answer Non-availability , Scarcity , Longer lead time

True/FalseQuestion Line balancing is a simulation technique.

Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion The line of balance is a device for planning and monitoring progress of :-

Correct Answer Purchase order execution , Project execution , Targeted programs

Your Answer Purchase order execution , Project execution , Targeted programs

Select The BlankQuestion Sales persons decides ________.

Correct Answer Synthetic forecast

Your Answer Current sales

True/FalseQuestion Material control Card is a document for record of issues of material and receipt of

unused material by production shop.Correct Answer False

Your Answer False

3rd Sem Operations – Production Planning and Control 44

Multiple Choice Single AnswerQuestion Work measurement is limited to measuring :-

Correct Answer Productive & non productive time

Your Answer Only product related activities

Match The FollowingQuestion Correct Answer Your Answer

Move order Transport material from and torequired work centers

Transport material from and torequired work centers

Materials Order Allocation of material required inconnection with shop order

Allocation of material required inconnection with shop order

Work Order Bird's eye view of productionprogramme

Bird's eye view of productionprogramme

Production Order Reserve material required inconnection with sales order

Reserve material required inconnection with sales order

Multiple Choice Multiple AnswerQuestion The software for line balancing should have following features :-

Correct Answer Easy to operate , Easy to install , Easy to upgrade

Your Answer Easy to operate , Easy to install , Unmanaged code should be available

Multiple Choice Single AnswerQuestion Man hours is commonly used unit of measurement for scheduling purposes in

following industry :-Correct Answer Engineering

Your Answer Engineering

Multiple Choice Multiple AnswerQuestion Customer plays very important role due to the following reasons :-

Correct Answer Gives us work , Dividends to share holders , Gets business from new customers

Your Answer Gives us work , Dividends to share holders , Gets business from new customers

Multiple Choice Single AnswerQuestion The 4X4 assignment problem involve following job-machine operations :-

Correct Answer 24

Your Answer 24

Multiple Choice Single AnswerQuestion The best of scientific tools available for scheduling is :-

Correct Answer CPA [ critical path analysis ]

3rd Sem Operations – Production Planning and Control 45

Your Answer Gantt Chart

Multiple Choice Multiple AnswerQuestion Work measurement is responsibility of :-

Correct Answer PPC , Industrial Engineering , Production department

Your Answer PPC , Industrial Engineering

Match The FollowingQuestion Correct Answer Your Answer

Long production run Mass and Flow production Mass and Flow production

Complex activities to beperformed in a particular orderwithin a give time & estimate.

Project production Project production

One or few units manufacturedas per customers requirement

Jobbing Production Jobbing Production

Short production run Batch Production Batch Production

Multiple Choice Single AnswerQuestion Value Analysis conducted in 'C' type of material is usually :-

Correct Answer Minimum

Your Answer Minimum

Multiple Choice Multiple AnswerQuestion Some of significant features of HML analysis are :-

Correct Answer To evolve buying policies to control purchases , To delegate authorities to differentbuyers to make petty cash purchases , Not to take consumption into account

Your Answer To evolve buying policies to control purchases , To delegate authorities to differentbuyers to make petty cash purchases

Multiple Choice Single AnswerQuestion What is the reasons for poor labour efficiency attributed by inefficient P.P.C.?

Correct Answer Failure to provide proper tools and control on work in progress on shop floor

Your Answer Failure to provide proper tools and control on work in progress on shop floor

Multiple Choice Single AnswerQuestion The administrative expenses towards the procurement of materials is called :-

Correct Answer Procurement cost

Your Answer Administrative cost

Multiple Choice Multiple Answer

3rd Sem Operations – Production Planning and Control 46

Question Smoothing performs following activities:-

Correct Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristicapproach

Your Answer Reallocation of resources , Improving utilization of resources , Conducting Heuristicapproach

True/FalseQuestion As per a study on materials management practices, a typical firm spends almost half

of its rupee sales on goods purchased from vendors.Correct Answer True

Your Answer True

Select The BlankQuestion Value analysis of ________ class items is usually inadvisable.

Correct Answer C

Your Answer C

True/FalseQuestion PPC system in the organisation is to be tailor made.

Correct Answer True

Your Answer True

9) a) Draw a flow chart to explain the procedure to schedule ‘n’ jobs on twomachines:

Ans: The following are the ten steps involved to schedule ‘n’ jobs on two machines:

Step 1) Prepare list of the jobs to be processed on the two machines.

Step 2) Estimate processing time for each job on each machine.

Step 3) Construct a job array, called sequencing matrix. To construct the matrix the jobsto be processed are recorded row head wise, the machines to be employed to process thejobs are recorded column head wise and the processing time of each job is recordedagainst the under the respective machine.

Step 4) Scan the job array and identify the smallest processing time.

Step 5) If the smallest time appears:

i. On the first machine, A, assign the corresponding jobs as close to thebeginning of the job sequence as possible.

ii. On the second machine, schedule the corresponding job as close to the endof the job sequence as possible.

iii. If there is a tie of minima for both machines i.e., if the smallest elementoccurs on both machines, (one minimal element on each machine), selectamong the tied up jobs the one with the smallest time on the first machineand schedule it as early in the job sequence as possible.

iv. If the tie of the minima occurs among the elements of the first machine,select among the tied up jobs the one with the smallest time on the secondmachine and schedule it as early in the job sequence as possible.

v. If the tie for the minima occurs among the elements in the secondmachine, select among the tied up jobs the one with the smallest time onthe first machine and schedule it as late in the sequence as possible.

Step 6) Delete from the array the jobs scheduled and its corresponding processing times.

Step 7) Repeat steps 4, 5, 6 and 7 for remaining processing times, placing the jobs next tofirst or next to last until all jobs are scheduled.

Step 8) Calculate the total elapsed time to process all jobs through the two machines.

Step 9) Calculate the idle time for machines A and B.

Fig: Flow chart for”n jobs: 2 machines” sequencing model

START

Construct a sequencing matrix withn jobs and two machines (A & B)

Scrutinize processing time of alljobs on both machines and select thesmallest time

Does thesmallest timeoccur on firstmachine? Schedule the job

corresponding to thesmallest time as closeto the end of the jobsequence as possibleSchedule the job corresponding to the

smallest time as close to the beginning ofthe job sequence as possible.

Delete the job scheduled and itscorresponding processing times

Have alljobs beenscheduled?

Calculate start and finish time ofeach job on machine A

Calculate start and finish time ofeach job on machine B

Determine total elapsed time toprocess all jobs though two machines

Calculate idle time of each machine

STOP

No

No

Yes

Yes

b) Five jobs A, B, C, D and E are required to be processed on two machines M1 andM2. Each job has to be processed on machine M1 and then on machine M2. Theorder of the completion of jobs has no significance. The processing time hours forfive jobs on the two machines is as under:

Ans: The smallest time in the job array is 2 hours and it appears for the first stage. Thecorresponding job D therefore is scheduled last and its entry is made in the last cell of thesequencing bar.

Delete the corresponding job schedule leaves us 4 jobs in the array.

The next smallest time is 4 hrs and it occurs on the job A which is present in the sequenceof Machine #1. Therefore the entry is made in the first cell of the sequencing bar.

Deleting the job schedule leaves us with 3 more entries in the array.

The next smallest time is 6 and is present in the job E, which is present in the sequence ofMachine #2. Therefore the entry is made in the last but one cell of the bar.

Deleting the job schedule leaves us with 2 more entries in the array.

The next smallest time is 7 and is present in the job B, which is present in the sequence ofMachine #2. Therefore the entry is made in the 3rd cell of the bar.

A DEB

A DE

D

Job

Machine A B C D E

Machine #1 4 17 14 9 11

Machine #2 5 7 12 2 6

A D

Since the last job is left unscheduled, it is therefore placed in the empty cell:Therefore the optimum sequence, therefore is A, C, B, E & D

2. What is Production Planning and Control? What are its key functions? How doesPPC contribute to the two basic objectives namely “long term growth of business”and “Profit of the company”?Ans: Introduction: Production Planning is a centralized activity (normally conducted inthe office) and includes such functions as order preparation, material control, processplanning, tools control and scheduling. Production control, on the contrary, a diffusedactivity (usually conducted in the shops) and includes such functions as dispatching,progressing and expediting.

Functions of Production Planning & Control:

Control Functions Optional Functions

A DEBC

1) Order Preparation includes activities likemaking of work orders, converting workorders into shop orders, preparing auxiliaryorders, and releasing such orders to shops toauthorize manufacturing activity.

2) Materials control concerns preparation ofmaterials estimates indenting non-stickmaterials, ascertaining availability ofmaterials purchased to stock, continualfollow-up with purchase and store for timelyreceipt of materials, advising store to allocaterequired quantities of available materials(alternatively on their receipt) againstspecific shop orders.

3) Processing Planning or Routing concernsfixation of method of manufacture operationsand their sequence, machine tools for eachoperation, jigs and fixtures, measuringinstruments and gauges etc to enable shops toproduce goods of the right quality at thelowest cost.

4) Tools Controls concerns preparation ofestimates of cutting tools (Standard as wellas non-standard tools), gauges and measuringinstruments including jigs & fixtures,indenting non-stock tooling, follow-up withtool room for timely manufacture of jigs &fixtures, periodical replenishment of worn-out-non-consumable tooling (e.g. workaborts, collets, copying masters, Allen keys,spanners. etc.)

1. Cost Estimation concerns preparation ofpre-production cost estimates to be used bysales department for quotation purposes.(Alternatively this function may beassigned to costing department or industrialengineering dept)

2. Work Measurement concerns fixation oftime to be allowed to a qualified workmanto carryout a specified task, under specifiedconditions and at the defined level ofperformance. Work measurement employsscientific, well-known techniques like timestudy, analytical estimating etc(Alternatively, work measurement workmay be assigned to industrial engineeringdept.)

3. Sub Contract concerns off-loading ofwork on outside vendors for economicreasons or to augment existingmanufacturing facilities. Sub-contract workalternatively may be handled byMaterials/Purchase Dept.

4. Capacity Planning concerns estimation ofrequirements of men and machines as thebasics of decision making to meet thefirm’s increased volume of business (Somecompanies prefer to assign this function toengineering dept)

b) Long term Growth of business and Profit of the Company:

Long term growth of business and profitability are the two basic objectives of anorganization. For long term growth, the company must have enough orders and forenough orders it must have large number of satisfied customers.

Five essentials to achieve customers’ satisfaction are:

1) Timely delivery2) Advance communication in case of expected late shipments3) Short lead time in emergency4) Consistent and good quality of products5) Competitive price.

Good production planning and control is necessary to meet these essentials of customers’satisfaction. Good PPC system is also necessary to minimize waiting time costs, overtimecosts, inventory costs and other manufacturing overheads. Goods PPC system helps toimprove utilization or resources morale of the employees.

5) Scheduling concerns preparation of machineloads, fixation of calendar dates of variousoperations to be performed on a job,coordination with sales to confirm deliverydates of new items and periodical preparationof dispatch schedules or regular items.

6) Dispatching concerns preparation anddistribution of shop orders and manufacturinginstructions to be concerned department astheir authority to perform the work accordingto the predetermined schedule.

7) Progressing concerns collection of data frommanufacturing shops, recording of progress ofwork, and comparing progress against the plan.

8) Expediting concerns intensive progresschasing to identify delays and interruptionswhich may hold up production, devising curesfrom time to time to keep rate of production inline with the schedule communicating possiblefailure in delivery commitments to salesdepartment.

5) Demand Forecasting concerns makingprojection of company’s product market,though, long term forecasts are given bysales department but short term forecastsrequired for materials planning, machinesloading, subcontracting etc, may be preparedby PPC departments.

3) (a) How does Production Planning differ from Production Control?Ans:Production Planning: It is the determination, acquisition and arrangement of allfacilities necessary for future production of items. In other words, production planning isessentially a pre-production activity, associated with the design of the production system.

Production Control: It is the corollary to short term production planning or schedulingand is quite simply concerned with the implementation of production schedules.

Production Planning Versus Production Control

PLANNING (Planning the Work) CONTROL (Working the plan)

1) Planning involves collection andmaintenance of data regarding timestandards, materials and their specifications,machines and their process capabilities,drawing and operational layouts etc.

2) Planning is seeing that requirements-tools,machines, men, instructions, authorizationsand the like-well be available at the righttime and in the right quantities and are ofproper quality.

3) Planning involves preparation of load chartsand fitting various work orders intouncommitted time available on thecompany’s facilities (men or machines).

4) Planning involves preparation of allnecessary forms and paper work

5) Planning involves designing suitablefeedback as to what may happen.

6) Planning involves forward thinking as to theremedial action to be taken if the job failsbehind schedule.

Planning therefore, is a centralized activity(in the office) and includes such function asmaterials control, tools control, preprocessplanning and scheduling.

1) Control involves dissemination of data,preparation of reports regarding output,machine and labour utilization, labourefficiency, percentage defectives etc.

2) Control is seeing that the requirements areactually made available at the right place inthe right quantities.

3) Control involves actual seeing that the jobsare started and completed as per scheduleprepared by scheduling cell of the PPC.

4) Control involves actual issue of forms andpaper work.

5) Control involves keeping track of what ishappening and collecting information as towhat has happened.

6) Control involves suggesting remedial actionwhen the job is falling behind schedule.

Control is thus a diffused activity (in theshops) and includes functions such asdispatching, progressing and expediting.

(b) What type of information is necessary for efficient functioning of PPCdepartment? Which department in the organization originates this information?Ans: Introduction: The efficiency of Production Planning and Control departmentdepends upon the information it gets from other departments and the accuracy of suchinformation. To prepare load and schedule chat, it must know the preventive maintenanceschedule. To give realistic delivery date, it must know the work content of each job.Production Planning and Control department generally requires the followinginformation:

Information Details Source DepartmentConcerning originating indicated

Information

1. Productionprogramme.

2. Productionmaterials

3. Tooling

4. QualityStandards

5. OperationMethods.

6. Path ofMaterials.

7. Operationtime.

8. Scheduling

9. Progress ofWork.

1. Quantity to be manufactured.2. Delivery date.

1. Kind and quality of material.2. Quantity of material required3.Stock on hand and reservations4. Lead time required for

procurement.1. Standard and special tooling

1. Dimensional requirements.2. Finish requirements3. Tolerance requirements4. Hardness desired.

1. Operations and their sequence.2. Machine tool for each

indicated operation3. Jigs and fixtures needed4. Speeds & Feeds.

1 List of Operations and theirSequence

2.Alternatives possible

1. Setup time and standard timefor each operation

1. Starting and finishing dates.

1. Work Completed as on date.

Sales order or OrderAcceptance

Drawings/Bill ofMaterialStock Cards

Tool Card

DrawingsCustomer’s feedback

Process sheetsCapacity charts

Experience

Route sheets

Plan layout

Work Measurementdata

Machine Load &Scheduled charts

Daily productionreports/Timeticket/Perforatedslips

Sales

Drawing Office

Stores Purchase

P.P.C

Drawing officeSales Department

PPCPPC

PPC

IndustrialEngineering

P.P.C

Production

4) How do the following management decisions influence design of the PPC system?

(i) Plan for meeting occasional increase in demand.(ii) Status of the PPC department in the organization(iii)Degree of centralization(iv)Internal structure of PPC department.

Ans: PLANNING MEETING SEASONAL OR OCCASIONAL INCREASE INDEMAND:This influences greatly the production planning and control system which the companyshould have. Alternatives available to the company and associated activities are as under:

i) Having factors of production for the peak demand and utilizing extra capacityto manufacture products of non-seasonal nature or taking up subcontract worketc.

ii) Having factors of production for the least demand and meeting requirementsof extra capacity by overtime or by holiday working or by hiring capacity orby sub-contracting etc. Production planning and control and the purchasingfunction under such a situation assumes very important role in the company.

STATUS OF THE PPC DEPARTMENT IN THE COMPANY:The status of PPC department in the company depends upon the company’smanufacturing processes.

If the work is highly repetitive and the number of workmen is not very large, the work ofplanning may be performed directly by the line staff, there being thus no formal PPCdepartment in the company. And in manufacturing units where plant and machinery islaid out as per sequence of operations and there is little difference in machine capacity fordifferent products, the PPC may be sub-division of the manufacturing department.

In firms, where either the product variety is very large or where machine capacities aredifferent for different products, or where plant and machinery is laid out as per functionin different departments not related to each other, PPC should be set up as an independentdepartment with the head of the department responsible to the managing director, Generalmanager, or works manager, depending upon the magnitude and complexity of theplanning functions and the size of the firm.

DEGREE OF CENTRALISATION:Degree of centralization implies extent to which planning activities are performed byPPC. Two systems in general are available:

i) Centralized Planning where the functions of production planning iscontrolled centrally by staff specialist (s).

ii) Decentralized Planning where planning is carried out by line executive-foremen-who direct normal work in their respective departments.

Both types of planning, centralized as well as decentralized planning, have their relativeadvantages and disadvantages, the centralized planning takes away the burden ofplanning from the line staff thus leaving free to handle men and machines moreeffectively.

Decentralized planning gives line staff sense of participation and opportunity to use theirexperience but it takes away lot of their valuable time in performing planning functionsThe trend today is towards the blend of “Centralized” and “Decentralized” system, calledsemi-centralized planning. It combines the merits of both the systems and it especiallygives better results in a large industrial complex.

Under semi-centralized planning, the scheduling of operations within the pre-fixed periodand allotment of work to men and machines is done by line staff while overall co-ordination of materials ordering, sub-contract work planning, progressing and follow-up,capacity planning man power planning, maintenance planning etc, is done centrally bythe staff specialists.

THE INTERNAL STRUCTURE OF THE PPC DEPARTMENTInternal structure implies the functions to be assigned to PPC which depends on thenature of industry the size of the company and the management policies. Differentcompanies assign different functions to the PPC department. It is common practice toassign following functions to PPC department:

i) Order Preparation. v) Schedulingii) Materials Control vi) Dispatchingiii) Tools Control vii) Progressingiv) Process planning viii) Expediting.

Few companies assign following four areas to PPC department:i) Cost Estimation iii) Sub-Contractingii) Work Measurement iv) Capacity planning

The functions actually to be assigned depend on the size of the company.

This aspect also considers assigning of various functions of production control todifferent cells which again depends on the size of the company. In a medium or largesized industry there may be following important cells in PPC department:

i) Materials Control Cell vi) Progressing Cellii) Tools Control Cell vii) Cost Estimation Celliii) Process Planning Cell viii) Sub-Contract Celliv) Scheduling Cell ix) Work Measurement Cellv) Dispatching Cell

Each cell may be headed by a senior engineer and supported by planning assistant(s) andclerk(s).

A representative production planning and control department of a medium size firm isillustrative in the following figure.

6) (a) “Data given on the process sheet can be put to lot many uses in the organization”Discuss.Ans: Introduction: Process planning is the process of establishing the shortest and mosteconomical path that each part is to follow from the point it is received as raw materials until itleaves as furnished part or a finished product. Process planning indicates operations to beperformed and their sequence; specified the machine tool for each indicated operation; shows thenecessary tooling (jigs and fixtures, cutting tools, cams and templates, measuring instruments,and gauges) for each indicated operation; gives manufacturing data such as speeds and feeds;sometimes the specifications of the skill for each operation. The document which incorporatesthis vital information is called process sheet or route sheet.

Text: The information contained in the process sheet can be put to a variety of uses:

(i) Scheduling: The scheduling cell of PPC can obtain for each operation the set-upand the processing time. This information helps them to prepare load andschedule charts

(ii) Materials Movement: The Shop supervisor and the dispatch clerk can knowwhere the jobs require to be sent for the next operation.

GeneralManager

DevelopmentDepartment

Factory Production Production Planning& Control

Inspection &Quality Control

PlantMaintenance

OrderPreparation

MaterialControl

ProcessPlanning

ToolsControl Scheduling Dispatching Progressing

(iii) Cost Reduction and Cost Control: A process sheet gives an idea of the tooling(standard tools, jigs and fixtures, templates, gauges and measuring instruments)which could be arranged prior to the starting of the operation. This cuts down set-up time and reduces labour cost and overheads.

(iv)Costing: Costing group can use the information to determine pre and postproduction cost of each component.

(v) Method of Working: Method study engineer without going on the shop floor canknow as to how presently the part is being manufactured.

(vi)Requirement of manpower and machines: Set up times and processing timesgiven in different route sheets may be consolidated machine wise into total man-hours or machine-hours required to enable the management to take decisionsconcerning requirements of manpower and machines.

(vii) Shop efficiency: Operation wise time data given in the process sheet is alsohelpful to the shop personnel to know whether the shop performance is in linewith the expected performance.

(b) A Small pump shaft is to be manufactured from a round bar on four machinesin a workshop. It is first cut to length on a power hack-saw which can produce 12pieces per hour. The cut pieces are then “faced to length” and “centered” on aspecial facing and centering machine. Once this machine is set-up (taking 30minutes), the operator can complete 30 pieces per hour. Faced and centered piecesare next moved to the copying lathe. It takes 45 minutes to set up the copying latheand 3 minutes to turn each piece. The final operation is cutting of the keyways on aspecial purpose key-way milling machine. It takes 8.50 minutes to cut hey-way oneach piece. 8.0 minutes are required to set-up the hack-saw and 10 minutes to set-upthe key-way milling machines. After cutting the key-ways the parts are debarredand inspected.

Draw up a process sheet for the manufacture of this part. Though tooling andgauges do not require to be indicated yet their relative position on the process sheetshould be shown.Sol:

P T O

7 (a) Why is it necessary to record the progress of work? What different methodsare available to collect information?Ans: Introduction: Progressing is the process of checking actual performance againstthe production plan and reporting exceptional deviations to the concerned authorities forthe corrective action. Progressing function consists in keeping a watch on flow ofmaterials, recognition of delays and interruptions, taking steps to rush up the remainingoperations and communicating possible delays to the customer (wherever necessary)

It is sometimes argued that progressing is only a substitute for poor planning. Should adriver take his hands off the steering wheel because the road is straight? Should a pilotdivert his attention from the control board because the weather is fine? No! They can’t dothis, similarly, progressing is required even if the material control and process planningfunctions are discharged satisfactorily, scheduling is done properly, manufacturing ordersare released. There are usually a number of factors which tend to push the schedules offthe mark. Some of the notable ones are as under:

Delay in receipt of material from vendor(s) Excessive absenteeism (more than the normal) Machines breakdowns Excessive spoilage Errors in drawings Strikes and acts of Gods.

The need for progressing is also created when the customers do the follow up on theirown to know the status of their orders.

Part Name: Pump ShaftPart No. : P0401125

Op. No. Operation Description Machine ToolingSet Up Time

Set up Std min

Cutting it to Length

Faced to length & Center

Copying Lathe

Cutting Keyways

1

2

3

4

Power Hack Saw

Spiral Machine

Lathe Machine

Key way millingMachine

80 60

30 60

45 3

10 8.50

12

30

PROCESS SHEET

REVISION DATE:

KALLURI ENGINEERSHYDERABAD - 500070.

Prepared by Checked by(Signature & Date) (Signature & Date)

Methods to collect information:

(i) Physical Count(ii) Daily production report(iii) Job Card(iv) Perforated route sheet(v) Detachable sheet

(b) Explain with a diagram any two methods to collect data on progress of work.Ans: Daily Production Report: It is prepared by the supervisor, this is another method

of obtaining feedback. A daily production report contains fixed space to record:

Operator’s Name and Token number Machine on which he worked Time spend Quantity produced Quantity checked by the patrolling inspector Results of the inspection Idle time and its reasons.

This report may be prepared either by the shop supervisor or the patrolling inspectorand is collected at the end of the shift or the next day by the progress clerk of the PPCdepartment. This method is best suited for large workshop having a process type oflayout producing number of non-standard parts.

DAILY PRODUCTION REPORTSECTION : Gear ShopDATE : 12.11.04SHIFT : First Shift

Machine

507

508

509

Operator’sName Code

A.R. Yande

-do-

Manjit

Part Name &No.

Double Gear:29 teethCam Shaft Gear(Op. No. 80)Idler Gear

Hours Worked

From To7AM 3.30 PM

7AM 3.30 PM

7AM 3.30 PM

Qty.produced78

42

60

First InspectionQty. OK OK Rej

20 20 -

18 17 1

15 15 -

ToleCode

-

E

G

IdleHours_

½ Hr

½ Hr

208/1

208/2

R. B. Kale

-do-

Axle Shaft(Op. No. 90)

Agro ControlShaft (Op. 120)

7AM 3.30PM

7AM 3.30PM

34

6

20 20 -

6 2 2

-

G

-

1 Hr

Perforated route sheet:

It is a useful method of production feed back/collecting data on progress of work. Theroute sheet for each job carries part number, product or assembly number it is in, list ofoperations to be performed, and the necessary information. The route sheet is handedover to the supervisor or is tied to the product. As soon as each operation is completed,the operator or the supervisor signs the lower portion of the route sheet, detaches it, andreturns to the progress section for their analysis.

This method is suitable for tool rooms, jobbing shops or workshops producing one or fewnumbers of a component.

SHOP ORDERNO.

OP. NO. OPERATIONDESCRIPTION

DATE OFCOMPLETIION

SIGN

2002 130 Inspect2002 120 Grind Chamfer2002 110 Thread Grind2002 100 Grind OD2002 90 Grind total length2002 80 Grind bore and face2002 70 Heat treat2002 60 Inspect2002 50 Cut keyway2002 40 Finish blank2002 30 Rough blank2002 20 Drill 50 hole2002 10 Saw off

Fig: Perforated route sheet for manufacture of a thread roll

10 (a) What are the steps involved in solving an assignment problem.Ans: Introduction:

Hungarian method is the most efficient method for solving an assignment probleminvolving minimum objective. Though its standard procedure is for balanced problems,minimization problem, free from restrictive, but it can be applied to even specialsituations by adopting additional steps.

Basic Principles:The Hungarian method is based on the following properties:

(i) If a constant element is added or subtracted from every element of any row orcolumn in the given cost matrix, an assignment that minimizes the total cost inthe original matrix also minimizes the total cost in the revised matrix.

(ii) In an assignment matrix, solution having zero total cost is the optimal solution.

Assumptions:

(i) Each facility is capable of performing each task

(ii) Tasks differ in their work contents and facility in their capabilities

(iii)Only one task can be assigned to each facility

(iv)As only one task can be assigned to each facility, the assignment matrix must beof n x n size. (In case the matrix is not square, dummy rows or columns, equal tothe difference, are added).

Procedural steps to solve standard assignment problems:

A standard assignment problem is a balanced assignment problem (i.e., number oftasks equal number of facilities), incorporates no restriction in allocation and involvedminimization objective, Hungarian method to solve such problem requires followingsteps:

Step 1: Express the problem into n x n assignment matrix

Step 2: Select the smallest element in each row and subtract it from every element ofthat row.

Step 3: Select the smallest element in each column of the reduced matrix obtainedfrom step 2 and subtract it from every element of that column.

Step 4: Cover all zero elements by minimum number of straight lines (horizontal andvertical lines only). If the number of lines drawn is equal to n(number ofrows/columns), the solution is optimal and proceed to Step 7. if the number of linesdrawn is smaller than n, go to step 5.

Step 5: Select the smallest uncovered element (i.e., smallest element not covered bythe lines), subtract it from all uncovered elements including itself, and add it to theelements covered twice (i.e. elements located at the intersection of any two lines), andreproduce other elements (i.e. elements through which only one line passes) as theyare.Step 6: Repeat steps 4 and 5 until an optimal solution is obtained.

Step 7: Given the optimal solution make the job assignments as follows:

(a) Examine the rows one by one starting with the first row until a row withan exclusive zero (i.e. row with exactly one zero) is found. Mark the zeroby enclosing it in a square indicating assignment of the task to the facility.Cross out all zeroes (if any) in the column as they cannot be used to makeother assignments.

(b) Examine next the columns for any mutual exclusive zero and mark each asabove, crossing out the remaining zeroes in that row.

(c) Repeat steps (a) and (b) successfully until either of the followingconditions occur:

i. All zeros have been marked / crossed and each row contains onemarked zero. This means that the optimal solution has reached.

ii. All zeros have not been marked / crossed. The remainingunmarked zeros lie at least two in each row and column. Thismeans that more than one optimal solution exists.

(b) A drawing office incharge has four tasks and equal number of draught men. Hisestimate of time for each job – draught men combination is given (in hours) in thefollowing matrix:

Jobs

DraughtmenProcessing time (Hours)

D1 D2 D3 D4

J1

J2

J3

J4

25 25 20 15

35 20 15 20

25 15 20 18

30 10 25 20

Find out the optimal assignment.

Sol:Step1: “Express the problem into n x n assignment matrix”. This step has already done inthe case problem.

Step2. “Subtract the smallest element in each row from every element in its row so as toobtain atleast one zero in each row.”

15, 15, 15 & 10 are the smallest in 1st, 2nd , 3rd and 4th rows respectively. Subtraction ofthe smallest element in the row from every element in its row gives rise to an assignmentmatrix shown in the following table.

Jobs

DraughtmenProcessing time (Hours)

D1 D2 D3 D4

J1

J2

J3

J4

10 10 5 0

20 5 0 5

10 0 5 3

20 0 15 10

Step 3. Subtract the smallest element in each column of assignment matrix obtained instep 2 from every element in its column. This step gives rise to yet another assignmentmatrix…

Connect all zeros in the assignment matrix obtained in step 3 by minimum number ofstraight lines. Min 4 straight lines are required to connect all zeros.

Step 4.(a) “Examine the rows one by one, starting with the first row until with an exclusive

zero (i.e. row with exactly one zero) is found. Mark the zero by enclosing it in asquare indicating assignment of the task to the facility. Cross out all zeros in thesame column as they cannot be used to make other assignments.

(b) Examine next the columns for any mutual exclusive zero and mark each as above,crossing the remaining zeros in that row.

Here…1) Row J1 has two exclusive zeros which occur at Junction J1 D1 and J1 D4 hence

the allocation of task J1 is postponed for the time being.2) Row J2 has 1 exclusive zero which occurs at junction J2 D3 hence Job J2 is

assigned to D3.3) Row J3 has two exclusive zeros which occur at Junction J3 D1 and J3 D2 hence

the allocation of task J1 is postponed for the time being.4) Row J4 has 1 exclusive zero which occurs at junction J4 D2 hence Job J2 is

assigned to D2.5) With the allocation of J2 and J4 we have 2 jobs left out unassigned. Looking at

the matrix again, we see that the Under J3 there are 2 zeros out of which theposition D2 is already assigned to J4 and cannot be reassigned to J1 as this is a

Jobs

DraughtmenProcessing time (Hours)

D1 D2 D3 D4

J1

J2

J3

J4

0 10 5 0

10 5 0 5

0 0 5 3

10 0 15 10

mutual exclusive zero assignment matrix. So the only position left out is J3D1.Hence the job J3 is assigned to D1.

6) With the allocation of Job J3 to D1 we are left out with J1. Considering theexclusive assignment matrix. The Job J1 can only be assigned to D4. HenceJ1D4.

So the Optimal assignment matrix is the following

11 (a) what is critical ratio scheduling? What advantages does this technique haveover other technique?Ans:Introduction: Critical ratio scheduling is a technique for establishing and maintainingpriorities among the jobs-be it in a production control department for the purpose ofscheduling or expending in a purchase department for the purpose of “Purchase orderfollow up” or in any other department of the company. The technique utilities concept ofratios called Critical ratios which provide time relationship between when aproduct/part/material is required and when it can be made available/supplied.

Definition: A Critical ratio in its simplest form, may be stated as the ration of “time whena product is required“to the “time when the product can be supplied”.

I.e. Critical Ratio = Time when a product is requiredTime when the product can be supplied

For E.g.,

Critical Ratio = The Product is required in 20 days.The product can be made available in 10 days

= 2.

Jobs

J1

J2

J3

J4

D4

D3

D1

D2

Draught Men Processing Time

15

15

25

10

65 HoursTotal Processing Time:

A critical ratio of 2 implies that the time available to deliver the product is twice the timerequired to manufacture the product, similarly, a critical ratio of ½ will mean that thetime available to deliver the product is half of the time required to manufacture theproduct. This also suggests that the processing time must be reduced to half of the normalexpected time otherwise the product will not be delivered on time.

Interpretation of critical ratios: Critical ratios have the following significance:

A critical ratio of

(i) Greater than one means that there is sufficient time and job can be completedahead of the schedule.

(ii) Equal to one implies that job is just on schedule and requires to be closelywatched.

(iii) Less than one suggests that the job is critical and needs to be expedited tocomplete it on schedule.

In general, the smaller the critical ratio, the more critical the job is from delivery point ofview.

Advantages: This technique of critical ratio scheduling helps to:

Determine the relative job priorities for scheduling.

Make automatic adjustment in the shop schedule when there are changes indemand and job progress.

Reduce dependence on expeditors since a properly designed critical ratio system,coupled with necessary progress reporting, identifies critical jobs.

Compare both stock and made to order jobs on a common basis.

Prevent crises in scheduling of production

Exercise control by exception.

Critical ratio scheduling, when applied to activities of production control departmenthelps in establishing and maintaining priorities among the jobs and when applied topurchase follow up on pending orders.

The technique helps to identify components/parts/ materials which require expediting oftheir pending quantities from their suppliers.

The technique utilizes the concept of ratios called critical ratios which provide a timerelationship between a product / part /material is required and when it can be madeavailable / supplied.

(b) Write few typical critical ratios and explain what they signify?Ans:

1) A total of 20 work orders completed over last one quarter were analyzed andfollowing data on ineffective timer per operation (days) was obtained:

2.0 2.5 6.0 3.0 2.80.8 1.20 3.5 2.7 1.83.2 5.80 3.4 4.9 2.34.9 2.06 1.6 0.6 0.9

Calculate

(i) The average time per operation the component stayed on theshop floor due to waiting queuing, hunting, job splitting, changein priorities, power failure, machine break down etc.

(ii) What total lead time should be considered for component withthe following details?

Batch quantity = 300 no.sTotal set up time = 12 hrsTotal processing time = 18 minNo. of operations = 5Average labour efficiency = 80 %against performance standards

N.B: The Company works two shifts per day, each shift of 8 hrs duration.

Sol:(a) Expected ineffective time per operation is

NEIT = ∑ Xi, P(Xi)

1

The computational process is given in the table below:

Therefore, expected value of ineffective time per operation = 2.60 days

(b) Total Lead time is given by the formula

N NTLT = P + ∑ (W + T) + ∑ S+QR

1 1 H X E

Where,

P = Order preparation time = 7 days (assumed)W = Expected value of ineffective time per operation x No. of

Operations= 2.60 x 5= 13 days

T = Transit time between operations x No. of operations= 0 (Transit time assumed to be insufficient)

Range ofineffectivetime peroperation(days)

Midvalue

Xi

FrequencyTally Total

Marks

Relativefrequency

ProbabilityP(Xi) thatineffectivetime peroperationshall be Xi

Xi .P (Xi)

Upto 1

1 – 2

2 – 3

3 – 4

4 – 5

5 - 6

.5

1.5

2.5

3.5

4.5

5.5

/ / / 3

/ / / / 4

/ / / / / / 7

/ / 2

/ / 2

/ / 2

0.15

0.20

0.35

0.10

0.10

0.10

0.15

0.20

0.35

0.10

0.10

0.10

0.075

0.300

0.875

0.350

0.450

0.550

20 Total: 2.600

AndN∑ S+QR = 12 + 18 / 60 X 3001 H X E 16 X 0.80

= 7.97 days

Therefore,

TKT = 7 + 13 + 7.97

= 28 days.

2) National Engineering Company utilizes critical-ratio-scheduling techniquefor the purpose of scheduling and expediting. The status of few made-to-stock items is given in the table below.

S.NoStock-on

handSafetystock

Average dailyconsumption

Average lead timeremaining (to

complete remainingoperations) (days)

1 1320 840 60 42 480 120 30 153 520 80 40 104 785 235 50 30

Calculate critical ratio for each of the items and decide on the action to be taken.

Sol:

Critical Ratio = Lead time available (LTA)Lead time required (LTR)

For made to stock items

LTA = (Stock on hand) – (Safety stock)Average daily consumption

LTR = Lead time required to the complete remaining operations

= This has been given in the problem

Critical ratios for above items have been calculated in the table below:

S.NoLead time

available (LTALead Timerequired Critical ratio

1 1320 - 840 / 60 = 8 4 8 / 4 = 2.00

2 480 - 120 / 30 = 12 15 12 / 15 = 0.80

3 520 - 80 / 40 = 11 10 11 / 10 = 1.10

4 785 - 235 / 50 = 11 30 11 / 30 = 0.37

From the above critical ratios, we can conclude that progress of item

(i) At serial 1 is more than satisfactory. The item is likely to get completed ontime and not much of attention is required to be paid to it.

(ii) At serial 2 is unsatisfactory. The item has become critical either because itsconsumption has risen above its average or the job has been delayed. In anycase, its progress must be accelerated to avoid potential stock out.

(iii) At serial 3 is just satisfactory. The item needs to be closely monitored(iv) At serial 4 is extremely critical. Every possible avenue should be explored to

expedite the remaining operations.

12 (a) What are make or buy decisions? What costs are considered while finding thecost to make and cost to buy?

Ans: Introduction: Make or buy decisions generally concern items required to thecompany’s own design. No firm can manufacture each and every item of its product. It isneither possible nor desirable. Items which do not form the company’s product line arealways purchased from outside. An automobile firm for example requires to purchase rawmaterials, forgings, castings, tyres, tubes, bulbs, wires, bearings, automotive wheels, etc,from others. Similarly, an engineering firm needs to buy grinding wheels, oils andgreases; tools etc., since the manufacture of these items require totally a differentmanufacturing process.

Items which require specialized technical knowledge or procurement of specialequipment are generally sub-contracted. A small firm for example normally gets its itemsheat-treated, surface coated (zinc plating, or galvanizing, or phosphating) from outside toget benefit of low price.

The exclusion of the above categories of items leaves the firm with items which requireto be manufactured to its design either at the home plant or to be purchased from outside

suppliers. The decision whether to make the item at the home plant or buy it from outsidevendors is referred to as “make-or-buy” decision.

Costs to be considered while making a make or buy decision:

Cost analysis refers to the determination of cost to make the item and cost to buy it. Acomplete and correct assessment of the various elements of the cost is essential to makesound economic decisions.

The following data needs to be collected and analysed.

Particulars Departments originating the informationRaw materials PurchaseLanded cost of the item Purchase or sub-contractingbeing cub-contractedWeight of raw materials/ Purchase/Production Planning & ControlCasting/forgingsWeight of finished component Production Planning & ControlPresent utilization of company’s facilities Production Planning & ControlMethods of manufacture (Route sheet) Production Planning & ControlSet up times and operational times Industrial EngineeringMachine hour cost and labour hour cost Costing/Industrial Engineering /

Sales/Finance

The analysis is based on annual requirements of components against the followingelements:

(a) Raw Material: The raw material cost consists of cost of raw materials less valuerecovered during to the sale of scrap like turnings, borings, end pieces etc. Theraw material cost is considered towards the cost to make. However, if the rawmaterial is supplied to the vendor free of cost, the cost of such materials alsorequired to be considered towards cost to purchase.

(b) Labour cost: Labour cost implies the wages and costs of other benefits(Provident fund, E.S.I., bonus, gratuity etc.) payable to the workmen engaged onthe job. This cost however, requires to be considered only when additional labourforce needs to be employed while production capacity is available.

(c) Tooling cost: Jigs and fixtures generally require to be made if the item is to bemachined at the home plant. The jigs and fixtures once made maintain theiraccuracy only for certain quantity, say “n” pieces, after which again a new set ofjigs and fixtures require to be made. The cost of tooling thus requires to beamortized over “n” pieces and the annual cost of such tooling requires to be addedto “cost to make”.

At times, when an item is purchased from outside vendors, certain special cuttingtools (broaches, hobs, shaping cutters etc.) and jigs and fixtures require to be

supplied to the vendor free of cost. The cost of such tooling, therefore, requires tobe considered separately as tooling cost towards “cost-to-buy”

(d) Overhead cost: the bulk of cost associated with a make or buy decision is thecost of production capacity. This is the area where most often mistakes are made.These costly errors can be avoided by keeping a single fact in mind that the costswhich influence make or buy decisions are just the incremental costs the costswhich will be incurred if the part currently made is purchased or vice versa.

(e) Recoupment cost: Recoupment cost implies the setup costs (if the item is to bemanufactured at the home plant) or the procurement cost (if the item is to bepurchased). Set-up cost is the “preparation cost” of the machines and it variesdepending upon the number of production runs in a year. The procurement cost isthe cost of raising a purchase order and processing the deliveries from thevendor(s) and it varies depending upon the frequency of receipts of the item fromthe vendor(s).

(f) Outside operations cost: The item manufactured at the home plant may requiresub-contracting of certain operations such as rough blanking, heat treatment,plating etc. The cost of such operations requires to be considered separatelytowards “cost to make”

(g) Purchase cost: Purchase cost includes the price given to the vendor, packing andforwarding, excise, sales tax, transport cost, control etc.

(h) Capacity cost: Capacity cost implies the cost of capacity rendered idle if the itemcurrently being manufactured is purchased. Such a cost requires to be added to“cost to buy”.

1. “Production Planning and Control department is called the nerve center of aproduction unit” Discuss.

Ans: Introduction: Good production planning and control system is a must for a firm toenable it to make reliable promises and then to stick to them. It is also essential to devisemethods which will ensure selection of right equipment, right tooling and enable the shopto make the job in the simplest but in the fool proof way. The following costs can becontrolled / avoided through better production, planning and control, which make it thenerve center of a production unit.

(a)Waiting time: “Time waste is the easiest of all wastes and yet the hardest to correctbecause it does not litter the floor” remarked Henry Ford once. This statement is astrue as death. Excessive waiting time is really a big hazard – a big expense.

A closer look around the department can enable us to spot some of these time leaks.We will find some of our workmen waiting at that tool crib. Some may be waiting forraw materials. Other may be waiting for the tools to be sharpened. Yet there may be

some waiting for prints and instructions for the next job. These little time leaks, ifconsidered in isolation, do no mean much but too many of these can certainly add to alarge amount, may be larger than few big ones. To reduce waiting time, eachsupervisor must know as to when the job in hand must be completed and when nextjob should get started so that necessary tools. Gauges, prints, materials, etc. for thenext job can be kept ready.

(b) Hunting Time: “An Operative in an engineering concern spends more than 2% of histime in wandering or looking for the things he needs to do the jobs” we will find themsharing their tools with other operators. Lot of operative’s time is wasted in searching forstraps, clamps, bolts, nuts and washers.” We can reduce this ineffective time by fixingright place for everything and providing our men a set of everything they need well inadvance of starting of the job. Good production planning and control can convert some ofthese time leaks into useful production hours.

(c) Stalling: “Workers usually try to coincide the end of their jobs with the end of the day bystretching the jobs in hand”. A worker usually tends to delay the completion of job so thathe does not need to start a fresh job towards the end of the day. “why start now, I wont beable to finish it in my shift” is the commonest attitude among our workmen. We cansomewhat avoid this by setting the system where by each workman knows when he isexpected to complete the job-in-hand and what is his next work assignment. Scientificscheduling can do this!

(d) Interrupted workloads: “Unplanned over lapping of operations lead to idle machinesand job split-ups”. Interrupted work from the previous operation not only results in partialutilization of the next machine but also seriously undermine morale of the shop. Carefulproduction planning can prevent such unnecessary losses of time.

(e) Costly overtime: “Poor planning is the common cause of overtime.” Prolonged overtimeis not merely the extra strain on the finance of the company but means much more.Excessive overtime and hence extra time earnings make the workers accustomed to a newstandard of living and any action on the part of the management to reduce or discontinueovertime is disliked by the workers. It is just not palatable to them. The mere knowledgethat the company intends to do away with the overtime make the workers slow downtheir pace and thus the company is forced to overtime working. It then becomes a viciouscircle and once caught in it the company cannot come out of it. The result is of anybody’sguess. The workers go on getting overtime day after day and month after month and thusworsening the already worsened situation. The overall effect is thus the lowering ofefficiency – firstly because of accumulation of fatigue and secondly because of slackeringof pace to get overtime.

The need for overtime arises due to: Unrealistic delivery dates without there being any leeway for unforeseeable. Acceptance of too many rush orders. Frequent delays in receipt of materials Excessive machine breakdowns

Lack of qualified workers Insufficient manpower or machines.The majority of the causes cited above can be avoided by proper planning

(f) Unproductive time of the machines: “Productivity of factors of production to a largeextent depends on the quality of supervision”. The prime responsibility of thesupervisory staff is to ensure that the company’s machines work for maximum timeand the loss of time due to different reasons is kept at minimum. The production timeof the machines is lost due to weaknesses in one or more of the following supervisoryfunctions:

Operators’ unauthorized absenteeism and the failure of the supervisor to makesubstitute arrangement

Enforced idle time of the machine for want of smooth movement of materials onthe shop floor

Lack of effective supervision which cause idle time of the machines sinceoperators merely shop around, visit unnecessarily places of personal needs, steallonger tea breaks, resume work 5-10 min late in the beginning of the shift andafter lunch break and close work 10-15 min prior to lunch break and the end ofthe shift.

Idle time of the machines due to delayed action by the supervisor to trace defectsto the source and stoppage of the machines by the workmen until then.

Wastage in factors of production enumerated above occurs not only because ofpoor quality of supervision but also when the supervisory staff gets burdened withroutine functions namely materials planning, tools planning, movement ofmaterials on the shop floor, machine loading, expediting etc. PPC relievessupervisory staff from clerical functions and thereby enable them to spend moretime for training of workmen, proper allocation of work to workmen, troubleshooting and maintaining shop discipline.

(g) Higher overhead costs: Since production planning anc control relieves supervisorystaff from a number of clerical responsibilities, they get more time for training ofworkmen, troubleshooting, maintaining shop discipline and improvising methods ofwork. At the same time they can handle more workmen and more machines, whichreduce supervisory overheads.

(h) Poor labour efficiency: “Workmen who get accustomed to working intermittentlynever work continuously”. This is no exaggeration. It is a fact based on humanphysiology and it holds good not only for workmen but also for supervisorypersonnel. Many a times in large companies, jobs get delayed due to irregulardeliveries of materials, interruptions from the supervisors, improper loading andscheduling, lack of sufficient volume of work etc. and as a result workmen are eitherrendered idle or are utilized for part of the time. And if such delays are frequent,workmen get accustomed to partial working and thus the efficiency of the shop floorsuffer a set back. They even do not work continuously when sufficient work isavailable.

PPC can prevent such a situation by exercising better control on availability of toolsand materials monitoring a close control on work-in-progress on the shop floor, re-allocating jobs from other machines by shifting idle operators to other machines,changing the route, ensuring smooth movement of materials from and into thedifferent shops, and reporting cases of idle time of men and machines to enable thescheduler to release new jobs.

(i) Investment in inventories: Good production planning and control can help the firmto ensure continuity in production with minimum inventory investment. Stock outsand higher inventory investment result if the requirements of materials are notindented on time and also if materials on receipt are not allowed properly to the workorders as per job priorities. Shop personnel can neither do forward planning ofmaterials nor can they keep track of receipts and issues of materials. Only acentralized agency such as PPC can co-ordinate the activities of shops, storesdepartment and the buying department.

Fig: Effect of production planning and control on the firm’s operations

(j) Lowered morale: A department plagues by rush orders, broken deliveries,uneven work loads, frequent revisions in process, costly overtime, excessivemachine breakdowns and the like can hardly be expected to have good morale. Anintegrated approach to production, planning and control can go a long way toeliminate or atleast minimize the occurrences of the above mentioned losses.

Certainly production, planning and control is the nerve center of a production unit.

Timelydeliveries

Quickfeedback onjob status

Lowercapitalinvestment

Betteravailability

Better co-ordinationbetween production,sales & stores.

PRODUCTIONPLANNING &

CONTROL

Effectivesupervision

Better jobsatisfaction

Cost reduction& cost control

Effective utilization offactors of production

Good return oninvestment

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple AnswerQuestion The commonly used network techniques other than PERT and

CPM are as follows :-Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project

Control System ] , GERT [ Graphical Evaluation ReviewTechniques ]

Your Answer MOSS [ Multi Operation Scheduling System ] , PCS [ ProjectControl System ] , GERT [ Graphical Evaluation ReviewTechniques ]

Multiple Choice Single AnswerQuestion In an unbalanced assignment, the tasks can be balanced by

adding :-Correct Answer Dummy tasks

Your Answer Dummy tasks

Multiple Choice Single AnswerQuestion One of the causes of inability to meet delivery date originally

promised :-Correct Answer Lack of availability of material in time

Your Answer Lack of availability of material in time

Multiple Choice Multiple AnswerQuestion The main characteristics of mass and flow production are :-

Correct Answer Continuous flow of material , Low skilled labour , Easysupervision

Your Answer Continuous flow of material , Low skilled labour , Easysupervision

Multiple Choice Multiple AnswerQuestion In a mass production assembly shop following work

measurement techniques are used :-Correct Answer Time study , Work sampling , Production study

Your Answer Time study , Work sampling , Production study

Multiple Choice Single AnswerQuestion As the quantity increases, the procurement cost :-

Correct Answer Reduces

Your Answer Reduces

True/FalseQuestion Fluctuation due to changes in season are called cyclical

fluctuation.Correct Answer False

Your Answer True

True/FalseQuestion A type items are always vital under VED analysis.

Correct Answer False

Your Answer False

Select The BlankQuestion Random fluctuation is considered for deciding ________.

Correct Answer Analytical estimate

Your Answer Seasonal fluctuation

True/FalseQuestion In assignment matrix, it is a must to determine Jacobean of the

determinant.Correct Answer False

Your Answer False

Select The BlankQuestion If Kwh consumption per 100 pieces is 8.01 and cost/kwh is Rs

0.80 the cost of power over the year for 40000 pieces with 2000numbers rejection would be Rs ________.

Correct Answer 2692

Your Answer 2692

Select The BlankQuestion At each ________, work is performed on a product either by

adding parts or by completing assembly operations.Correct Answer Work station

Your Answer Work station

Multiple Choice Multiple AnswerQuestion To operate fixed order quantity system, following parameters are

required to be fixed:-

Correct Answer Standard reorder quantity , Minimum stock , Re-order point

Your Answer Minimum stock , Re-order point , Standard reorder quantity

Multiple Choice Single AnswerQuestion Why customer is called the king?

Correct Answer Customer's orders gives us work

Your Answer Customer's orders gives us work

Select The BlankQuestion A progress card normally contains ________ squares.

Correct Answer Less than 25

Your Answer Less than 25

Select The BlankQuestion ________ models of OR serve as an ideal aid for determining

optimal sequence of jobs.Correct Answer Sequencing

Your Answer Sequencing

Multiple Choice Single AnswerQuestion Ordering of raw material is based on :-

Correct Answer Sales forecast

Your Answer Sales forecast

Select The BlankQuestion Heuristics approach gave very good results when Wester and

Kilbridge applied it to ________ assembly line.Correct Answer TV

Your Answer Car

Multiple Choice Single AnswerQuestion What can be the consequence of inefficient working of

department like sales?Correct Answer Failure on delivery date to customer

Your Answer Failure on delivery date to customer

True/False

Question In PERT, use of dummy activities is not much essential.

Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion Work measurement is responsibility of :-

Correct Answer PPC , Industrial Engineering , Production department

Your Answer PPC , Industrial Engineering , Production department

Select The BlankQuestion The batch production requires ________ capital investment as

compared to job production.Correct Answer High

Your Answer High

Select The BlankQuestion Time waste is the earliest of all wastes and yet the________ to

correct because it does not litter the floor.Correct Answer Hazards

Your Answer Hazards

True/FalseQuestion To solve "n jobs - 2 machines" sequencing problem, it is

assumed that each machine can perform only one type ofoperation and can undertake only one job at a time.

Correct Answer True

Your Answer True

True/FalseQuestion PERT is suitable in defense projects and R&D where activity

times can not be really predicted.Correct Answer True

Your Answer True

True/FalseQuestion In precedence diagram the length of arrow has very high degree

of significance.Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Earliest possible occurrence time [ I.e. stray time ] of activity [ies

] emanating from the event is represented by :-Correct Answer Earliest event time

Your Answer Earliest event time

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-

Correct Answer Moving average , Exponential smothering , Curve fitting

Your Answer Moving average , Exponential smothering , Curve fitting

Multiple Choice Single AnswerQuestion The production system characterized by complex set of activities

that must be performed in a particular order within a given periodand within an estimated expenditure is known as :-

Correct Answer Project production

Your Answer Project production

Match The FollowingQuestion Correct Answer Your Answer

Time taken by each job ateach machine

Processing time Processing time

Time between starting offirst job and completion oflast job

Elapsed time Elapsed time

Number of stages the jobhas to pass

Number of machines Number of machines

Time during which themachine is standstill

Idle time Idle time

Select The BlankQuestion In the assignment model, the measure of effectiveness of each

job for each machine can be represented by means of________.

Correct Answer Matrix

Your Answer Matrix

Multiple Choice Single Answer

Question The ROI of the company can be increased by :-

Correct Answer Increasing profit & decreasing inventory

Your Answer Increasing investment/sales ratio

Multiple Choice Multiple AnswerQuestion The software for CPA would require the following parameters:-

Correct Answer Algorithms , Program code , Database

Your Answer Algorithms , Program code , Database

Multiple Choice Multiple AnswerQuestion Some of significant characteristics of fixed order quantity system

under replenishment systems are as follows :-Correct Answer Safety stock is kept to take care of increase in demand during

lead time as well as to meet demand when lead time isextended. , Re-order level equals safety stock plus averageconsumption during lead time , Average inventory equals safetystock plus half of reorder quantity.

Your Answer Safety stock is kept to take care of increase in demand duringlead time as well as to meet demand when lead time isextended. , Re-order level equals safety stock plus averageconsumption during lead time , Average inventory equals safetystock plus half of reorder quantity.

Multiple Choice Multiple AnswerQuestion Important considerations in scheduling are :-

Correct Answer Degree of centralization , Relative job priority , Load chart

Your Answer Degree of centralization , Relative job priority , Load chart

Multiple Choice Multiple AnswerQuestion Methods for recording actual progress of work for shop orders

are :-Correct Answer Progress card , Display board , Network updating

Your Answer Progress card , Display board , Network updating

Select The BlankQuestion The unit cost of manufacturing is largest in case of ________.

Correct Answer Job production

Your Answer Job production

Match The FollowingQuestion Correct Answer Your Answer

HML Analysis Price orientation Price orientation

SDE Analysis Procurement difficulties Procurement difficulties

ABC analysis Usage value Usage value

VED Analysis Criticality Criticality

True/FalseQuestion The non-mathematical rationale of the assignment method is

one of minimizing opportunity costs.Correct Answer True

Your Answer False

True/FalseQuestion Moving average method lags behind the latest trend.

Correct Answer True

Your Answer True

True/FalseQuestion The 'G' group of GOLF analysis involves moderate delivery time

and availability of credit usually in the range of 30 to 60 days.Correct Answer True

Your Answer False

Multiple Choice Multiple AnswerQuestion Following difficulties are faced by SDE analysis :-

Correct Answer More delivery period , Geographical location of supplier ,Reliability of suppliers

Your Answer More delivery period , Geographical location of supplier ,Reliability of suppliers

Multiple Choice Single AnswerQuestion The work measurement and time study belong to the school of

management which was pioneered by :-Correct Answer Fedric Winslow Taylor

Your Answer Fedric Winslow Taylor

Multiple Choice Single AnswerQuestion Stock of finished goods are based on :-

Correct Answer Sales forecast

Your Answer Sales forecast

Multiple Choice Single AnswerQuestion The data in respect of spindle nose pertains to :-

Correct Answer Tooling

Your Answer Raw material data

Multiple Choice Multiple AnswerQuestion In linear programming method of line balancing, there are three

types of constraints namely :-Correct Answer Cycle time constraint , Step or task constraint , Precedence

constraintsYour Answer Cycle time constraint , Step or task constraint , Precedence

constraints

Select The BlankQuestion Buying for C quantities should be made in ________ quantities .

Correct Answer Large

Your Answer Large

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'B' type of items is :-

Correct Answer Medium

Your Answer Minimum

Select The BlankQuestion In the assignment model, the________ is formed between jobs

and machines.Correct Answer Matrix

Your Answer Matrix

Select The BlankQuestion Production Planning and Control department acts as a link

between company's sales and ________ department.Correct Answer Manufacturing

Your Answer Manufacturing

Select The BlankQuestion ________ is used for planning capacity.

Correct Answer Standard Time

Your Answer Standard Time

Select The BlankQuestion Being capable to adjust their production facilities shortly just after

change in demand for products and without incurring heavyexpenses, greater flexibility in production is provided by________.

Correct Answer Job & batch production

Your Answer Continuous production

True/FalseQuestion PERT uses linear programming and probability concepts for

planning and controlling activities.Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion Proper Production Planning and Control can reduce cost in :-

Correct Answer Overtime cost

Your Answer Overtime cost

Multiple Choice Single AnswerQuestion Detachable ticket, after filling in required information is :-

Correct Answer Placed in a tray/box

Your Answer Placed in a tray/box

Select The BlankQuestion The effectiveness of sequencing model technique ________ if

the company has backlog of orders.Correct Answer Increases

Your Answer Decreases

Multiple Choice Multiple AnswerQuestion Computerisation of line balancing involve following requirements

:-Correct Answer System software , Application software , User friendly interface

Your Answer System software , Application software , User friendly interface

True/FalseQuestion Curve fitting method of statistical forecasting uses curve line

approach.Correct Answer False

Your Answer False

True/FalseQuestion If set up time for four operations involved is 2 ,1.5, 2 , 2.5 hours

respectively, total set up time would be 10 hours.Correct Answer False

Your Answer False

Match The FollowingQuestion Correct Answer Your Answer

Bought out materials Maintenance, repair, Maintenance, repair,

required for productionprocess but do notbecome part of finishedproduct.

operating [MRO]inventories

operating [MRO]inventories

Finished goods, ready forsale to customer

Finished goods inventory Finished goods inventory

Idle resource of any kindhaving economic value

Inventory Inventory

Raw materials, parts,components required toproduced finished product

Production inventory Production inventory

Select The BlankQuestion Rational figure on utilization index can be obtained by carrying

out ________ study.Correct Answer Work- sampling

Your Answer Work- sampling

Multiple Choice Single AnswerQuestion The assignment algorithm was developed by a Hungarian

mathematician named :-Correct Answer D. Konig

Your Answer D. Konig

Multiple Choice Multiple AnswerQuestion The minimum requirements for application software for line

balancing are as follows :-Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or

equivalent operating system.Your Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or

equivalent operating system.

Multiple Choice Multiple AnswerQuestion A firm has 6 jobs to be processed on three machines A,B and C

in the order ABC. The processing time of each job is given in thetable below:- Find the idle time on different machines . JobProcessing time [ hours ] Machine A Machine B Machine C J125 16 20 J2 26 20 19 J3 24 17 18 J4 22 20 21 J5 24 21 17 J6 2818 13

Correct Answer 74 , 31 , 58

Your Answer 31 , 58 , 60

Multiple Choice Multiple AnswerQuestion PERT terminology uses words like :-

Correct Answer Network diagram , Events , Slack

Your Answer Network diagram , Events , Slack

Multiple Choice Single AnswerQuestion The most common assembly line is a moving conveyor that

passes a series of workstations in a uniform time interval called:-

Correct Answer Cycle time

Your Answer Cycle time

True/FalseQuestion The make-or-buy decision is not related with profit of the factory.

Correct Answer False

Your Answer True

Select The BlankQuestion Generally for ________ flow system, Heuristic method is

preferred.Correct Answer Intermittent

Your Answer Intermittent

Multiple Choice Single AnswerQuestion Document raised by sales department to authorise activities of

PPC department for items manufactured to customers order iscalled :-

Correct Answer Order Acceptance

Your Answer Order Acceptance

Multiple Choice Multiple AnswerQuestion What factors affect the status of PPC department in the

company for achieving informal status?Correct Answer Manufacturing Process , Work is highly repetitive , Number of

workmen is not very largeYour Answer Manufacturing Process , Work is highly repetitive , Number of

workmen is not very large

True/FalseQuestion Increase in inventory carrying cost increases EOQ.

Correct Answer False

Your Answer False

True/FalseQuestion Progressing is only a substitute for poor planning.

Correct Answer False

Your Answer True

Multiple Choice Multiple AnswerQuestion Detachable Card contain following information :-

Correct Answer Quantity produced , Operation , Date of completion

Your Answer Quantity produced , Operation , Date of completion

Multiple Choice Multiple AnswerQuestion Weaknesses of PPC department can be studied on following

grounds :-Correct Answer Failures in delivery commitment , Cancellation of orders ,

Complaints from customersYour Answer Failures in delivery commitment , Cancellation of orders ,

Complaints from customers

Multiple Choice Single AnswerQuestion Activity R can not start unless activities P & Q are completed .

And activity S can not start unless activity Q is over [ I.e. activityP may not be even over ]. Activity R is therefore succedding toactivity P & Q while activity S is succeeding to activity :-

Correct Answer Q

Your Answer Q

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the reorder

point is at 120 Units, find the lead time.Correct Answer 4 months

Your Answer 4 months

Multiple Choice Multiple AnswerQuestion Due to the following emergent events, the queue time has to

compensate for the time for which the job has to undergo anextra time :-

Correct Answer Tool breakage , Job split up , Change in priorities

Your Answer Tool breakage , Job split up , Change in priorities

True/FalseQuestion Stores issue order for an item is prepared as soon as the route

sheet is ready.Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion Time study is useful method of measurement for :-

Correct Answer Short cycle time operations

Your Answer Long cycle time operations

Match The FollowingQuestion Correct Answer Your Answer

Index method Loading and allocation ofdifferent jobs on differentmachines

Loading and allocation ofdifferent jobs on differentmachines

Critical Path Analysis Schedule of activities ofproject

Schedule of activities ofproject

Jonsons method Optimal job sequence for2 machines n jobs

Schedule using prioritynumbers

Critical Ratio Scheduling Establishing prioritiesamong jobs

Establishing prioritiesamong jobs

Select The BlankQuestion In check list approach, ________ rating indicates that existing

PPC system requires some major improvements in indicatedareas.

Correct Answer Fair

Your Answer Fair

Multiple Choice Multiple AnswerQuestion Because of following reasons there are limitations in forwarding

quotation against sales enquiry :-Correct Answer The lot is not as per EOQ , Tools / plants required to execute

order are not available. , The item is not within the manufacturingrange of a company

Your Answer The lot is not as per EOQ , Tools / plants required to executeorder are not available. , The item is not within the manufacturingrange of a company

Multiple Choice Multiple Answer

Question Following are the factors which influence tool life :-

Correct Answer Type of tool , Material it is required to operate upon , Operatorsefficiency

Your Answer Type of tool , Material it is required to operate upon , Operatorsefficiency

True/FalseQuestion C type items would never be vital under VED analysis.

Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion The Hungarian method is based on following assumptions :-

Correct Answer Tasks differ in their work contents and facility differ in theircapabilities. , Only one task can be assigned to each facility. , Asonly one task can be assigned to each facility, the matrix mustbe of nXn order.

Your Answer Tasks differ in their work contents and facility differ in theircapabilities. , Only one task can be assigned to each facility. , Asonly one task can be assigned to each facility, the matrix mustbe of nXn order.

Multiple Choice Single AnswerQuestion The ratio between "time when a product is required" and " time

when the product is supplied " is known as :-Correct Answer Critical ratio

Your Answer Critical ratio

Select The BlankQuestion ________ inventories help to balance company's supply with

market demand.Correct Answer Finished goods

Your Answer Finished goods

True/FalseQuestion In order to complete a project on time, each critical activity need

not be completed in time.Correct Answer False

Your Answer False

Multiple Choice Single Answer

Question Production output in night shift is :-

Correct Answer Less than I shift production

Your Answer Less than I shift production

Select The BlankQuestion ________reflects impact of money tied up in inventory.

Correct Answer Inventory turnover

Your Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion The line of balance is a device for planning and monitoring

progress of :-Correct Answer Purchase order execution , Project execution , Targeted

programsYour Answer Purchase order execution , Project execution , Targeted

programs

Select The BlankQuestion Forecasting is function of ________.

Correct Answer Marketing department

Your Answer Chief Executive officer

True/FalseQuestion The Heuristics approach has a base of binary number theory.

Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion What shall be the consequence of acceptance of frequent rush

orders by sales department?Correct Answer Delivery failure

Your Answer Disturbed scheduling

PRODUCTION PLANNING AND CONTROL

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single AnswerQuestion Find EOQ in Rs from the following data :-Annual consumption = 20, 000

units, Ordering and receiving cost of material = Rs 20 per order, Annualcarrying cost or storage cost = 10% of unit cost of material, Cost ofmaterial = Rs 50.

Correct Answer 20000

Your Answer 20000

Multiple Choice Single AnswerQuestion Tools control is :-

Correct Answer Set of techniques for providing required tooling

Your Answer Set of techniques for providing required tooling

Multiple Choice Multiple AnswerQuestion The line of balance is a device for planning and monitoring progress of

:-Correct Answer Purchase order execution , Project execution , Targeted programs

Your Answer Purchase order execution , Project execution , Targeted programs

Select The BlankQuestion ________ analysis mainly helps to identify non-existing items for which

store keeps bin cards, wastes computer memory or wastes computerstationary while preparing stores ledger.

Correct Answer MNG Analysis

Your Answer MNG Analysis

Select The BlankQuestion Network ________ is defined as any adjustment to the arrow diagram

which becomes necessary owing to departure from the project schedulelaid down earlier.

Correct Answer Updating

Your Answer Updating

Select The BlankQuestion If number of work stations is 8 and work content of all stations is 32 ,

the cycle time would be ________.

Correct Answer 4

Your Answer 4

Multiple Choice Single AnswerQuestion Why customer is called the king?

Correct Answer Customer's orders gives us work

Your Answer Customer's orders gives us work

Multiple Choice Multiple AnswerQuestion The check list approach comprises of following parameters :-

Correct Answer Each department head concerned with efficiency of PPC function isgiven a set of questions to be answered. , The department head has toanswer in "Yes/no" format only , Each "Yes" answer gives one negativescore

Your Answer Each department head concerned with efficiency of PPC function isgiven a set of questions to be answered. , The department head has toanswer in "Yes/no" format only , In remark column details are to befurnished .

Match The FollowingQuestion Correct Answer Your Answer

Time taken by each job ateach machine

Processing time Processing time

Time between starting offirst job and completion oflast job

Elapsed time Elapsed time

Number of stages the jobhas to pass

Number of machines Number of machines

Time during which themachine is standstill

Idle time Idle time

True/FalseQuestion To solve "n jobs - 2 machines" sequencing problem, it is assumed that

each machine can perform only one type of operation and canundertake only one job at a time.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion If Assignment model is to be applied to 5 jobs, number of machines

required would be :-

Correct Answer 5

Your Answer 5

Select The BlankQuestion Given the following data :- procurement cost per order = Rs 30 ;

frequency of ordering per year =4 ; number of suppliers = 3 . Form theabove data, total procurement cost would be Rs ________.

Correct Answer 360

Your Answer 360

Multiple Choice Multiple AnswerQuestion If actual demand is much lower than forecasted sale :-

Correct Answer Inventory will increase , Machine utilization will drop , Absolute projectwill reduce

Your Answer Inventory will increase , Machine utilization will drop , Absolute projectwill reduce

Multiple Choice Multiple AnswerQuestion The main characteristics of batch production are :-

Correct Answer Short runs , Skilled labours in specific trade , Supervisor to possesknowledge of specific process

Your Answer Short runs , Skilled labours in specific trade , Supervisor to possesknowledge of specific process

Match The FollowingQuestion Correct Answer Your Answer

Economic order quantity Quantity at which there isneither overstocking norunder stocking.

Quantity at which there isneither overstocking norunder stocking.

Carrying cost Cost of 'holding' the materialin store

Cost of 'holding' the materialin store

Procurement cost Administrative cost forprocurement

Cost of procurement ofmaterial

Inventory cost Sum of carrying andinventory cost

Sum of carrying andinventory cost

Multiple Choice Multiple AnswerQuestion The Hungarian method is based on following assumptions :-

Correct Answer Tasks differ in their work contents and facility differ in their capabilities. ,Only one task can be assigned to each facility. , As only one task canbe assigned to each facility, the matrix must be of nXn order.

Your Answer Tasks differ in their work contents and facility differ in their capabilities. ,Only one task can be assigned to each facility. , As only one task can

be assigned to each facility, the matrix must be of nXn order.

Multiple Choice Multiple AnswerQuestion The essential features of batch production are :-

Correct Answer General purpose machines and process type layout , Manual materialshandling , Flexibility of production schedule

Your Answer General purpose machines and process type layout , Flexibility ofproduction schedule

Multiple Choice Single AnswerQuestion The works such as preparation of machine loads, fixation of calendar

dates of various operations, coordination with sales to confirm deliverydates of new items and periodical preparation of dispatch schedule arecategorized under :-

Correct Answer Scheduling

Your Answer Process planning

Multiple Choice Multiple AnswerQuestion In case of overloading actions to be considered include following :-

Correct Answer Subcontracting , Hiring capacity , Overtime working

Your Answer Subcontracting , Hiring capacity , Overtime working

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?

Correct Answer Consistent good quality of products

Your Answer Consistent good quality of products

Select The BlankQuestion In an unbalanced assignment matrix, the columns can be balanced by

adding ________.Correct Answer Dummy columns

Your Answer Dummy rows

True/FalseQuestion Random fluctuation is addition of cyclical fluctuation and seasonal

fluctuation.Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Effective Production Planning and Control, reduce investment in

inventories effectively :-Correct Answer By proper coordination between shop floor, stores and buying

departmentYour Answer By proper coordination between shop floor, stores and buying

department

True/FalseQuestion Exponential smoothening is weighted average method.

Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion The labour cost comprises of :-

Correct Answer Provident Fund , ESI , Bonus

Your Answer Provident Fund , ESI , Bonus

Multiple Choice Single AnswerQuestion The ratio between "time when a product is required" and " time when

the product is supplied " is known as :-Correct Answer Critical ratio

Your Answer Critical ratio

True/FalseQuestion LOB is a manual planning and scheduling technique similar in nature to

MRP [Material Resource Planning].Correct Answer True

Your Answer True

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of

different items specially where lead times are extended.Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion Following difficulties are faced by SDE analysis :-

Correct Answer More delivery period , Geographical location of supplier , Reliability ofsuppliers

Your Answer More delivery period , Geographical location of supplier , Reliability ofsuppliers

Select The BlankQuestion Complexity of dispatcher's work varies with the type of ________.

Correct Answer Manufacture

Your Answer Manufacture

Select The BlankQuestion The ________ makes scheduling process simpler but does not provide

economy in manufacture.Correct Answer First-come-first scheduled

Your Answer Johnson's rule

Multiple Choice Single AnswerQuestion Installed capacity means :-

Correct Answer Cumulative capacity of all locations

Your Answer Capacity at one location

Multiple Choice Single AnswerQuestion Forecast is :-

Correct Answer Short termed and Long termed

Your Answer Short termed and Long termed

Multiple Choice Multiple AnswerQuestion Steps involved in process planning include the following :-

Correct Answer Enlist feature influencing selection of manufacturing process , Preparesequence of basic operation , Write down route sheet

Your Answer Enlist feature influencing selection of manufacturing process , Preparesequence of basic operation , Write down route sheet

Multiple Choice Multiple AnswerQuestion Due to the following emergent events, the queue time has to

compensate for the time for which the job has to undergo an extra time:-

Correct Answer Tool breakage , Job split up , Change in priorities

Your Answer Tool breakage , Job split up , Change in priorities

True/False

Question In assignment matrix, it is a must to determine adjoint of the matrix.

Correct Answer False

Your Answer False

Multiple Choice Single AnswerQuestion Such spares which are required for a system but the system can

continue to work in absence of such spares are categorized as :-Correct Answer Essential

Your Answer Desirable

True/FalseQuestion Mere communication to customer expressing inability to meet delivery

commitment and reasons for delays is not enough.Correct Answer True

Your Answer True

Select The BlankQuestion Process plan is the process of establishing the ________ and most

economical path that each part is to follow from raw material stage tofinished product stage.

Correct Answer Shortest

Your Answer Shortest

Multiple Choice Multiple AnswerQuestion In SDE analysis, the responsibility of buyers is fixed as follows :-

Correct Answer Senior buyers may be given the responsibility of 'S' and 'D' , Items in 'E'are handled by junior buyers , Items in 'E' are handled directly by thestorekeeper

Your Answer Senior buyers may be given the responsibility of 'S' and 'D' , Items in 'E'are handled directly by the storekeeper

True/FalseQuestion PERT does not help in decision making.

Correct Answer False

Your Answer False

True/FalseQuestion Curve fitting method of statistical forecasting uses curve line approach.

Correct Answer False

Your Answer True

Select The BlankQuestion Heuristics approach gave very good results when Wester and Kilbridge

applied it to ________ assembly line.Correct Answer TV

Your Answer TV

Multiple Choice Single AnswerQuestion Proper Production Planning and Control can reduce cost in :-

Correct Answer Overtime cost

Your Answer Overtime cost

Multiple Choice Single AnswerQuestion The term Stock allowance in context of Lot Size refers to the quantity

that may be required to meet the requirement of spares for the followingperiod :-

Correct Answer Specified period

Your Answer One month

True/FalseQuestion Work measurement function is attached to line management.

Correct Answer False

Your Answer True

Select The BlankQuestion ________ is the sum of set up time and run time.

Correct Answer Manufacturing time

Your Answer Manufacturing time

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single AnswerQuestion The activities such as preparation of estimates of tools, gauges,

measuring instruments, follow up with tool room, periodic replenishmentare grouped under :-

Correct Answer Tool controls

Your Answer Tool controls

Multiple Choice Single AnswerQuestion Break light is essential for an automobile from safety point of view.

However, the vehicle can be driven even in absence of break light.Thus break light can be categorized as :-

Correct Answer Essential

Your Answer Essential

Multiple Choice Single AnswerQuestion Given a decision for designing a line layout, major problem is

subdividing a work so that smooth flow can result. The subdivisionprocess is called :-

Correct Answer Line balancing

Your Answer Line of balance

True/FalseQuestion As per a study on materials management practices, a typical firm

spends almost half of its rupee sales on goods purchased fromvendors.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?

Correct Answer Consistent good quality of products

Your Answer Consistent good quality of products

Select The BlankQuestion Labour efficiency depends upon ________

Correct Answer Training and experience

Your Answer Training and experience

Match The FollowingQuestion Correct Answer Your Answer

Work element Smallest portion of workidentified during thebreakdown analysis of thejob.

Smallest portion of workidentified during thebreakdown analysis of thejob.

Production line Arrangement of workstationswhere each workmanperforms a pre-determinedtask on an incomplete unitwhich passes down the lineof subsequent unit until it isfinished.

Arrangement of workstationswhere each workmanperforms a pre-determinedtask on an incomplete unitwhich passes down the lineof subsequent unit until it isfinished.

Work Station Assigned location, zone,place or stage in assemblywhere designated work isperformed on partcomponent of product.

Assigned location, zone,place or stage in assemblywhere designated work isperformed on part componentof product.

Station work content Time required to perform thedesignated amount of workat a given work station andis obtained by adding uptime of work elementsallotted to the work station.

Time required to perform thedesignated amount of work ata given work station and isobtained by adding up time ofwork elements allotted to thework station.

Multiple Choice Single AnswerQuestion Effective Production Planning and Control, reduce investment in

inventories effectively :-Correct Answer By proper coordination between shop floor, stores and buying

departmentYour Answer By proper coordination between shop floor, stores and buying

department

Select The BlankQuestion In the assignment model, the________ is formed between jobs and

machines.Correct Answer Matrix

Your Answer Matrix

True/FalseQuestion To solve "n jobs - 2 machines " sequencing problem, all jobs require

same sequence of operations. Each job must be processed first onmachine A and then on machine B in a fixed sequence AB.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion Let us suppose that activity P & Q can not start until activity R& S are

completed. Activities P &Q are therefore :-

Correct Answer Succeeding

Your Answer Preceding

Multiple Choice Multiple AnswerQuestion What is meant by production control?

Correct Answer Control is seeing that the requirements are made available at the rightplace and right quantities , Reporting back the progress to theproduction planning , Control involves suggesting action when the jobsis falling behind schedule

Your Answer Control is seeing that the requirements are made available at the rightplace and right quantities , Reporting back the progress to theproduction planning , Control involves suggesting action when the jobsis falling behind schedule

Multiple Choice Multiple AnswerQuestion The software for CPA would require the following parameters:-

Correct Answer Algorithms , Program code , Database

Your Answer Algorithms , Program code , Database

Multiple Choice Single AnswerQuestion The assignment method is also called as :-

Correct Answer Hungarian Method

Your Answer Hungarian Method

True/FalseQuestion A buyer has little or no control over a lead time.

Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Why customer is called the king?

Correct Answer Customer's orders gives us work

Your Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion What is the reasons for poor labour efficiency attributed by inefficient

P.P.C.?Correct Answer Failure to provide proper tools and control on work in progress on shop

floor

Your Answer Failure to provide proper tools and control on work in progress on shopfloor

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'C' type of items is :-

Correct Answer Few

Your Answer Few

Multiple Choice Multiple AnswerQuestion The features of program plan are as follows :-

Correct Answer Each row of activities is associated with one component of finalassembly. , Final completion date is zero , Time scale runs from right toleft

Your Answer Time scale runs from right to left , Program plan is prepared in form ofmathematical model. , Final completion date is zero

Multiple Choice Multiple AnswerQuestion Failure to identify accumulated load on a given machine at a given time

and identify periods available for allocation of future orders leads toCorrect Answer Delays in delivery , High overtime payment , Broken promises

Your Answer Delays in delivery , High overtime payment , Higher rejections/rework

True/FalseQuestion A manufacturing firm in the present days have virtually no control on

their profitsCorrect Answer False

Your Answer True

Multiple Choice Multiple AnswerQuestion Customer plays very important role due to the following reasons :-

Correct Answer Gives us work , Dividends to share holders , Gets business from newcustomers

Your Answer Gives us work , Dividends to share holders , Gets business from newcustomers , Set the wheel of our production rolling

True/FalseQuestion If customers orders often get completed ahead of the schedule, it is a

sign of good scheduling.Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Proper Production Planning and Control can reduce cost in :-

Correct Answer Overtime cost

Your Answer Overtime cost

Multiple Choice Multiple AnswerQuestion Subcontracting department works under :-

Correct Answer Planning , Purchase , Production

Your Answer Planning , Purchase , Production

Select The BlankQuestion Given total work content as 370 and maximum allowable cycle time to

be 90 seconds, the theoretical number of work stations would be________.

Correct Answer 4.11

Your Answer 4.11

Select The BlankQuestion Orders with ________ slack time remaining per operation are run first.

Correct Answer Shortest

Your Answer Shortest

Multiple Choice Single AnswerQuestion If total lead time of certain item is 30 days and lead time of operations

completed is 6 days, the lead time required [ LTR ] would be :-Correct Answer 24

Your Answer 24

Select The BlankQuestion The performance standard is required by ________ to determine

individual machine capacity for the purpose of machine loading andassigning machine hours and man hours .

Correct Answer Scheduler

Your Answer Industrial engineer

Select The Blank

Question At each ________, work is performed on a product either by addingparts or by completing assembly operations.

Correct Answer Work station

Your Answer Work station

Multiple Choice Single AnswerQuestion Detachable ticket, after filling in required information is :-

Correct Answer Placed in a tray/box

Your Answer Placed in a tray/box

True/FalseQuestion PERT finds applications where resources [ men, materials and money ]

are always made available as and when required.Correct Answer True

Your Answer True

Select The BlankQuestion Rational figure on utilization index can be obtained by carrying out

________ study.Correct Answer Work- sampling

Your Answer Work- sampling

True/FalseQuestion EOQ is that quantity at which price paid by buyer is minimum.

Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Keeping available time per day constant, if the desired production rate

per day is to be doubled ,cycle time will be reduced by :-Correct Answer 0.5

Your Answer 0.5

Multiple Choice Multiple AnswerQuestion To prepare load chart following job related information should be

collected :-Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on

hand

Your Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs onhand

Select The BlankQuestion Job production requires ________ capital investment.

Correct Answer Lowest

Your Answer Largest

Multiple Choice Multiple AnswerQuestion The main characteristics of mass and flow production are :-

Correct Answer Continuous flow of material , Low skilled labour , Easy supervision

Your Answer Continuous flow of material , Low skilled labour , Easy supervision

Select The BlankQuestion ________ represents productive time of the job.

Correct Answer Manufacturing time

Your Answer Manufacturing time

Multiple Choice Multiple AnswerQuestion CPM terminology uses words like

Correct Answer Arrow diagram , Nodes , Float

Your Answer Arrow diagram , Nodes , Float

Multiple Choice Single AnswerQuestion The Follow up required for early delivery in case of 'B' types of items is

usually :-Correct Answer Periodic

Your Answer Periodic

Match The FollowingQuestion Correct Answer Your Answer

Job splitting Dividing job in more thanone lot

Dividing job in more than onelot

Change in priority Shift equipment/workmen todelayed jobs

Shift equipment/workmen todelayed jobs

Alternate routing Processing on costliermachine

Running jobs on onemachine sequentially

Overlapping Running jobs simultaneouslyon more than one machine

Running jobs simultaneouslyon more than one machine

Multiple Choice Single AnswerQuestion The event is graphically represented by :-

Correct Answer Circle

Your Answer Circle

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'B' type of items is :-

Correct Answer Medium

Your Answer Medium

Select The BlankQuestion ________ analysis is based on consumption figures of an item.

Correct Answer FSN

Your Answer ABC

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of

different items specially where lead times are extended.Correct Answer True

Your Answer True

True/FalseQuestion More than one subcontractor should be developed for each

subcontracted operation/Job.Correct Answer True

Your Answer True

2nd Copy

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple AnswerQuestion If actual demand far exceeds forecast, it will result into :-Correct Answer Better utilization of equipment , Project margin , Higher material

purchase

Your Answer Higher material purchase , Increase in labour productivity , Better utilizationof equipment , Project margin

Select The BlankQuestion To know the accumulated ________ for a given machine at a given time Load

charts are necessary.Correct Answer LoadYour Answer Load

Multiple Choice Single AnswerQuestion LOB technique was developed by US navy in the year :-Correct Answer 1958Your Answer 1958

True/FalseQuestion In continuous or process production , only one product is manufactured.Correct Answer TrueYour Answer True

Select The BlankQuestion ________reflects impact of money tied up in inventory.Correct Answer Inventory turnoverYour Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion Methods for recording actual progress of work for shop orders are :-Correct Answer Progress card , Display board , Network updatingYour Answer Progress card , Display board , Network updating , Job card

Select The BlankQuestion A progress card is the most ________ method of recording of progress of work.Correct Answer ConvenientYour Answer Convenient

Multiple Choice Multiple AnswerQuestion Following are some of the common standard cutting tools :-Correct Answer Cutting saw , Inserts , ReamersYour Answer Form tool , Cutting saw , Inserts , Reamers

Multiple Choice Multiple AnswerQuestion Tooling cost comprises the cost of :-Correct Answer Gigs , Fixtures , Drill bitsYour Answer Gigs , Fixtures , Drill bits , Stationary

Multiple Choice Single AnswerQuestion The light engineering company has one special purpose facing & centering

machine And one copying lathe. The foreman has five work orders for processing . Theoperation Sequence is fixed [ each job is first faced and centered and then copy turned ] .The standard Hours required for each machine to process each work order are shown in thefollowing Table :- Work Order Processing Time [Hours ] Facing & centering machine CopyingLathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements ofmachine hours.Correct Answer IV-I-II-V-III

Your Answer I-II-III-IV-V

Select The BlankQuestion ________ represents the time that elapses between the receipt of requirement

of job until the job is adopted in the production control department.Correct Answer Order preparation timeYour Answer Queue time

True/FalseQuestion PERT basically does not demarcate between critical and non-critical activities.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion The assignment method is also called as :-Correct Answer Hungarian MethodYour Answer Analytical Method

Multiple Choice Multiple AnswerQuestion Outside operations cost involves expenses such as :-Correct Answer Rough blanking , Heat treatment , PlatingYour Answer Heat treatment , Plating , Inventory control , Rough blanking

Select The BlankQuestion The correct fitting of orders with capacity considerably lessens ________

burden of control.Correct Answer Foreman'sYour Answer Foreman's

Multiple Choice Multiple AnswerQuestion The 'F' group of GOLF analysis involves following requirements :-Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements

for shipping and port clearanceYour Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for

shipping and port clearance , Account in foreign bank

Match The FollowingQuestion Correct Answer Your Answer

Order quantity Factor influencing process planning Break even analysis

Machine capacity chart Dimensional accuracy Dimensional accuracy

Mass production Special purpose machines Special purpose machines

Standard elemental time data Compare alternative processes Factor influencing processplanning

Multiple Choice Multiple AnswerQuestion The tooling data is prepared in respect of following measuring instruments :-Correct Answer Vernier caliper , Micrometer screw gauge , Strain gaugeYour Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits

Multiple Choice Multiple AnswerQuestion In replenishment system, the fixed order quantity system is also called by

following names :-Correct Answer Fixed order system , Min-max system , Re-order point systemYour Answer Fixed order system , Min-max system , Re-order point system , Lead time

system

Multiple Choice Multiple AnswerQuestion How you will Judge the failure of production planning and control department?Correct Answer Frequent broken delivery promises , Underutilization of men, machines ,

Excessive overtimeYour Answer Frequent broken delivery promises , Underutilization of men, machines ,

Excessive overtime , Better coordination with other section

Multiple Choice Single AnswerQuestion In Cost Vs Quantity plot, the total inventory Cost curve is :-Correct Answer ParabolicYour Answer Inverse

True/FalseQuestion Given stock in hand = 1320 units, safety stock=840 units and average daily

consumption = 60 units, the lead time available would be 10 hours.Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the reorder point is at 120

Units, find the lead time.Correct Answer 4 monthsYour Answer 4 months

Multiple Choice Single AnswerQuestion The assignment algorithm was developed by a Hungarian mathematician named

:-Correct Answer D. KonigYour Answer Charles simony

Multiple Choice Single AnswerQuestion So far as possible, number of activities should be :-Correct Answer LimitedYour Answer Limited

True/FalseQuestion Production Planning and Control makes the supervisor ineffective.Correct Answer TrueYour Answer False

Multiple Choice Single AnswerQuestion Unit of loading and scheduling depends on following factor :-Correct Answer Operating cycleYour Answer Unit of capacity

True/FalseQuestion The 'G' group of GOLF analysis involves moderate delivery time and availability

of credit usually in the range of 30 to 60 days.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Load charts are used for following :-Correct Answer To know the accumulated load on a given machine at a given time ,

Identify periods available for allocation in future to orders , Matching orders and loadsYour Answer Improving supply of material , To know the accumulated load on a given

machine at a given time , Identify periods available for allocation in future to orders ,Matching orders and loads

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost

Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturingcost would be Rs ________.Correct Answer 6 LacsYour Answer 6 Lacs

Select The BlankQuestion An inventory control system in which stock of item is physically or conceptually

divided into ________ bins is calledTwo bin system.Correct Answer TwoYour Answer Pair

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-Correct Answer Moving average , Exponential smothering , Curve fittingYour Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys

Multiple Choice Single AnswerQuestion For goods manufactured to stock, following department is expected to

periodically undertake replenishment action as stocks are depleted :-Correct Answer Production Planning ControlYour Answer Production

True/FalseQuestion Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation.Correct Answer FalseYour Answer True

True/FalseQuestion Scientific inventory control system requires to be followed for machine aid, work

aid and inspection aid :-Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion Value Analysis conducted in 'C' type of material is usually :-Correct Answer MinimumYour Answer Minimum

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of different

items specially where lead times are extended.Correct Answer TrueYour Answer True

True/FalseQuestion In assignment matrix, it is a must to determine Jacobean of the determinant.Correct Answer FalseYour Answer True

Select The BlankQuestion For replenishment action for stock items which are reserved by PPC, the stores

work out ________ stock which equals the stock on hand less stock reserved.Correct Answer FreeYour Answer Net

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?Correct Answer Consistent good quality of productsYour Answer Consistent good quality of products

Match The FollowingQuestion Correct Answer Your Answer

End piece allowance Material insufficient to produce one piece Material insufficient toproduce one piece

Stock allowance Quantity to meet requirement of spares Quantity to meet requirement ofspares

Machining allowance Extra material requirement Extra material requirement

Spoilage allowance Process rejection Process rejection

Multiple Choice Single AnswerQuestion Why customer is called the king?Correct Answer Customer's orders gives us workYour Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion PPC is expected to have good inter-departmental relationships to achieve the

production targets. Which is the most important factor that shall affect production targets?Correct Answer Timely availability of material, manpowerYour Answer Timely availability of material, manpower

Select The BlankQuestion Generally for ________ flow system, Heuristic method is preferred.Correct Answer IntermittentYour Answer Continuous

Select The BlankQuestion In control board________ compartment contains copy of work orders/shop

orders of the item to be processed next on the machine.Correct Answer MiddleYour Answer Bottom

True/FalseQuestion Work measurement function is attached to line management.Correct Answer FalseYour Answer True

Multiple Choice Multiple AnswerQuestion The technical feasibility of sales enquiry is carried out on the following grounds

:-Correct Answer Tools and plants are available , Technical know how is available ,

Competent persons are presentYour Answer Tools and plants are available , Technical know how is available , Competent

persons are present , Cost data of raw material is available.

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single AnswerQuestion The activities such as preparation of estimates of tools, gauges,

measuring instruments, follow up with tool room, periodic replenishmentare grouped under :-

Correct Answer Tool controls

Your Answer Tool controls

Multiple Choice Single AnswerQuestion Break light is essential for an automobile from safety point of view.

However, the vehicle can be driven even in absence of break light.Thus break light can be categorized as :-

Correct Answer Essential

Your Answer Essential

Multiple Choice Single AnswerQuestion Given a decision for designing a line layout, major problem is

subdividing a work so that smooth flow can result. The subdivisionprocess is called :-

Correct Answer Line balancing

Your Answer Line of balance

True/False

Question As per a study on materials management practices, a typical firmspends almost half of its rupee sales on goods purchased fromvendors.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?

Correct Answer Consistent good quality of products

Your Answer Consistent good quality of products

Select The BlankQuestion Labour efficiency depends upon ________

Correct Answer Training and experience

Your Answer Training and experience

Match The FollowingQuestion Correct Answer Your Answer

Work element Smallest portion of workidentified during thebreakdown analysis of thejob.

Smallest portion of workidentified during thebreakdown analysis of thejob.

Production line Arrangement of workstationswhere each workmanperforms a pre-determinedtask on an incomplete unitwhich passes down the lineof subsequent unit until it isfinished.

Arrangement of workstationswhere each workmanperforms a pre-determinedtask on an incomplete unitwhich passes down the lineof subsequent unit until it isfinished.

Work Station Assigned location, zone,place or stage in assemblywhere designated work isperformed on partcomponent of product.

Assigned location, zone,place or stage in assemblywhere designated work isperformed on part componentof product.

Station work content Time required to perform thedesignated amount of workat a given work station andis obtained by adding uptime of work elementsallotted to the work station.

Time required to perform thedesignated amount of work ata given work station and isobtained by adding up time ofwork elements allotted to thework station.

Multiple Choice Single Answer

Question Effective Production Planning and Control, reduce investment ininventories effectively :-

Correct Answer By proper coordination between shop floor, stores and buyingdepartment

Your Answer By proper coordination between shop floor, stores and buyingdepartment

Select The BlankQuestion In the assignment model, the________ is formed between jobs and

machines.Correct Answer Matrix

Your Answer Matrix

True/FalseQuestion To solve "n jobs - 2 machines " sequencing problem, all jobs require

same sequence of operations. Each job must be processed first onmachine A and then on machine B in a fixed sequence AB.

Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion Let us suppose that activity P & Q can not start until activity R& S are

completed. Activities P &Q are therefore :-Correct Answer Succeeding

Your Answer Preceding

Multiple Choice Multiple AnswerQuestion What is meant by production control?

Correct Answer Control is seeing that the requirements are made available at the rightplace and right quantities , Reporting back the progress to theproduction planning , Control involves suggesting action when the jobsis falling behind schedule

Your Answer Control is seeing that the requirements are made available at the rightplace and right quantities , Reporting back the progress to theproduction planning , Control involves suggesting action when the jobsis falling behind schedule

Multiple Choice Multiple AnswerQuestion The software for CPA would require the following parameters:-

Correct Answer Algorithms , Program code , Database

Your Answer Algorithms , Program code , Database

Multiple Choice Single Answer

Question The assignment method is also called as :-

Correct Answer Hungarian Method

Your Answer Hungarian Method

True/FalseQuestion A buyer has little or no control over a lead time.

Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Why customer is called the king?

Correct Answer Customer's orders gives us work

Your Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion What is the reasons for poor labour efficiency attributed by inefficient

P.P.C.?Correct Answer Failure to provide proper tools and control on work in progress on shop

floorYour Answer Failure to provide proper tools and control on work in progress on shop

floor

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'C' type of items is :-

Correct Answer Few

Your Answer Few

Multiple Choice Multiple AnswerQuestion The features of program plan are as follows :-

Correct Answer Each row of activities is associated with one component of finalassembly. , Final completion date is zero , Time scale runs from right toleft

Your Answer Time scale runs from right to left , Program plan is prepared in form ofmathematical model. , Final completion date is zero

Multiple Choice Multiple AnswerQuestion Failure to identify accumulated load on a given machine at a given time

and identify periods available for allocation of future orders leads toCorrect Answer Delays in delivery , High overtime payment , Broken promises

Your Answer Delays in delivery , High overtime payment , Higher rejections/rework

True/FalseQuestion A manufacturing firm in the present days have virtually no control on

their profitsCorrect Answer False

Your Answer True

Multiple Choice Multiple AnswerQuestion Customer plays very important role due to the following reasons :-

Correct Answer Gives us work , Dividends to share holders , Gets business from newcustomers

Your Answer Gives us work , Dividends to share holders , Gets business from newcustomers , Set the wheel of our production rolling

True/FalseQuestion If customers orders often get completed ahead of the schedule, it is a

sign of good scheduling.Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Proper Production Planning and Control can reduce cost in :-

Correct Answer Overtime cost

Your Answer Overtime cost

Multiple Choice Multiple AnswerQuestion Subcontracting department works under :-

Correct Answer Planning , Purchase , Production

Your Answer Planning , Purchase , Production

Select The BlankQuestion Given total work content as 370 and maximum allowable cycle time to

be 90 seconds, the theoretical number of work stations would be________.

Correct Answer 4.11

Your Answer 4.11

Select The Blank

Question Orders with ________ slack time remaining per operation are run first.

Correct Answer Shortest

Your Answer Shortest

Multiple Choice Single AnswerQuestion If total lead time of certain item is 30 days and lead time of operations

completed is 6 days, the lead time required [ LTR ] would be :-Correct Answer 24

Your Answer 24

Select The BlankQuestion The performance standard is required by ________ to determine

individual machine capacity for the purpose of machine loading andassigning machine hours and man hours .

Correct Answer Scheduler

Your Answer Industrial engineer

Select The BlankQuestion At each ________, work is performed on a product either by adding

parts or by completing assembly operations.Correct Answer Work station

Your Answer Work station

Multiple Choice Single AnswerQuestion Detachable ticket, after filling in required information is :-

Correct Answer Placed in a tray/box

Your Answer Placed in a tray/box

True/FalseQuestion PERT finds applications where resources [ men, materials and money ]

are always made available as and when required.Correct Answer True

Your Answer True

Select The BlankQuestion Rational figure on utilization index can be obtained by carrying out

________ study.Correct Answer Work- sampling

Your Answer Work- sampling

True/FalseQuestion EOQ is that quantity at which price paid by buyer is minimum.

Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Keeping available time per day constant, if the desired production rate

per day is to be doubled ,cycle time will be reduced by :-Correct Answer 0.5

Your Answer 0.5

Multiple Choice Multiple AnswerQuestion To prepare load chart following job related information should be

collected :-Correct Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on

handYour Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on

hand

Select The BlankQuestion Job production requires ________ capital investment.

Correct Answer Lowest

Your Answer Largest

Multiple Choice Multiple AnswerQuestion The main characteristics of mass and flow production are :-

Correct Answer Continuous flow of material , Low skilled labour , Easy supervision

Your Answer Continuous flow of material , Low skilled labour , Easy supervision

Select The BlankQuestion ________ represents productive time of the job.

Correct Answer Manufacturing time

Your Answer Manufacturing time

Multiple Choice Multiple Answer

Question CPM terminology uses words like

Correct Answer Arrow diagram , Nodes , Float

Your Answer Arrow diagram , Nodes , Float

Multiple Choice Single AnswerQuestion The Follow up required for early delivery in case of 'B' types of items is

usually :-Correct Answer Periodic

Your Answer Periodic

Match The FollowingQuestion Correct Answer Your Answer

Job splitting Dividing job in more thanone lot

Dividing job in more than onelot

Change in priority Shift equipment/workmen todelayed jobs

Shift equipment/workmen todelayed jobs

Alternate routing Processing on costliermachine

Running jobs on onemachine sequentially

Overlapping Running jobs simultaneouslyon more than one machine

Running jobs simultaneouslyon more than one machine

Multiple Choice Single AnswerQuestion The event is graphically represented by :-

Correct Answer Circle

Your Answer Circle

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'B' type of items is :-

Correct Answer Medium

Your Answer Medium

Select The BlankQuestion ________ analysis is based on consumption figures of an item.

Correct Answer FSN

Your Answer ABC

True/False

Question Purchase department must keep PPC informed regarding lead time ofdifferent items specially where lead times are extended.

Correct Answer True

Your Answer True

True/FalseQuestion More than one subcontractor should be developed for each

subcontracted operation/Job.Correct Answer True

Your Answer True

Production Planning & Control assgn :03: AbhraMultiple Choice Single AnswerQuestion The activities such as preparation of estimates of tools, gauges, measuring instruments,

follow up with tool room, periodic replenishment are grouped under :-Correct

AnswerTool controls

Your Answer Tool controls

Multiple Choice Single AnswerQuestion Break light is essential for an automobile from safety point of view. However, the vehicle

can be driven even in absence of break light. Thus break light can be categorized as :-Correct

AnswerEssential

Your Answer Essential

Multiple Choice Single AnswerQuestion Given a decision for designing a line layout, major problem is subdividing a work so that

smooth flow can result. The subdivision process is called :-Correct

AnswerLine balancing

Your Answer Line of balance

True/FalseQuestion As per a study on materials management practices, a typical firm spends almost half of

its rupee sales on goods purchased from vendors.Correct

AnswerTrue

Your Answer True

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?

CorrectAnswer

Consistent good quality of products

Your Answer Consistent good quality of products

Select The BlankQuestion Labour efficiency depends upon ________

CorrectAnswer

Training and experience

Your Answer Training and experience

Match The Following

Question Correct Answer Your Answer

Work element Smallest portion of work identifiedduring the breakdown analysis ofthe job.

Smallest portion of work identifiedduring the breakdown analysis ofthe job.

Production line Arrangement of workstationswhere each workman performs apre-determined task on anincomplete unit which passesdown the line of subsequent unituntil it is finished.

Arrangement of workstationswhere each workman performs apre-determined task on anincomplete unit which passes downthe line of subsequent unit until itis finished.

Work Station Assigned location, zone, place orstage in assembly wheredesignated work is performed onpart component of product.

Assigned location, zone, place orstage in assembly wheredesignated work is performed onpart component of product.

Station work content Time required to perform thedesignated amount of work at agiven work station and is obtainedby adding up time of workelements allotted to the workstation.

Time required to perform thedesignated amount of work at agiven work station and is obtainedby adding up time of workelements allotted to the workstation.

Multiple Choice Single AnswerQuestion Effective Production Planning and Control, reduce investment in inventories effectively :-

CorrectAnswer

By proper coordination between shop floor, stores and buying department

Your Answer By proper coordination between shop floor, stores and buying department

Select The BlankQuestion In the assignment model, the________ is formed between jobs and machines.

CorrectAnswer

Matrix

Your Answer Matrix

True/FalseQuestion To solve "n jobs - 2 machines " sequencing problem, all jobs require same sequence of

operations. Each job must be processed first on machine A and then on machine B in afixed sequence AB.

CorrectAnswer

True

Your Answer True

Multiple Choice Single AnswerQuestion Let us suppose that activity P & Q can not start until activity R& S are completed.

Activities P &Q are therefore :-Correct

AnswerSucceeding

Your Answer Preceding

Multiple Choice Multiple AnswerQuestion What is meant by production control?

CorrectAnswer

Control is seeing that the requirements are made available at the right place and rightquantities , Reporting back the progress to the production planning , Control involvessuggesting action when the jobs is falling behind schedule

Your Answer Control is seeing that the requirements are made available at the right place and rightquantities , Reporting back the progress to the production planning , Control involvessuggesting action when the jobs is falling behind schedule

Multiple Choice Multiple AnswerQuestion The software for CPA would require the following parameters:-

CorrectAnswer

Algorithms , Program code , Database

Your Answer Algorithms , Program code , Database

Multiple Choice Single AnswerQuestion The assignment method is also called as :-

CorrectAnswer

Hungarian Method

Your Answer Hungarian Method

True/FalseQuestion A buyer has little or no control over a lead time.

CorrectAnswer

False

Your Answer True

Multiple Choice Single AnswerQuestion Why customer is called the king?

CorrectAnswer

Customer's orders gives us work

Your Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion What is the reasons for poor labour efficiency attributed by inefficient P.P.C.?

CorrectAnswer

Failure to provide proper tools and control on work in progress on shop floor

Your Answer Failure to provide proper tools and control on work in progress on shop floor

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'C' type of items is :-

CorrectAnswer

Few

Your Answer Few

Multiple Choice Multiple AnswerQuestion The features of program plan are as follows :-

CorrectAnswer

Each row of activities is associated with one component of final assembly. , Finalcompletion date is zero , Time scale runs from right to left

Your Answer Time scale runs from right to left , Program plan is prepared in form of mathematicalmodel. , Final completion date is zero

Multiple Choice Multiple AnswerQuestion Failure to identify accumulated load on a given machine at a given time and identify

periods available for allocation of future orders leads toCorrect

AnswerDelays in delivery , High overtime payment , Broken promises

Your Answer Delays in delivery , High overtime payment , Higher rejections/rework

True/FalseQuestion A manufacturing firm in the present days have virtually no control on their profits

CorrectAnswer

False

Your Answer True

Multiple Choice Multiple AnswerQuestion Customer plays very important role due to the following reasons :-

CorrectAnswer

Gives us work , Dividends to share holders , Gets business from new customers

Your Answer Gives us work , Dividends to share holders , Gets business from new customers , Set thewheel of our production rolling

True/FalseQuestion If customers orders often get completed ahead of the schedule, it is a sign of good

scheduling.Correct

AnswerFalse

Your Answer True

Multiple Choice Single AnswerQuestion Proper Production Planning and Control can reduce cost in :-

CorrectAnswer

Overtime cost

Your Answer Overtime cost

Multiple Choice Multiple AnswerQuestion Subcontracting department works under :-

CorrectAnswer

Planning , Purchase , Production

Your Answer Planning , Purchase , Production

Select The BlankQuestion Given total work content as 370 and maximum allowable cycle time to be 90 seconds,

the theoretical number of work stations would be ________.Correct

Answer4.11

Your Answer 4.11

Select The BlankQuestion Orders with ________ slack time remaining per operation are run first.

CorrectAnswer

Shortest

Your Answer Shortest

Multiple Choice Single AnswerQuestion If total lead time of certain item is 30 days and lead time of operations completed is 6

days, the lead time required [ LTR ] would be :-Correct

Answer24

Your Answer 24

Select The Blank

Question The performance standard is required by ________ to determine individual machinecapacity for the purpose of machine loading and assigning machine hours and man hours.

CorrectAnswer

Scheduler

Your Answer Industrial engineer

Select The BlankQuestion At each ________, work is performed on a product either by adding parts or by

completing assembly operations.Correct

AnswerWork station

Your Answer Work station

Multiple Choice Single AnswerQuestion Detachable ticket, after filling in required information is :-

CorrectAnswer

Placed in a tray/box

Your Answer Placed in a tray/box

True/FalseQuestion PERT finds applications where resources [ men, materials and money ] are always made

available as and when required.Correct

AnswerTrue

Your Answer True

Select The BlankQuestion Rational figure on utilization index can be obtained by carrying out ________ study.

CorrectAnswer

Work- sampling

Your Answer Work- sampling

True/FalseQuestion EOQ is that quantity at which price paid by buyer is minimum.

CorrectAnswer

False

Your Answer True

Multiple Choice Single AnswerQuestion Keeping available time per day constant, if the desired production rate per day is to be

doubled ,cycle time will be reduced by :-Correct 0.5

Answer

Your Answer 0.5

Multiple Choice Multiple AnswerQuestion To prepare load chart following job related information should be collected :-

CorrectAnswer

Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand

Your Answer Jobs on the machine , Jobs on hand , Delivery commitments of jobs on hand

Select The BlankQuestion Job production requires ________ capital investment.

CorrectAnswer

Lowest

Your Answer Largest

Multiple Choice Multiple AnswerQuestion The main characteristics of mass and flow production are :-

CorrectAnswer

Continuous flow of material , Low skilled labour , Easy supervision

Your Answer Continuous flow of material , Low skilled labour , Easy supervision

Select The BlankQuestion ________ represents productive time of the job.

CorrectAnswer

Manufacturing time

Your Answer Manufacturing time

Multiple Choice Multiple AnswerQuestion CPM terminology uses words like

CorrectAnswer

Arrow diagram , Nodes , Float

Your Answer Arrow diagram , Nodes , Float

Multiple Choice Single AnswerQuestion The Follow up required for early delivery in case of 'B' types of items is usually :-

CorrectAnswer

Periodic

Your Answer Periodic

Match The FollowingQuestion Correct Answer Your Answer

Job splitting Dividing job in more than one lot Dividing job in more than one lot

Change in priority Shift equipment/workmen todelayed jobs

Shift equipment/workmen todelayed jobs

Alternate routing Processing on costlier machine Running jobs on one machinesequentially

Overlapping Running jobs simultaneously onmore than one machine

Running jobs simultaneously onmore than one machine

Multiple Choice Single AnswerQuestion The event is graphically represented by :-

CorrectAnswer

Circle

Your Answer Circle

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'B' type of items is :-

CorrectAnswer

Medium

Your Answer Medium

Select The BlankQuestion ________ analysis is based on consumption figures of an item.

CorrectAnswer

FSN

Your Answer ABC

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of different items

specially where lead times are extended.Correct

AnswerTrue

Your Answer True

True/FalseQuestion More than one subcontractor should be developed for each subcontracted operation/Job.

CorrectAnswer

True

Your Answer True

Production Planning & Control assgn:04: SameerMultiple Choice Multiple AnswerQuestion If actual demand far exceeds forecast, it will result into :-Correct Answer Better utilization of equipment , Project margin , Higher material

purchaseYour Answer Higher material purchase , Increase in labour productivity , Better utilization

of equipment , Project margin

Select The BlankQuestion To know the accumulated ________ for a given machine at a given time Load

charts are necessary.Correct Answer LoadYour Answer Load

Multiple Choice Single AnswerQuestion LOB technique was developed by US navy in the year :-Correct Answer 1958Your Answer 1958

True/FalseQuestion In continuous or process production , only one product is manufactured.Correct Answer TrueYour Answer True

Select The BlankQuestion ________reflects impact of money tied up in inventory.Correct Answer Inventory turnoverYour Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion Methods for recording actual progress of work for shop orders are :-Correct Answer Progress card , Display board , Network updatingYour Answer Progress card , Display board , Network updating , Job card

Select The BlankQuestion A progress card is the most ________ method of recording of progress of work.Correct Answer ConvenientYour Answer Convenient

Multiple Choice Multiple AnswerQuestion Following are some of the common standard cutting tools :-Correct Answer Cutting saw , Inserts , ReamersYour Answer Form tool , Cutting saw , Inserts , Reamers

Multiple Choice Multiple AnswerQuestion Tooling cost comprises the cost of :-Correct Answer Gigs , Fixtures , Drill bitsYour Answer Gigs , Fixtures , Drill bits , Stationary

Multiple Choice Single AnswerQuestion The light engineering company has one special purpose facing & centering

machine And one copying lathe. The foreman has five work orders for processing . The

operation Sequence is fixed [ each job is first faced and centered and then copy turned ] .The standard Hours required for each machine to process each work order are shown in thefollowing Table :- Work Order Processing Time [Hours ] Facing & centering machine CopyingLathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence to minimize requirements ofmachine hours.Correct Answer IV-I-II-V-IIIYour Answer I-II-III-IV-V

Select The BlankQuestion ________ represents the time that elapses between the receipt of requirement

of job until the job is adopted in the production control department.Correct Answer Order preparation timeYour Answer Queue time

True/FalseQuestion PERT basically does not demarcate between critical and non-critical activities.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion The assignment method is also called as :-Correct Answer Hungarian MethodYour Answer Analytical Method

Multiple Choice Multiple AnswerQuestion Outside operations cost involves expenses such as :-Correct Answer Rough blanking , Heat treatment , PlatingYour Answer Heat treatment , Plating , Inventory control , Rough blanking

Select The BlankQuestion The correct fitting of orders with capacity considerably lessens ________

burden of control.Correct Answer Foreman'sYour Answer Foreman's

Multiple Choice Multiple AnswerQuestion The 'F' group of GOLF analysis involves following requirements :-Correct Answer Search for foreign suppliers , Opening of letter of credit , Arrangements

for shipping and port clearanceYour Answer Search for foreign suppliers , Opening of letter of credit , Arrangements for

shipping and port clearance , Account in foreign bank

Match The FollowingQuestion Correct Answer Your Answer

Order quantity Factor influencing process planning Break even analysis

Machine capacity chart Dimensional accuracy Dimensional accuracy

Mass production Special purpose machines Special purpose machines

Standard elemental time data Compare alternative processes Factor influencing processplanning

Multiple Choice Multiple AnswerQuestion The tooling data is prepared in respect of following measuring instruments :-Correct Answer Vernier caliper , Micrometer screw gauge , Strain gaugeYour Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits

Multiple Choice Multiple AnswerQuestion In replenishment system, the fixed order quantity system is also called by

following names :-Correct Answer Fixed order system , Min-max system , Re-order point systemYour Answer Fixed order system , Min-max system , Re-order point system , Lead time

system

Multiple Choice Multiple AnswerQuestion How you will Judge the failure of production planning and control department?Correct Answer Frequent broken delivery promises , Underutilization of men, machines ,

Excessive overtimeYour Answer Frequent broken delivery promises , Underutilization of men, machines ,

Excessive overtime , Better coordination with other section

Multiple Choice Single AnswerQuestion In Cost Vs Quantity plot, the total inventory Cost curve is :-Correct Answer ParabolicYour Answer Inverse

True/FalseQuestion Given stock in hand = 1320 units, safety stock=840 units and average daily

consumption = 60 units, the lead time available would be 10 hours.Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the reorder point is at 120

Units, find the lead time.Correct Answer 4 monthsYour Answer 4 months

Multiple Choice Single AnswerQuestion The assignment algorithm was developed by a Hungarian mathematician named

:-Correct Answer D. KonigYour Answer Charles simony

Multiple Choice Single AnswerQuestion So far as possible, number of activities should be :-Correct Answer LimitedYour Answer Limited

True/FalseQuestion Production Planning and Control makes the supervisor ineffective.Correct Answer TrueYour Answer False

Multiple Choice Single AnswerQuestion Unit of loading and scheduling depends on following factor :-Correct Answer Operating cycleYour Answer Unit of capacity

True/FalseQuestion The 'G' group of GOLF analysis involves moderate delivery time and availability

of credit usually in the range of 30 to 60 days.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Load charts are used for following :-Correct Answer To know the accumulated load on a given machine at a given time ,

Identify periods available for allocation in future to orders , Matching orders and loadsYour Answer Improving supply of material , To know the accumulated load on a given

machine at a given time , Identify periods available for allocation in future to orders ,Matching orders and loads

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labour cost

Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturingcost would be Rs ________.Correct Answer 6 LacsYour Answer 6 Lacs

Select The BlankQuestion An inventory control system in which stock of item is physically or conceptually

divided into ________ bins is calledTwo bin system.Correct Answer TwoYour Answer Pair

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-Correct Answer Moving average , Exponential smothering , Curve fittingYour Answer Moving average , Exponential smothering , Curve fitting , Opinion surveys

Multiple Choice Single AnswerQuestion For goods manufactured to stock, following department is expected to

periodically undertake replenishment action as stocks are depleted :-Correct Answer Production Planning ControlYour Answer Production

True/FalseQuestion Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation.Correct Answer FalseYour Answer True

True/FalseQuestion Scientific inventory control system requires to be followed for machine aid, work

aid and inspection aid :-Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Value Analysis conducted in 'C' type of material is usually :-Correct Answer MinimumYour Answer Minimum

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of different

items specially where lead times are extended.Correct Answer TrueYour Answer True

True/FalseQuestion In assignment matrix, it is a must to determine Jacobean of the determinant.Correct Answer FalseYour Answer True

Select The BlankQuestion For replenishment action for stock items which are reserved by PPC, the stores

work out ________ stock which equals the stock on hand less stock reserved.Correct Answer FreeYour Answer Net

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?Correct Answer Consistent good quality of productsYour Answer Consistent good quality of products

Match The FollowingQuestion Correct Answer Your Answer

End piece allowance Material insufficient to produce one piece Material insufficient toproduce one piece

Stock allowance Quantity to meet requirement of spares Quantity to meet requirement ofspares

Machining allowance Extra material requirement Extra material requirement

Spoilage allowance Process rejection Process rejection

Multiple Choice Single AnswerQuestion Why customer is called the king?Correct Answer Customer's orders gives us workYour Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion PPC is expected to have good inter-departmental relationships to achieve the

production targets. Which is the most important factor that shall affect production targets?Correct Answer Timely availability of material, manpowerYour Answer Timely availability of material, manpower

Select The BlankQuestion Generally for ________ flow system, Heuristic method is preferred.Correct Answer IntermittentYour Answer Continuous

Select The BlankQuestion In control board________ compartment contains copy of work orders/shop

orders of the item to be processed next on the machine.Correct Answer MiddleYour Answer Bottom

True/FalseQuestion Work measurement function is attached to line management.Correct Answer FalseYour Answer True

Multiple Choice Multiple AnswerQuestion The technical feasibility of sales enquiry is carried out on the following grounds

:-Correct Answer Tools and plants are available , Technical know how is available ,

Competent persons are presentYour Answer Tools and plants are available , Technical know how is available , Competent

persons are present , Cost data of raw material is available.

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 1 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

True/FalseQuestion: XYZ when combined with FSN analysis helps to

classify non-moving items into XN , YN and ZN.Correct Answer: TrueYour Answer True

Multiple Choice Single AnswersQuestion: Forecast is based on:-Correct Answer: Past dataYour Answer Competitor's market share

Select the BlankQuestion: Network ________ is defined as any adjustment

to the arrow diagram which becomes necessary owing to departurefrom the project schedule laid down earlier.Correct Answer: UpdatingYour Answer Design

Multiple Choice Single AnswersQuestion: For goods manufactured to stock, following

department is expected to periodically undertake replenishmentaction as stocks are depleted:-Correct Answer: Production Planning ControlYour Answer Production Planning Control

True/FalseQuestion: CPM marks critical activities.Correct Answer: TrueYour Answer True

Select The BlankQuestion: A shop order may combine more than one

________ requiring identical items.Correct Answer: Work orderYour Answer Sales order

Multiple Choice Single AnswerQuestion: What are the customer's expectation from the

supplier?Correct Answer: Consistent good quality of productsYour Answer Consistent good quality of products

Select The BlankQuestion: ________ inventories help to balance company's

supply with market demand.Correct Answer: Finished goodsYour Answer WIP

Select The BlankQuestion: Short term forecasts are for ________.

Correct Answer: Material PlanningYour Answer Cash flow management

Multiple Choice Single AnswerQuestion: For process planning following is one of the basic

document used :-Correct Answer: Operation LayoutYour Answer Process Layout

Multiple Choice Single AnswerQuestion: Scheduled start of an operation is authorized by

issuing a document called :-Correct Answer: Job cardYour Answer Route card

Multiple Choice Multiple AnswerQuestion: SOS Analysis involves following type of items :-Correct Answer: Seasonal items available only for a

limited period. , Seasonal items available throughout the year. ,Non-seasonal items whose quantity is decided on differentconsiderations.

Your Answer Seasonal items available throughout the year. ,Non-seasonal items whose quantity is decided on differentconsiderations. , Machine spare parts

Multiple Choice Multiple AnswerQuestion: The basic procedure of assignment technique is

designed to solve problems wherein :-Correct Answer: Number of tasks equal to number of

facilities. , The objective function is minimization. , There are norestrictions in allocation

Your Answer Number of tasks equal to number of facilities. ,There are no restrictions in allocation , Cost of machine should betaken into consideration.

True/FalseQuestion: There are five manufacturing systems. However,

many manufacturers combines two or more systems to produce afinal product.

Correct Answer: TrueYour Answer True

True/FalseQuestion: In LOB, the regular progress checks the future

effect of any current delays and indicates degree of urgency forcorrective action.

Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: 5 jobs are to be processed on machines M1 and

M2 , first on M1 and then on M2. The processing times in hours are

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 2 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

as follows. Find the sequence for 5 jobs that will minimize totalelapsed time .also find idle time & total elapsed time. JobProcessing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 8 97 6 3 8 5 10 4Correct Answer: 2-4-3-5-1 , Minimum time 28 hours ,

Idle time = 1 & 2 Hours for M1 & M2 respectively.Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours

for M1 & M2 respectively.

True/FalseQuestion: When shop floor scheduling problem larger than

3 machines arise the analytical solution procedures leading tooptimality are complex and difficult.Correct Answer: TrueYour Answer True

Match The FollowingQuestion: Correct Answer:Your Answer

End piece allowance Material insufficient to produce onepiece Material insufficient to produce one piece

Stock allowance Quantity to meet requirement of sparesExtra material requirement

Machining allowance Extra material requirementMaterial lossin handling

Spoilage allowance Process rejection Quantity to meetrequirement of spares

Select The BlankQuestion: ________ is required for machine set ups as well

as regular production.Correct Answer: Performance standardYour Answer Machine design data

Multiple Choice Single AnswerQuestion: If a product is required within 20 days and the

product can be made available in 10 days, the Critical ratio wouldbe :-Correct Answer: 2Your Answer 0.5

Multiple Choice Single AnswerQuestion: A subcontractor is :-Correct Answer: Another form acting as a supplierYour Answer Manufacturer of specialized products on whom

the buyer is dependent for 100% of requirement of main assembly

Multiple Choice Single Answer

Question: The data regarding maximum run out betweencenters pertains to :-

Correct Answer: Process planningYour Answer Raw material data

True/FalseQuestion: Lead time information is required for

determination of safety stock.Correct Answer: FalseYour Answer True

Select The BlankQuestion: Americans like to use the word 'inventory'

whereas for same context British use the term________.Correct Answer: StockYour Answer Stock

Multiple Choice Multiple AnswerQuestion: SDE analysis is employed by the purchase

department for :-Correct Answer: Contract buying for some of 'easy' items.

, Forward buying of some of 'scarce' items. , Scheduled buying forsome of 'easy' items.

Your Answer Forward buying of some of 'scarce' items. ,Scheduled buying for some of 'easy' items. , Contract buying forsome of 'easy' items.

True/FalseQuestion: Labour efficiency factor is applied after capacity

requirement of equipment is calculated.Correct Answer: FalseYour Answer True

Multiple Choice Multiple AnswerQuestion: PERT terminology uses words like :-Correct Answer: Network diagram , Events , SlackYour Answer Network diagram , Events

True/FalseQuestion: The LOB technique is most appropriate for

assembly operations involving number of distinct components.Correct Answer: TrueYour Answer True

True/FalseQuestion: Transit time for manufactured items should be

considered only when it is insignificant.Correct Answer: FalseYour Answer True

Select The Blank

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 3 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: A progress card normally contains ________squares.Correct Answer: Less than 25Your Answer More than 50

Multiple Choice Multiple AnswerQuestion: Due to the following emergent events, the queue

time has to compensate for the time for which the job has toundergo an extra time :-Correct Answer: Tool breakage , Job split up , Change in

prioritiesYour Answer Tool breakage , Job split up , Store inventory

Multiple Choice Single AnswerQuestion: One of the following is not an task of progressing

:-Correct Answer: Ensuring supply of material and issue of

documents to manufacturing shopsYour Answer Expediting to rush up remaining operations of the

delays jobs

Multiple Choice Single AnswerQuestion: Production output in night shift is :-Correct Answer: Less than I shift productionYour Answer More than I shift production

Multiple Choice Multiple AnswerQuestion: The minimum requirements for application

software for line balancing are as follows :-Correct Answer: 1 Ghz processor , 1 Gb hard Disk free

memory , Windows or equivalent operating system.Your Answer 1 Gb hard Disk free memory , Windows or

equivalent operating system.

Multiple Choice Single AnswerQuestion: The work measurement and time study belong to

the following school of management :-Correct Answer: Scientific School of managementYour Answer Functional School of management

Multiple Choice Multiple AnswerQuestion: Before planning subcontracting points to be

considered are :-Correct Answer: Whether overtime can be given , One

more shift can be startedYour Answer Whether overtime can be given , One more shift

can be started , Set up time can be reduced

Multiple Choice Multiple AnswerQuestion: The main requirements of re-order level system

are as follows :-

Correct Answer: Incoming materials and materialsreturned from shop must be deposited in appropriate bins and theirstock cards must be posted for "goods receipt report" and "materialreturn note" for the quantities received physically . , Items shouldbe issued in correct quantities. , The balance on the stock cardsshould be periodically tallied with physical stock.

Your Answer Incoming materials and materials returned fromshop must be deposited in appropriate bins and their stock cardsmust be posted for "goods receipt report" and "material return note"for the quantities received physically . , Items should be issued incorrect quantities. , The balance on the stock cards should beperiodically tallied with physical stock.

Multiple Choice Multiple AnswerQuestion: The following are salient features of the fixed

order quantity system :-Correct Answer: Reorder quantity is always the same

which is usually economic order quantity , The time intervalbetween deliveries varies. , Replenishment action is initiated whenthe stock on hand is just sufficient to meet demand during the leadtime.

Your Answer Reorder quantity is always the same which isusually economic order quantity , The time interval betweendeliveries varies. , Percent cumulative cost of item is taken intoconsideration.

Select The BlankQuestion: ABC company manufactures MS bolts. Given

fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs3 Lacs, overhead cost Rs 0.5 Lacs. If bough from outside, the costof buying is Rs 8 per piece. The firm uses 100000 MS bolts everyyear. Under these circumstances, the firm would take a decision to________.

Correct Answer: Make at homeYour Answer Buy from outside

Multiple Choice Multiple AnswerQuestion: Following difficulties are faced by SDE analysis

:-Correct Answer: More delivery period , Geographical

location of supplier , Reliability of suppliersYour Answer More delivery period , Reliability of suppliers ,

Excise duty

Select The BlankQuestion: For replenishment action for stock items which

are reserved by PPC, the stores work out ________ stock whichequals the stock on hand less stock reserved.

Correct Answer: FreeYour Answer Net

True/FalseQuestion: Route sheets for custom built job is prepared for

each new order received.

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 4 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Correct Answer: TrueYour Answer True

Match The FollowingQuestion: Correct Answer:Your Answer

Order quantity Factor influencing process planningComparealternative processes

Machine capacity chart Dimensional accuracy Generalpurpose machines with special toolings

Mass production Special purpose machines Break even analysis

Standard elemental time data Compare alternative processesFactor influencing process planning

Multiple Choice Multiple AnswerQuestion: Following are some of the common standard

cutting tools :-Correct Answer: Cutting saw , Inserts , ReamersYour Answer Form tool , Inserts , Reamers

Multiple Choice Single AnswerQuestion: The Carrying cost is stated in terms of :-Correct Answer: Per item per yearYour Answer Per order

Select The BlankQuestion: The definitive statement of policy stating when to

procure and how much to procure usually to ensure that the sum ofall costs associated with ________ are minimised is calledInventory policy.Correct Answer: InventoryYour Answer Buying

Select The BlankQuestion: Buying for C quantities should be made in

________ quantities .Correct Answer: LargeYour Answer Medium

Select The BlankQuestion: In the assignment model, the________ is formed

between jobs and machines.Correct Answer: MatrixYour Answer Matrix

Select The BlankQuestion: ________ analysis mainly helps to identify non-

existing items for which store keeps bin cards, wastes computer

memory or wastes computer stationary while preparing storesledger.

Correct Answer: MNG AnalysisYour Answer SOS Analysis

Multiple Choice Single AnswerQuestion: Why customer is called the king?Correct Answer: Customer's orders gives us workYour Answer Gives satisfaction to workers

Multiple Choice Single AnswerQuestion: Negative value of critical ratio :-Correct Answer: Is meaninglessYour Answer Indicates excess of scheduled delivery period

Multiple Choice Multiple AnswerQuestion: The main characteristics of batch production are

:-Correct Answer: Short runs , Skilled labours in specific

trade , Supervisor to posses knowledge of specific processYour Answer Short runs , Skilled labours in specific trade ,

Supervisor to posses knowledge of specific process

True/FalseQuestion: If lead time available is 11days and lead time

required is 10 days, the critical ratio would be 1.10.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: What are the factor affecting decision about

centralized planning system?Correct Answer: Product variety is large , Jobbing and

batch production methods of manufacturing , Work is less repetitiveYour Answer Product variety is large , Jobbing and batch

production methods of manufacturing , Work is less repetitive

True/FalseQuestion: In continuous or process production , only one

product is manufactured.Correct Answer: TrueYour Answer True

True/FalseQuestion: The make-or-buy decision becomes necessary

when the current source of supply is not able to supply the materialin accordance with buyer's quality requirements.

Correct Answer: TrueYour Answer True

True/False

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 5 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: Work measurement function is attached to linemanagement.Correct Answer: FalseYour Answer True

Multiple Choice Single AnswerQuestion: Placement of purchase orders in case of 'A' type

of items is usually :-Correct Answer: FrequentYour Answer Frequent

Match The FollowingQuestion: Correct Answer:Your Answer

Economic order quantity Quantity at which there is neitheroverstocking nor under stocking. Quantity at which there isneither overstocking nor under stocking.

Carrying cost Cost of 'holding' the material in store Costof transportation [carrying] of material

Procurement cost Administrative cost for procurement Costof procurement of material

Inventory cost Sum of carrying and inventory cost Sum ofcarrying and inventory cost

True/FalseQuestion: To solve "n jobs - 3 machines" sequencing

problem, the largest of time of any job on the second machine mustbe smaller than or equal to the smallest time of any job on firstmachine or third machine.Correct Answer: TrueYour Answer False

True/FalseQuestion: Systematic procedures must be set in the

operating functions prior to installation of PPC in the firm.Correct Answer: TrueYour Answer True

Select The BlankQuestion: Time waste is the earliest of all wastes and yet

the________ to correct because it does not litter the floor.Correct Answer: HazardsYour Answer Big hazard

Multiple Choice Single AnswerQuestion: If the annual usage of a material is 1200 units and

the reorder point is at 120 Units, find the lead time.Correct Answer: 4 monthsYour Answer 1.2 Months

Multiple Choice Single AnswerQuestion: Which factor influence plan for meeting seasonal

or occasional increase in demand?Correct Answer: SubcontractingYour Answer Subcontracting

Multiple Choice Single AnswerQuestion: Which of the following is the function of

Production Planning?Correct Answer: Process planning and schedulingYour Answer Progressing

Select The BlankQuestion: Because of uncertainty of activity timings, PERT

acquired a shape of ________ model.Correct Answer: ProbabilisticYour Answer Statistical

True/FalseQuestion: Scientific inventory control system requires to be

followed for machine aid, work aid and inspection aid :-Correct Answer: FalseYour Answer True

True/FalseQuestion: Job schedule is a chart showing work ahead of

each machine with respect to time.Correct Answer: FalseYour Answer True

Match The FollowingQuestion: Correct Answer:Your Answer

Tooling cost Jigs and Fixtures Jigs and Fixtures

Opportunity costsMonitory value sacrificed in rejection Costof giving opportunity to do a business

Incremental cost Vary with decision to make or buy Vary withdecision to make or buy

Labour cost Wages and other benefits Wages and otherbenefits

Multiple Choice Single AnswerQuestion: The goods are manufactured as per customer's

definite order in case of :-Correct Answer: Job productionYour Answer Batch production

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 6 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Multiple Choice Multiple AnswerQuestion: The commonly used network techniques other

than PERT and CPM are as follows :-Correct Answer: MOSS [ Multi Operation Scheduling

System ] , PCS [ Project Control System ] , GERT [ GraphicalEvaluation Review Techniques ]Your Answer MIS [ Management Information Systems ]

Multiple Choice Multiple AnswerQuestion: To minimize total throughout time we are

required to minimize :-Correct Answer: Queuing , Idle time , InventoryYour Answer Queuing , Idle time

Multiple Choice Multiple AnswerQuestion: Following conditions are required to be fulfilled

for processing n jobs through 2 machines :-Correct Answer: The jobs are ready to be processed

before the period under consideration begins . , Transient time tomove a job from one machine to the another is negligible. , Inprocess inventory is allowed.Your Answer The jobs are ready to be processed before the

period under consideration begins . , In process inventory isallowed.

Select The BlankQuestion: An inventory control technique based on selective

approach to stock items is called ________ analysis.Correct Answer: Pareto'sYour Answer Pareto's

Multiple Choice Multiple AnswerQuestion: While communicating to customer on delays in

delivery following information should be given :-Correct Answer: Information on identification of job ,

Reasons for delays , Revised date of deliveryYour Answer Reasons for delays , Revised date of delivery

Select The BlankQuestion: CPM is ________ oriented system.Correct Answer: ActivityYour Answer Activity

Multiple Choice Single AnswerQuestion: One of the following is not consumable tool :-Correct Answer: ArborsYour Answer Arbors

True/FalseQuestion: LOB is a manual planning and scheduling

technique similar in nature to MRP [Material Resource Planning].

Correct Answer: TrueYour Answer False

Select The BlankQuestion: ________ is required when expediting fails to

bring deviated plan to its actual path.Correct Answer: ReplanningYour Answer Replanning

Multiple Choice Multiple AnswerQuestion: The process of contraction or compression

involves extra cost because extra money is required to be spent onfactors such as :-

Correct Answer: Overtime engagement of workforce ,Purchase of additional machinery , Use of better materials

Your Answer Overtime engagement of workforce , Purchase ofadditional machinery , Purchase of stationary of good quality

Multiple Choice Single AnswerQuestion: In job production one single product is

manufactured while a batch of group of products is turned out at atime under a system of :-

Correct Answer: Batch productionYour Answer Process production

Multiple Choice Multiple AnswerQuestion: The 'F' group of GOLF analysis involves

following requirements :-Correct Answer: Search for foreign suppliers , Opening of

letter of credit , Arrangements for shipping and port clearanceYour Answer Search for foreign suppliers

Multiple Choice Single AnswerQuestion: The production system characterized by complex

set of activities that must be performed in a particular order within agiven period and within an estimated expenditure is known as :-

Correct Answer: Project productionYour Answer Project production

Multiple Choice Single AnswerQuestion: Proper Production Planning and Control can

reduce cost in :-Correct Answer: Overtime costYour Answer Overtime cost

Select The BlankQuestion: ________ is the specific instant of time that

marks start and end of activity.Correct Answer: EventYour Answer Event

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 7 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Select The BlankQuestion: Overlapping of operations help to ________

manufacturing time.Correct Answer: ReduceYour Answer Reduce

Multiple Choice Multiple AnswerQuestion: "Difficult" items have following attributes :-Correct Answer: Available indigenously but are not easy

to procure , Items which come from longer distance , Items whichare difficult to manufactureYour Answer Available indigenously but are not easy to

procure , Items which come from longer distance , Items havingcomplex specifications

Multiple Choice Multiple AnswerQuestion: They are type of analytical estimate :-Correct Answer: Moving average , Exponential

smothering , Curve fittingYour Answer Moving average , Curve fitting

Select The BlankQuestion: The performance standard is required by

________ to determine individual machine capacity for the purposeof machine loading and assigning machine hours and man hours .Correct Answer: SchedulerYour Answer Production engineer

Multiple Choice Multiple AnswerQuestion: The network analysis involves following works :-Correct Answer: Obtaining a work breakdown structure to

a set of individual jobs which are arranged in a logical network. ,Estimation of job duration , Scheduling to discover which jobscontrol completion of project and reallocation of resources.Your Answer Obtaining a work breakdown structure to a set of

individual jobs which are arranged in a logical network. ,Estimation of job duration , Scheduling to discover which jobscontrol completion of project and reallocation of resources.

Multiple Choice Single AnswerQuestion: The assembly work content [ Wi ] of the i'th

station having n work stations is given by :-Correct Answer: å Wi from i=1 to nYour Answer å Wi from i=1 to n

Multiple Choice Multiple AnswerQuestion: Essentials of good forecasts are :-Correct Answer: Stability , Fairly accurate , Economical

to generateYour Answer Stability , Fairly accurate , Economical to

generate

True/FalseQuestion: The 'G' group of GOLF analysis involves

moderate delivery time and availability of credit usually in therange of 30 to 60 days.

Correct Answer: TrueYour Answer True

Select The BlankQuestion: ABC company manufactures MS bolts. Given

fixed cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs3 Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing costwould be Rs ________.

Correct Answer: 6 LacsYour Answer 6 Lacs

LIST OF ATTEMPTED QUESTION:S AND ANSWERS

Multiple Choice Multiple AnswerQuestion: If actual demand far exceeds forecast, it will result

into :-Correct Answer: Better utilization of equipment , Project

margin , Higher material purchaseYour Answer Higher material purchase , Increase in labour

productivity , Better utilization of equipment , Project margin

Select The BlankQuestion: To know the accumulated ________ for a given

machine at a given time Load charts are necessary.Correct Answer: LoadYour Answer Load

Multiple Choice Single AnswerQuestion: LOB technique was developed by US navy in the year

:-Correct Answer: 1958Your Answer 1958

True/FalseQuestion: In continuous or process production , only one product

is manufactured.Correct Answer: TrueYour Answer True

Select The BlankQuestion: ________reflects impact of money tied up in

inventory.Correct Answer: Inventory turnoverYour Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion: Methods for recording actual progress of work for

shop orders are :-Correct Answer: Progress card , Display board , Network

updatingYour Answer Progress card , Display board , Network updating ,

Job card

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 8 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Select The BlankQuestion: A progress card is the most ________ method of

recording of progress of work.Correct Answer: ConvenientYour Answer Convenient

Multiple Choice Multiple AnswerQuestion: Following are some of the common standard cutting

tools :-Correct Answer: Cutting saw , Inserts , ReamersYour Answer Form tool , Cutting saw , Inserts , Reamers

Multiple Choice Multiple AnswerQuestion: Tooling cost comprises the cost of :-Correct Answer: Gigs , Fixtures , Drill bitsYour Answer Gigs , Fixtures , Drill bits , Stationary

Multiple Choice Single AnswerQuestion: The light engineering company has one special

purpose facing & centering machine And one copying lathe. Theforeman has five work orders for processing . The operationSequence is fixed [ each job is first faced and centered and thencopy turned ] . The standard Hours required for each machine toprocess each work order are shown in the following Table :- WorkOrder Processing Time [Hours ] Facing & centering machineCopying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 findsequence to minimize requirements of machine hours.Correct Answer: IV-I-II-V-IIIYour Answer I-II-III-IV-V

Select The BlankQuestion: ________ represents the time that elapses between the

receipt of requirement of job until the job is adopted in theproduction control department.Correct Answer: Order preparation timeYour Answer Queue time

True/FalseQuestion: PERT basically does not demarcate between critical

and non-critical activities.Correct Answer: TrueYour Answer True

Multiple Choice Single AnswerQuestion: The assignment method is also called as :-Correct Answer: Hungarian MethodYour Answer Analytical Method

Multiple Choice Multiple AnswerQuestion: Outside operations cost involves expenses such as :-Correct Answer: Rough blanking , Heat treatment , PlatingYour Answer Heat treatment , Plating , Inventory control , Rough

blanking

Select The BlankQuestion: The correct fitting of orders with capacity

considerably lessens ________ burden of control.Correct Answer: Foreman'sYour Answer Foreman's

Multiple Choice Multiple AnswerQuestion: The 'F' group of GOLF analysis involves following

requirements :-Correct Answer: Search for foreign suppliers , Opening of letter

of credit , Arrangements for shipping and port clearanceYour Answer Search for foreign suppliers , Opening of letter of

credit , Arrangements for shipping and port clearance , Account inforeign bank

Match The FollowingQuestion: Correct Answer: Your Answer

Order quantity Factor influencing process planning Break evenanalysis

Machine capacity chart Dimensional accuracy Dimensionalaccuracy

Mass production Special purpose machines Special purposemachines

Standard elemental time data Compare alternative processes Factorinfluencing process planning

Multiple Choice Multiple AnswerQuestion: The tooling data is prepared in respect of following

measuring instruments :-Correct Answer: Vernier caliper , Micrometer screw gauge ,

Strain gaugeYour Answer Vernier caliper , Micrometer screw gauge , Strain

gauge , Drill bits

Multiple Choice Multiple AnswerQuestion: In replenishment system, the fixed order quantity

system is also called by following names :-Correct Answer: Fixed order system , Min-max system , Re-

order point systemYour Answer Fixed order system , Min-max system , Re-order

point system , Lead time system

Multiple Choice Multiple AnswerQuestion: How you will Judge the failure of production planning

and control department?Correct Answer: Frequent broken delivery promises ,

Underutilization of men, machines , Excessive overtimeYour Answer Frequent broken delivery promises ,

Underutilization of men, machines , Excessive overtime , Bettercoordination with other section

Multiple Choice Single AnswerQuestion: In Cost Vs Quantity plot, the total inventory Cost

curve is :-Correct Answer: ParabolicYour Answer Inverse

True/False

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 9 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: Given stock in hand = 1320 units, safety stock=840units and average daily consumption = 60 units, the lead timeavailable would be 10 hours.Correct Answer: FalseYour Answer True

Multiple Choice Single AnswerQuestion: If the annual usage of a material is 1200 units and the

reorder point is at 120 Units, find the lead time.Correct Answer: 4 monthsYour Answer 4 months

Multiple Choice Single AnswerQuestion: The assignment algorithm was developed by a

Hungarian mathematician named :-Correct Answer: D. KonigYour Answer Charles simony

Multiple Choice Single AnswerQuestion: So far as possible, number of activities should be :-Correct Answer: LimitedYour Answer Limited

True/FalseQuestion: Production Planning and Control makes the supervisor

ineffective.Correct Answer: TrueYour Answer False

Multiple Choice Single AnswerQuestion: Unit of loading and scheduling depends on following

factor :-Correct Answer: Operating cycleYour Answer Unit of capacity

True/FalseQuestion: The 'G' group of GOLF analysis involves moderate

delivery time and availability of credit usually in the range of 30 to60 days.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: Load charts are used for following :-Correct Answer: To know the accumulated load on a given

machine at a given time , Identify periods available for allocation infuture to orders , Matching orders and loadsYour Answer Improving supply of material , To know the

accumulated load on a given machine at a given time , Identifyperiods available for allocation in future to orders , Matching ordersand loads

Select The BlankQuestion: ABC company manufactures MS bolts. Given fixed

cost Rs 0.5 Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3Lacs, overhead cost Rs 0.5 Lacs, the total manufacturing cost wouldbe Rs ________.Correct Answer: 6 LacsYour Answer 6 Lacs

Select The BlankQuestion: An inventory control system in which stock of item is

physically or conceptually divided into ________ bins is calledTwobin system.

Correct Answer: TwoYour Answer Pair

Multiple Choice Multiple AnswerQuestion: They are type of analytical estimate :-Correct Answer: Moving average , Exponential smothering ,

Curve fittingYour Answer Moving average , Exponential smothering , Curve

fitting , Opinion surveys

Multiple Choice Single AnswerQuestion: For goods manufactured to stock, following

department is expected to periodically undertake replenishmentaction as stocks are depleted :-

Correct Answer: Production Planning ControlYour Answer Production

True/FalseQuestion: Random fluctuation is addition of cyclical fluctuation

and seasonal fluctuation.Correct Answer: FalseYour Answer True

True/FalseQuestion: Scientific inventory control system requires to be

followed for machine aid, work aid and inspection aid :-Correct Answer: FalseYour Answer True

Multiple Choice Single AnswerQuestion: Value Analysis conducted in 'C' type of material is

usually :-Correct Answer: MinimumYour Answer Minimum

True/FalseQuestion: Purchase department must keep PPC informed

regarding lead time of different items specially where lead times areextended.

Correct Answer: TrueYour Answer True

True/FalseQuestion: In assignment matrix, it is a must to determine

Jacobean of the determinant.Correct Answer: FalseYour Answer True

Select The BlankQuestion: For replenishment action for stock items which are

reserved by PPC, the stores work out ________ stock which equalsthe stock on hand less stock reserved.

Correct Answer: FreeYour Answer Net

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 10 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Multiple Choice Single AnswerQuestion: What are the customer's expectation from the

supplier?Correct Answer: Consistent good quality of productsYour Answer Consistent good quality of products

Match The FollowingQuestion: Correct Answer: Your Answer

End piece allowance Material insufficient to produce one pieceMaterial insufficient to produce one piece

Stock allowance Quantity to meet requirement of spares Quantity tomeet requirement of spares

Machining allowance Extra material requirement Extra materialrequirement

Spoilage allowance Process rejection Process rejection

Multiple Choice Single AnswerQuestion: Why customer is called the king?Correct Answer: Customer's orders gives us workYour Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion: PPC is expected to have good inter-departmental

relationships to achieve the production targets. Which is the mostimportant factor that shall affect production targets?Correct Answer: Timely availability of material, manpowerYour Answer Timely availability of material, manpower

Select The BlankQuestion: Generally for ________ flow system, Heuristic

method is preferred.Correct Answer: IntermittentYour Answer Continuous

Select The BlankQuestion: In control board________ compartment contains copy

of work orders/shop orders of the item to be processed next on themachine.Correct Answer: MiddleYour Answer Bottom

True/FalseQuestion: Work measurement function is attached to line

management.Correct Answer: FalseYour Answer True

Multiple Choice Multiple AnswerQuestion: The technical feasibility of sales enquiry is carried out

on the following grounds :-Correct Answer: Tools and plants are available , Technical

know how is available , Competent persons are present

Your Answer Tools and plants are available , Technical knowhow is available , Competent persons are present , Cost data of rawmaterial is available.

LIST OF ATTEMPTED QUESTION:S AND ANSWERS

Multiple Choice Multiple AnswerQuestion: Following are the factors which influence tool life

:-Correct Answer: Operators efficiency , Type of tool ,

Material it is required to operate uponYour Answer Operators efficiency , Type of tool , Material it is

required to operate upon

Multiple Choice Single AnswerQuestion: The document which incorporates details of

process planning for a job is called :-Correct Answer: Route SheetYour Answer Route Sheet

Multiple Choice Multiple AnswerQuestion: CPM terminology uses words likeCorrect Answer: Arrow diagram , Nodes , FloatYour Answer Arrow diagram , Nodes

Select The BlankQuestion: Forecasting is function of ________.Correct Answer: Marketing departmentYour Answer Planning in charge

Select The BlankQuestion: Johnsons method of scheduling can be used when

operation sequence involve ________ machines.Correct Answer: TwoYour Answer Two

Select The BlankQuestion: Good quality and ________are the two main

requirements to secure maximum business from a customer.Correct Answer: Competitive ratesYour Answer Competitive rates

Select The BlankQuestion: Sum of queue, transit, order preparation and

manufacturing times is known as ________Correct Answer: Total Lead TimeYour Answer Total Lead Time

True/False

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 11 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: To conduct FSN analysis we require, last date ofreceipt or last date of issue whichever is later and period.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: Overtime can be avoided in many ways and they

are :-Correct Answer: Unrealistic delivery date , Acceptance of

too many rush order , Excessive machine breakdownYour Answer Unrealistic delivery date , Acceptance of too

many rush order , Excessive machine breakdown

Multiple Choice Multiple AnswerQuestion: Material control function embraces a following

techniques :-Correct Answer: Make -or -buy decision , Pareto's

analysis , Replenishment systemYour Answer Make -or -buy decision , Pareto's analysis ,

Replenishment system

True/FalseQuestion: Work measurement is not useful for choosing

between two alternate methods of production.Correct Answer: FalseYour Answer False

Multiple Choice Multiple AnswerQuestion: Process Sheet contains following information :-Correct Answer: Material Specification , Sequence of

operation , Skill of LabourYour Answer Material Specification , Sequence of operation ,

Skill of Labour

True/FalseQuestion: More than one subcontractor should be developed

for each subcontracted operation/Job.Correct Answer: TrueYour Answer True

Select The BlankQuestion: Classification of items on basis of their capital

lock up is called ________ analysis.Correct Answer: XYZYour Answer XYZ

Select The BlankQuestion: Purchase section must keep ________posted on

the progress of purchase orders and expected delays.Correct Answer: P.P.C.Your Answer P.P.C.

Multiple Choice Single AnswerQuestion: Effective Production Planning and Control,

reduce investment in inventories effectively :-Correct Answer: By proper coordination between shop

floor, stores and buying departmentYour Answer By proper coordination between shop floor, stores

and buying department

True/FalseQuestion: Fluctuation due to changes in season are called

cyclical fluctuation.Correct Answer: FalseYour Answer False

True/FalseQuestion: Flexibility and product variety are not inter-

related with each other.Correct Answer: FalseYour Answer True

True/FalseQuestion: Overlapping of operations help to reduce

manufacturing time.Correct Answer: TrueYour Answer True

Select The BlankQuestion: The LOB technique is made more accurate and

fast by using ________.Correct Answer: ComputersYour Answer Reduction techniques

True/FalseQuestion: Overtime is undesirable since it increases

manufacturing cost of the product.Correct Answer: TrueYour Answer False

Multiple Choice Multiple AnswerQuestion: The essential features of batch production are :-Correct Answer: General purpose machines and process

type layout , Manual materials handling , Flexibility of productionschedule

Your Answer General purpose machines and process typelayout , Manual materials handling , Flexibility of productionschedule

Multiple Choice Single AnswerQuestion: The sourcing of vendors in case of 'B' type of

items is :-Correct Answer: Medium

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 12 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Your Answer Few

Multiple Choice Single AnswerQuestion: Dispatcher withdraws required quantity of

material from stores using following document :-Correct Answer: Stores issue orderYour Answer Bill of material

Multiple Choice Multiple AnswerQuestion: In a mass production assembly shop following

work measurement techniques are used :-Correct Answer: Time study , Work sampling ,

Production studyYour Answer Time study , Work sampling , Production study ,

Analytical estimating

Multiple Choice Multiple AnswerQuestion: SDE analysis is based on problems of

procurement namely :-Correct Answer: Non-availability , Scarcity , Longer lead

timeYour Answer Non-availability , Scarcity , Longer lead time

True/FalseQuestion: Line balancing is a simulation technique.Correct Answer: FalseYour Answer False

Multiple Choice Multiple AnswerQuestion: The line of balance is a device for planning and

monitoring progress of :-Correct Answer: Purchase order execution , Project

execution , Targeted programsYour Answer Purchase order execution , Project execution ,

Targeted programs

Select The BlankQuestion: Sales persons decides ________.Correct Answer: Synthetic forecastYour Answer Current sales

True/FalseQuestion: Material control Card is a document for record of

issues of material and receipt of unused material by productionshop.Correct Answer: FalseYour Answer False

Multiple Choice Single AnswerQuestion: Work measurement is limited to measuring :-Correct Answer: Productive & non productive time

Your Answer Only product related activities

Match The FollowingQuestion: Correct Answer:Your Answer

Move order Transport material from and to required workcenters Transport material from and to required work centers

Materials Order Allocation of material required in connection withshop order Allocation of material required in connection withshop order

Work Order Bird's eye view of production programmeBird's eye view of production programme

Production Order Reserve material required in connection withsales order Reserve material required in connection withsales order

Multiple Choice Multiple AnswerQuestion: The software for line balancing should have

following features :-Correct Answer: Easy to operate , Easy to install , Easy to

upgradeYour Answer Easy to operate , Easy to install , Unmanaged

code should be available

Multiple Choice Single AnswerQuestion: Man hours is commonly used unit of

measurement for scheduling purposes in following industry :-Correct Answer: EngineeringYour Answer Engineering

Multiple Choice Multiple AnswerQuestion: Customer plays very important role due to the

following reasons :-Correct Answer: Gives us work , Dividends to share

holders , Gets business from new customersYour Answer Gives us work , Dividends to share holders , Gets

business from new customers

Multiple Choice Single AnswerQuestion: The 4X4 assignment problem involve following

job-machine operations :-Correct Answer: 24Your Answer 24

Multiple Choice Single AnswerQuestion: The best of scientific tools available for

scheduling is :-Correct Answer: CPA [ critical path analysis ]Your Answer Gantt Chart

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 13 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Multiple Choice Multiple AnswerQuestion: Work measurement is responsibility of :-Correct Answer: PPC , Industrial Engineering ,

Production departmentYour Answer PPC , Industrial Engineering

Match The FollowingQuestion: Correct Answer:Your Answer

Long production run Mass and Flow productionMass andFlow production

Complex activities to be performed in a particular order within agive time & estimate. Project production Projectproduction

One or few units manufactured as per customers requirementJobbing Production Jobbing Production

Short production run Batch Production Batch Production

Multiple Choice Single AnswerQuestion: Value Analysis conducted in 'C' type of material

is usually :-Correct Answer: MinimumYour Answer Minimum

Multiple Choice Multiple AnswerQuestion: Some of significant features of HML analysis are

:-Correct Answer: To evolve buying policies to control

purchases , To delegate authorities to different buyers to make pettycash purchases , Not to take consumption into accountYour Answer To evolve buying policies to control purchases ,

To delegate authorities to different buyers to make petty cashpurchases

Multiple Choice Single AnswerQuestion: What is the reasons for poor labour efficiency

attributed by inefficient P.P.C.?Correct Answer: Failure to provide proper tools and

control on work in progress on shop floorYour Answer Failure to provide proper tools and control on

work in progress on shop floor

Multiple Choice Single AnswerQuestion: The administrative expenses towards the

procurement of materials is called :-Correct Answer: Procurement costYour Answer Administrative cost

Multiple Choice Multiple AnswerQuestion: Smoothing performs following activities:-Correct Answer: Reallocation of resources , Improving

utilization of resources , Conducting Heuristic approachYour Answer Reallocation of resources , Improving utilization

of resources , Conducting Heuristic approach

True/FalseQuestion: As per a study on materials management

practices, a typical firm spends almost half of its rupee sales ongoods purchased from vendors.

Correct Answer: TrueYour Answer True

Select The BlankQuestion: Value analysis of ________ class items is usually

inadvisable.Correct Answer: CYour Answer C

True/FalseQuestion: PPC system in the organisation is to be tailor

made.Correct Answer: TrueYour Answer True

LIST OF ATTEMPTED QUESTION:S AND ANSWERS

True/FalseQuestion: Performance benchmarking does not involves

comparison of financial ratios at the aggregate level.Correct Answer: FalseYour Answer False

Multiple Choice Single AnswerQuestion: Setup time includes :-Correct Answer: Internal setup time & External setup timeYour Answer Internal setup time & External setup time

Multiple Choice Single AnswerQuestion: Participants of the groups for quality circles

should be decided by :-Correct Answer: Employees coming together by their own

enthusiasmYour Answer Employees coming together by their own

enthusiasm

Multiple Choice Single Answer

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 14 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Question: Check sheet are also used as :-Correct Answer: Data gathering & interpretation toolYour Answer Data gathering & interpretation tool

Multiple Choice Single AnswerQuestion: SMED means :-Correct Answer: Single minute exchange of diesYour Answer Single minute exchange of dies

Match The FollowingQuestion: Correct Answer:Your Answer

Productivity performance measurement Turnover employeeCost of quality

Financial performance measurement Sales of the monthsSales of the months

Customer satisfaction measurementCustomer complaints per periodCustomer complaints per period

Staff attitude measurementEmployee satisfaction indexEmployee satisfaction index

Select The BlankQuestion: ________ is an effect due to the muda of defect.Correct Answer: Wear & tear of parts while

disassemblingYour Answer Poor production planning & control

Select The BlankQuestion: If some defective parts are discovered by the

subsequent process they should be returned to the ________ toprevent reoccurrence.Correct Answer: Preceding processYour Answer Return to stores

Multiple Choice Multiple AnswerQuestion: The results oriented efforts of the quality circle

should also include :-Correct Answer: Efforts to avoid the problem

permanently , Ultimate aim of the customers satisfaction , Attackingthe real root causes & all possibilitiesYour Answer Efforts to avoid the problem permanently ,

Publication or advertisement of your contribution , Attacking thereal root causes & all possibilities

Match The FollowingQuestion: Correct Answer:Your Answer

Parato diagram always indicates Magnitude of defectsPhilosophy of 20% of the activity causes 80% of the effect

Parato analysis underlines & operates on Philosophy of "vitalfew:trivial many" Philosophy of "vital few:trivial many"

Parato analysis is technique of identifying vital causes byArranging data according to the descending order of their

frequency of occurrence Arranging data according to thedescending order of their frequency of occurrence

Parato diagram is a Bar graph with height or value drawn byArranging data in descending order Magnitude of defects

Multiple Choice Multiple AnswerQuestion: Few steps in construction in Radar chart are :-Correct Answer: Brainstorming to enlist characteristics

which require to be evaluated & draw the circle & divide it into'slices' equal to number of characteristics , The first slice begins at12 noon. Then draw vertical line & calibrate it equal to the numberof levels required , Draw concentric circles from each gradiationusing 'o' point as centre

Your Answer Brainstorming to enlist characteristics whichrequire to be evaluated & draw the circle & divide it into 'slices'equal to number of characteristics , The first slice begins at 12noon. Then draw vertical line & calibrate it equal to the number oflevels required , Draw concentric circles from each gradiation using'o' point as centre

Select The BlankQuestion: 5 S audit result is discussed in ________ meeting.Correct Answer: MonthlyYour Answer Monthly

True/FalseQuestion: Fishbone analysis is used both in analysis &

planning.Correct Answer: TrueYour Answer False

Multiple Choice Single AnswerQuestion: One Green Belt may head a team of :-Correct Answer: 20 employeesYour Answer 20 employees

Multiple Choice Multiple AnswerQuestion: Role of champions are :-Correct Answer: Approve six sigma projects , Remove

road block in the path of six sigma implementation , Monitorprogress of six sigma projects

Your Answer Monitor progress of six sigma projects , Approvesix sigma projects , Remove road block in the path of six sigmaimplementation

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 15 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

Multiple Choice Multiple AnswerQuestion: To draw control charts, sample must be

representative of homogeneous segment of production for which :-Correct Answer: The items of the sample should be from

the same machine setting , The items should be of the same batch ,Items should be made from the same raw material batchYour Answer The items of the sample should be from the same

machine setting , The items should be of the same batch , Itemsshould be made from the same raw material batch

Multiple Choice Single AnswerQuestion: Failure mode and effect analysis (FMEA)

establishCorrect Answer: Process failure and minimize frequencyYour Answer Process failure and minimize frequency

Multiple Choice Multiple AnswerQuestion: What are the steps in deciding the benchmarking

partner?Correct Answer: Decide level of benchmarking , List

down a few prospective candidates of partnership , Collectinformation of short listed partnersYour Answer Decide level of benchmarking , List down a few

prospective candidates of partnership , Collect information of shortlisted partners

Multiple Choice Single AnswerQuestion: One Master Black Belt may head a team of :-Correct Answer: 15-20 Black BeltsYour Answer 15-20 Black Belts

Multiple Choice Single AnswerQuestion: Competitive benchmarking involves identifying

key competitive product, services or processes & comparing withthose of :-Correct Answer: Main competitorYour Answer Main competitor

Multiple Choice Single AnswerQuestion: Implication of Quality problem is:-Correct Answer: Gap in performanceYour Answer Gap in performance

Select The BlankQuestion: Number of defects in an individual component,

like gear, shaft, wheel etc can be monitored through ________ typeof control chart.Correct Answer: c-chartYour Answer c-chart

True/False

Question: Non-availability of files /document in time is aproblem to be addressed by office TPM.

Correct Answer: TrueYour Answer True

Multiple Choice Single AnswerQuestion: Check sheet is easy to use because it is :-Correct Answer: Simplest toolYour Answer Simplest tool

Multiple Choice Single AnswerQuestion: Benchmarking helps to identify the gap between

the current performance of the organization and the :-Correct Answer: Performance of the best organizationYour Answer Performance of the best organization

True/FalseQuestion: Flow chart is pictorial representation of the steps

in production control.Correct Answer: FalseYour Answer True

Multiple Choice Multiple AnswerQuestion: Breakdown problem may be stratified by :-Correct Answer: Sections , Machines , Type of

breakdown (e.g mech. Or electrical)Your Answer Sections , Machines , Type of breakdown (e.g

mech. Or electrical)

Select The BlankQuestion: A control chart to exhibit counted data on number

of defect is called ________.Correct Answer: c-chartYour Answer c-chart

Select The BlankQuestion: Procedure for implementation of TPM consists of

________ numbers of steps.Correct Answer: 12Your Answer 8

Select The BlankQuestion: Capability index Cp = ________Correct Answer: Specification width/process widthYour Answer Specification width/process width

Multiple Choice Single AnswerQuestion: Pareto's analysis underlines & operates

philosophy of :-Correct Answer: Vital few = trivial manyYour Answer Vital few = trivial many

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 16 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

True/FalseQuestion: Kanban signals are required when assembly work,

subassembly work and manufacturing at parts is carried out atdifferent locations.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: To reduce clamping & declamping time,

following actions are desirable :-Correct Answer: Standardize clamping bolts / screws ,

Cut off unnecessary threads , Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off

unnecessary threads , Use quick clamping device

Select The BlankQuestion: Benchmarking allows exchange of ________

between the benchmarking partners.Correct Answer: InformationYour Answer Information

Multiple Choice Multiple AnswerQuestion: TQM can never flourish if the staff are:-Correct Answer: Worried about losing jobs , Afraid of

being reprimanded if there are mistakes , Scared of their bossesYour Answer Worried about losing jobs , Afraid of being

reprimanded if there are mistakes , Scared of their bosses

True/FalseQuestion: In bar graph each bar is of same height.Correct Answer: FalseYour Answer False

Multiple Choice Multiple AnswerQuestion: During SMED implementation, primary study

consists of :-Correct Answer: Equipment analysis , Setup change

analysis , Preparation items (storage place , method) analysisYour Answer Equipment analysis , Setup change analysis ,

Preparation items (storage place , method) analysis

True/FalseQuestion: Daily work management can also be extended to

non manufacturing areas like procurement, QA, HRD etc.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: Types of Poka-Yoke are :-

Correct Answer: Prevention type Poka-Yoke , Detectiontype Poka-Yoke

Your Answer Prevention type Poka-Yoke , Detection typePoka-Yoke

Multiple Choice Single AnswerQuestion: Quality problem solving tool is used to :-Correct Answer: Improve qualityYour Answer Save time

True/FalseQuestion: Along with problem solving tools experience and

judgment is also used.Correct Answer: TrueYour Answer False

Select The BlankQuestion: JIT advocates the philosophy at elimination of

waste from system which occurs due to ________.Correct Answer: Over ProductionYour Answer Over Production

True/FalseQuestion: Without measuring initial performance, target

can't be set.Correct Answer: TrueYour Answer False

Multiple Choice Multiple AnswerQuestion: An erratic patterns falling above & below the

control limits indicates :-Correct Answer: Defect in materials , Frequent adjustment

of machines , Poorly trained operatorsYour Answer Defect in materials , Frequent adjustment of

machines , Poorly trained operators

True/FalseQuestion: Sample size for the construction of p-chart are

larger than X bar-R chart.Correct Answer: TrueYour Answer True

Multiple Choice Multiple AnswerQuestion: Histogram is an important diagnostic tool.

Analysis of the histogram gives :-Correct Answer: It shows cause which affects the process

, An idea of what is happening to the process , Whether the processis capable of meeting process or not i.e. around correct average &within specific limits

Your Answer An idea of what is happening to the process ,Whether the process is capable of meeting process or not i.e. around

P P C 3rd SEMESTER OPERATIONS (PGDBA)

PAGE NO: 17 OF 17<Join symbiosispgdba2005 in yahoo groups for More>

correct average & within specific limits , A bird's eye view of thevariation

Multiple Choice Single AnswerQuestion: Productivity improves by :-Correct Answer: Voluntary participants of everyoneYour Answer Voluntary participants of everyone

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/FalseQuestion XYZ when combined with FSN analysis helps to classify non-

moving items into XN , YN and ZN.Correct Answer True

Your Answer True

Multiple Choice Single AnswerQuestion Forecast is based on :-

Correct Answer Past data

Your Answer Competitor's market share

Select The BlankQuestion Network ________ is defined as any adjustment to the arrow

diagram which becomes necessary owing to departure from theproject schedule laid down earlier.

Correct Answer Updating

Your Answer Design

Multiple Choice Single AnswerQuestion For goods manufactured to stock, following department is

expected to periodically undertake replenishment action asstocks are depleted :-

Correct Answer Production Planning Control

Your Answer Production Planning Control

True/FalseQuestion CPM marks critical activities.

Correct Answer True

Your Answer True

Select The BlankQuestion A shop order may combine more than one ________ requiring

identical items.Correct Answer Work order

Your Answer Sales order

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?

Correct Answer Consistent good quality of products

Your Answer Consistent good quality of products

Select The BlankQuestion ________ inventories help to balance company's supply with

market demand.Correct Answer Finished goods

Your Answer WIP

Select The BlankQuestion Short term forecasts are for ________.

Correct Answer Material Planning

Your Answer Cash flow management

Multiple Choice Single AnswerQuestion For process planning following is one of the basic document

used :-Correct Answer Operation Layout

Your Answer Process Layout

Multiple Choice Single AnswerQuestion Scheduled start of an operation is authorized by issuing a

document called :-Correct Answer Job card

Your Answer Route card

Multiple Choice Multiple AnswerQuestion SOS Analysis involves following type of items :-

Correct Answer Seasonal items available only for a limited period. , Seasonalitems available throughout the year. , Non-seasonal items whosequantity is decided on different considerations.

Your Answer Seasonal items available throughout the year. , Non-seasonalitems whose quantity is decided on different considerations. ,Machine spare parts

Multiple Choice Multiple AnswerQuestion The basic procedure of assignment technique is designed to

solve problems wherein :-

Correct Answer Number of tasks equal to number of facilities. , The objectivefunction is minimization. , There are no restrictions in allocation

Your Answer Number of tasks equal to number of facilities. , There are norestrictions in allocation , Cost of machine should be taken intoconsideration.

True/FalseQuestion There are five manufacturing systems. However, many

manufacturers combines two or more systems to produce a finalproduct.

Correct Answer True

Your Answer True

True/FalseQuestion In LOB, the regular progress checks the future effect of any

current delays and indicates degree of urgency for correctiveaction.

Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion 5 jobs are to be processed on machines M1 and M2 , first on M1

and then on M2. The processing times in hours are asfollows.Find the sequence for 5 jobs that will minimize totalelapsed time .also find idle time & total elapsed time. JobProcessing time [ hours ] Machine M1 Machine M2 1 5 2 2 1 6 89 7 6 3 8 5 10 4

Correct Answer 2-4-3-5-1 , Minimum time 28 hours , Idle time = 1 & 2 Hours forM1 & M2 respectively.

Your Answer Minimum time 28 hours , Idle time = 1 & 2 Hours for M1 & M2respectively.

True/FalseQuestion When shop floor scheduling problem larger than 3 machines

arise the analytical solution procedures leading to optimality arecomplex and difficult.

Correct Answer True

Your Answer True

Match The FollowingQuestion Correct Answer Your Answer

End piece allowance Material insufficient toproduce one piece

Material insufficient toproduce one piece

Stock allowance Quantity to meetrequirement of spares

Extra material requirement

Machining allowance Extra material requirement Material loss in handling

Spoilage allowance Process rejection Quantity to meetrequirement of spares

Select The BlankQuestion ________ is required for machine set ups as well as regular

production.Correct Answer Performance standard

Your Answer Machine design data

Multiple Choice Single AnswerQuestion If a product is required within 20 days and the product can be

made available in 10 days, the Critical ratio would be :-Correct Answer 2

Your Answer 0.5

Multiple Choice Single AnswerQuestion A subcontractor is :-

Correct Answer Another form acting as a supplier

Your Answer Manufacturer of specialized products on whom the buyer isdependent for 100% of requirement of main assembly

Multiple Choice Single AnswerQuestion The data regarding maximum run out between centers pertains

to :-Correct Answer Process planning

Your Answer Raw material data

True/FalseQuestion Lead time information is required for determination of safety

stock.Correct Answer False

Your Answer True

Select The BlankQuestion Americans like to use the word 'inventory' whereas for same

context British use the term________.Correct Answer Stock

Your Answer Stock

Multiple Choice Multiple AnswerQuestion SDE analysis is employed by the purchase department for :-

Correct Answer Contract buying for some of 'easy' items. , Forward buying ofsome of 'scarce' items. , Scheduled buying for some of 'easy'items.

Your Answer Forward buying of some of 'scarce' items. , Scheduled buying forsome of 'easy' items. , Contract buying for some of 'easy' items.

True/FalseQuestion Labour efficiency factor is applied after capacity requirement of

equipment is calculated.Correct Answer False

Your Answer True

Multiple Choice Multiple AnswerQuestion PERT terminology uses words like :-

Correct Answer Network diagram , Events , Slack

Your Answer Network diagram , Events

True/FalseQuestion The LOB technique is most appropriate for assembly operations

involving number of distinct components.Correct Answer True

Your Answer True

True/FalseQuestion Transit time for manufactured items should be considered only

when it is insignificant.Correct Answer False

Your Answer True

Select The BlankQuestion A progress card normally contains ________ squares.

Correct Answer Less than 25

Your Answer More than 50

Multiple Choice Multiple AnswerQuestion Due to the following emergent events, the queue time has to

compensate for the time for which the job has to undergo an

extra time :-

Correct Answer Tool breakage , Job split up , Change in priorities

Your Answer Tool breakage , Job split up , Store inventory

Multiple Choice Single AnswerQuestion One of the following is not an task of progressing :-

Correct Answer Ensuring supply of material and issue of documents tomanufacturing shops

Your Answer Expediting to rush up remaining operations of the delays jobs

Multiple Choice Single AnswerQuestion Production output in night shift is :-

Correct Answer Less than I shift production

Your Answer More than I shift production

Multiple Choice Multiple AnswerQuestion The minimum requirements for application software for line

balancing are as follows :-Correct Answer 1 Ghz processor , 1 Gb hard Disk free memory , Windows or

equivalent operating system.Your Answer 1 Gb hard Disk free memory , Windows or equivalent operating

system.

Multiple Choice Single AnswerQuestion The work measurement and time study belong to the following

school of management :-Correct Answer Scientific School of management

Your Answer Functional School of management

Multiple Choice Multiple AnswerQuestion Before planning subcontracting points to be considered are :-

Correct Answer Whether overtime can be given , One more shift can be started

Your Answer Whether overtime can be given , One more shift can be started ,Set up time can be reduced

Multiple Choice Multiple AnswerQuestion The main requirements of re-order level system are as follows :-

Correct Answer Incoming materials and materials returned from shop must bedeposited in appropriate bins and their stock cards must beposted for "goods receipt report" and "material return note" for

the quantities received physically . , Items should be issued incorrect quantities. , The balance on the stock cards should beperiodically tallied with physical stock.

Your Answer Incoming materials and materials returned from shop must bedeposited in appropriate bins and their stock cards must beposted for "goods receipt report" and "material return note" forthe quantities received physically . , Items should be issued incorrect quantities. , The balance on the stock cards should beperiodically tallied with physical stock.

Multiple Choice Multiple AnswerQuestion The following are salient features of the fixed order quantity

system :-Correct Answer Reorder quantity is always the same which is usually economic

order quantity , The time interval between deliveries varies. ,Replenishment action is initiated when the stock on hand is justsufficient to meet demand during the lead time.

Your Answer Reorder quantity is always the same which is usually economicorder quantity , The time interval between deliveries varies. ,Percent cumulative cost of item is taken into consideration.

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost Rs 0.5

Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs,overhead cost Rs 0.5 Lacs. If bough from outside, the cost ofbuying is Rs 8 per piece. The firm uses 100000 MS bolts everyyear. Under these circumstances, the firm would take a decisionto ________.

Correct Answer Make at home

Your Answer Buy from outside

Multiple Choice Multiple AnswerQuestion Following difficulties are faced by SDE analysis :-

Correct Answer More delivery period , Geographical location of supplier ,Reliability of suppliers

Your Answer More delivery period , Reliability of suppliers , Excise duty

Select The BlankQuestion For replenishment action for stock items which are reserved by

PPC, the stores work out ________ stock which equals the stockon hand less stock reserved.

Correct Answer Free

Your Answer Net

True/FalseQuestion Route sheets for custom built job is prepared for each new order

received.

Correct Answer True

Your Answer True

Match The FollowingQuestion Correct Answer Your Answer

Order quantity Factor influencing processplanning

Compare alternativeprocesses

Machine capacity chart Dimensional accuracy General purpose machineswith special toolings

Mass production Special purpose machines Break even analysis

Standard elemental timedata

Compare alternativeprocesses

Factor influencing processplanning

Multiple Choice Multiple AnswerQuestion Following are some of the common standard cutting tools :-

Correct Answer Cutting saw , Inserts , Reamers

Your Answer Form tool , Inserts , Reamers

Multiple Choice Single AnswerQuestion The Carrying cost is stated in terms of :-

Correct Answer Per item per year

Your Answer Per order

Select The BlankQuestion The definitive statement of policy stating when to procure and

how much to procure usually to ensure that the sum of all costsassociated with ________ are minimised is called Inventorypolicy.

Correct Answer Inventory

Your Answer Buying

Select The BlankQuestion Buying for C quantities should be made in ________ quantities .

Correct Answer Large

Your Answer Medium

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The BlankQuestion In the assignment model, the________ is formed between jobs

and machines.Correct Answer Matrix

Your Answer Matrix

Select The BlankQuestion ________ analysis mainly helps to identify non-existing items for

which store keeps bin cards, wastes computer memory orwastes computer stationary while preparing stores ledger.

Correct Answer MNG Analysis

Your Answer SOS Analysis

Multiple Choice Single AnswerQuestion Why customer is called the king?

Correct Answer Customer's orders gives us work

Your Answer Gives satisfaction to workers

Multiple Choice Single AnswerQuestion Negative value of critical ratio :-

Correct Answer Is meaningless

Your Answer Indicates excess of scheduled delivery period

Multiple Choice Multiple AnswerQuestion The main characteristics of batch production are :-

Correct Answer Short runs , Skilled labours in specific trade , Supervisor toposses knowledge of specific process

Your Answer Short runs , Skilled labours in specific trade , Supervisor toposses knowledge of specific process

True/FalseQuestion If lead time available is 11days and lead time required is 10

days, the critical ratio would be 1.10.Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion What are the factor affecting decision about centralized planning

system?Correct Answer Product variety is large , Jobbing and batch production methods

of manufacturing , Work is less repetitiveYour Answer Product variety is large , Jobbing and batch production methods

of manufacturing , Work is less repetitive

True/FalseQuestion In continuous or process production , only one product is

manufactured.Correct Answer True

Your Answer True

True/FalseQuestion The make-or-buy decision becomes necessary when the current

source of supply is not able to supply the material in accordancewith buyer's quality requirements.

Correct Answer True

Your Answer True

True/FalseQuestion Work measurement function is attached to line management.

Correct Answer False

Your Answer True

Multiple Choice Single AnswerQuestion Placement of purchase orders in case of 'A' type of items is

usually :-Correct Answer Frequent

Your Answer Frequent

Match The FollowingQuestion Correct Answer Your Answer

Economic order quantity Quantity at which there isneither overstocking norunder stocking.

Quantity at which there isneither overstocking norunder stocking.

Carrying cost Cost of 'holding' thematerial in store

Cost of transportation[carrying] of material

Procurement cost Administrative cost forprocurement

Cost of procurement ofmaterial

Inventory cost Sum of carrying andinventory cost

Sum of carrying andinventory cost

True/FalseQuestion To solve "n jobs - 3 machines" sequencing problem, the largest

of time of any job on the second machine must be smaller thanor equal to the smallest time of any job on first machine or thirdmachine.

Correct Answer True

Your Answer False

True/FalseQuestion Systematic procedures must be set in the operating functions

prior to installation of PPC in the firm.Correct Answer True

Your Answer True

Select The BlankQuestion Time waste is the earliest of all wastes and yet the________ to

correct because it does not litter the floor.Correct Answer Hazards

Your Answer Big hazard

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the reorder

point is at 120 Units, find the lead time.Correct Answer 4 months

Your Answer 1.2 Months

Multiple Choice Single AnswerQuestion Which factor influence plan for meeting seasonal or occasional

increase in demand?Correct Answer Subcontracting

Your Answer Subcontracting

Multiple Choice Single AnswerQuestion Which of the following is the function of Production Planning?

Correct Answer Process planning and scheduling

Your Answer Progressing

Select The BlankQuestion Because of uncertainty of activity timings, PERT acquired a

shape of ________ model.Correct Answer Probabilistic

Your Answer Statistical

True/FalseQuestion Scientific inventory control system requires to be followed for

machine aid, work aid and inspection aid :-Correct Answer False

Your Answer True

True/FalseQuestion Job schedule is a chart showing work ahead of each machine

with respect to time.Correct Answer False

Your Answer True

Match The FollowingQuestion Correct Answer Your Answer

Tooling cost Jigs and Fixtures Jigs and Fixtures

Opportunity costs Monitory value sacrificedin rejection

Cost of giving opportunityto do a business

Incremental cost Vary with decision tomake or buy

Vary with decision to makeor buy

Labour cost Wages and other benefits Wages and other benefits

Multiple Choice Single AnswerQuestion The goods are manufactured as per customer's definite order in

case of :-Correct Answer Job production

Your Answer Batch production

Multiple Choice Multiple AnswerQuestion The commonly used network techniques other than PERT and

CPM are as follows :-Correct Answer MOSS [ Multi Operation Scheduling System ] , PCS [ Project

Control System ] , GERT [ Graphical Evaluation ReviewTechniques ]

Your Answer MIS [ Management Information Systems ]

Multiple Choice Multiple AnswerQuestion To minimize total throughout time we are required to minimize :-

Correct Answer Queuing , Idle time , Inventory

Your Answer Queuing , Idle time

Multiple Choice Multiple AnswerQuestion Following conditions are required to be fulfilled for processing n

jobs through 2 machines :-Correct Answer The jobs are ready to be processed before the period under

consideration begins . , Transient time to move a job from onemachine to the another is negligible. , In process inventory isallowed.

Your Answer The jobs are ready to be processed before the period underconsideration begins . , In process inventory is allowed.

Select The BlankQuestion An inventory control technique based on selective approach to

stock items is called ________ analysis.Correct Answer Pareto's

Your Answer Pareto's

Multiple Choice Multiple AnswerQuestion While communicating to customer on delays in delivery following

information should be given :-Correct Answer Information on identification of job , Reasons for delays ,

Revised date of deliveryYour Answer Reasons for delays , Revised date of delivery

Select The BlankQuestion CPM is ________ oriented system.

Correct Answer Activity

Your Answer Activity

Multiple Choice Single AnswerQuestion One of the following is not consumable tool :-

Correct Answer Arbors

Your Answer Arbors

True/FalseQuestion LOB is a manual planning and scheduling technique similar in

nature to MRP [Material Resource Planning].Correct Answer True

Your Answer False

Select The BlankQuestion ________ is required when expediting fails to bring deviated

plan to its actual path.Correct Answer Replanning

Your Answer Replanning

Multiple Choice Multiple AnswerQuestion The process of contraction or compression involves extra cost

because extra money is required to be spent on factors such as:-

Correct Answer Overtime engagement of workforce , Purchase of additionalmachinery , Use of better materials

Your Answer Overtime engagement of workforce , Purchase of additionalmachinery , Purchase of stationary of good quality

Multiple Choice Single AnswerQuestion In job production one single product is manufactured while a

batch of group of products is turned out at a time under a systemof :-

Correct Answer Batch production

Your Answer Process production

Multiple Choice Multiple AnswerQuestion The 'F' group of GOLF analysis involves following requirements

:-Correct Answer Search for foreign suppliers , Opening of letter of credit ,

Arrangements for shipping and port clearanceYour Answer Search for foreign suppliers

Multiple Choice Single AnswerQuestion The production system characterized by complex set of activities

that must be performed in a particular order within a given periodand within an estimated expenditure is known as :-

Correct Answer Project production

Your Answer Project production

Multiple Choice Single Answer

Question Proper Production Planning and Control can reduce cost in :-

Correct Answer Overtime cost

Your Answer Overtime cost

Select The BlankQuestion ________ is the specific instant of time that marks start and end

of activity.Correct Answer Event

Your Answer Event

Select The BlankQuestion Overlapping of operations help to ________ manufacturing time.

Correct Answer Reduce

Your Answer Reduce

Multiple Choice Multiple AnswerQuestion "Difficult" items have following attributes :-

Correct Answer Available indigenously but are not easy to procure , Items whichcome from longer distance , Items which are difficult tomanufacture

Your Answer Available indigenously but are not easy to procure , Items whichcome from longer distance , Items having complex specifications

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-

Correct Answer Moving average , Exponential smothering , Curve fitting

Your Answer Moving average , Curve fitting

Select The BlankQuestion The performance standard is required by ________ to determine

individual machine capacity for the purpose of machine loadingand assigning machine hours and man hours .

Correct Answer Scheduler

Your Answer Production engineer

Multiple Choice Multiple AnswerQuestion The network analysis involves following works :-

Correct Answer Obtaining a work breakdown structure to a set of individual jobs

which are arranged in a logical network. , Estimation of jobduration , Scheduling to discover which jobs control completionof project and reallocation of resources.

Your Answer Obtaining a work breakdown structure to a set of individual jobswhich are arranged in a logical network. , Estimation of jobduration , Scheduling to discover which jobs control completionof project and reallocation of resources.

Multiple Choice Single AnswerQuestion The assembly work content [ Wi ] of the i'th station having n work

stations is given by :-Correct Answer å Wi from i=1 to n

Your Answer å Wi from i=1 to n

Multiple Choice Multiple AnswerQuestion Essentials of good forecasts are :-

Correct Answer Stability , Fairly accurate , Economical to generate

Your Answer Stability , Fairly accurate , Economical to generate

True/FalseQuestion The 'G' group of GOLF analysis involves moderate delivery time

and availability of credit usually in the range of 30 to 60 days.Correct Answer True

Your Answer True

Select The BlankQuestion ABC company manufactures MS bolts. Given fixed cost Rs 0.5

Lac, Labour cost Rs 2 Lacs, Raw Material cost Rs 3 Lacs,overhead cost Rs 0.5 Lacs, the total manufacturing cost wouldbe Rs ________.

Correct Answer 6 Lacs

Your Answer 6 Lacs

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple AnswerQuestion If actual demand far exceeds forecast, it will result into :-Correct Answer Better utilization of equipment , Project margin , Higher material

purchaseYour Answer Higher material purchase , Increase in labour productivity , Better

utilization of equipment , Project margin

Select The BlankQuestion To know the accumulated ________ for a given machine at a given time

Load charts are necessary.Correct Answer LoadYour Answer Load

Multiple Choice Single AnswerQuestion LOB technique was developed by US navy in the year :-Correct Answer 1958Your Answer 1958

True/FalseQuestion In continuous or process production , only one product is manufactured.Correct Answer TrueYour Answer True

Select The BlankQuestion ________reflects impact of money tied up in inventory.Correct Answer Inventory turnoverYour Answer Inventory turnover

Multiple Choice Multiple AnswerQuestion Methods for recording actual progress of work for shop orders are :-Correct Answer Progress card , Display board , Network updatingYour Answer Progress card , Display board , Network updating , Job card

Select The BlankQuestion A progress card is the most ________ method of recording of progress of

work.Correct Answer ConvenientYour Answer Convenient

Multiple Choice Multiple AnswerQuestion Following are some of the common standard cutting tools :-Correct Answer Cutting saw , Inserts , ReamersYour Answer Form tool , Cutting saw , Inserts , Reamers

Multiple Choice Multiple AnswerQuestion Tooling cost comprises the cost of :-Correct Answer Gigs , Fixtures , Drill bitsYour Answer Gigs , Fixtures , Drill bits , Stationary

Multiple Choice Single AnswerQuestion The light engineering company has one special purpose facing & centering

machine And one copying lathe. The foreman has five work orders for processing . Theoperation Sequence is fixed [ each job is first faced and centered and then copy turned ] .The standard Hours required for each machine to process each work order are shown inthe following Table :- Work Order Processing Time [Hours ] Facing & centeringmachine Copying Lathe I 16 40 II 30 60 III 20 6 IV 15 16 V 25 12 find sequence tominimize requirements of machine hours.

Correct Answer IV-I-II-V-IIIYour Answer I-II-III-IV-V

Select The BlankQuestion ________ represents the time that elapses between the receipt of requirement

of job until the job is adopted in the production control department.Correct Answer Order preparation timeYour Answer Queue time

True/FalseQuestion PERT basically does not demarcate between critical and non-critical

activities.Correct Answer TrueYour Answer True

Multiple Choice Single AnswerQuestion The assignment method is also called as :-Correct Answer Hungarian MethodYour Answer Analytical Method

Multiple Choice Multiple AnswerQuestion Outside operations cost involves expenses such as :-Correct Answer Rough blanking , Heat treatment , PlatingYour Answer Heat treatment , Plating , Inventory control , Rough blanking

Select The BlankQuestion The correct fitting of orders with capacity considerably lessens ________

burden of control.Correct Answer Foreman'sYour Answer Foreman's

Multiple Choice Multiple AnswerQuestion The 'F' group of GOLF analysis involves following requirements :-

Correct Answer Search for foreign suppliers , Opening of letter of credit ,Arrangements for shipping and port clearance

Your Answer Search for foreign suppliers , Opening of letter of credit , Arrangementsfor shipping and port clearance , Account in foreign bank

Match The FollowingQuestion Correct Answer Your Answer

Order quantity Factor influencing process planning Break even analysis

Machine capacity chart Dimensional accuracy Dimensional accuracy

Mass production Special purpose machines Special purpose machines

Standard elemental time data Compare alternative processes Factor influencing processplanning

Multiple Choice Multiple AnswerQuestion The tooling data is prepared in respect of following measuring instruments :-Correct Answer Vernier caliper , Micrometer screw gauge , Strain gaugeYour Answer Vernier caliper , Micrometer screw gauge , Strain gauge , Drill bits

Multiple Choice Multiple AnswerQuestion In replenishment system, the fixed order quantity system is also called by

following names :-Correct Answer Fixed order system , Min-max system , Re-order point systemYour Answer Fixed order system , Min-max system , Re-order point system , Lead

time system

Multiple Choice Multiple AnswerQuestion How you will Judge the failure of production planning and control

department?Correct Answer Frequent broken delivery promises , Underutilization of men,

machines , Excessive overtimeYour Answer Frequent broken delivery promises , Underutilization of men, machines ,

Excessive overtime , Better coordination with other section

Multiple Choice Single AnswerQuestion In Cost Vs Quantity plot, the total inventory Cost curve is :-Correct Answer ParabolicYour Answer Inverse

True/FalseQuestion Given stock in hand = 1320 units, safety stock=840 units and average daily

consumption = 60 units, the lead time available would be 10 hours.

Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion If the annual usage of a material is 1200 units and the reorder point is at 120

Units, find the lead time.Correct Answer 4 monthsYour Answer 4 months

Multiple Choice Single AnswerQuestion The assignment algorithm was developed by a Hungarian mathematician

named :-Correct Answer D. KonigYour Answer Charles simony

Multiple Choice Single AnswerQuestion So far as possible, number of activities should be :-Correct Answer LimitedYour Answer Limited

True/FalseQuestion Production Planning and Control makes the supervisor ineffective.Correct Answer TrueYour Answer False

Multiple Choice Single AnswerQuestion Unit of loading and scheduling depends on following factor :-Correct Answer Operating cycleYour Answer Unit of capacity

True/FalseQuestion The 'G' group of GOLF analysis involves moderate delivery time and

availability of credit usually in the range of 30 to 60 days.Correct Answer TrueYour Answer True

Multiple Choice Multiple AnswerQuestion Load charts are used for following :-Correct Answer To know the accumulated load on a given machine at a given time ,

Identify periods available for allocation in future to orders , Matching orders and loadsYour Answer Improving supply of material , To know the accumulated load on a given

machine at a given time , Identify periods available for allocation in future to orders ,Matching orders and loads

Select The Blank

Question ABC company manufactures MS bolts. Given fixed cost Rs 0.5 Lac, Labourcost Rs 2 Lacs, Raw Material cost Rs 3 Lacs, overhead cost Rs 0.5 Lacs, the totalmanufacturing cost would be Rs ________.

Correct Answer 6 LacsYour Answer 6 Lacs

Select The BlankQuestion An inventory control system in which stock of item is physically or

conceptually divided into ________ bins is calledTwo bin system.Correct Answer TwoYour Answer Pair

Multiple Choice Multiple AnswerQuestion They are type of analytical estimate :-Correct Answer Moving average , Exponential smothering , Curve fittingYour Answer Moving average , Exponential smothering , Curve fitting , Opinion

surveys

Multiple Choice Single AnswerQuestion For goods manufactured to stock, following department is expected to

periodically undertake replenishment action as stocks are depleted :-Correct Answer Production Planning ControlYour Answer Production

True/FalseQuestion Random fluctuation is addition of cyclical fluctuation and seasonal

fluctuation.Correct Answer FalseYour Answer True

True/FalseQuestion Scientific inventory control system requires to be followed for machine aid,

work aid and inspection aid :-Correct Answer FalseYour Answer True

Multiple Choice Single AnswerQuestion Value Analysis conducted in 'C' type of material is usually :-Correct Answer MinimumYour Answer Minimum

True/FalseQuestion Purchase department must keep PPC informed regarding lead time of

different items specially where lead times are extended.Correct Answer TrueYour Answer True

True/FalseQuestion In assignment matrix, it is a must to determine Jacobean of the determinant.Correct Answer FalseYour Answer True

Select The BlankQuestion For replenishment action for stock items which are reserved by PPC, the

stores work out ________ stock which equals the stock on hand less stock reserved.Correct Answer FreeYour Answer Net

Multiple Choice Single AnswerQuestion What are the customer's expectation from the supplier?Correct Answer Consistent good quality of productsYour Answer Consistent good quality of products

Match The FollowingQuestion Correct Answer Your Answer

End piece allowance Material insufficient to produce one piece Material insufficient toproduce one piece

Stock allowance Quantity to meet requirement of spares Quantity to meet requirement ofspares

Machining allowance Extra material requirement Extra material requirement

Spoilage allowance Process rejection Process rejection

Multiple Choice Single AnswerQuestion Why customer is called the king?Correct Answer Customer's orders gives us workYour Answer Customer's orders gives us work

Multiple Choice Single AnswerQuestion PPC is expected to have good inter-departmental relationships to achieve the

production targets. Which is the most important factor that shall affect productiontargets?

Correct Answer Timely availability of material, manpowerYour Answer Timely availability of material, manpower

Select The BlankQuestion Generally for ________ flow system, Heuristic method is preferred.Correct Answer Intermittent

Your Answer Continuous

Select The BlankQuestion In control board________ compartment contains copy of work orders/shop

orders of the item to be processed next on the machine.Correct Answer MiddleYour Answer Bottom

True/FalseQuestion Work measurement function is attached to line management.Correct Answer FalseYour Answer True

Multiple Choice Multiple AnswerQuestion The technical feasibility of sales enquiry is carried out on the following

grounds :-Correct Answer Tools and plants are available , Technical know how is available ,

Competent persons are presentYour Answer Tools and plants are available , Technical know how is available ,

Competent persons are present , Cost data of raw material is available.

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple AnswerQuestion Following are the factors which influence tool life :-

Correct Answer Operators efficiency , Type of tool , Material it is required to operateupon

Your Answer Operators efficiency , Type of tool , Material it is required to operateupon

Multiple Choice Single AnswerQuestion The document which incorporates details of process planning for a

job is called :-Correct Answer Route Sheet

Your Answer Route Sheet

Multiple Choice Multiple AnswerQuestion CPM terminology uses words like

Correct Answer Arrow diagram , Nodes , Float

Your Answer Arrow diagram , Nodes

Select The BlankQuestion Forecasting is function of ________.

Correct Answer Marketing department

Your Answer Planning in charge

Select The BlankQuestion Johnsons method of scheduling can be used when operation

sequence involve ________ machines.Correct Answer Two

Your Answer Two

Select The BlankQuestion Good quality and ________are the two main requirements to secure

maximum business from a customer.Correct Answer Competitive rates

Your Answer Competitive rates

Select The BlankQuestion Sum of queue, transit, order preparation and manufacturing times is

known as ________Correct Answer Total Lead Time

Your Answer Total Lead Time

True/FalseQuestion To conduct FSN analysis we require, last date of receipt or last date

of issue whichever is later and period.Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion Overtime can be avoided in many ways and they are :-

Correct Answer Unrealistic delivery date , Acceptance of too many rush order ,Excessive machine breakdown

Your Answer Unrealistic delivery date , Acceptance of too many rush order ,Excessive machine breakdown

Multiple Choice Multiple AnswerQuestion Material control function embraces a following techniques :-

Correct Answer Make -or -buy decision , Pareto's analysis , Replenishment system

Your Answer Make -or -buy decision , Pareto's analysis , Replenishment system

True/FalseQuestion Work measurement is not useful for choosing between two alternate

methods of production.Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion Process Sheet contains following information :-

Correct Answer Material Specification , Sequence of operation , Skill of Labour

Your Answer Material Specification , Sequence of operation , Skill of Labour

True/FalseQuestion More than one subcontractor should be developed for each

subcontracted operation/Job.Correct Answer True

Your Answer True

Select The BlankQuestion Classification of items on basis of their capital lock up is called

________ analysis.Correct Answer XYZ

Your Answer XYZ

Select The BlankQuestion Purchase section must keep ________posted on the progress of

purchase orders and expected delays.Correct Answer P.P.C.

Your Answer P.P.C.

Multiple Choice Single AnswerQuestion Effective Production Planning and Control, reduce investment in

inventories effectively :-Correct Answer By proper coordination between shop floor, stores and buying

departmentYour Answer By proper coordination between shop floor, stores and buying

department

True/FalseQuestion Fluctuation due to changes in season are called cyclical fluctuation.

Correct Answer False

Your Answer False

True/FalseQuestion Flexibility and product variety are not inter-related with each other.

Correct Answer False

Your Answer True

True/FalseQuestion Overlapping of operations help to reduce manufacturing time.

Correct Answer True

Your Answer True

Select The BlankQuestion The LOB technique is made more accurate and fast by using

________.Correct Answer Computers

Your Answer Reduction techniques

True/FalseQuestion Overtime is undesirable since it increases manufacturing cost of the

product.Correct Answer True

Your Answer False

Multiple Choice Multiple Answer

Question The essential features of batch production are :-

Correct Answer General purpose machines and process type layout , Manualmaterials handling , Flexibility of production schedule

Your Answer General purpose machines and process type layout , Manualmaterials handling , Flexibility of production schedule

Multiple Choice Single AnswerQuestion The sourcing of vendors in case of 'B' type of items is :-

Correct Answer Medium

Your Answer Few

Multiple Choice Single AnswerQuestion Dispatcher withdraws required quantity of material from stores using

following document :-Correct Answer Stores issue order

Your Answer Bill of material

Multiple Choice Multiple AnswerQuestion In a mass production assembly shop following work measurement

techniques are used :-Correct Answer Time study , Work sampling , Production study

Your Answer Time study , Work sampling , Production study , Analyticalestimating

Multiple Choice Multiple AnswerQuestion SDE analysis is based on problems of procurement namely :-

Correct Answer Non-availability , Scarcity , Longer lead time

Your Answer Non-availability , Scarcity , Longer lead time

True/FalseQuestion Line balancing is a simulation technique.

Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion The line of balance is a device for planning and monitoring progress

of :-Correct Answer Purchase order execution , Project execution , Targeted programs

Your Answer Purchase order execution , Project execution , Targeted programs

Select The BlankQuestion Sales persons decides ________.

Correct Answer Synthetic forecast

Your Answer Current sales

True/FalseQuestion Material control Card is a document for record of issues of material

and receipt of unused material by production shop.Correct Answer False

Your Answer False

Multiple Choice Single AnswerQuestion Work measurement is limited to measuring :-

Correct Answer Productive & non productive time

Your Answer Only product related activities

Match The FollowingQuestion Correct Answer Your Answer

Move order Transport material from andto required work centers

Transport material from andto required work centers

Materials Order Allocation of materialrequired in connection withshop order

Allocation of materialrequired in connection withshop order

Work Order Bird's eye view ofproduction programme

Bird's eye view of productionprogramme

Production Order Reserve material requiredin connection with salesorder

Reserve material required inconnection with sales order

Multiple Choice Multiple AnswerQuestion The software for line balancing should have following features :-

Correct Answer Easy to operate , Easy to install , Easy to upgrade

Your Answer Easy to operate , Easy to install , Unmanaged code should beavailable

Multiple Choice Single AnswerQuestion Man hours is commonly used unit of measurement for scheduling

purposes in following industry :-Correct Answer Engineering

Your Answer Engineering

Multiple Choice Multiple AnswerQuestion Customer plays very important role due to the following reasons :-

Correct Answer Gives us work , Dividends to share holders , Gets business from

new customers

Your Answer Gives us work , Dividends to share holders , Gets business fromnew customers

Multiple Choice Single AnswerQuestion The 4X4 assignment problem involve following job-machine

operations :-Correct Answer 24

Your Answer 24

Multiple Choice Single AnswerQuestion The best of scientific tools available for scheduling is :-

Correct Answer CPA [ critical path analysis ]

Your Answer Gantt Chart

Multiple Choice Multiple AnswerQuestion Work measurement is responsibility of :-

Correct Answer PPC , Industrial Engineering , Production department

Your Answer PPC , Industrial Engineering

Match The FollowingQuestion Correct Answer Your Answer

Long production run Mass and Flow production Mass and Flow production

Complex activities to beperformed in a particularorder within a give time &estimate.

Project production Project production

One or few unitsmanufactured as percustomers requirement

Jobbing Production Jobbing Production

Short production run Batch Production Batch Production

Multiple Choice Single AnswerQuestion Value Analysis conducted in 'C' type of material is usually :-

Correct Answer Minimum

Your Answer Minimum

Multiple Choice Multiple AnswerQuestion Some of significant features of HML analysis are :-

Correct Answer To evolve buying policies to control purchases , To delegateauthorities to different buyers to make petty cash purchases , Not totake consumption into account

Your Answer To evolve buying policies to control purchases , To delegateauthorities to different buyers to make petty cash purchases

Multiple Choice Single AnswerQuestion What is the reasons for poor labour efficiency attributed by inefficient

P.P.C.?Correct Answer Failure to provide proper tools and control on work in progress on

shop floorYour Answer Failure to provide proper tools and control on work in progress on

shop floor

Multiple Choice Single AnswerQuestion The administrative expenses towards the procurement of materials

is called :-Correct Answer Procurement cost

Your Answer Administrative cost

Multiple Choice Multiple AnswerQuestion Smoothing performs following activities:-

Correct Answer Reallocation of resources , Improving utilization of resources ,Conducting Heuristic approach

Your Answer Reallocation of resources , Improving utilization of resources ,Conducting Heuristic approach

True/FalseQuestion As per a study on materials management practices, a typical firm

spends almost half of its rupee sales on goods purchased fromvendors.

Correct Answer True

Your Answer True

Select The BlankQuestion Value analysis of ________ class items is usually inadvisable.

Correct Answer C

Your Answer C

True/FalseQuestion PPC system in the organisation is to be tailor made.

Correct Answer True

Your Answer True

Sem – 3rd Techniques for Operations Efficiency 1

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/FalseQuestion Performance benchmarking does not involves comparison of

financial ratios at the aggregate level.Correct Answer False

Your Answer False

Multiple Choice Single AnswerQuestion Setup time includes :-

Correct Answer Internal setup time & External setup time

Your Answer Internal setup time & External setup time

Multiple Choice Single AnswerQuestion Participants of the groups for quality circles should be decided

by :-Correct Answer Employees coming together by their own enthusiasm

Your Answer Employees coming together by their own enthusiasm

Multiple Choice Single AnswerQuestion Check sheet are also used as :-

Correct Answer Data gathering & interpretation tool

Your Answer Data gathering & interpretation tool

Multiple Choice Single AnswerQuestion SMED means :-

Correct Answer Single minute exchange of dies

Your Answer Single minute exchange of dies

Match The FollowingQuestion Correct Answer Your Answer

Productivity performancemeasurement

Turnover employee Cost of quality

Financial performancemeasurement

Sales of the months Sales of the months

Customer satisfactionmeasurement

Customer complaints perperiod

Customer complaints perperiod

Sem – 3rd Techniques for Operations Efficiency 2

Staff attitudemeasurement

Employee satisfactionindex

Employee satisfactionindex

Select The BlankQuestion ________ is an effect due to the muda of defect.

Correct Answer Wear & tear of parts while disassembling

Your Answer Poor production planning & control

Select The BlankQuestion If some defective parts are discovered by the subsequent

process they should be returned to the ________ to preventreoccurrence.

Correct Answer Preceding process

Your Answer Return to stores

Multiple Choice Multiple AnswerQuestion The results oriented efforts of the quality circle should also

include :-Correct Answer Efforts to avoid the problem permanently , Ultimate aim of the

customers satisfaction , Attacking the real root causes & allpossibilities

Your Answer Efforts to avoid the problem permanently , Publication oradvertisement of your contribution , Attacking the real rootcauses & all possibilities

Match The FollowingQuestion Correct Answer Your Answer

Parato diagram alwaysindicates

Magnitude of defects Philosophy of 20% of theactivity causes 80% of theeffect

Parato analysis underlines& operates on

Philosophy of "vitalfew:trivial many"

Philosophy of "vitalfew:trivial many"

Parato analysis istechnique of identifyingvital causes by

Arranging data accordingto the descending order oftheir frequency ofoccurrence

Arranging data accordingto the descending order oftheir frequency ofoccurrence

Parato diagram is a Bargraph with height or valuedrawn by

Arranging data indescending order

Magnitude of defects

Multiple Choice Multiple AnswerQuestion Few steps in construction in Radar chart are :-

Correct Answer Brainstorming to enlist characteristics which require to beevaluated & draw the circle & divide it into 'slices' equal tonumber of characteristics , The first slice begins at 12 noon.Then draw vertical line & calibrate it equal to the number of

Sem – 3rd Techniques for Operations Efficiency 3

levels required , Draw concentric circles from each gradiationusing 'o' point as centre

Your Answer Brainstorming to enlist characteristics which require to beevaluated & draw the circle & divide it into 'slices' equal tonumber of characteristics , The first slice begins at 12 noon.Then draw vertical line & calibrate it equal to the number oflevels required , Draw concentric circles from each gradiationusing 'o' point as centre

Select The BlankQuestion 5 S audit result is discussed in ________ meeting.

Correct Answer Monthly

Your Answer Monthly

True/FalseQuestion Fishbone analysis is used both in analysis & planning.

Correct Answer True

Your Answer False

Multiple Choice Single AnswerQuestion One Green Belt may head a team of :-

Correct Answer 20 employees

Your Answer 20 employees

Multiple Choice Multiple AnswerQuestion Role of champions are :-

Correct Answer Approve six sigma projects , Remove road block in the path ofsix sigma implementation , Monitor progress of six sigmaprojects

Your Answer Monitor progress of six sigma projects , Approve six sigmaprojects , Remove road block in the path of six sigmaimplementation

Multiple Choice Multiple AnswerQuestion To draw control charts, sample must be representative of

homogeneous segment of production for which :-Correct Answer The items of the sample should be from the same machine

setting , The items should be of the same batch , Items shouldbe made from the same raw material batch

Your Answer The items of the sample should be from the same machinesetting , The items should be of the same batch , Items shouldbe made from the same raw material batch

Multiple Choice Single Answer

Sem – 3rd Techniques for Operations Efficiency 4

Question Failure mode and effect analysis (FMEA) establish

Correct Answer Process failure and minimize frequency

Your Answer Process failure and minimize frequency

Multiple Choice Multiple AnswerQuestion What are the steps in deciding the benchmarking partner?

Correct Answer Decide level of benchmarking , List down a few prospectivecandidates of partnership , Collect information of short listedpartners

Your Answer Decide level of benchmarking , List down a few prospectivecandidates of partnership , Collect information of short listedpartners

Multiple Choice Single AnswerQuestion One Master Black Belt may head a team of :-

Correct Answer 15-20 Black Belts

Your Answer 15-20 Black Belts

Multiple Choice Single AnswerQuestion Competitive benchmarking involves identifying key competitive

product, services or processes & comparing with those of :-Correct Answer Main competitor

Your Answer Main competitor

Multiple Choice Single AnswerQuestion Implication of Quality problem is:-

Correct Answer Gap in performance

Your Answer Gap in performance

Select The BlankQuestion Number of defects in an individual component, like gear, shaft,

wheel etc can be monitored through ________ type of controlchart.

Correct Answer c-chart

Your Answer c-chart

True/FalseQuestion Non-availability of files /document in time is a problem to be

addressed by office TPM.Correct Answer True

Sem – 3rd Techniques for Operations Efficiency 5

Your Answer True

Multiple Choice Single AnswerQuestion Check sheet is easy to use because it is :-

Correct Answer Simplest tool

Your Answer Simplest tool

Multiple Choice Single AnswerQuestion Benchmarking helps to identify the gap between the current

performance of the organization and the :-Correct Answer Performance of the best organization

Your Answer Performance of the best organization

True/FalseQuestion Flow chart is pictorial representation of the steps in production

control.Correct Answer False

Your Answer True

Multiple Choice Multiple AnswerQuestion Breakdown problem may be stratified by :-

Correct Answer Sections , Machines , Type of breakdown (e.g mech. Orelectrical)

Your Answer Sections , Machines , Type of breakdown (e.g mech. Orelectrical)

Select The BlankQuestion A control chart to exhibit counted data on number of defect is

called ________.Correct Answer c-chart

Your Answer c-chart

Select The BlankQuestion Procedure for implementation of TPM consists of ________

numbers of steps.Correct Answer 12

Your Answer 8

Select The BlankQuestion Capability index Cp = ________

Correct Answer Specification width/process width

Sem – 3rd Techniques for Operations Efficiency 6

Your Answer Specification width/process width

Multiple Choice Single AnswerQuestion Pareto's analysis underlines & operates philosophy of :-

Correct Answer Vital few = trivial many

Your Answer Vital few = trivial many

True/FalseQuestion Kanban signals are required when assembly work, subassembly

work and manufacturing at parts is carried out at differentlocations.

Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion To reduce clamping & declamping time, following actions are

desirable :-Correct Answer Standardize clamping bolts / screws , Cut off unnecessary

threads , Use quick clamping deviceYour Answer Standardize clamping bolts / screws , Cut off unnecessary

threads , Use quick clamping device

Select The BlankQuestion Benchmarking allows exchange of ________ between the

benchmarking partners.Correct Answer Information

Your Answer Information

Multiple Choice Multiple AnswerQuestion TQM can never flourish if the staff are:-

Correct Answer Worried about losing jobs , Afraid of being reprimanded if thereare mistakes , Scared of their bosses

Your Answer Worried about losing jobs , Afraid of being reprimanded if thereare mistakes , Scared of their bosses

True/FalseQuestion In bar graph each bar is of same height.

Correct Answer False

Your Answer False

Multiple Choice Multiple AnswerQuestion During SMED implementation, primary study consists of :-

Sem – 3rd Techniques for Operations Efficiency 7

Correct Answer Equipment analysis , Setup change analysis , Preparation items(storage place , method) analysis

Your Answer Equipment analysis , Setup change analysis , Preparation items(storage place , method) analysis

True/FalseQuestion Daily work management can also be extended to non

manufacturing areas like procurement, QA, HRD etc.Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion Types of Poka-Yoke are :-

Correct Answer Prevention type Poka-Yoke , Detection type Poka-Yoke

Your Answer Prevention type Poka-Yoke , Detection type Poka-Yoke

Multiple Choice Single AnswerQuestion Quality problem solving tool is used to :-

Correct Answer Improve quality

Your Answer Save time

True/FalseQuestion Along with problem solving tools experience and judgment is

also used.Correct Answer True

Your Answer False

Select The BlankQuestion JIT advocates the philosophy at elimination of waste from

system which occurs due to ________.Correct Answer Over Production

Your Answer Over Production

True/FalseQuestion Without measuring initial performance, target can't be set.

Correct Answer True

Your Answer False

Multiple Choice Multiple AnswerQuestion An erratic patterns falling above & below the control limits

indicates :-

Sem – 3rd Techniques for Operations Efficiency 8

Correct Answer Defect in materials , Frequent adjustment of machines , Poorlytrained operators

Your Answer Defect in materials , Frequent adjustment of machines , Poorlytrained operators

True/FalseQuestion Sample size for the construction of p-chart are larger than X bar-

R chart.Correct Answer True

Your Answer True

Multiple Choice Multiple AnswerQuestion Histogram is an important diagnostic tool. Analysis of the

histogram gives :-Correct Answer It shows cause which affects the process , An idea of what is

happening to the process , Whether the process is capable ofmeeting process or not i.e. around correct average & withinspecific limits

Your Answer An idea of what is happening to the process , Whether theprocess is capable of meeting process or not i.e. around correctaverage & within specific limits , A bird's eye view of the variation

Multiple Choice Single AnswerQuestion Productivity improves by :-

Correct Answer Voluntary participants of everyone

Your Answer Voluntary participants of everyone