p1 · other architectural, ... utilities and shall notify the contractor of any discrepancies. ......

3
P1.00 1. 2 AND LEGENDS PLUMBING NOTES DESCRIPTION AFF AHU BFF CTE COTG FCO GPH GPM ABOVE FINISHED FLOOR AIR HANDLING UNIT BELOW FINISHED FLOOR CO CLEANOUT CLEANOUT TO GRADE DN DOWN FLOOR CLEANOUT FD GALLONS PER HOUR GALLONS PER MINUTE HD HUB DRAIN INV NTS PRV PSI INVERT ELEVATION NOT TO SCALE POUNDS PER SQ. IN. WG. (GAUGE) RI / FC ROUGH-IN & FINAL CONNECT T&P UNO WCO TEMPERATURE AND PRESSURE UNLESS NOTED OTHERWISE WALL CLEANOUT FLOOR DRAIN PRESSURE REDUCING VALVE AD AREA DRAIN BP CI CAST IRON BACKFLOW PREVENTER CW COLD WATER FS FLOOR SINK HB HOSE BIBB HW HOT WATER TYP TYPICAL T.R. THROUGH ROOF SA SHOCK ABSORBER V VENT PIPING VB VACUUM BREAKER WHYD WALL HYDRANT LAV LAVATORY ABBREVIATION PLUMBING ABBREVIATIONS TPS TRAP PRIMER SUPPLY CONNECT TO EXISTING GUH GAS UNIT HEATER NOTE: ALL SYMBOLS AND ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS HW CW SYMBOL DESCRIPTION P1.# WH-# F-# WATER HEATER DESIGNATION REFER TO NOTE ON THIS DRAWING COLD WATER SUPPLY (CW) HOT WATER PIPING (HW) SANITARY SEWER ABOVE GRADE SANITARY SEWER LINE BELOW GRADE SANITARY VENT LINE (SV) EXISTING TO REMAIN EXISTING TO BE REMOVED CONNECT TO EXISTING BALL VALVE FIXTURE DESIGNATION DRAWING DESIGNATION PLUMBING LEGEND VENT LINE THRU ROOF NOTE: ALL SYMBOLS AND ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS 1 PLUMBING SPECIFICATIONS MATERIALS ALL MATERIALS SHALL BE NEW AND FREE OF DEFECTS. ORDINANCES, PERMITS AND CODES WORKMANSHIP AND MATERIALS COVERED BY THESE SPECIFICATIONS SHALL CONFORM TO ALL ORDINANCES AND REGULATIONS OF THE CITY, COUNTY, STATE AND/OR OTHER AUTHORITIES HAVING JURISDICTION. OBTAIN ALL PERMITS AND INSPECTIONS REQUIRED FOR THE INSTALLATION OF THIS WORK AND PAY ALL CHARGES INCIDENT THERETO. DELIVER ALL CERTIFICATES OF INSPECTION TO THE OWNER. PLUMBING WORK SHALL CONFORM TO THE FOLLOWING: 1. 2012 INTERNATIONAL PLUMBING CODE WITH GEORGIA AMENDMENTS. COORDINATION THE DRAWINGS SPECIFICALLY APPLICABLE TO PLUMBING WORK ARE IDENTIFIED BY PREFIX "P" (PLUMBING). THE CONTRACTOR SHALL REFER TO ALL OTHER DRAWINGS FOR ADDITIONAL DETAILS SUCH AS CEILING HEIGHTS, FINISHES, DIMENSIONS, BUILDING MATERIALS, DOOR OPENING, TYPE OF CEILINGS, AND OTHER ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL FEATURES WHICH MAY AFFECT PLUMBING WORK. THE PLUMBING DRAWINGS ACCOMPANYING THESE SPECIFICATIONS ARE GENERALLY DIAGRAMMATIC AND ARE NOT TO BE SCALED. WHILE THESE ARE TO BE FOLLOWED AS CLOSELY AS POSSIBLE, THE CONTRACTOR SHALL COORDINATE THE WORK TO AVOID INTERFERENCES WITH THE OTHER TRADES. THE CONTRACTOR SHALL CONFIRM AND CORRELATE ALL DIMENSIONS AT THE JOB SITE. SHOP DRAWINGS SUBMIT AN ELECTRONIC SHOP DRAWING FOR THE FOLLOWING EQUIPMENT FOR APPROVAL. THIS EQUIPMENT SHALL NOT BE PURCHASED OR INSTALLED UNTIL THE EQUIPMENT HAS BEEN APPROVED. 1. PLUMBING: A. PLUMBING FIXTURES AND TRIM B. DRAINS C. VALVES D. INSULATION MATERIALS E. WATER HEATER INSTRUCTIONS TO THE OWNER THE CONTRACTOR SHALL DELIVER TO THE OWNER’S REPRESENTATIVE ALL PRINTED INSTRUCTION MATERIAL FURNISHED WITH ALL EQUIPMENT. WRITTEN WARRANTIES ON ALL EQUIPMENT WHERE SPECIFIED WARRANTY IS FOR A LONGER PERIOD OF TIME THAN CONTRACTOR’S WARRANTY PERIOD. SAFETY DEVICES THE CONTRACTOR SHALL NOT OPERATE ANY EQUIPMENT WHICH IS REQUIRED BY THIS SECTION OF THESE SPECIFICATIONS OR BY THE REFERENCED CODES TO HAVE A SAFETY DEVICE OR DEVICES, UNLESS SUCH DEVICES ARE INSTALLED. CLEANING AND PAINTING UPON COMPLETION OF THE PLUMBING WORK, ALL UNINSULATED PIPE AND ALL EQUIPMENT SHALL BE CLEANED OF ALL OIL, GREASE AND DIRT. ALL SURFACES SHALL BE LEFT CLEAN, FREE OF CORROSION AND READY FOR PAINTING. CLEANING UP CONTRACTOR, AFTER THE COMPLETION OF WORK, SHALL REMOVE ALL SURPLUS MATERIAL, BROKEN AND DAMAGED FITTINGS, AND PIPE BROUGHT TO THE PREMISES FOR USE IN HIS WORK. HE SHALL ALSO REMOVE ALL DEBRIS CAUSED BY HIS WORK. TESTING CONCEALED WORK TO REMAIN UNCOVERED UNTIL REQUIRED TESTS HAVE BEEN COMPLETED. IF NECESSARY, TESTS ON PORTIONS OF THE WORK MAY BE CONCEALED AFTER BEING INSPECTED AND DEFECTS ELIMINATED. REPAIR DEFECTS THAT ARE DISCOVERED AS A RESULT OF INSPECTION OR TEST WITH NEW MATERIALS. CAULKING OF SCREWED JOINTS, CRACKS OR HOLES OR PLUGGING LEAKS WILL NOT BE ACCEPTED. REPEAT TEST AFTER DEFECTS HAVE BEEN ELIMINATED. ALL POTABLE WATER PIPE SHALL BE TESTED BEFORE FIXTURES AND FAUCETS OR LOW PRESSURE EQUIPMENT ARE CONNECTED AND BEFORE CONNECTING TO EXISTING PIPING SYSTEMS, BY FILLING THE SYSTEM WITH WATER, AND APPLYING A HYDROSTATIC PRESSURE OF 150 LBS. PER SQUARE INCH FOR A PERIOD OF 30 MINUTES WITHOUT LEAKS OR LOSS OF PRESSURE. EXISTING UTILITIES THE LOCATIONS, SIZES OR ELEVATIONS OF EXISTING UTILITIES AS SHOWN ON THE PLANS ARE BASED ON INFORMATION AVAILABLE DURING DESIGN. BEFORE COMMENCING WITH THE WORK, THE PLUMBING SUBCONTRACTOR SHALL VERIFY THE ACTUAL LOCATIONS, SIZES AND ELEVATIONS OF SAID UTILITIES AND SHALL NOTIFY THE CONTRACTOR OF ANY DISCREPANCIES. NO WORK SHALL THEREAFTER BE PERFORMED UNTIL THE PLUMBING SUBCONTRACTOR HAS RECEIVED AUTHORIZATION TO PROCEED. STANDARDS FOR PLUMBING MATERIALS PLUMBING MATERIALS SPECIFIED UNDER THESE SPECIFICATIONS SHALL COMPLY WITH THE APPLICABLE STANDARDS REQUIRED BY THE MATERIALS SECTION OF THE REFERENCED PLUMBING CODE. HANGER SPACING FOR COPPER PIPE DIELECTRIC COUPLINGS PROVIDED DIELECTRIC COUPLINGS BETWEEN COPPER PIPE AND STEEL OR IRON PIPE. VALVES STERILIZATION PROCEDURE UPON SUCCESSFUL COMPLETION OF TESTING PROCEDURES AS HEREINBEFORE SPECIFIED AND AFTER ALL FINAL CONNECTIONS ARE COMPLETE, THE ENTIRE POTABLE WATER SYSTEM SHALL BE STERILIZED BY USING ONE OF THE FOLLOWING PROCEDURES: THE SYSTEM, OR PART THEREOF, SHALL BE FILLED WITH A SOLUTION CONTAINING FIFTY (50) PARTS PER MILLION OF AVAILABLE CHLORINE AND ALLOWED TO STAND SIX (6) HOURS BEFORE FLUSHING AND RETURNING TO SERVICE. THE SYSTEM, OR PART THEREOF, SHALL BE FILLED WITH A SOLUTION CONTAINING ONE HUNDRED (100) PARTS PER MILLION OF AVAILABLE CHLORINE AND ALLOWED TO STAND TWO (2) HOURS BEFORE FLUSHING AND RETURNING TO SERVICE. ABOVE GRADE PIPING ALL PIPING INSTALLED ABOVE GRADE SHALL BE INSTALLED PARALLEL TO BUILDING WALLS UNLESS SPECIFICALLY SHOWN OTHERWISE ON THE PLANS AND SHALL BE INSTALLED WITH A UNIFORM SLOPE OR GRADE TO ELIMINATE UNDRAINABLE LOW POINTS. SHOP DRAWINGS SHOP DRAWINGS SHALL BE SUBMITTED ON THE FOLLOWING ITEMS: 1. PLUMBING BRASS AND TRIM FOR FIXTURES AND EQUIPMENT. WASTE AND VENT STACKS SHALL MATCH EXISTING. PLUMBING FIXTURES - INSTALLATION ALL WATER RUNOUTS TO FIXTURES SHALL BE SECURED INSIDE PLUMBING CHASE TO RIGID BUILDING STRUCTURE OR TO RIGID PLUMBING DRAINAGE PIPING. FILL VOID UNDER FAUCET ON LAVATORIES AND SINKS WITH PLUMBER’S PUTTY TO PREVENT WATER FROM DRAINING THROUGH FIXTURE HOLES. FIXTURE PROTECTION IMMEDIATELY AFTER FIXTURES ARE SET, THEY SHALL BE COVERED WITH REINFORCED HEAVY KRAFT PAPER TAPED OR PLASTERED IN PLACE, AND THIS PROTECTION SHALL NOT BE REMOVED UNTIL COMPLETION OF THE WORK. FIRE AND SMOKE HAZARD RATING ALL PIPE AND FITTING INSULATION, JACKETS AND ADHESIVES SHALL HAVE A COMPOSITE FLAME SPREAD RATING NOT EXCEEDING 25 WITHOUT EVIDENCE OF CONTINUED PROGRESSIVE COMBUSTION (SELF-EXTINGUISHING) AND WITH A SMOKE DEVELOPED RATING NOT EXCEEDING 50 AS DETERMINED BY THE STANDARD METHOD OF TEST OF SURFACE BURNING CHARACTERISTICS OF BUILDING MATERIALS, NFPA 255, AND BY THE FIRE AND SMOKE HAZARD CLASSIFICATION ASTM E-84. FITTINGS, EXCEPT VALVES AND UNIONS, SHALL BE INSULATED WITH MITERED SECTIONS OF INSULATION SECURED WITH ARMSTRONG 520 ADHESIVE OR BE INSULATED WITH PVC FITTING COVERS AND FIBERGLASS INSERTS. SECURE EDGES OF FITTING COVERS TO INSULATION USING 3M NUMBER 471 TAPE. FIBERGLASS PIPE INSULATION FIBERGLASS PIPE INSULATION SHALL HAVE A MINIMUM DENSITY OF 6 POUNDS PER CUBIC FOOT, A MAXIMUM "K" VALUE OF 0.24 AT 75 DEGREES F. MEAN TEMPERATURE, A FACTORY APPLIED SELF-SEALING ALL SERVICE VAPOR BARRIER JACKET AND SELF-SEALING LAP. SEAL AND JOINTS WITH JOINT SEALING TAPE MANUFACTURED FROM VAPOR BARRIER MATERIAL. ONE (1) INCH THICK INSULATION SHALL BE APPLIED TO PIPE AND FITTINGS AS FOLLOWS: 1. ALL ABOVE GROUND POTABLE HOT AND COLD WATER PIPING. FITTINGS SHALL BE INSULATED WITH PVC JACKETS AND DOUBLE INSERTS OR MITERED SECTIONS OF PIPE INSULATION. INSTALLATION INSULATION SHALL BE APPLIED ONLY AFTER TESTING IS COMPLETE AND ALL SURFACES TO WHICH INSULATION IS APPLIED SHALL BE CLEAN AND DRY. SEAL RAW ENDS ON FIBERGLASS PIPE INSULATION WITH 6 OZ. CANVAS JACKET PASTED ON. ALL INSULATION SHALL BE CONTINUOUS THROUGH WALL AND CEILING OPENINGS AND SLEEVES. ALL SURFACES TO BE INSULATED SHALL BE COVERED WITHOUT VOIDS. VAPOR BARRIERS SHALL BE FREE OF DAMAGE OR HOLES. ABOVE GROUND, HORIZONTAL PIPE: 1. COPPER PIPE SHALL BE SUPPORTED WITHIN 18" OF EACH CHANGE OF DIRECTION AND AT MAXIMUM INTERVALS AS LISTED BELOW. 1/2" PIPE 5 FEET 3/4" 5 FEET 1" 6 FEET BALL VALVES SHALL BE USED FOR POTABLE WATER PIPING: 1. BALL VALVES 2" AND SMALLER: APOLLO 32-100 SERIES (PROVIDE EXTENDED TEE HANDLES FOR ALL BALL VALVES TO CLEAR INSULATION.) PLUMBING GENERAL REQUIREMENTS PLUMBING PIPING SYSTEMS PLUMBING FIXTURES PLUMBING INSULATION FURNISH AND INSTALL PLUMBING FIXTURES AS SCHEDULED ON THE DRAWINGS OR APPROVED EQUAL, COMPLETE WITH ALL EQUIPMENT, FITTINGS, TRIMMINGS AND ACCESSORIES AS DESCRIBED. SEE ARCHITECTURAL PLANS AND DETAILS FOR EXACT LOCATION OF PLUMBING FIXTURES. PROVIDE STOPS ON WATER SUPPLIED TO ALL FIXTURES. SUPPLIES AND STOPS SHALL BE CHROME PLATED, STANDARD DUTY TYPE COMPARABLE TO ENGINEERED BRASS COMPANY. ALL P-TRAPS AND SUPPLIES SHALL BE BY THE FIXTURE MANUFACTURER OR SHALL BE MCGUIRE, JAMECO OR BRASS CRAFT. ALL P-TRAPS SHALL BE BY THE SAME MANUFACTURER AND ALL SUPPLIES SHALL BE BY THE SAME MANUFACTURER. P-TRAPS FOR LAVATORIES AND SINKS SHALL HAVE DEEP ESCUTCHEON TO COVER CONNECTION AT WALL. EXPOSED BRASS TRIM ON EACH PLUMBING FIXTURE SHALL BE CHROMIUM PLATED. PLUMBING FIXTURE CONNECTIONS SANITARY WASTE AND VENT PIPING PIPE MATERIAL: HUBLESS CAST-IRON SOIL PIPE AND HEAVY-DUTY, 4 BAND, HUBLESS PIPING INSTALLATION: DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS. INSTALL PIPING AS INDICATED UNLESS DEVIATIONS TO LAYOUT ARE REQUIRED FOR COORDINATION WITH OTHER SYSTEMS. INSTALL PIPING ABOVE ACCESSIBLE CEILINGS TO ALLOW SUFFICIENT SPACE FOR CEILING PANEL REMOVAL. INSTALL PIPING FREE OF SAGS AND BENDS. INSTALL FITTINGS FOR CHANGES IN DIRECTION AND BRANCH CONNECTIONS. MAKE CHANGES IN DIRECTION FOR SOIL AND WASTE DRAINAGE AND VENT PIPING USING APPROPRIATE BRANCHES, BENDS, AND LONG-SWEEP BENDS. STRAIGHT TEES, ELBOWS, AND CROSSES MAY BE USED ON VENT LINES. DO NOT CHANGE DIRECTION OF FLOW MORE THAN 90 DEGREES. BELOW SINK ADA INSULATION PROVIDE BELOW SINK PIPE PROTECTION FOR ADA ACCESSIBLE SINKS. PIPE INSULATION SHALL BE TRUEBRO LAV GUARD 2 OR APPROVED EQUAL. PROVIDE IN WHITE. COPPER PIPE - TYPE L HANGERS AND SUPPORTS - GENERAL HANGERS AND SUPPORTS - COPPER PIPE ANGERS FOR HORIZONTAL COPPER PIPE SHALL BE COPPER PLATED STEEL BAND WITH MALLEABLE IRON NUT AS FOLLOWS: 1. MICHIGAN HANGER CO., NO. 2. 2. B-LINE, FIG. B317OCT. 3. GRINNELL, FIG. CT99. COPPER PIPE, TYPE L, HARD DRAWN WITH WROUGHT COPPER SWEAT FITTINGS SHALL BE USED ON THE FOLLOWING SERVICES: 1. ABOVE GROUND HOT AND COLD DOMESTIC WATER PIPE. JOINTS SHALL BE SOLDERED WITH LEAD-FREE SOLDER USING NON-ACID REGULAR FLUX PASTE. SOLDER CONTAINING LEAD IS NOT PERMITTED. HANGER RODS SHALL BE BLACK STEEL AND SHALL BE ATTACHED TO THE BUILDING FRAME. PROVIDE CLAMPS, BRACKETS, THROUGH BOLTS, INSERTS, HANGER ROD SUPPORT MEMBERS AND ACCESSORIES FOR HANGER INSTALLATION. UNLESS OTHERWISE NOTED, WHERE PIPING IS SUPPORTED ADJACENT TO WALLS OR SUPPORTED FROM WALLS, BRACKETS SHALL BE USED AND THESE BRACKETS SHALL BE ANCHORED TO THE WALL FROM WHICH THE HANGERS RODS SHALL SUSPEND TO SUPPORT THE PIPE HANGERS. HANGERS SHALL BE SIZED TO INCLUDE INSULATION USING INSULATION BLOCKS AND SHIELDS TO GO AROUND PIPE WITH INSULATION. ALL WATER PIPING INSIDE THE BUILDING WALL AT RUNOUT TO PLUMBING FIXTURES SHALL BE SECURED TO WALL STRUCTURE ONLY. a. b. INSTALL SOIL AND WASTE AND VENT PIPING AT THE FOLLOWING MINIMUM SLOPES UNLESS OTHERWISE INDICATED: SANITARY WASTE: 2 PERCENT DOWNWARD IN DIRECTION OF FLOW FOR PIPING NPS 2 ‰ AND SMALLER; 1 PERCENT DOWNWARD IN DIRECTION OF FLOW FOR PIPING NPS3 TO 6. VENT PIPING: 1 PERCENT DOWN TOWARD VERTICAL FIXTURE VENT OR TOWARD VENT STACK. INSTALL CAST-IRON SOIL PIPING ACCORDING TO CISPI’S "CAST IRON SOIL PIPE AND FITTINGS HANDBOOK," CHAPTERIV, "INSTALLATION OF CAST IRON SOIL PIPE AND FITTINGS." GENERAL PLUMBING NOTES ELEVATIONS IN FIELD PRIOR TO PERFORMING ANY WORK. ALL UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS ONLY. VERIFY EXACT LOCATIONS AND WHERE INSTALLED. MAINTAIN FIRE RATINGS AT ALL RATED MEMBERS. LOCATIONS. FIRE RATINGS OF ACCESS DOORS AND FRAMES SHALL MATCH THAT OF THE AREA THE ARCHITECT PRIOR TO THE INSTALLATION OF ACCESS DOORS TO ASSURE COMPATIBLE COORDINATE WITH ALL OTHER TRADES AND THE ARCHITECTURAL DRAWINGS. NOTIFY (IN WRITING) ACCESS TO VALVES, CLEANOUTS AND ALL EQUIPMENT AND ACCESSORIES REQUIRING SERVICE. PROVIDE ACCESS PANELS IN CEILINGS, CHASES OR WALLS WHEREVER NECESSARY TO AFFORD 3. MAINTAIN FIRE RATING AT ALL RATED MEMBERS. PIPE SLEEVES FOR ALL PIPE PENETRATIONS THRU FIRE & SMOKE WALLS AND FLOORS. 4. DRAWINGS AND DIMENSIONS. THE CONTRACTOR SHALL MAKE ALLOWANCES FOR FITTINGS, TRIM, ACCESSORIES, EQUIPMENT, SHOP THE PURPOSE OF THESE DRAWINGS IS TO INDICATE EQUIPMENT ARRANGEMENTS AND LOCATIONS. 5. INSTALLTION OF EXPANSION JOINTS. STRUCTURAL DRAWINGS AND MAKE PROVISIONS FOR THE ABSORPTION OF PIPE MOVEMENTS BY THE CONTRACTOR SHALL COORDINATE ALL PIPING CROSSING EXPANSION JOINTS AS INDICATED ON THE 6. INSTALLATION. DUCTWORK, ELECTRICAL FIXTURES, CASWORK, AND ALL STRUCTURAL CONDITIONS PRIOR TO CONTRACTOR SHALL COORDINATE ALL PIPING, FIXTURE AND EQUIPMENT LOCATIONS WITH HAVC 7. ANY MATERIAL, OR PERFORMING ANY WORK. VISIT THE JOB SITE AND CHECK ALL EXISTING CONDITIONS BEFORE SUBMITTING A PRICE, ORDERING 8. COORDINATE HANGING OF EQUIPMENT WITH STRUCTURAL DRAWINGS. CONTRACTOR SHALL NOT CUT ANY STRUCTURAL MEMBERS OF BUILDING WITHOUT PRIOR APPROVAL. 9. GREATER THAN 50 AND FLAME SPREAD RATINGS NOT GREATER THAN 25. MATERIALS AND SHALL ONLY CONTAIN MATERIALS WHICH HAVE SMOKE DEVELOPED RATINGS NOT ALL AREAS USED AS RETURN AIR PLENUMS SHALL BE CONSTRUCTED WITH FIRE RESISTANT 10. MODIFICATIONS TO EXISTING AND NEW AS REQUIRED FOR PIPING INSTALLATION. SPACE IN THE PLENUM IS VERY LIMITED. ALL WORK SHALL BE COORDINATED. PROVIDE 11. ENGINEER. UTILITY CONNECTIONS INTO EXISTING BUILDING SYSTEMS SHALL BE COORDINATED WITH BUILDING 12. AND SELECT BEST POSSIBLE ROUTING. DRAWINGS SHOW A PROPOSED PIPE ROUTING. CONTRACTOR TO FIELD VERIFY EXACT CONDITIONS 13. STEEL OR CHROME PLATED. ALL PLUMBING FIXTURE SUPPLIES, VALVES, OR ANY OTHER VISIBLE PLUMBING ARE TO BE STAINLESS CAST-IRON HUB AND SPIGOT WITH PUSH ON JOINTS FOR BELOW SLAB, COUPLINGS FOR ABOVE GRADE. PROFESSIONAL No. 25541 R E G I S T E R E D R O E G G I A E E N G I N E R P . A L I O C M S H E E N E S N T V BRANCH LIBRARY DUNWOODY Location: 720 Design Inc. Architect: 00118 Project Number: ISSUE: DATE: 23 August 2017 Approval Client Review & CONSTRUCTION FOR BIDDING & Dunwoody, GA 30338 5339 Chamblee-Dunwoody Road Stevens & Wilkinson MEP Engineers: 2017 18 September Construction Issue for Bid & Approval Client Review & 19 October 2017 Bidding Release for 2017 19 December

Upload: lambao

Post on 02-Aug-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

P1.00

1.

2

AND LEGENDS

PLUMBING NOTES

DESCRIPTION

AFF

AHU

BFF

CTE

COTG

FCO

GPH

GPM

ABOVE FINISHED FLOOR

AIR HANDLING UNIT

BELOW FINISHED FLOOR

CO CLEANOUT

CLEANOUT TO GRADE

DN DOWN

FLOOR CLEANOUT

FD

GALLONS PER HOUR

GALLONS PER MINUTE

HD HUB DRAIN

INV

NTS

PRV

PSI

INVERT ELEVATION

NOT TO SCALE

POUNDS PER SQ. IN. WG. (GAUGE)

RI / FC ROUGH-IN & FINAL CONNECT

T&P

UNO

WCO

TEMPERATURE AND PRESSURE

UNLESS NOTED OTHERWISE

WALL CLEANOUT

FLOOR DRAIN

PRESSURE REDUCING VALVE

AD AREA DRAIN

BP

CI CAST IRON

BACKFLOW PREVENTER

CW COLD WATER

FS FLOOR SINK

HB HOSE BIBB

HW HOT WATER

TYP TYPICAL

T.R. THROUGH ROOF

SA SHOCK ABSORBER

V VENT PIPING

VB VACUUM BREAKER

WHYD WALL HYDRANT

LAV LAVATORY

ABBREVIATION

PLUMBING ABBREVIATIONS

TPS TRAP PRIMER SUPPLY

CONNECT TO EXISTING

GUH GAS UNIT HEATER

NOTE: ALL SYMBOLS AND ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS

HW

CW

SYMBOL DESCRIPTION

P1.#

WH-#

F-#

WATER HEATER DESIGNATION

REFER TO NOTE ON THIS DRAWING

COLD WATER SUPPLY (CW)

HOT WATER PIPING (HW)

SANITARY SEWER ABOVE GRADE

SANITARY SEWER LINE BELOW GRADE

SANITARY VENT LINE (SV)

EXISTING TO REMAIN

EXISTING TO BE REMOVED

CONNECT TO EXISTING

BALL VALVE

FIXTURE DESIGNATION

DRAWING DESIGNATION

PLUMBING LEGEND

VENT LINE THRU ROOF

NOTE: ALL SYMBOLS AND ABBREVIATIONS MAY NOT APPEAR ON THE DRAWINGS

1

PLUMBING SPECIFICATIONS

MATERIALS

ALL MATERIALS SHALL BE NEW AND FREE OF DEFECTS.

ORDINANCES, PERMITS AND CODES

WORKMANSHIP AND MATERIALS COVERED BY THESE SPECIFICATIONS SHALL

CONFORM TO ALL ORDINANCES AND REGULATIONS OF THE CITY, COUNTY, STATE

AND/OR OTHER AUTHORITIES HAVING JURISDICTION.

OBTAIN ALL PERMITS AND INSPECTIONS REQUIRED FOR THE INSTALLATION OF

THIS WORK AND PAY ALL CHARGES INCIDENT THERETO. DELIVER ALL

CERTIFICATES OF INSPECTION TO THE OWNER.

PLUMBING WORK SHALL CONFORM TO THE FOLLOWING:

1. 2012 INTERNATIONAL PLUMBING CODE WITH GEORGIA AMENDMENTS.

COORDINATION

THE DRAWINGS SPECIFICALLY APPLICABLE TO PLUMBING WORK ARE IDENTIFIED

BY PREFIX "P" (PLUMBING). THE CONTRACTOR SHALL REFER TO ALL OTHER

DRAWINGS FOR ADDITIONAL DETAILS SUCH AS CEILING HEIGHTS, FINISHES,

DIMENSIONS, BUILDING MATERIALS, DOOR OPENING, TYPE OF CEILINGS, AND

OTHER ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL FEATURES

WHICH MAY AFFECT PLUMBING WORK.

THE PLUMBING DRAWINGS ACCOMPANYING THESE SPECIFICATIONS ARE

GENERALLY DIAGRAMMATIC AND ARE NOT TO BE SCALED. WHILE THESE ARE TO

BE FOLLOWED AS CLOSELY AS POSSIBLE, THE CONTRACTOR SHALL COORDINATE

THE WORK TO AVOID INTERFERENCES WITH THE OTHER TRADES. THE

CONTRACTOR SHALL CONFIRM AND CORRELATE ALL DIMENSIONS AT THE JOB

SITE.

SHOP DRAWINGS

SUBMIT AN ELECTRONIC SHOP DRAWING FOR THE FOLLOWING EQUIPMENT FOR

APPROVAL. THIS EQUIPMENT SHALL NOT BE PURCHASED OR INSTALLED UNTIL

THE EQUIPMENT HAS BEEN APPROVED.

1. PLUMBING:

A. PLUMBING FIXTURES AND TRIM

B. DRAINS

C. VALVES

D. INSULATION MATERIALS

E. WATER HEATER

INSTRUCTIONS TO THE OWNER

THE CONTRACTOR SHALL DELIVER TO THE OWNER’S REPRESENTATIVE ALL

PRINTED INSTRUCTION MATERIAL FURNISHED WITH ALL EQUIPMENT. WRITTEN

WARRANTIES ON ALL EQUIPMENT WHERE SPECIFIED WARRANTY IS FOR A

LONGER PERIOD OF TIME THAN CONTRACTOR’S WARRANTY PERIOD.

SAFETY DEVICES

THE CONTRACTOR SHALL NOT OPERATE ANY EQUIPMENT WHICH IS REQUIRED BY

THIS SECTION OF THESE SPECIFICATIONS OR BY THE REFERENCED CODES TO HAVE

A SAFETY DEVICE OR DEVICES, UNLESS SUCH DEVICES ARE INSTALLED.

CLEANING AND PAINTING

UPON COMPLETION OF THE PLUMBING WORK, ALL UNINSULATED PIPE AND ALL

EQUIPMENT SHALL BE CLEANED OF ALL OIL, GREASE AND DIRT. ALL SURFACES SHALL

BE LEFT CLEAN, FREE OF CORROSION AND READY FOR PAINTING.

CLEANING UP

CONTRACTOR, AFTER THE COMPLETION OF WORK, SHALL REMOVE ALL SURPLUS

MATERIAL, BROKEN AND DAMAGED FITTINGS, AND PIPE BROUGHT TO THE

PREMISES FOR USE IN HIS WORK. HE SHALL ALSO REMOVE ALL DEBRIS CAUSED

BY HIS WORK.

TESTING

CONCEALED WORK TO REMAIN UNCOVERED UNTIL REQUIRED TESTS HAVE

BEEN COMPLETED. IF NECESSARY, TESTS ON PORTIONS OF THE WORK MAY BE

CONCEALED AFTER BEING INSPECTED AND DEFECTS ELIMINATED. REPAIR

DEFECTS THAT ARE DISCOVERED AS A RESULT OF INSPECTION OR TEST WITH

NEW MATERIALS. CAULKING OF SCREWED JOINTS, CRACKS OR HOLES OR

PLUGGING LEAKS WILL NOT BE ACCEPTED. REPEAT TEST AFTER DEFECTS

HAVE BEEN ELIMINATED.

ALL POTABLE WATER PIPE SHALL BE TESTED BEFORE FIXTURES AND FAUCETS

OR LOW PRESSURE EQUIPMENT ARE CONNECTED AND BEFORE CONNECTING

TO EXISTING PIPING SYSTEMS, BY FILLING THE SYSTEM WITH WATER, AND

APPLYING A HYDROSTATIC PRESSURE OF 150 LBS. PER SQUARE INCH FOR A

PERIOD OF 30 MINUTES WITHOUT LEAKS OR LOSS OF PRESSURE.

EXISTING UTILITIES

THE LOCATIONS, SIZES OR ELEVATIONS OF EXISTING UTILITIES AS SHOWN

ON THE PLANS ARE BASED ON INFORMATION AVAILABLE DURING DESIGN.

BEFORE COMMENCING WITH THE WORK, THE PLUMBING SUBCONTRACTOR

SHALL VERIFY THE ACTUAL LOCATIONS, SIZES AND ELEVATIONS OF SAID

UTILITIES AND SHALL NOTIFY THE CONTRACTOR OF ANY DISCREPANCIES.

NO WORK SHALL THEREAFTER BE PERFORMED UNTIL THE PLUMBING

SUBCONTRACTOR HAS RECEIVED AUTHORIZATION TO PROCEED.

STANDARDS FOR PLUMBING MATERIALS

PLUMBING MATERIALS SPECIFIED UNDER THESE SPECIFICATIONS SHALL

COMPLY WITH THE APPLICABLE STANDARDS REQUIRED BY THE MATERIALS

SECTION OF THE REFERENCED PLUMBING CODE.

HANGER SPACING FOR COPPER PIPE

DIELECTRIC COUPLINGS

PROVIDED DIELECTRIC COUPLINGS BETWEEN COPPER PIPE AND STEEL OR IRON PIPE.

VALVES

STERILIZATION PROCEDURE

UPON SUCCESSFUL COMPLETION OF TESTING PROCEDURES AS HEREINBEFORE

SPECIFIED AND AFTER ALL FINAL CONNECTIONS ARE COMPLETE, THE ENTIRE

POTABLE WATER SYSTEM SHALL BE STERILIZED BY USING ONE OF THE FOLLOWING

PROCEDURES:

THE SYSTEM, OR PART THEREOF, SHALL BE FILLED WITH A SOLUTION CONTAINING

FIFTY (50) PARTS PER MILLION OF AVAILABLE CHLORINE AND ALLOWED TO STAND SIX

(6) HOURS BEFORE FLUSHING AND RETURNING TO SERVICE.

THE SYSTEM, OR PART THEREOF, SHALL BE FILLED WITH A SOLUTION CONTAINING

ONE HUNDRED (100) PARTS PER MILLION OF AVAILABLE CHLORINE AND ALLOWED TO

STAND TWO (2) HOURS BEFORE FLUSHING AND RETURNING TO SERVICE.

ABOVE GRADE PIPING

ALL PIPING INSTALLED ABOVE GRADE SHALL BE INSTALLED PARALLEL TO BUILDING

WALLS UNLESS SPECIFICALLY SHOWN OTHERWISE ON THE PLANS AND SHALL BE

INSTALLED WITH A UNIFORM SLOPE OR GRADE TO ELIMINATE UNDRAINABLE LOW POINTS.

SHOP DRAWINGS

SHOP DRAWINGS SHALL BE SUBMITTED ON THE FOLLOWING ITEMS:

1. PLUMBING BRASS AND TRIM FOR FIXTURES AND EQUIPMENT.

WASTE AND VENT STACKS SHALL MATCH EXISTING.

PLUMBING FIXTURES - INSTALLATION

ALL WATER RUNOUTS TO FIXTURES SHALL BE SECURED INSIDE PLUMBING CHASE

TO RIGID BUILDING STRUCTURE OR TO RIGID PLUMBING DRAINAGE PIPING. FILL

VOID UNDER FAUCET ON LAVATORIES AND SINKS WITH PLUMBER’S PUTTY TO

PREVENT WATER FROM DRAINING THROUGH FIXTURE HOLES.

FIXTURE PROTECTION

IMMEDIATELY AFTER FIXTURES ARE SET, THEY SHALL BE COVERED WITH REINFORCED

HEAVY KRAFT PAPER TAPED OR PLASTERED IN PLACE, AND THIS PROTECTION SHALL

NOT BE REMOVED UNTIL COMPLETION OF THE WORK.

FIRE AND SMOKE HAZARD RATING

ALL PIPE AND FITTING INSULATION, JACKETS AND ADHESIVES SHALL HAVE A

COMPOSITE FLAME SPREAD RATING NOT EXCEEDING 25 WITHOUT EVIDENCE OF

CONTINUED PROGRESSIVE COMBUSTION (SELF-EXTINGUISHING) AND WITH A SMOKE

DEVELOPED RATING NOT EXCEEDING 50 AS DETERMINED BY THE STANDARD

METHOD OF TEST OF SURFACE BURNING CHARACTERISTICS OF BUILDING

MATERIALS, NFPA 255, AND BY THE FIRE AND SMOKE HAZARD CLASSIFICATION ASTM

E-84.

FITTINGS, EXCEPT VALVES AND UNIONS, SHALL BE INSULATED WITH MITERED

SECTIONS OF INSULATION SECURED WITH ARMSTRONG 520 ADHESIVE OR BE

INSULATED WITH PVC FITTING COVERS AND FIBERGLASS INSERTS. SECURE EDGES

OF FITTING COVERS TO INSULATION USING 3M NUMBER 471 TAPE.

FIBERGLASS PIPE INSULATION

FIBERGLASS PIPE INSULATION SHALL HAVE A MINIMUM DENSITY OF 6 POUNDS PER CUBIC

FOOT, A MAXIMUM "K" VALUE OF 0.24 AT 75 DEGREES F. MEAN TEMPERATURE, A FACTORY

APPLIED SELF-SEALING ALL SERVICE VAPOR BARRIER JACKET AND SELF-SEALING LAP.

SEAL AND JOINTS WITH JOINT SEALING TAPE MANUFACTURED FROM VAPOR BARRIER

MATERIAL.

ONE (1) INCH THICK INSULATION SHALL BE APPLIED TO PIPE AND FITTINGS AS FOLLOWS:

1. ALL ABOVE GROUND POTABLE HOT AND COLD WATER PIPING.

FITTINGS SHALL BE INSULATED WITH PVC JACKETS AND DOUBLE INSERTS OR MITERED

SECTIONS OF PIPE INSULATION.

INSTALLATION

INSULATION SHALL BE APPLIED ONLY AFTER TESTING IS COMPLETE AND ALL SURFACES TO WHICH

INSULATION IS APPLIED SHALL BE CLEAN AND DRY.

SEAL RAW ENDS ON FIBERGLASS PIPE INSULATION WITH 6 OZ. CANVAS JACKET PASTED ON.

ALL INSULATION SHALL BE CONTINUOUS THROUGH WALL AND CEILING OPENINGS AND SLEEVES.

ALL SURFACES TO BE INSULATED SHALL BE COVERED WITHOUT VOIDS. VAPOR BARRIERS SHALL BE

FREE OF DAMAGE OR HOLES.

ABOVE GROUND, HORIZONTAL PIPE:

1. COPPER PIPE SHALL BE SUPPORTED WITHIN 18" OF EACH CHANGE OF

DIRECTION AND AT MAXIMUM INTERVALS AS LISTED BELOW.

1/2" PIPE 5 FEET

3/4" 5 FEET

1" 6 FEET

BALL VALVES SHALL BE USED FOR POTABLE WATER PIPING:

1. BALL VALVES 2" AND SMALLER:

APOLLO 32-100 SERIES

(PROVIDE EXTENDED TEE HANDLES FOR ALL BALL VALVES TO CLEAR INSULATION.)

PLUMBING GENERAL REQUIREMENTS

PLUMBING PIPING SYSTEMS

PLUMBING FIXTURES

PLUMBING INSULATION

FURNISH AND INSTALL PLUMBING FIXTURES AS SCHEDULED ON THE DRAWINGS OR

APPROVED EQUAL, COMPLETE WITH ALL EQUIPMENT, FITTINGS, TRIMMINGS AND

ACCESSORIES AS DESCRIBED. SEE ARCHITECTURAL PLANS AND DETAILS FOR EXACT

LOCATION OF PLUMBING FIXTURES.

PROVIDE STOPS ON WATER SUPPLIED TO ALL FIXTURES. SUPPLIES AND STOPS SHALL

BE CHROME PLATED, STANDARD DUTY TYPE COMPARABLE TO ENGINEERED BRASS

COMPANY.

ALL P-TRAPS AND SUPPLIES SHALL BE BY THE FIXTURE MANUFACTURER OR SHALL BE

MCGUIRE, JAMECO OR BRASS CRAFT. ALL P-TRAPS SHALL BE BY THE SAME

MANUFACTURER AND ALL SUPPLIES SHALL BE BY THE SAME MANUFACTURER. P-TRAPS

FOR LAVATORIES AND SINKS SHALL HAVE DEEP ESCUTCHEON TO COVER CONNECTION

AT WALL.

EXPOSED BRASS TRIM ON EACH PLUMBING FIXTURE SHALL BE CHROMIUM PLATED.

PLUMBING FIXTURE CONNECTIONS

SANITARY WASTE AND VENT PIPING

PIPE MATERIAL:

HUBLESS CAST-IRON SOIL PIPE AND HEAVY-DUTY, 4 BAND, HUBLESS PIPING

INSTALLATION:

DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL

LOCATION AND ARRANGEMENT OF PIPING SYSTEMS. INSTALL PIPING AS

INDICATED UNLESS DEVIATIONS TO LAYOUT ARE REQUIRED FOR

COORDINATION WITH OTHER SYSTEMS. INSTALL PIPING ABOVE ACCESSIBLE

CEILINGS TO ALLOW SUFFICIENT SPACE FOR CEILING PANEL REMOVAL.

INSTALL PIPING FREE OF SAGS AND BENDS. INSTALL FITTINGS FOR CHANGES

IN DIRECTION AND BRANCH CONNECTIONS. MAKE CHANGES IN DIRECTION

FOR SOIL AND WASTE DRAINAGE AND VENT PIPING USING APPROPRIATE

BRANCHES, BENDS, AND LONG-SWEEP BENDS. STRAIGHT TEES, ELBOWS,

AND CROSSES MAY BE USED ON VENT LINES. DO NOT CHANGE DIRECTION

OF FLOW MORE THAN 90 DEGREES.

BELOW SINK ADA INSULATION

PROVIDE BELOW SINK PIPE PROTECTION FOR ADA ACCESSIBLE SINKS. PIPE INSULATION SHALL BE

TRUEBRO LAV GUARD 2 OR APPROVED EQUAL. PROVIDE IN WHITE.

COPPER PIPE - TYPE L

HANGERS AND SUPPORTS - GENERAL

HANGERS AND SUPPORTS - COPPER PIPE

ANGERS FOR HORIZONTAL COPPER PIPE SHALL BE COPPER PLATED STEEL BAND WITH

MALLEABLE IRON NUT AS FOLLOWS:

1. MICHIGAN HANGER CO., NO. 2.

2. B-LINE, FIG. B317OCT.

3. GRINNELL, FIG. CT99.

COPPER PIPE, TYPE L, HARD DRAWN WITH WROUGHT COPPER SWEAT

FITTINGS SHALL BE USED ON THE FOLLOWING SERVICES:

1. ABOVE GROUND HOT AND COLD DOMESTIC WATER PIPE. JOINTS

SHALL BE SOLDERED WITH LEAD-FREE SOLDER USING NON-ACID REGULAR

FLUX PASTE. SOLDER CONTAINING LEAD IS NOT PERMITTED.

HANGER RODS SHALL BE BLACK STEEL AND SHALL BE ATTACHED TO THE

BUILDING FRAME. PROVIDE CLAMPS, BRACKETS, THROUGH BOLTS, INSERTS,

HANGER ROD SUPPORT MEMBERS AND ACCESSORIES FOR HANGER

INSTALLATION. UNLESS OTHERWISE NOTED, WHERE PIPING IS SUPPORTED

ADJACENT TO WALLS OR SUPPORTED FROM WALLS, BRACKETS SHALL BE

USED AND THESE BRACKETS SHALL BE ANCHORED TO THE WALL FROM WHICH

THE HANGERS RODS SHALL SUSPEND TO SUPPORT THE PIPE HANGERS.

HANGERS SHALL BE SIZED TO INCLUDE INSULATION USING INSULATION

BLOCKS AND SHIELDS TO GO AROUND PIPE WITH INSULATION.

ALL WATER PIPING INSIDE THE BUILDING WALL AT RUNOUT TO PLUMBING

FIXTURES SHALL BE SECURED TO WALL STRUCTURE ONLY.

a.

b.

INSTALL SOIL AND WASTE AND VENT PIPING AT THE FOLLOWING MINIMUM

SLOPES UNLESS OTHERWISE INDICATED:

SANITARY WASTE: 2 PERCENT DOWNWARD IN DIRECTION OF FLOW

FOR PIPING NPS 2 ‰� AND SMALLER;1 PERCENT DOWNWARD IN

DIRECTION OF FLOW FOR PIPING NPS 3� TO 6�.

VENT PIPING: 1 PERCENT DOWN TOWARD VERTICAL FIXTURE VENT

OR TOWARD VENT STACK.

INSTALL CAST-IRON SOIL PIPING ACCORDING TO CISPI’S "CAST IRON SOIL

PIPE AND FITTINGS HANDBOOK," CHAPTER IV, "INSTALLATION OF CAST IRON

SOIL PIPE AND FITTINGS."

GENERAL PLUMBING NOTES

ELEVATIONS IN FIELD PRIOR TO PERFORMING ANY WORK.

ALL UTILITIES ARE SHOWN IN APPROXIMATE LOCATIONS ONLY. VERIFY EXACT LOCATIONS AND

WHERE INSTALLED. MAINTAIN FIRE RATINGS AT ALL RATED MEMBERS.

LOCATIONS. FIRE RATINGS OF ACCESS DOORS AND FRAMES SHALL MATCH THAT OF THE AREA

THE ARCHITECT PRIOR TO THE INSTALLATION OF ACCESS DOORS TO ASSURE COMPATIBLE

COORDINATE WITH ALL OTHER TRADES AND THE ARCHITECTURAL DRAWINGS. NOTIFY (IN WRITING)

ACCESS TO VALVES, CLEANOUTS AND ALL EQUIPMENT AND ACCESSORIES REQUIRING SERVICE.

PROVIDE ACCESS PANELS IN CEILINGS, CHASES OR WALLS WHEREVER NECESSARY TO AFFORD

3.

MAINTAIN FIRE RATING AT ALL RATED MEMBERS.

PIPE SLEEVES FOR ALL PIPE PENETRATIONS THRU FIRE & SMOKE WALLS AND FLOORS.

4.

DRAWINGS AND DIMENSIONS.

THE CONTRACTOR SHALL MAKE ALLOWANCES FOR FITTINGS, TRIM, ACCESSORIES, EQUIPMENT, SHOP

THE PURPOSE OF THESE DRAWINGS IS TO INDICATE EQUIPMENT ARRANGEMENTS AND LOCATIONS.

5.

INSTALLTION OF EXPANSION JOINTS.

STRUCTURAL DRAWINGS AND MAKE PROVISIONS FOR THE ABSORPTION OF PIPE MOVEMENTS BY THE

CONTRACTOR SHALL COORDINATE ALL PIPING CROSSING EXPANSION JOINTS AS INDICATED ON THE

6.

INSTALLATION.

DUCTWORK, ELECTRICAL FIXTURES, CASWORK, AND ALL STRUCTURAL CONDITIONS PRIOR TO

CONTRACTOR SHALL COORDINATE ALL PIPING, FIXTURE AND EQUIPMENT LOCATIONS WITH HAVC

7.

ANY MATERIAL, OR PERFORMING ANY WORK.

VISIT THE JOB SITE AND CHECK ALL EXISTING CONDITIONS BEFORE SUBMITTING A PRICE, ORDERING

8.

COORDINATE HANGING OF EQUIPMENT WITH STRUCTURAL DRAWINGS.

CONTRACTOR SHALL NOT CUT ANY STRUCTURAL MEMBERS OF BUILDING WITHOUT PRIOR APPROVAL.

9.

GREATER THAN 50 AND FLAME SPREAD RATINGS NOT GREATER THAN 25.

MATERIALS AND SHALL ONLY CONTAIN MATERIALS WHICH HAVE SMOKE DEVELOPED RATINGS NOT

ALL AREAS USED AS RETURN AIR PLENUMS SHALL BE CONSTRUCTED WITH FIRE RESISTANT

10.

MODIFICATIONS TO EXISTING AND NEW AS REQUIRED FOR PIPING INSTALLATION.

SPACE IN THE PLENUM IS VERY LIMITED. ALL WORK SHALL BE COORDINATED. PROVIDE

11.

ENGINEER.

UTILITY CONNECTIONS INTO EXISTING BUILDING SYSTEMS SHALL BE COORDINATED WITH BUILDING

12.

AND SELECT BEST POSSIBLE ROUTING.

DRAWINGS SHOW A PROPOSED PIPE ROUTING. CONTRACTOR TO FIELD VERIFY EXACT CONDITIONS

13.

STEEL OR CHROME PLATED.

ALL PLUMBING FIXTURE SUPPLIES, VALVES, OR ANY OTHER VISIBLE PLUMBING ARE TO BE STAINLESS

CAST-IRON HUB AND SPIGOT WITH PUSH ON JOINTS FOR BELOW SLAB,

COUPLINGS FOR ABOVE GRADE.

PROFESSIONAL

No. 25541

REGISTERE

D

ROE

G

GIA

EENGINER

P.

A

L

I

OCM

S

H

E

EN

E

SN

TV

BRANCH LIBRARY

DUNWOODY

Location:

720 Design Inc.

Architect:

00118

Project Number:

ISSUE:DATE:

23 August 2017

Approval

Client Review &

CONSTRUCTION

FOR BIDDING &

Dunwoody, GA 30338

5339 Chamblee-Dunwoody Road

Stevens & Wilkinson

MEP Engineers:

2017

18 September

Construction

Issue for Bid &

Approval

Client Review &19 October 2017

Bidding

Release for

2017

19 December

P2.001

New Work Plan

1Demolition Plan

PLUMBING PLANS

Scale: 1/8" = 1’- 0"

Scale: 1/8" = 1’- 0"

5

6 7 8

9

1

4"

4

2

3

1

3

DEMOLITION KEY NOTES

1

EXACT LOCATION AND DEPTH NOT KNOWN.

APPROXIMATE LOCATION OF EXISTING SANITARY / WASTE PIPING BELOW EXISTING FLOOR SLAB.

2 EXISTING DOWNSPOUT TO REMAIN.

3 APPROXIMATE LOCATION OF EXISTING OVERHEAD RAINWATER PIPING TO REMAIN.

4

WASTE, VENT, AND WATER PIPING NOT REUSED FOR NEW WORK SHALL BE CAPPED AS REQUIRED.

EXISTING WATER CLOSET, LAVATORY, SINK, WATER HEATER, AND WATER COOLER TO BE REMOVED.

5 EXISTING CLEANOUT TO REMAIN.

6 EXISTING WASTE AND VENT TO BE REMOVED. CAP WASTE LINE BELOW FLOOR.

7

NEW WATER CLOSET LOCATION.

EXSITING WATER CLOSET CONNECTION TO BE REMOVED. SEE NEW WORK PLAN FOR

8

9

10

CAP WASTE BELOW FLOOR, AND VENT & WATER ABOVE THE CEILING.

EXISTING WASTE, VENT, AND COLD WATER PIPING FOR WATER COOLER TO BE REMOVED.

OFFICE

104

LOUNGE

103

102

RESTROOM

101

DELIVERY

STAFF WORKROOM SUITE

100

5 2 6 7

9 3

3/4" 17

13

1

11

NEW WORK KEY NOTES

S

V

41

1

18

2

16

15

1412

F-3

3"

1/2"

3

11

4 F-2

2"1/2"

10

F-1

EXISTING CLEANOUT TO REMAIN.

2

3

4 SAW CUT AND REPAIR FLOOR. SEE DETAIL 1 ON P4.00.

5

6 1-1/2" CW DN. TO LAVATORY AND WATER CLOSET. SEE WATER RISER ON SHEET P4.00.

7 4" SANITARY UP TO WATER CLOSET. SAW CUT AND REPAIR FLOOR SLAB.

8 CONNECT NEW 4" SANITARY TO EXISTING 4" WASTE BELOW FLOOR.

9 NEW 2" VENT UP FROM EXISTING 4" SAINTARY LINE BELOW SLAB.

10 CONNECT NEW 2" VENT TO EXISTING 4" VENT THROUGH ROOF.

12 3" HUB DRAIN FOR WATER HEATER RELIEF DISCHARGE.

13 3/4" CW DN. TO SINK AND WATER HEATER.

14 NEW ELECTRIC WATER HEATER WH-1. SEE DETAIL 2 ON P4.00.

15 1/2" HW UP.

16 1/2" H/CW DN. TO SINK FAUCET.

17

8

EXISTING 4" WASTE AND VENT STACK TO BE REMOVED. EXISTING VENT THROUGH ROOF TO REMAIN.

11 EXISTING COLD WATER DROP TO BE REMOVED. SEE NEW WORK PLAN.

NEW 2" WASTE AND VENT STACK FOR LAVATORY OR SINK.

APPROXIMATE LOCATION OF EXISTING 4" WASTE BELOW FLOOR. FIELD VERIFY EXACT LOCATION.

CONNECT NEW WASTE TO EXISTING 4" SANITARY BELOW FLOOR.

DROP NEW 1/2" HOT WATER DN. TO NEW LAVATORY.

18 APPROXIMATE LOCATION OF EXISTING COLD WATER.

19 CONNECT NEW 1-1/2" COLD WATER TO EXSITING ABOVE CEILING.

10

11

19

EXISTING WASTE, VENT, WATER PIPING, AND WATER HEATER TO BE REMOVED. REMOVE & REUSE SINK.

F-4

1/2" CW DN. TO WATER BOX (F-4) FOR ICE MAKER CONNECTION.

PROFESSIONAL

No. 25541

REGISTERE

D

ROE

G

GIA

EENGINER

P.

A

L

I

OCM

S

H

E

EN

E

SN

TV

SS1090

TA3232

ATLAS

TA42

TA42

NEW DESK

BBFBBF

SCOPE OF WORK

REF

MW

COF

WH

BRANCH LIBRARY

DUNWOODY

Location:

720 Design Inc.

Architect:

00118

Project Number:

ISSUE:DATE:

23 August 2017

Approval

Client Review &

CONSTRUCTION

FOR BIDDING &

Dunwoody, GA 30338

5339 Chamblee-Dunwoody Road

Stevens & Wilkinson

MEP Engineers:

2017

18 September

Construction

Issue for Bid &

Approval

Client Review &19 October 2017

Bidding

Release for

2017

19 December

SCOPE OF WORK

FEC

FE

FEC

S

P4.00

AND SCHEDULES

PLUMBING DETAILS

PLUMBING FIXTURE SCHEDULE AND SPECIFICATIONS

FIXTURE

NUMBERFIXTURE WASTE COLD HOT SPECIFICATION

F-1 4" --

F-3SINK

1 1/2" 1/2" 1/2"

F-2 11/4" 1/2" 1/2"

ABSORBOTRON TYPE NO.

P.D.I. SYMBOLS A B C D E F

FIXTURE-UNIT RATING 1-11 12-32 33-60 61-113 114-154 155-330

5005 5010 5020 5030 5040 5050

NOTE: SMITH NUMBERS SHOWN, EQUAL - JOSAM OR ZURN.

SHOCK ABSORBER SCHEDULE

FINISHED CEILING

FINISHED FLOOR

BALL VALVE (TYP)

HOT COLD

COUNTER

FAUCET

N.T.S.

SINK PIPING DETAIL

N.T.S.

WATER RISER DIAGRAMW1

1

N.T.S.

WASTE RISER DIAGRAMS1

LAV

WC

SA-A

WATER BOX

SINK

LAV

WC

(E) 4" FCO

2"

2"

1/2"

3/4"

3/4"

1/2"

1-1/2"

1/2"

CW

HW

1/2"

(E) 4"S

(E) 4"S

(E) 4"S

3"

3"HDSINK

2"

2"

2"

V

(E) 4" VTR

2"

NO.

WATER HEATER SCHEDULE

RECOVERY INPUT STORAGE VOLTS/PH. MODEL # OR APPROVED EQUALQUAN.

3/4"CW IN WALL SPACE

IN RESTROOM1/2" HW TO LAVATORY

1/2" HW

1/2" HW INTO WALL

RELIEF LINE TO HUB DRAINT&P RELIEF VALVE, RUN

1/2" CW OUT OF WALL

TRAP PRIMER VALVE

HEATER WH-1ELECTRIC WATER

3" HUB DRAIN

1/4 TURN STOPS1/2" SUPPLIES W/

1"

WH-1

DN. IN WALL

3/4" CW & 1/2" HW

PIPING AT WATER HEATER WH-1.

SEE DETAIL 1 THIS SHEET FOR

2SLAB REMOVAL & REPLACEMENT DETAIL

N.T.S. (FOR NEW PLUMBING LINES BELOWEXIST. SLAB ON GRADE)

1’-0" MIN.

(AS REQ"D.)

9" MIN.

(GREASE ONE END)

EXISTING SLAB

16" GROUTED INTO

SMOOTH DOWELS @

" DIAMETER x 18" 43

CONC. SLAB

EXISTING

X X X X X XX X X X X

EACH WAY

#3@12" MAX.

W.W.F.

EXISTING EXISTING SLAB

SAW CUT

NEW DRAINS

W.W.F.TO INSTALL

CUT EXISTING 1

1

NEW UTILITY LINE

NOTE:

DRAWINGS FOR REQUIRED REINFORCEMENT AS SHOWN.

POUR WITH CONTROL AND CONSTRUCTION JOINTS SHOWN AND SHOP

1. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL, THE PROPOSED

2. NO EXISTING FOOTING MAY BE UNDERCUT.

3. BACKFILL THE EXCAVATED AREA W/#57 STONE.

1 10 GPH @ 80 2 KW 10 GAL 208 / 1 RHEEM MODEL EGSP10

(ADA)FLOOR OUTLETWATER CLOSET

(WALL HUNG)LAVATORY

(LOUNGE 103)

CONENCTIONCOFFEE MAKERPROVIDE OUTLET FOR

1/2"

PROVIDE P-TRAP, WASTE, AND 1/4 TURN SUPPLY STOPS WITH STAINLESS STEEL FLEX SUPPLIES.ELKAY HOSPITALITY SINK MODEL BPSRA150C SIZE 15" x 15" x 6" STAINLESS STEEL SINK WITH FAUCET AND STRAINER.

F-4 1/2"WATER BOX - - OATEY METAL ICE MAKER BOX. INSTALL AT 24" AFF.

INSTALL WITH FLUSH HANDLE ON WIDE SIDE OF STALL PER ADA REQUIREMENTS.AND BEMIS MODEL 1955SSCT SEAT. PROVIDE KOHLER MODEL K-13517 MANUAL FLUSH VALVE ANDKOHLER HIGHLINE MODEL K-4405 1.28 GPF VITREOUS CHINA ELONGATED FLOOR OUTLET BOWL,

PROVIDE P-TRAP, WASTE, AND 1/4 TURN SUPPLY STOPS WITH STAINLESS STEEL FLEX SUPPLIES.PROVIDE LINEA MODEL 5401 FAUCET WITH MIXING VALVE, MODEL 53922 TRAP AND MODEL 53991 DRAIN.WS BATH COLLECTION UNLIMITED TO WALL MOUNTED 27.6" x 17.7" x 4.3" BATHROOM SINK IN CERAMIC WHITE.

PROFESSIONAL

No. 25541

REGISTERE

D

ROE

G

GIA

EENGINER

P.

A

L

I

OCM

S

H

E

EN

E

SN

TV

BRANCH LIBRARY

DUNWOODY

Location:

720 Design Inc.

Architect:

00118

Project Number:

ISSUE:DATE:

23 August 2017

Approval

Client Review &

CONSTRUCTION

FOR BIDDING &

Dunwoody, GA 30338

5339 Chamblee-Dunwoody Road

Stevens & Wilkinson

MEP Engineers:

2017

18 September

Construction

Issue for Bid &

Approval

Client Review &19 October 2017

Bidding

Release for

2017

19 December