P13631 Functional
ReviewJames Brinkerhoff, Christopher Kulbago, Patrick O’Connell, Lauren Pahls,
Ted Rakiewicz, Sarah Salmon
Schedule & Planning
Budget & Costs
0
200
400
600
800
1000
1200
1400
1600
Budget Tracking
Actual SpentAnticipated SpendingOriginal Request
Money (
$)
Customer Needs• Did we meet them?
Customer need: Does project fulfill need?
Safety Yes
Ergonomics Yes
Mobility Yes
Teaching Manually Yes
Teaching Auto-Controls Almost
Ease of Assembly Yes
Low Cost Yes
Use of LabVIEW Yes
Drained Tank Dynamics Yes
Engineering Specifications
• In order to complete the project, the group had to translate customer needs into technical specifications.
• How well the group did in staying within the 19 specifications is summarized below:
17
1 1
Specifications
Specifi-cations metSpecification assumed metSpecification not met
Specifications Met: Part 1
Specifications Met: Part 2
Specifications Met: Part 3
Specification Assumed Met
Contingency Plan for Assumed Specification• Contact 4th year chemical engineering students to
test cart after apparatus is fully assembled and connected with LabVIEW.
• Conduct time and operation trials on all contacted persons with cart and lab manual.
Electrical Issues• Remaining Issues
o Digital to analog converter codeo I/P circuit
• Result: Unmet Specificationo Manual P/PI control can be achieved, but complete control through
LabVIEW is not yet possible.
Action Plan for Electrical Issues
• PID Automatic Controlo Fix issues with digital to analog converter code.o Continue testing PID control.o Continue testing and finalize circuit.
Deliverables• Technical Paper
o Whole team will review paper and sign copyright forms before 11/22.
• Lab Manualo Team will turn in Lab Manual by 11/22.
• Assembly/Maintenance Manualo Team will turn in assembly manual by 12/12.
• Technical Postero Team will turn in poster by 12/2.
• Edge Websiteo Team will complete Edge by 12/12.
• Final Presentationo Whole team will rehearse for presentation before 12/5.
Questions?