P14415: Subsystem Design Review
Patrick Morabito John Wilson Michael CoffeyNathan ConklinSamuel Svintozelsky
![Page 2: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/2.jpg)
Agenda
• Background and Recap Information
• Engineering Requirement Flowdown
• Subsystems
• Proof of Concepto Prototypingo Economic Analysis
• Test Procedure & Risks
• Moving Forward
![Page 3: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/3.jpg)
Background InformationInadequate sanitation is a major cause of
preventable illnesses in children around the world. According to UNICEF, diarrhea alone causes over 1.6 million deaths in children under 5. These illnesses can easily be prevented by improving sanitation. However, cost is a major barrier limiting the adoption of sanitation in Haiti.
Peter Morgan’s Arborloo is a simple latrine built over a small pit, which when filled is then moved to a new pit location. The old, filled pit then has vegetation planted on top of it, such as a fruit tree.
![Page 4: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/4.jpg)
New Learnings
• Meeting with Johnnyo Low-cost reaffirmed as critical constrainto Building capabilities explored
• Mock up buildo Hole size requirement revisited
o Platform size improvementsxxx
![Page 5: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/5.jpg)
Engineering Requirements - Updates
• S4-Maximum squat hole diameter
• S8-Complexity of tools needed
![Page 6: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/6.jpg)
Critical Requirements Recap
• Costo Continuously surfaces as
primary requirement
• Weighto Crucial to remote users
• Load Bearing Abilityo Main functional requirement
(From Engineering Requirements) https://edge.rit.edu/edge/P14415/public/Project%20Planning%20Phase/Engineering_Requirements_14415.xls
![Page 7: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/7.jpg)
Highlighted Functions
• Guides Raw Sewage
• Supports Weight
• Separates User from the Pit
• Establishes Barrier Between User and Waste
![Page 8: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/8.jpg)
Subsystems
• Manufacturing Process
• Material Selection
• Shape & Form
![Page 9: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/9.jpg)
Manufacturing Processes
![Page 10: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/10.jpg)
Materials Considered
Cost Matrix
Acquired Quotes for these materials are a little too costly.
![Page 11: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/11.jpg)
Design #1
• Explored Rib Design Models
• Built Full Scale Mockup
• Built Vacuum Formed Scale Model
• Two Directions
![Page 12: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/12.jpg)
Design #1 Rib Design Set up
2000N Load
Fixed at 4 corners
Model Tensile Strength: 9.5 * 10 ^7 N/m^2Fixed at 4 corners of baseLoad: 2000N Load*Refer to reports for mesh information
![Page 13: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/13.jpg)
Design #1 Exploration
![Page 14: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/14.jpg)
Design #1: Highlighted Beta Designs
![Page 15: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/15.jpg)
Design 1 Rib Design Summary
![Page 16: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/16.jpg)
Design #1 - Half Scale ModelPurpose:
● Test ABS Plastic● Test vacuum forming capabilities
![Page 17: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/17.jpg)
Design #1 - Half Scale Model Cont.
![Page 18: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/18.jpg)
Design #1 - Half Scale Model Cont.Lessons Learned
Weak/Thin Corners
Poor edge draft/vacuumStrong ribs & durable top surface
![Page 19: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/19.jpg)
Design #2
• Full Scale Mockup
• Material Selections
• Cost Analysis
![Page 20: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/20.jpg)
Design #2 Cost Analysis
• 1 x 6” Designo 11/16” thicko 14’ Plastic board o 10’ 2x2 ribbingo $43.7 total
• 10-¼ x ¼”o ¼” thicko 1.5 12’ boardo 10’ 2x2 ribbingo $35.66 total
![Page 21: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/21.jpg)
Cost Analysis - Design #1 & #2 Full Scale Models
![Page 22: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/22.jpg)
Designs #3 & #4
• Not Feasible Designs
• Cardboard Modelso Difficult to sit and stando Scale required to cover hole required separate
supporting base
• Better as Seatso Can easily be integrated with a bucket
![Page 23: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/23.jpg)
Updated Risks Assessment (Technical)
![Page 24: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/24.jpg)
Updated Risks Assessment (Project)
![Page 25: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/25.jpg)
Updated Risks Assessment (Team)
![Page 26: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/26.jpg)
Test Plan - Revisited
![Page 27: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/27.jpg)
Updated Project Plan
![Page 28: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/28.jpg)
Key Decisions from Subsystem Phase
• Design 1: Two Directionso Plastic Ribbing & Supportso Recycled/Repurposed Material
• Design 2: “Local Industry”
• Designs 3 & 4: No Longer Full Designso Possible Seat Integration
• Possible Manufacturing Processeso Vacuum Formingo Rotational Moldingo “Kit”o Recycled
![Page 29: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/29.jpg)
Moving Forward - Next Phase
• Design 1: Repurposed Materials Method
• Design 2: Support Structure
• Lid Designs
• Seats (Upgradable)
• Cleanability
![Page 30: P14415: Subsystem Design Review Patrick Morabito John Wilson Michael Coffey Nathan Conklin Samuel Svintozelsky](https://reader035.vdocuments.net/reader035/viewer/2022062715/56649daa5503460f94a97f6d/html5/thumbnails/30.jpg)
Questions?