P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Upload: vuonghuong

Post on 21-May-2018

226 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

P&A Cementing Technology UpdateP&A Seminar October 29th 2015

Alexander Ryabchikov,

Norway Cementing Technical Manager

Page 2: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

© 2015 Schlumberger. All rights reserved.

An asterisk is used throughout this presentation to denote a mark of Schlumberger. Other company, product, and service names are the properties of their respective owners.

Page 3: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Agenda

CEMENTICS* Cement Plug Placement Design

Invizion Evaluation* Service – External Barrier Verification

Sealing Fluids Technology Update

– FlexSTONE*

– FUTUR*

Summary

Page 4: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Cement Plug Placement Challenges

Cement plug is typically small in volume, often contingency, hence prone to failure

Cement plug failure can be very expensive and multiple failures are possible

Failures can be caused by:

Well condition (inaccurate temperature data, losses, hole size uncertainty, etc.)

Slurry design (incorrect time to T, poor compressive strength, etc.)

Oilfield placement technique and design (contamination with brine/spacer during placement, incompatible fluids, unstable base, etc.)

Execution problem Unstable fluid interface, Schlumberger Cambridge

Research

Page 5: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Downhole Fluids Contamination

Critical part: Cement plug placement in the wellbore

Far less tolerant to contamination than Primary cementing due to small volume– Fluid mixing while cement displacement

down the pipe and up the annulus

– Fluid mixing when POOH with cement stinger

Resulting cement contamination with wellbore fluid with sub-optimal cement compressive strength development – failure in verification

Page 6: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

CEMENTICS* Plug Design

Well & fluid Well & fluid data

formation, temperature, fluidsTubulars, open hole, formation, temperature, fluids

Page 7: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Pumping scheduleCEMENTICS* Plug Design

Well & fluid Well & fluid data

Volume optimization

Volume optimization

VBALANCE

VOLUME

BALANCE

Page 8: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Extent of contamination zoneCEMENTICS* Plug Design

Well & fluid Well & fluid data

Volume optimization

Volume optimization

POOHPOOH

SIMULATOR

POOH SIMULATOR

VBALANCE

VOLUME

BALANCE

Zoom

Page 9: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Control of the wellCEMENTICS* Plug Design

Well & fluid Well & fluid data

Volume optimization

Volume optimization

POOH

Hydraulic Hydraulic placement

HSIMULATOR

HYDRAULIC

SIMULATOR

POOH SIMULATOR

POOH SIMULATOR

VBALANCE

VOLUME

BALANCE

Page 10: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

(pipe + annulus)Mixing due to fluid placement (pipe + annulus)

CEMENTICS* Plug Design

Well & fluid Well & fluid data

Volume optimization

Volume optimization

POOH

Hydraulic Hydraulic placement

Mixing during Mixing during placement

W CIII

WELLCLEAN

III

HSIMULATOR

HYDRAULIC

SIMULATOR

POOH SIMULATOR

POOH SIMULATOR

VBALANCE

VOLUME

BALANCE

Page 11: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

(placement + POOH)Combined mixing (placement + POOH)

CEMENTICS* Plug Design

Well & fluid Well & fluid data

Volume optimization

Volume optimization

POOH

Hydraulic Hydraulic placement

Mixing during Mixing during placementCombine

mixing (POOH)Combine

mixing (POOH)

W CIII

WELLCLEAN

III

HSIMULATOR

HYDRAULIC

SIMULATOR

POOH SIMULATOR

POOH SIMULATOR

POOH SIMULATOR

POOH SIMULATOR

VBALANCE

VOLUME

BALANCE

Page 12: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Summary: CEMENTICS

Options offered:

Optimizing under-displacement, or customizing for sensitivity analysis

Allowing wet pull out simulation

During placement and after POOH, showing individual fluid concentrations, not only contamination risk zones

Accurate WOC time prediction !

Page 13: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Multiple methods for identifying the presence of cement

They all should corroborate

Difficult to compare them with one another

What about other wellbore data?- Open hole logs: gamma ray, resistivity,

temperature, deviation, caliper- Pore pressure / frac gradient- Formation tops, rock types, known fractured

zone

How can we integrate all available well data to make the best possible assessment of cement integrity?

050

0.0

1000

.01500

.0

m

Well

0 3 6 9

deg

Deviation

Deviation

0 0.5 1.0 1.5 2.0 2.5 3.0 3.5

(x 1000) psi

Dynamic Well Security

Hydros tatic

Min. Hydrostatic

Max. Dynamic

Min. Dynamic

Frac

Pore

WA

RN

ING

: L

OS

SE

S

Lithology

Sandstone

Sandstone Shallow Gas Zone

Shale

Sandstone Water

Shale

Evaporite Halite

Limestone Oil - Pay Zone

Ga

sW

ate

rO

il

Challenges in Annular Barrier Verification

Page 14: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Invizion Evaluation* Workflow

Objectives, Formation characterization: Which formations / zones do you want to isolate?Drilling: What the hole is telling us?Cement Placement: How is your barrier placed?

Analyze Forecast Measure

Acoustic Logs: What are the logging results?Interpretation: What are the outcomes and why?

Page 15: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Local Servers

Cementing

Wireline

Mud-Logging

Drilling Fluids

Drilling and Measurements

Well Information Storage

Page 16: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Invizion Evaluation for Efficient P&A

P&A Decision

Cur

rent

Wel

l Sta

tus

Fin

al W

ell S

tatu

s

Relevant Well Info

Acoustic Logging Data

Invizion Evaluation

Annulus fill evaluation

External Barrier

Verification

P&A Program

Page 17: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

The need for full cement plug integrity is clear

Minimizing/eliminate microannuli by expansion

Better zonal isolation

Saving you time and money……a robust solution

Particle Size Distribution

Flexible Particle

Expanding Agent

FlexSTONE* SystemsSummary

Page 18: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

To demonstrate that a FlexSTONE system can form a leak tight seal in a large-scale laboratory test under downhole conditions and at a differential pressure of 2.5 bar/m

The conditions were those of the problematic well

Proved expansion during dry-gas conditions (no H20)

SPE/IADC 97347

P&A TestingJoint Industry Collaboration - Shell

Page 19: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Self-Responding to problems when and where

they ariseSurface operations remain

unchanged

Prevents downhole isolation failures from becoming surface problems (SCP,

SCVF)

Matrix swells to re-establish the hydraulic seal across the cracks and/or micro annulus

Self-Healing Cement-Based Blend

Can be mixed and pumped as part of primary cementing operation

Presence of hydrocarbons (gas, condensate, oil) triggers the self-healing effect

FUTUR* Active Set Cement

Page 20: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Applications

For wells in fields with history of leaks (SCP, SCVF)

Remedial cementing - for Plug and Abandonment applications

For wells in areas with environmental concerns

Primary cementing of Gas or Oil wells on Land and Offshore, UGS wells

In wells subjected to unplanned pressure and/or temperature changes

For fields subjected to geological formation changes or tectonic activities

95%Methane Concentration, mol

FUTUR-Gas

Oil – All Types

FUTUR-Oil

1440 1920 Density, [kg/m3]

20 138Exposure Temperature, DegC

0% 2%ExpansionUp to…

FUTUR Active Set Cement

Page 21: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Summary

CEMENTICS Software:

– Reduce cement plugs costs & risk

Integrity for eternity – Sealants that last

Invizion Evaluation barrier verification:

Reservoir Reservoir

Tubing

Production Casing

– Top of Cement

– Barite sag

– Formation creep

– Casing centralization

Cement Plug

Effective Internal Barrier Placement

Page 22: P&A Cementing Technology Update - norskoljeoggass.no · P&A Cementing Technology Update P&A Seminar October 29th 2015 Alexander Ryabchikov, Norway Cementing Technical Manager

Thank You