pag2

1
Münster (Westfalia) Domplatz - Germany November 2010 - February 2012 February 2012 June 2012 95 mq LWL Regional Museum of Art and Cultural History, Münster (D) 160.000 € Modulorbeat Ambitious Urbanists & Planners Führer Kosch Jürges, Prof. Dr.-Ing. Thomas Jürges, Aachen (D) GOLDEN SPLENDOUR PAVILION TECU® Gold copper-alluminium alloy KME Germany AG & Co. KG (D) MN Metallverarbeitung Neustadt GmbH, Neustadt (D) softwood 40 m3; concrete 10 m3 H.Schoster GmbH & Co. KG, Münster (D) Niggemann GmbH + Co. KG, Münster (D) carpentry Wieskötter GmbH & Co. KG., Senden (D) Building firm Herbort, Münster, (D) 2 Location Period End of work Removal Utility space Client Cost Architects Structural Design Facade material Productor Manufacturing Building material Wood construction Glass Doors Concrete construction PROJECT

Upload: marta-vannucchi

Post on 10-Mar-2016

212 views

Category:

Documents


0 download

DESCRIPTION

information about the Pavilion

TRANSCRIPT

Page 1: pag2

Münster (Westfalia) Domplatz - GermanyNovember 2010 - February 2012February 2012June 201295 mqLWL Regional Museum of Art and Cultural History, Münster (D)160.000 €

Modulorbeat Ambitious Urbanists & PlannersFührer Kosch Jürges, Prof. Dr.-Ing. Thomas Jürges, Aachen (D)

GOLDEN SPLENDOUR PAVILION

TECU® Gold copper-alluminium alloyKME Germany AG & Co. KG (D)MN Metallverarbeitung Neustadt GmbH, Neustadt (D)

softwood 40 m3; concrete 10 m3H.Schoster GmbH & Co. KG, Münster (D)Niggemann GmbH + Co. KG, Münster (D)carpentry Wieskötter GmbH & Co. KG., Senden (D)Building �rm Herbort, Münster, (D)

2

Location

PeriodEnd of work

RemovalUtility space

Client

Cost

Architects

Structural Design

Facade material

ProductorManufacturing

Building material

Wood construction

GlassDoors

Concrete construction

PROJECT