page 1 a brief on rasg-mid ismaeil al balooshi(chair rasg-mid) pirg-rasg global coordination...

8
Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID Agenda item 2

Upload: derick-mosley

Post on 16-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID

Page 1

A brief on RASG-MID

Ismaeil Al Balooshi(Chair RASG-MID)

PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

PIRG/RASG GCM-2013/PPT-3 RASG-MIDAgenda item 2

Page 2: Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID

Page 2PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

RASG-MIDChairperson (State) UAE1st Vice Chairperson (State) Oman2nd Vice Chairperson (Industry) IATA/Etihad

RAST(Regional Aviation

Safety Team)

SST(Safety

Support Team)

RGSIFDLOC-I CFIT

ASRT(Annual

Safety Report Team)

Annual Safety Report

SecretariatICAO MID

Steering Committee (RSC)Co-Chair (State) Lebanon• Co-Chair (Int’l Org./Industry) Boeing

RASG-MID working arrangements

Page 3: Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID

Page 3PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

Identification of 4 Focus Areas: 1) Runway and Ground Safety (RGS), 2) In-Flight Damage

(IFD), 3) Loss Of Control In-flight (LOC-I), and 4) Controlled Flight Into Terrain (CFIT);

Endorsement of the First MID Region Annual Safety Report; Endorsement of initial Draft set of SEIs and DIPs for further

review, prioritization and development; RASG-MID work programme for 2013 developed in

coordination with all safety partners (IATA, CANSO, Boeing, COSCAP-GS, UN-WFP, etc.); and

Agreement to organize a MID Region Safety Summit on annual basis as a collaborative effort.

RASG-MID: Successes

Page 4: Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID

Page 4PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

• Consolidate efforts and eliminate duplication of efforts, to the max extent possible.

• First MID Region Safety Summit (Bahrain, 28-30 April 2013).

• Define Safety indicators and Targets to measure effectiveness of actions.

• Review, prioritize, and further develop SEIs and DIPs.• Implement the RASG-MID Work Programme for 2013.

RASG-MID: Priorities

Page 5: Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID

Page 5PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

• Very similar to MIDANPIRG Roadblocks.

RASG-MID: Roadblocks

Page 6: Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID

Page 6PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

• Political instability and sensitivity between certain States.

• Lack of Human resources/Expertise to cope with all the developments at global, regional and national level and to provide necessary support to the MIDANPIRG subsidiary bodies.

• Weak regulatory framework at State level (clear separation between Regulator and Service Providers).

• Involvement of regulatory and industry personnel in MIDANPIRG activities.

• Financial constraints for travel (ICAO meetings, Seminars, etc).

• Concept of regional cooperation.

• Regional/Sub-regional framework (ACAC, GCC).

• Duplication of efforts with Regional Organizations (ACAC, CANSO, GCC).

• Level of reporting of data by States, including replies to State Letters, Questionnaires, etc.

• Airspace users involvement and contribution (IATA, IFALPA, AACO, etc.).

RASG-MID/MIDANPIRG : Roadblocks

Page 7: Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID

Page 7PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013

• Support to RASG-MID (access to and availability of necessary safety information from all sources, including States, ICAO, etc.).

• Clear process of coordination with MIDANPIRG.• ATM safety to continue to be addressed by MIDANPIRG until

the RASG-MID reaches maturity. RASG-MID should continue dealing mainly with safety of flight operations and aerodrome safety.

• Planning should be initiated as soon as circumstances permit (maturity of RASG-MID) to adopt a safety management approach so that RASG-MID addresses safety issues from an integrated perspective that includes also ATM safety.

RASG-MID: Expectations

Page 8: Page 1 A brief on RASG-MID Ismaeil Al Balooshi(Chair RASG-MID) PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013 PIRG/RASG GCM-2013/PPT-3 RASG-MID

Page 8PIRG-RASG Global Coordination Meeting, Montreal 19 March 2013