Page 1 of I DATA TRANSMITTAL l.EDT 624730 2. To: (Receiving Drganization) 3. From: (Originating Organization) 5. Proj .lProg.lDept ./Div. : Distribution TWRS Projects/SST Retrieval W-320 TWRSITCPN # 02991 6. Design Authority1 Design AgentlCog. Engr.: JW Bailey, NHC 8. Originator Remarks: For approval and release of a new supporting document. This document has been generated to ensure retrievabil ity of the Project W-320 "Master Calculation List". 11. Receiver Remarks: 11A. Design Baseline Docunent? [] Yes [XI NO 4. Related EDT No.: 7. Purchase Order No.: n/a n/a n/a 9. Equip./Corrponent No.: io. System/BLdg.lFacility: 241-C-106 12. M a j o r Assm. Dug. No.: 13. PermitlPermit Application No.: 14. Required Response Date: 15. DATA TRANSMITTED - IEI Title or Description of Data IAI IC1 ID1 NO. NO. I01 DocumentlDrawinp No. Sheet Rev. Transmitted item NO. - 1 (F) Approval Dssiw nator (H) Origi- niltor Dispo- sition (1) Rscsir Dihpo- sition er I HNF-2527 - 0 Project W-320, NA 241-C-106 Sluicing, Master Calculation Approval Designator (FI Roolion for Transmittal I51 E. S. Q. D or NIA 1. Approval 4. Review 1888 WHGCM-55, 2. Release 5. Post-Review Sec.12.71 3. Information 6. Dist. (Receipt Acknow. Required) ED-7400172-1 Disposition [HI & Ill 1. Approved 4. Reviewed nolcomment 2. Approved wleommsnt 5. Reviewed wlcommsm 3. Disapproved wlcomment 6. Receipt acknowledged

Upload: others

Post on 30-Sep-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Page 1 of I DATA TRANSMITTAL

l.EDT 624730

2. To: (Receiv ing Drgan iza t i on ) 3. From: ( O r i g i n a t i n g Organizat ion)

5. P r o j .lProg.lDept ./Div. : Distribution TWRS Projects/SST Retrieval

W-320 TWRSITCPN # 02991 6. Design A u t h o r i t y 1 Design AgentlCog.

Engr.: JW Bailey, NHC

8. O r i g i n a t o r Remarks: For approval and release o f a new supporting document. This document has been generated to ensure retrievabil ity o f the Project W-320 "Master Calculation List". 11. Receiver Remarks: 11A. Design Base l i ne Docunent? [ ] Yes [XI NO

4. Re la ted EDT No.:

7. Purchase Order No.: n/a

n/a

n/a 9. Equip./Corrponent No.:

io. System/BLdg. lFaci l i ty :

241-C-106 12. Major Assm. Dug. No.:

13. Pe rm i t lPe rm i t A p p l i c a t i o n No.:

14. Required Response Date:

15. DATA TRANSMITTED - IEI Title or Description of Data

IAI IC1 ID1

NO. NO. I01 DocumentlDrawinp No. Sheet Rev. Transmitted item NO.

- 1

( F ) Approval Dssiw nator

(H ) Origi- niltor

Dispo- sition

( 1 ) Rscsir

Dihpo- sition

er

I HNF-2527 - 0 Project W-320, NA

241-C-106 Sluicing, Master Calculation

Approval Designator (FI Roolion for Transmittal I51 E. S. Q. D or NIA 1. Approval 4. Review 1888 WHGCM-55, 2. Release 5. Post-Review Sec.12.71 3. Information 6. Dist. (Receipt Acknow. Required)

ED-7400172-1

Disposition [HI & Ill 1. Approved 4. Reviewed nolcomment 2. Approved wleommsnt 5. Reviewed wlcommsm 3. Disapproved wlcomment 6. Receipt acknowledged

Page 2: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

HNF-2527, Rev. 0

Project W-320, 241 -C-I 06 Sluicing, Master Calculation List

John W. Bailey Numatec Hanford C o . , Richland, WA 99352 U.S. Department o f Energy Contract DE-AC09-96RL13200

EDT/ECN: 624730 UC: 506 Org Code: 8C452 Charge Code: D2991/HANA0600 B&R Code: EW3130010 Total Pages: /8

Key Words: Calcu la t ion , WRSS.

W-320, S lu ic ing , Tank 241-C-106, Tank 241-AY-102,

Abstract : "Master Calcu la t ion List" r e a d i l y r e t r i e v a b l e .

T h i s support ing document has been prepared t o make t h e

TRADEMARK DISCLAIMER. trade name, trademark, manufacturer, or otheruise, does not necessarily constitute or inply i t s endorsement, recmndation, or favoring by the United States Govermnt or any agency thereof or i t s contractors or subcontractors.

Printed i n the United States of America. To obtain copies of this docmnt, contact: Docmnt Control Services, P.O. Box 950, Maitstop Hb-08, Richland UA 99352, Phone (509) 372-2420; Fax (509) 376-4989.

Reference herein to any specific c m r c i a l product, process, or service by

& & 3" Reless ApprOV ate

Approved for Public Release

I A-6400-073 (01197) GEF321

Page 3: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List HNF-2527, Rev. 0

Issued Rev Status Discpl Calculation Title , Originator Comments Under

HNF-

Calc No. w320-

Page 1 of 17

Page 4: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

HNF-2527, Rev. 0 Project W-320 Master Calculation List

27

29

30

I y::2 I Rev I Status I Discpl I Calculation Title I Originator I Comments

24-025 1 App'd :::At Cover Block Lifting Bail Evaluation MB Lasota C-Farm: 2468

24-026 Struct Missile Evaluation 51A/51B; Design Verified (simple SC 3/1) 2468

MB Lasota C-Farm: SC 3 Equip. Anchorage 2468 24-027 Struct Related Equipment Attachments

RW Davidson C-Farm: 2468 24-028 Struct Grade Items

Civl Seismic Shutdown System Padmind JR AY- & C-Farm: 241-AY-51A/51B, 241-C-

Civ/

Civ/ Engineering Evaluation of Commercial

Seismic Analysis for Misc. Safety

17 1 24-015 I 1 1 App'd I 1241-C-106 Dome Load Summary Repord RW Davidson IC-Farm: Tank 241-C-106 1 2466

32 24-030 As-Built Civ/ Struct

I MB Lasota IAY-Farm: Pit AY- 18 I 24-016 I 2 /As-Built1 L:v!+ ISluice Pit AY-OZE Analysis E P ,I

MR Custer HVAC Skid: 2468 Electrical Equipment and Conduit Supports-Process Bldg. Skid

Civ/ Equipment FOL 25 I 24-023 I 0 IAS-BUiltl P .... "I I0 .. -^^

31 I 24-029 I 2 I As-Built1 g::Lt lElemrical Structural Equipment Analysis of supports, safety Related I MB Lasota IAY- & C-Farm

33 24-031 0 As-Built Struct Process Bldg Equip Skid Rigging Frame MR Custer ~ ~ ~ ~ ~ t : ~ ~ ~ ~ b S n l ; h r , " ~ ~ ~ ~ ~ ~ ~ d 2468 I I I I civl I 34 I 24-032 I 0 ( As-Built1 :/::+ ICover Block Analysis-Sluice Pit AY-OZEI MB Lasota IAY-Farm: Pit AY-O2E; ECN W-320-173 I 2468

Page 2 of 17

Page 5: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List

Originator

RL Ackerman

HNF-2527, Rev. 0

Issued Comments Under

HNF-

C-Farm: 2468

41

Status Discpl

4 2

Calculation Title

43

MR Custer

NG Ha

AS Langevin

LA Valle

CA Fargo

44

2468 C-Farm: 241-C-91 retained for record only and listed on the drawing index

C-Farm: Exhaust Air Cleanup Train 2468

C-Farm: 2468

AY-Farm; 2468

AY- & C-Farm: Exhausters VTP-POR-007 & - 2468

45

4s-Built

4S-BUilt

App’d

As-Buiit

:ale No. w-320-

24-033

24-034

24-035

24-036

24-037

- - -

-

-

;::it Process Bldg Lower Lifting Frame

Civ/ RecirculationlExhaust Skid Strl Struct Evaluations

:::it Exhaust Skid Platform Modification

Struct Equipment Rack

Struct Exhauster

Civ/

Civ/ DBE Analysis for 1000 CFM Portable

Check Calcs for AY-102 Electrical

24-038

RC Campbell

RC Campbell

RC Campbell

RC Campbell

RC Campbell

25-001

Equipment Removal Sys: Use of Spray Ring deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index

Equipment Removal Sys: Removal of the existing Transfer Pump and the use of the Pump Lifting Fixture deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Removal of the existing Heel Jet and the use of the Heel Jet Lifting Fixture deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Removal of the Heel Jet deleted from project. Calc given final review, retained for record only and not listed on the drawing index

Equipment Removal Sys: Removal of the Agitator Pump deleted from project. Calc given final review, retained for record only and not listed on the drawing index

No

No

No

No

No

25-002

25-003

__

25-004

____

25-005

0

1

1

0

0

hs-Built/ :::it IVehicle Load Over Pipeline

As-Built I Mech IDecontamination Spray Ring Pipe Stres:

Lifting Fixture Stress Analysis, Transfer Pump Lifting Fixture

Lifting Fixture Stress Analysis, Heel Jet Lifting Fixture

Mech Center of Gravity, Heel Jet, Tank 106C I IPitB

Mech Center of Gravity, Agitator Pump, Tank 1 102AY. Pit B App’d 1 Page 3 of 17

Page 6: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

HNF-2527, Rev. 0 Project W-320 Master Calculation List

Originator Comments Calc No. w-320-

25-006

Issued Under CINE.

25-007

RC Campbell

RC Campbell

RC Campbell

RC Campbell

RC Campbell

RC

RC Campbell

25-008

Equipment Removal Sys: Removal ot the existing Transfer Pump deleted-from project. Calc given final review, retained for record only and not listed on the drawing index

Equipment Removal Sys: Removal of the existing Agitator Pump and the use of the Pump Lifting Fixture deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Use of the Pit B spool piece deleted from project. Calc checked against released drawings, .retained for record only and not listed on the drawing index Equipment Removal Sys: Use of the Pit A spool piece deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Use of the Pit B spool piece deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index

Equipment Removal Sys: Use of spool pieces deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index

Equipment Removal Sys: Removal of the existing Transfer Pump deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawinp index

No

No

No

No

No

No

No

25-009

25-01 0

25-01 1

25-01 2

Status Discpl Calculation Title

106C. Pit A "Mystery Pump"

~s-Buiit Mech Lifting Fixture Stress Analysis, Agitator Pump Lifting Fixture I 1

As-Built Mech Spool Piece Weight, Pump Pit 102AY. Pit B

As-Buiit Mech Spool Piece Weight, Pump Pit 106C. Pii A

As-Built Mech Spool Piece Weight, Pump Pit 106C. Pi1 l lB As-Built Mech Tie Rod Sizing for Spool Pieces

As-Built Mech Pump Lifting Point Strength Analysis

Page 4 of 17

Page 7: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List

Originator

RC Campbell

RC

Rc Campbell

HNF-2527, Rev. 0

Issued Comments Under

HNF- Equipment Removal Sys: Removal of the Heel Jet deleted from project. Calc given final review, retained for record only and not listed on the drawing index Equipment Removal Sys: Removal of the Heel Jet deleted from project. Calc given final review, retained for record only and not listed on the drawing index

Equipment Removal Sys: Removal of the Agitator Pump deleted from project. Calc glven final review, retained for record only and not listed on the drawing index

No

No

No

:ale No. w.320- - 25-013

~

25-014

RC Campbell

RC

RC Campbell

RC Campbell

25-015

Equipment Removal Sys: Removal of the Trasfer Pump and the use of the Mock-up deleted from project. Calc checked against No released drawings, retained for record only and not listed on the drawing index

Equipment Removal Sys: Shielding plugs used for installation only and not part of permanent facility modification. Calc checked against released drawings, retained for record only and not listed on the drawing index Equipment Removal Sys: Shielding plugs used for installation only and not part of permanent facility modification. Calc checked against released drawings, retained for record only and not listed on the drawing index

Equipment Removal Sys: Removal of the Heel Jet deleted from project. Calc checked against released drawings, retained for record only and not listed on the drawing index

No

No

No

25-016

25-017

25-01 a

25-01 9

Status Discpl Calculation Title

Mech Weight and Center of Gravity for Heel App'd 1 1 Jet Mock-up

Weight and Center of Gravity for Transfer Pump Mock-up

As-Built Mech Flange Thickness of Shielding Plugs l l As-Built Mech Lifting Capacity of Bails

As-Built Mech Pin sizing of Heel Jet Mockup Joints l l Page 5 of 17

Page 8: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

ON

ON

B Z O - 9 z

P Z O - 9 Z

-

EZO-9Z

z z o - 9 z

Page 9: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

27-008 I I

Discpl

Piping

Piping

Piping

Piping

Project W-320 Master Calculation List

Calculation Title

Sizing of Drain Lines for the Pump Pit (241-CR-06A1, the Heel Pit (241-CR- 066). and the Sluice Pit (241-CR-06CI

Hydraulic Analysis for Slurry Pump Normal Operations at Maximum Operational Temperature

Slurry Pumps Hydraulic Calculation

Hydraulic Analysis for Slurry Pump Star up Operations at Maximum Operational Temperature

Originator Comments

Not Used I

NJ Juplo

DL Stone

NJ Juplo

Not Used I

C-Farm: Heel Pit work deleted. Drain slots covered and replaced by 6" dia. drain hole in sluicer top plate, see H-2-818551 sh 4. Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-041

C-Farm: Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-048

C-Farm: For Pumps P-1361 & P-1362 and Line 4" SL-100-M9. Calc not As-Built, given final review and original content retained for record, to suppon Pump P-Spec, W-32O-Pl7, dated 1/17/95. Superseded by 27-048

DL Stone

HNF-2527, Rev. 0

C-Farm: Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-048

Piping Hydraulic Analysis for Slurry Pump Star up Operations at Minimum Operational Temperature

DL Stone C-Farm: Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-048

I Not Used

Piping

I Not Used

Hydraulic Analysis for Sluice Pump at Maximum Operating Temperature DL Stone

- Issued Under HNF- - No

-

No

-

247 1

AY-Farm: Calc voided, given final review, retained for record only and not listed on the drawing index. Superseded by calc 27-048

No

No

NA

NA

No

Page 7 of 17

Page 10: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List

Status

HNF-2527, Rev. 0

Issued Discpl Calculation Title Originator Comments Under

7 4 Aw'd

75

AY-Farm: For Pumps P-0621 & P-0622 and Line 4" SN-200-M9. Calc not As-Built, given

record, to support Pump P-Spec, W-32O-Pl7. dated 1 I1 7/95. Superseded by 27-048

AY, C & Inter-Farm: Significant pressure

Piping Hydraulic Analysis for Sluice Pump at Minimum Operating Temperature K. Cleveland final review and original content retained for 2471

7 7

As-Built

Void

As-Built 78 - 7 9

80 -

- 81 - 82 -

index.

Piping Sizing of Compressor NJ Juplo C-Farm: Air Compressor CPR-1361 247 1

AY, C & Inter-Farm: Significant pressure transients due to sudden valve closure only.

Calc voided, given final review, retained for record only and not listed on the drawing index. AY, C & Inter-Farm: Lines 4" SL-lOO-Mg &

Piping Pressure Forces at Changes in Direction Merzouk Valves on process lines deleted from project. in Transfer Line During Transient States No

Piping Process Pipe Stress Analysis DL Stone 4" SN-200-M9. Ref calc's 27-016, 029 & 2472

83

As-Built

As-Built

As-Built

27-010

055 AY, C & Inter-Farm: Lines 4" SL-lOO-Mg & 4" SN-200-M9 encasements AY, C & Inter-Farm: Lines 4" SL-lOO-Mg & 4" SN-200-M9 structural supports C-Farm: Pit C-06A (jumper US-A,Bl & Pit C-

DL Stone

DL Stone JR Booth

2473 Piping Encasement Pipe Stress Analysis

2474 Piping Support Structural Analysis

Piping C Farm Jumper Stress Analysis DL Stone 06C (jumper U6-AI. Ref calc's 27-01 3 & 2474

0

C-Farm: Requirement to pressure relieve

Calc voided, retained for record only and not listed on the drawing index.

process flow (350 gpml deleted from project.

27-012

No

0

transients due to sudden valve closure only.

Calc voided, given final review, retained for record only and not listed on the drawing

No Estimate Water Hammer Due to Sudden

Transfer Pump Void 1 Piping 1 Valve Closure or Sudden Power Loss to Valves On process lines deleted from

As-Built I Piping IDistributor Stress Analysis I RC Campbell IAY-Farm; Distributor D-0621 I 2474

VOID Piping Sizing of Pressure Relief Valve 1 1 Page 8 of 17

Page 11: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List

Discpl

Piping

HNF-2527. Rev. 0

Calculation Title

Winch Analysis

85

D.L. Stone

86

AY & C-Farm: Winches W-0621 & W-1361 2474

87

-

88 -

89 -

Piping

9 0

Alternate Routing Analysis, M10, M1 1, M12, and M13

91

RC Campbell

RC Campbell

RC Campbell

M c ~ . ~ o l s

RC Campbell

RC Campbell

DL Stone

DL Stone

Calc No.

27-019 0

27-020 0

27-021 0

27-022 0

27-023

27-024 0

27-025 0

AY-Farm: Alternate routing not used, calc given final review, retained for record only & not listed on drawing index

AY-Farm: Calc given final review, retained for record only & not listed on drawing index. Superseded by calc's 27-045 & 27-048

AY-Farm: Caic given final review, retained for record only & not listed on drawing index. Superseded by calck 27-045 & 27-048

No

No

No

Not Used NA

AY & C-Farm: Calc voided, retained for record only & not listed on the drawing index. Superseded by calc 27-041

C-Farm: Heel Pump deleted from project. Calc voided, given final review, retained for record only & not listed on drawing index.

C-Farm: Eductor System deleted from project. Calc voided, given final review, retained for record only & not listed on drawing index.

No

No

No

Not Used NA

2475 C-Farm: Drain Line, 3" DR-302-M9, & it's 6" encasement AY-Farm: Pit AY-02E (jumper UP-A,B) & Pit AY-O2A (iumDer U l l -A I . Ref calc's 27-013 2475

I

Piping

Piping

Piping

Piping

27-027

27-030

27-031 0

Distributor Siphon Breakei

Sluice Pump Siphon Break

Not Used

Tank Template Drain Flow

Heel Pump System Operating Point

- status - - 4s-Buill

AW McNichols

~

Not Used

. . & 055 C-Farm: Loops 6" VT-1001-M42 & 6" VT- 1002 -M42 2475

Void __

Void

Void

- Not

Used

4s-Buili

4s-Buili

4s-Buili

4s-Buili

Piping Eductor Sizing System Curve

I Not Used

Piping IMiscellaneous Pipe Stress Analysis

Piping Miscellaneous Jumper Pipe Stress Analysis - AY Farm

Piping JHVAC Seal ~ o o p

Piping IBooster Pump Restrain Analysis

Originator I Comments

RC Campbell IAY-Farm: Sluice Pump, P-0622 I 2475

Page 9 of 17

Page 12: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List

Originator

NJ Juplo

HNF-2527. Rev. 0

Issued Comments Under

HNF-

C-Farm: Slurry Pump, P-1361 2476 97 27-032 0

9 8 27-033 0

99 27-034 0

100 27-035 0

101 27-036 1

102 27-037 0

103 27-038 0

104 27-039 0

105 27-040 0

106 27-041 1

107 27-042 0

AW McNichols

MB Lasota

A. Tedrow

DL Stone

DL Stone

MH Ahmed

JG Rupert

Status Discpl Calculation Title

As-Built Piping Slurry Pump Seismic Stability

C-Farm: Calc voided, given final review, retained for record only & not listed on the drawing index. Superseded by calc's 27-034 & 27-044

C-Farm: Sluicer, S-1361 2476

C-Farm: Sluicer, S-1361 2476

2476 AY & C-Farm: Rigging assembly for winches W-0621 & W-1361 AY & C-Farm; Test assembly used for trainingltesting only, not part of a permanent facility modification. Calc given final review, No retained for record only & not listed on drawing index.

AY & C-Farm: The option to bury encasement pipe in controlled fill was not used. Calc given final review, retained for record only & not listed on drawing index.

AY & C-Farm: The platform was used to support installation and was not part of a permanent facility modification. Calc given No final review, retained for record only & not

No

No

Void 1 Piping Istress on Sluicer Arm

DL Stone

Piping WinchlPump Simulation Testing App'd 1 1 Assembly

listed on drawing index. C-Farm: Booster Pump P-1362 seismic restraint AY & C-Farm: The 6" dia. drain is used in C-

2476

Piping Stress Analysis of Encasement Pipe Buried in Controlled Density Fill

App'd I I App'd Piping Temporary Winch Support Platform I 1

As-Built1 Piping IBooster Pump Assembly Components

As-Built Piping High Capacity Drain Flow

As-Built I Piping IAdapter Plate Stress Analysis

Farm Pits 06A & 06C and in AY-Farm Pits 02A & 02E. Drains have been installed in Winches W-0621 & W-1361, Distributor D- 0621, and Sluicer S-1361. Supersedes calc's 27-001 and 27-024 I::: DL Stone AY 1361 & C-Farm: & W-0621 Adapter plates for winches W-

DL Stone

Page 10 of 17

Page 13: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List HNF-2527, Rev. 0

Status

As-Built

As-Built

As-Built

Issued Discpl Calculation Title Originator Comments Under

HNF-

Piping Reynolds Numbers at Various % Solids DL Stone Inter-Farm: Lines 4" SL-100-M9 2476

2477 Piping Sluicer Nozzle Force Analysis

Piping Pipe Drain Flows & Anti-Siphon Sizing DL Stone Lines 4" SL-100-M9 (D-06211 & 4 " 2477

4" SN-200-M9 C-Farm: Hydraulic force of Sluicer (S-13611 nozzle. Supersedes calc 27-033

SN-200-M9 (W-06211

DL Stone

108 27-043

109 27-044

110 27-045

1'11 27-046

112 27-047

113 27-048

114 27-049

115 27-050

116 27-051

117 27-052

118 27-053

119 27-054

1 TK Peterson AY-Farm: Lifting force on shielding plugs in lcover blocks for AY-Farm's pits 02A & 02E I 2477 Flushing Nozzle Lifting Force

0

0

0

0

0

0

0

0

0

0

0

0

As-Built

As-Built

As-Built

App'd

As-Built

AY-Farm: Filter housing used for testing only

given final review, retained for record only & not listed on the drawing index.

1 2479 and removed before project turn over. Calc AY-102 Annulus Supply Air Filter Housing Installation Analysis

2477 MR Custer AY & C-Farm: 6C's Pits 06A & 06C and 2AY's Pits 02A & 02E

AY, C & Inter-Farm: Lines 4" SL-100-M9 & 4" SN-200-M9 and their appurtenances. As-

Calc. Supersedes Calc's 27-002, 003, 004, 005,008,009,021 & 022.

Piping Pit Volume and In/Out Flow Areas

Piping SlurrylSupernate Hydraulic Analysis K Hayase Built Slurry and Sluice Systems Hydraulic 2478

Piping Size of HVAC Duct Flushing System NJ Juplo HVAC Skid: Duct' lo" VT-l 'lo- 2479 M8 AY & C-Farm: Portable exhausters are for

installed. Calc given final review but not As- Build. AY-Farm: Pits 02A &02E jumpers to support

Piping Portable Exhauster Installation Analysis K Hayase emergency back-up and are not 2479

Piping Jumper Flushing Supply Head Analysis K Hayase flushing lines 4" SL-lOO-Mg & 4" SN-200- 2479

As-Built1 Piping lNew Supernate Jumper Analysis I K Hayase /AY-Farm: Pit 02A. (jumper U3-U11-B) I 2479

App'd

AY & C-Farm: System curves for portable exhausters to be used for 6C's dome exhaust

Portable exhausters are not installed. Calc given final review but not As-Built.

Piping System Curves for Exhauster K Hayase air and 2AY's dome & annulus exhaust air. 2479 Installation

Page 11 Of 17

Page 14: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List HNF-2527, Rev. 0

Issued Status Discpl Calculation Title Originator Comments Under

HNF-

Page 12 of 17

Page 15: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

HNF-2527, Rev. 0 Project W-320 Master Calculation List

Rev Status Discpl Calculation Title Calc No. w-320-

I 3 2 28-01 2 0 As-built HVAC Process Building HVAC

Issued Originator Comments Under

HNF-

C-Farm: Process bldg's Fan FN-1364, Filter F-

Renumbered from H-012 to 28-01 2 RA Pina 1368 and Heaters UH-1362 & UH-1361. 2484

C-Farm: Lines 3" CWS-803-M4 & 3" CWR- 850-M4. Calc done by offsite subcontractor. Renumbered from H-013 to 28-013 and Heat Gain 133 28-013 0 As-built HVAC Water Line I I / / / 2484

Inter-Farm: Air &Water Service Bldg's Filter F-1366, Fan FN-1363, and Heater HC-1363 Renumbered from H-017 to 28-017

2484 37 28-o, As-built HVAC Service Building Fan Selection and I 1 1 1 IHeating Load

, 34 28-014 App,d HVAC Air Flow Calc System Review for Capture Velocity

135 28-015 1 As-built HVAC Sizing of Moisture Separator

136 28-01 6 0 As-built HVAC Pressure Relief Seal Loop Sizing

Loss Upstream of the Exhaust HVAC Skid & C-Farm: Fans FN-1361 and FN- 1362. Renumbered from H-018 to 28-018 2484

Equipment Removal Sys: Used to support equipment removal and not part of permanent

RG Hale faciliw modification. Calc given final review, No retained for record only and not listed on drawing index.

Renumbered from H-015 to 28-015

C-Farm: 6" VT-1001-M42 & 6" VT-1002-M9. Ref calc's 28-020 (commercial grade

verification). Renumbered from H-016 to 28- 01 6

RA Pins HVAC Skid: Moisture Separator MS-1361 2484

PH Langowski analysis) and 28-031 (independent 2484

139 28-019 Not Used Not Used

4o 28-020 As-built HVAC Commercial Grade Item Analysis, Pressure Relief Seal Loop pH Langowski

Not Used NA

C-Farm: 6" VT-1001-M42 & 6" VT-1002- M42. Ref calc's 28-020 (seal loop sizing) & 28-03 1 (independent verification). Renumbered from H-020 to 28-020

2484

Page 13 of 17

141 28-021 As-built HVAC Above Ground Pipe Stress Analysis for Duct Piping

C-Farm: 10" VT-1010-M8, 8" VT-1022-M8,

021 to 28-021 DL Stone and 6" VT-1060-M8 Renumbered from H- 2485

Page 16: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master.Calculation List

Originator

RA Pins

HNF-2527, Rev. 0

Issued Comments Under

HNF-

2485 C-Farm: Process bldg 241-C-91's seal pot sizing. Renumbered from H-022 to 28-022

14

'H Langowski

14 - 14

14 -

-

AY & C-Farm: Heating/Cooling Units; AC- 1361, AC-1362, AC-0621, and AC-0622. Renumbered from H-023 to 28-023

2485

15

28-024

28-025

28-026

28-027

28-028

28-029

28-030

28-031 15

2

1

0

1

N/A

1

1

0

:ale No.

Langowskl

,H Langowskl

RA Pina

RC Campbell

N/A

I ~~ ~~

2485 AY-Farm: Enclosure Skid 241-AY-51. Renumbered from H-024 to 28-024

C-Farm: Enclosure Skid 241-C-51. Renumbered from H-025 to 28-025

HVAC Skid: Process Bldg 241-C-91 insulation. Renumbered from H-026 to 28- 2485 026

HVAC Skid: Bldg 241-C-91 duct supports Renumbered from H-027 to 28427

2485

2485

NA Void

I

N/A NIA

28-032 I 0

RA Plna

I

~~~~

2485 C-Farm: Pump Pit 06A cooling load. Renumbered from H-029 to 28-029

28-033 1 0

WJ Hodges

EL Dalpiaz

RC Campbell

RC Campbell

Status Discpl Calculation Title

As-built HVAC Seal Pot Sizing for Leak Detection

AY-Farm: Sluice Pit AY-OPE cooling load. Chiller R-0621 & Fan/Coil FC-0621.. Renumbered from H-030 to 2 8 4 3 0

C-Farm: 6" VT-1001-M42 & 6" VT-1002- M42. Ref calc's 28-01 6 (seal loop sizing) & 28-020 (commercial grade analysisl. Renumbered from H-031 to 28431

HVAC Skid: Process Bldg 241-C-91 dome exhaust air piping (ducting). Renumbered from H-032 to 28-032 HVAC Skid: Process Bldg 241-C-91 pipe (duct) supports. Renumbered from H-033

Cooling and Heating Required for Seismic Switch Missile Enclosure

As-built HVAC Cooling and Heating Required for 1 IVariable Speed Drive (VSD) Enclosure

As-built HVAC Above Ground Pipe Support Stress I IAnaIysis

Pressure Relief Seal Loop Design Verification

As-built HVAC Process Building Piping Stress Analysis I I Process Building Duct Support Stress Analysis

2486

-

2486

2486

2486

Page 14 of 17

Page 17: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Project W-320 Master Calculation List

y:k Rev Status Discpl Calculation Title

HNF-2527, Rev. 0

Issued Originator Comments Under

HNF-

Elect Total Loads for Fabrication Shop, Lunchroom Trailer & Office Trailer 162 31-007 1 App'd

I DL Equipment Removal Sys: Done to Support Levandowski Construction Trailer Installation. 1611 31-006 1 0 1 App'd I Elect ITotal Loads for Fabrication shop

NO DL Equipment Removal Sys: Done to Support Levandowski Construction Trailer Installation.

I

Tank C-106 Load Determination,

Lighting Calculations & Conduit Sizing. 166 31-01 1 1 As-built Elect FeederIProtection Sizing, Voltage Drop, DE Larson C-Farm:

Not Used Not Used Not Used 167 31-012

Equipment Removal Sys: Done to Support I Levandowski DL I Construction Trailer Installation. 1631 31-008 I 1 I App'd I Elect IWireway Sizes for Rack Details

2487

2487

NA

Equipment Removal Sys: Done to Support NO Levandowski Construction Trailer Installation. I DL I Conduit, Nipple, conductor, Grounding

164) 31-009 I 1 I I Elect 1 &Trip Setting sizing

C-106 Demand Load Analysis, Size 165 31-010 1 As-built I I I ' I Elect Ifeeders, Voltage Drop, and Fault Study I TJ Kasnick

Page 15 of 17

Page 18: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

Calculation Title Calc No. w320- Rev Status Discpl

168 31-013 0 App'd Elect Cable Pulling Tension -C-Farm

Control Room: Cancelled by Descoping Control System to C-Farm Wire Sizing, Voltage Drop and Conduit Sizing 179 I 31-024 I 0 I Void I Elect I

Issued Originator Comments Under

HNF-

No DE Larson C-Farm: Not required for design will be used to direct wire instailation during construction.

180

Page 16 of 17

C-Farm: This calc was used to determined radiation fields during demolition and was not

Calc given final review, retained for record only & not listed on drawing index.

No Mech 33-001 0 App'd Above Open Pit (Tank c-106, Pump Pit GJ Peter part of a permanent facility modification. Exposure Rate with Pump Vertically

Page 19: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

HNF-2527. Rev. 0 Project W-320 Master Calculation List

Originator

181 33-002

182 33-003

183 33-004

184 33-005

185 33-006

186 33-007

187 33-008

188 33-009

189 33-010

190 34-001

Comments Status Discpl Calculation Title

Mech Plug Thickness at End of Riser 42" Rise (ID = 32") Pit CR-O6A Tank C-106 App'd

Above Pit Shielding Thickness with Pump or Plug in Place - Pit CR - 06A (Tank C-106)

App'd Mech

GJ Peter

GJ Peter

SR Gedeon Earth Cover Shielding Thickness for Project W-320

C-Farm: This calc was used to size a shielding plug to be used during demolition and was not part of a permanent facility modification. Calc given final review, retained for record only & not listed on drawing index. C-Farm: This calc was used to size a shielding plug to be used during demolition and was not part of a permanent facility modification. Calc given final review, retained for record only & not listed on drawing index.

AY. C & Inter-Farm: Lines 4" SL-lOO-Mg & 4" SN-200-M9 earth cover Shielding. Caic done by onsite (WHC) subcontractor.

Cover Block, Sidewall Shielding As-Built Mech Thickness for Pump Pit 241-C-06A and

GJ Peter

Sluice Pit 241 C 0 6 C Individual Shielding Thickness for HEMF or HEME Shielding Thickness to Reduce 10

AS-BUilt Mech HVAC Skid: HME-1361 & HMF-1361 shielding

Plate or (6) Air Ga Determine if Shielding Necessary for

CT Li

SR Gedeon

GJ Peter

AR Snowhite

App,d Mech Determine the Worst Exposure Rate Inside the Pump Pit 241 G 0 6 A

C-Farm: Line 10" VT-1010-M8 shielding

AY-Farm: Pits 241-AY-02A & 241-AY-02E shielding. Calc done by onsite (WHC) subcontractor C-Farm: This calc was used to estimate exposure rates for an in Pit (C-06A) entry during demolition and was not part of a permanent facility modification. Calc given final review, retained for record only & not listed on drawing index.

Site work As-Built I Cthdc IRectifier 46 [Cross-Site Transfer Lines)

CT Li C-Farm: Pit 241-C-06A shielding

CT Li IHVAC Skid: Bldg 241-C-91 Shielding wail

- Issued Under HNF- -

No

No

2489

- 2489

2489

2489

2489 ___

2489

No

2492

Page 17 of 17

Page 20: Page of I DATA TRANSMITTAL l.EDT 624730/67531/metadc678463/m2/1/high_re… · Project W-320 Master Calculation List HNF-2527, Rev. 0 27 29 30 I y::2 I Rev I Status I Discpl I Calculation

To From

Distribution JW Bai 1 ey Project Titleiwork Order Project W-320, HNF-2527, Master Calculation L i s t

JW Bailey S2-48 DE Evans S2-47 W-320 Project Fi les R1-29

Page 1 of 1 Date 6 August 1998 EDT No. 624730 ECN No. n/a

A-6000-135 (01/93) UEF067

Text Text Only Attach./ Name MSlN With All Appendix

Attach. Only

EDTlECN Only