Pajaro River Watershed Flood Prevention Authority
Board of Directors Agenda
c/o RAPS, Inc.
P.O. Box 2453
Seaside, CA 93955
(831) 883-3750
PRWFPA Chair - John Varela
PRWFPA Vice Chair - John Phillips Watsonville Civic Center Plaza Building
Council Chambers
275 Main Street, 4th Floor
(Parking is located on the 6th Floor of the parking structure)
March 10, 2017 9:00 a.m. Watsonville, CA 95076
RECOMMENDED ACTION
1. CALL TO ORDER
2. PLEDGE OF ALLEGIANCE
3. ROLL CALL
4. ORAL COMMUNICATIONS FROM THE PUBLIC
ON ITEMS NOT ON THE AGENDA (A maximum of three minutes on any subject not on the agenda)
5. ORAL COMMUNICATIONS FROM THE BOARD
ON ITEMS NOT ON THE AGENDA
6. ELECTION OF OFFICERS FOR 2017 ELECT
7. Draft Audited Financial Statements for FY 2015-2016 INFORMATION -Arleicka Conley
Receive presentation from Daffodil Nguyen, CPA from Moss, Levy &
Hartzheim, LLP, on PRWFPA’s Draft Audited Financial Statements for fiscal
year 2015-2016 (separately enclosed). (Page 5)
Page 1 of 38
8. CONSENT AGENDA APPROVE
A. Minutes of the October 26, 2016 and November 16, 2016 Board of Directors
Meetings -Ana Flores, RAPS, Inc.
Approve the minutes of the October 26, 2016 and November 16, 2016 Board of
Directors meetings.
(Page 7)
B. Approval of Payment of Gutierrez Consultants -Lidia Gutierrez, Gutierrez Consultants
Approve the January 2017 invoice for Lidia Gutierrez’s work on the Soap
Lake Preservation Project. (Page 15)
C. Approval of Payment to RAPS, Inc. -Maura Twomey, RAPS, Inc.
Approve the January 2017 invoice for services rendered by RAPS, Inc. (Page 17)
9. ADMINISTRATION
A. Financial Update Report INFORMATION -Arleicka Conley, RAPS, Inc.
Receive the financial update report which provides an update on
PRWFPA's current financial position and accompanying financial
statements. (Page 21)
B. Legislative Support for the Pajaro River Flood Risk Reduction APPROVE
Project -Lidia Gutierrez
Approve the Budget Amendment in the amount of $6,300 to fund the
legislative support for the Pajaro River Flood Risk Reduction Project.
(Page 29)
C. California High Speed Rail (HSR) INFORMATION -Maura Twomey
Receive a report from Maura Twomey, Executive Director.
Page 2 of 38
10. PLANNING
A. Soap Lake Floodplain Preservation Project Update INFORMATION -Lidia Gutierrez, Gutierrez Consultants
Receive an update from Lidia Gutierrez, Gutierrez Consultants.
11. OTHER BUSINESS
12. ADJOURN TO WORKSHOP
REFERENCE ITEMS: A. 2017 PRWFPA Meeting Schedule (Page 35) B. Acronym Guide (Page 37)
NEXT BOARD OF DIRECTORS MEETING:
Date: April 7, 2017
Location: San Benito County Board of Supervisors Chambers
481 Fourth Street, Hollister, CA 95023
Time: 9:00 AM
Note: Action listed for each Agenda item represents the staff recommendation. The Board of Directors may, at
its discretion, take any action on the items listed in the Agenda.
If requested, the agenda shall be made available in appropriate alternative formats to persons with a disability,
as required by Section 202 of the Americans with Disabilities Act of 1990 (42 USC Sec. 12132), and the federal
rules and regulations adopted in implementation thereof.
If you have a request for disability-related modification or accommodation, including auxiliary aids or services,
contact Ana Flores at 831-883-3750, or by email [email protected], at least 48 hours prior to the meeting date.
Mission: The purpose of the Authority is to identify, evaluate, fund and implement environmentally
sound flood prevention and control strategies in the Pajaro River Watershed, on an
intergovernmental, cooperative basis as required by the Pajaro River Watershed Flood Prevention
Authority Act.
Page 3 of 38
THIS PAGE IS
INTENTIONALLY BLANK
Page 4 of 38
`
MEMORANDUM
TO: PRWFPA Board of Directors
FROM: Maura F. Twomey, Executive Coordinator
RECOMMENDED BY: Arleicka Conley, Director of Finance &
Administrative Services
SUBJECT: Draft Audited Financial Statements for FY 2015-
2016
MEETING DATE: March 10, 2017
RECOMMENDATION:
Receive presentation from Daffodil Nguyen, CPA from Moss, Levy &
Hartzheim, LLP, on PRWFPA’s Draft Audited Financial Statements for fiscal
year (FY) 2015-2016 and accept the statements.
BACKGROUND/DISCUSSION:
Pursuant to PRWFPA’s by-laws, an independent audit firm performs an
annual financial audit and an opinion is issued on PRWFPA’s financial
position as of the year ended June 30. The Draft Audited Financial
Statements for FY 2015-2016 is for the period ending June 30, 2016.
PRWFPA received an unmodified (“clean”) opinion.
The Draft Audited Financial Statements for FY 2015-2016 (separately
enclosed) are comprised of two sections:
Financial Section – this section has the independent auditors’ report
from Moss, Levy & Hartzheim, LLP; the Management Discussion and
Analysis, which is managements’ overview of PRWFPA’s financial position;
a description of how the budget is adopted and managed; identification of
P.O. Box 2453, Seaside, CA 93955 Phone: 831.883.3750 FAX: 831.883.3755 www.pajaroriverwatershed.org Member Agencies:
County of Monterey
County of San Benito
County of Santa Clara
County of Santa Cruz
Monterey County Water
Resources Agency
San Benito County
Water District
Santa Clara Valley
Water District
Santa Cruz County Zone
7 Flood Control District
Page 5 of 38
any major issues and projections for the future; the government-wide and
fund financial statements; and notes disclosures of the financial statements.
Required Supplementary Information – this section includes budgetary
comparison schedules for the general fund and for each major special
revenue fund that has a legally adopted annual budget.
FINANCIAL IMPACT: The Management Discussion and Analysis section of the Draft Audited
Financial Statements for FY 2015-2016 discloses managements’ perspective
on the financial position of PRWFPA. PRWFPA had a positive net position
of $655,945 representing an increase of $51,986 over the prior year fiscal
year. COORDINATION: The Association of Monterey Bay Area Governments (AMBAG) staff worked
with auditors from Moss, Levy & Hartzheim, LLP prior to, during and
subsequent to onsite audit fieldwork to ensure the timely and successful
completion of this audit. ATTACHMENT: 1. Draft Audited Financial Statements for FY 2015-2016 are separately
enclosed. APPROVED BY:
__________________________________
Maura F. Twomey, Executive Coordinator
Page 6 of 38
MINUTES OF THE PROCEEDINGS OF THE BOARD OF DIRECTORS OF THE
Pajaro River Watershed Flood Prevention Authority
PRWFPA October 26, 2016 1. CALL TO ORDER The Board of Directors of the Pajaro River Watershed Flood Prevention Authority, Chair Varela presiding, convened at the Watsonville Civic Center Plaza Building, Council Chambers at 12:03 p.m. on Wednesday, October 26, 2016. 2. PLEDGE OF ALLEGIANCE Chair Varela led the Pledge of Allegiance. 3. ROLL CALL Members – Board of Directors
Representative
Present
Absent
County of San Benito Supervisor Margie Barrios X County of Santa Cruz Supervisor Greg Caput X County of Monterey Supervisor John Phillips X County of Santa Clara Supervisor Mike Wasserman X Monterey County Water Resources Agency Director Abby Taylor-Silva X San Benito County Water District Director Frank Bettencourt X Santa Clara County Water District Director John Varela X Zone 7 Flood Control District Director Nancy Bilicich X City of Gilroy (Associate Member) Rick Smelser, Engineering Director X City of Hollister (Associate Member) Vacant X City of Morgan Hill (Associate Member) Councilmember Siebert X
Others Present: Bill Springer, SCVWD; Mike Sapunor, Bruce Laclergue, Count of Santa Cruz; Richard P. Santos, SCVWD; Tony Gregorio, County of Santa Cruz; Bill Phillips, MCWRA; Manuel Quezada, MCWRA; Lidia Gutierrez, Gutierrez Consultants; Maura Twomey, Arleicka Conley, and Ana Flores, Regional Analysis and Planning Services, Inc. (RAPS, Inc.). 4. ORAL COMMUNICATIONS FROM THE PUBLIC ON ITEMS NOT ON THE
AGENDA None. 5. ORAL COMMUNICATIONS FROM THE BOARD ON ITEMS NOT ON THE
AGENDA Director Varela presented Director Margie Barrios with a plaque thanking her for her dedication to the PRWFPA. This will be Director Barrios’ last meeting.
Page 7 of 38
6. CONSENT AGENDA
A. Minutes of the September 9, 2016 Board of Directors Meeting The minutes of the September 9, 2016 Board of Directors meeting were approved. B. Approval of Payment to Gutierrez Consultants Invoices for services rendered by Gutierrez Consultants in August 2016 – September 2016 were approved. C. Approval of Payment to RAPS, Inc.
Invoices for services rendered by RAPS, Inc. in August 2016 – September 2016 were approved.
D. ABC Law Firm Invoices Invoices for services rendered by ABC Law firm were approved. E. ESA Invoice Invoice for services rendered by ESA was approved. F. 2017 Calendar of Meetings The 2017 calendar of meetings was approved. G. Financial Update Report The financial update report was accepted. Motion made by Director Barrios, seconded by Director Phillips to approve the
consent agenda. Motion passed unanimously.
7. ITEMS REMOVED FROM CONSENT CALENDAR FOR DISCUSSION AND POSSIBLE ACTION None. 8. PLANNING A. Soap Lake Floodplain Preservation Project Update
Lidia Gutierrez, Gutierrez Consultants reported that the Santa Clara County Open Space Authority (OSA) has received the lab results from the removal of the underground storage tank (UST) on the Leung property. Ms. Gutierrez reported that the results do not warrant opening a leak case and there is no indication that additional work will be necessary. The County of Santa Clara will be sending a letter stating that no further action will be required.
Page 8 of 38
The project is on track to close by the deadline of November 30, 2016. Brief discussion followed. 9. Other Business Chair Varela announced that the 2016 Legislative Conference is scheduled to start at 1:00 PM. The conference is open to the public. 10. ADJOURNED The meeting adjourned at 12:13 a.m.
Page 9 of 38
PRWFPA BOARD OF DIRECTORS MEETING ATTENDANCE & VOTING RECORD
BOARD MEETING DATE: October 26, 2016
Attendance (X= Present; AB= Absent) Voting (Y= Yes; N=No; A=Abstain)
MEMBER PRWFPA REP
Attendance Item# 6 Consent
County of Monterey John Phillips X Y - - -
County of San Benito Margie Barrios X Y - - -
County of Santa Clara Mike Wasserman X Y - - -
County of Santa Cruz Greg Caput X Y - - -
Monterey County Water Resources Agency
Abby Taylor-Silva AB - - - -
San Benito County Water District
Frank Bettencourt AB - - - -
Santa Clara Valley Water District
John Varela X Y - - -
Zone 7 Flood Control Nancy Bilicich X Y - - -
Associate Members (Non-Voting Members)
City of Gilroy (Associate Member)
Rich Smelser, Engineering Director AB
City of Hollister (Associate Member)
Vacant AB
City of Morgan Hill (Associate Member)
Gordon Siebert AB
(* = Board Members that arrived late, therefore, did not vote on the item. Please refer the minutes)
Page 10 of 38
MINUTES OF THE PROCEEDINGS OF THE BOARD OF DIRECTORS OF THE
Pajaro River Watershed Flood Prevention Authority
PRWFPA November 16, 2016 1. CALL TO ORDER The Board of Directors of the Pajaro River Watershed Flood Prevention Authority, Chair Varela presiding, convened via conference call at 10:02 a.m. on Wednesday, November 16, 2016. 2. ROLL CALL Members – Board of Directors
Representative
Present
Absent
County of San Benito Supervisor Margie Barrios X County of Santa Cruz Supervisor Greg Caput X County of Monterey Supervisor John Phillips X County of Santa Clara Supervisor Mike Wasserman X Monterey County Water Resources Agency Director Abby Taylor-Silva X San Benito County Water District Director Frank Bettencourt X Santa Clara County Water District Director John Varela X Zone 7 Flood Control District Director Nancy Bilicich X City of Gilroy (Associate Member) Vacant X City of Hollister (Associate Member) Vacant X City of Morgan Hill (Associate Member) Councilmember Siebert X
Others Present: Jackie McCloud, City of Watsonville; Lidia Gutierrez, Gutierrez Consultants; Maura Twomey and Ana Flores, Regional Analysis and Planning Services, Inc. (RAPS, Inc.). 3. ORAL COMMUNICATIONS FROM THE PUBLIC ON ITEMS NOT ON THE
AGENDA None. 4. ORAL COMMUNICATIONS FROM THE BOARD ON ITEMS NOT ON THE
AGENDA None. 5. PLANNING A. Soap Lake Floodplain Preservation Project Update
Lidia Gutierrez, Gutierrez Consultants reported that staff is recommending approval of an amendment to the date of close of escrow for the $1,882,500 contingent grant awarded to the Open Space Authority (OSA). Ms. Gutierrez also stated that there is a correction to the board memo. Item (A) of the conditions should state (a) OSA entering into and fully
Page 11 of 38
executing a purchase and sale agreement with the sellers for fee title acquisition of the Leung Property by no later than August 17, 2016. The recommended change is as follows. Approve OSA grant award of $1,882,500 and direct staff to proceed with grant contracting with OSA, contingent upon OSA’s satisfaction of all of the following conditions precedent: (a) OSA entering into and fully executing a purchase and sale agreement with the sellers for fee title acquisition of the Leung Property by no later than August 17, 2016, (b) If required by the State of California Department of Water Resources (DWR), OSA obtaining an updated appraisal that supports the specified grant award amount and is approved by the State of California Department of Water Resources, Pajaro Valley Water Management Agency, and FPA, (c) OSA closing escrow and completing the transaction (acquisition of fee title of the Leung Property) by no later than November 30, 2016 December 14, 2016, (d) OSA executing a Grant Agreement for Acquisition of Fee Interest with the FPA in form approved by FPA, which incorporates the Proposition 50 Grant Agreement Between State of California Department of Water Resources (DWR) and Pajaro Valley Water Management Agency (PVWMA), Agreement Number 4600007652 Under Water Security, Clean Drinking Water, Coastal and Beach Protection Act of 2002 (“Proposition 50 Grant Agreement”), and the Standard Conditions incorporated therein (including, but not limited, Standard Conditions D.6, Budget Contingency, D.16, Income Restrictions, and D.23, Prohibition Against Disposal of Project Without State Permission), and includes any conditions relating to environmental site conditions and CEQA review required by the DWR, and (e) Approval of the invoices (by FPA, Pajaro Valley Water Management Agency and the State) and availability and disbursement of funds from the State under the Proposition 50 Grant Agreement. Motion made by Director Wasserman, seconded by Director Barrios to approve the extension of the close of escrow date to the contingent grant awarded to OSA from November 30, 2016 to December 14, 2016. Motion passed unanimously. 6. Other Business None. 7. ADJOURNED The meeting adjourned at 10:12 a.m.
Page 12 of 38
PRWFPA BOARD OF DIRECTORS MEETING ATTENDANCE & VOTING RECORD
BOARD MEETING DATE: November 16, 2016
Attendance (X= Present; AB= Absent) Voting (Y= Yes; N=No; A=Abstain)
MEMBER PRWFPA REP
Attendance Item# 5.A
County of Monterey John Phillips X Y - - -
County of San Benito Margie Barrios X Y - - -
County of Santa Clara Mike Wasserman X Y - - -
County of Santa Cruz Greg Caput X Y - - -
Monterey County Water Resources Agency
Abby Taylor-Silva AB - - - -
San Benito County Water District
Frank Bettencourt X Y - - -
Santa Clara Valley Water District
John Varela X Y - - -
Zone 7 Flood Control Nancy Bilicich X Y - - -
Associate Members (Non-Voting Members)
City of Gilroy (Associate Member)
Vacant AB
City of Hollister (Associate Member)
Vacant AB
City of Morgan Hill (Associate Member)
Gordon Siebert AB
(* = Board Members that arrived late, therefore, did not vote on the item. Please refer the minutes)
Page 13 of 38
THIS PAGE IS
INTENTIONALLY BLANK
Page 14 of 38
February 14, 2017 Ms. Maura Twomey, Executive Director Pajaro River Watershed FPA Post Office Box 2453 Seaside, CA 93955-2453 Dear Maura: Attached is an invoice from Gutierrez Consultants for professional services provided from January 1, 2017 through January 31, 2017. The services were provided in accordance with the Soap Lake Floodplain Preservation Project Contract. The invoice is for a total amount of $5,793.30 and the balance remaining is $41,751.90.
Sincerely, Lidia Gutierrez Principal
Page 15 of 38
Bill To:Pajaro River Watershed FPAPO Box 2453Seaside, CA 93955-2453
Invoice
Item Description Quantity Rate AmountFPA Subtask1.9 PartnerFacilit
Prepare for and participate in Staff Working Groupmeeting (call) on January 10, 2017; review HighSpeed Rail project information documents; reviewfinal executed Open Space Authority and FloodPrevention Authority grant agreement; prepare draftBoard of Directors powerpoint presentations; reviewand edit Staff Working Group agenda; reviewAgricultural Land Mitigation Program Grantguidelines; prepare draft FY 17/18 projectexpenditure projections; prepare for and attendJanuary 26, 2017 Staff Working Group meeting inWatsonville; review revised Board memo andagenda
27 211.00 5,697.00
ODCs Mileage: travel to January 26, 2017 Staff WorkingGroup meeting in Watsonville
180 0.535 96.30
Date02/14/17
Gutierrez Consultants118 Diablo Ranch CourtDanville, CA 94506
Invoice No.1034
Project
Total
Service Period
1/1/17-1/31/17
$5,793.30
Page 16 of 38
Page 17 of 38
Page 18 of 38
Page 19 of 38
THIS PAGE IS
INTENTIONALLY BLANK
Page 20 of 38
`
MEMORANDUM
TO: PRWFPA Board of Directors
FROM: Maura F. Twomey, Executive Coordinator
RECOMMENDED BY: Arleicka Conley, Director of Finance &
Administrative Services
SUBJECT: Financial Update Report
MEETING DATE: March 10, 2017
RECOMMENDATION:
It is recommended that the Board of Directors receive the financial update
report.
BACKGROUND/DISCUSSION:
Regional Analysis & Planning Services, Inc. (RAPS) provides contract
staffing services to the Pajaro River Watershed Flood Prevention Authority
(PRWFPA). The contract includes administrative and financial services for
the Board as well as the Staff Working Group (SWG). The monthly financial
reporting, budget preparation and audit assistance fall within RAPS, Inc.
duties. The Board packet includes the year-to-date financial reports through
January 31, 2017 as well as a budget-to-actual comparison for fiscal year (FY)
2016-2017. Amounts in the financial update report are unaudited.
The Balance Sheet reflects a cash balance of $589,086.47. Accounts
receivables outstanding as of the end of January 2017 totaled $1,762,814.53,
consisting of three outstanding quarterly invoices to Pajaro Valley Water
Management Agency (PVWMA) for the period of April 1, 2016 through
December 31, 2016.
The current liabilities balance is $1,741,197.03. PRWFPA has sufficient
current assets on hand to pay all known current obligations.
P.O. Box 2453, Seaside, CA 93955 Phone: 831.883.3750 FAX: 831.883.3755 www.pajaroriverwatershed.org Member Agencies:
County of Monterey
County of San Benito
County of Santa Clara
County of Santa Cruz
Monterey County Water
Resources Agency
San Benito County
Water District
Santa Clara Valley
Water District
Santa Cruz County Zone
7 Flood Control District
Page 21 of 38
During the period of July through January, PRWFPA incurred routine
operational expenditures for contractual services. The services provided are
summarized as follows:
RAPS, Inc.: Staff Working Group and Board of Director’s agenda
preparation and meeting attendance; accounting and audit related
work and Legislative Conference administration.
Gutierrez Consultants: work associated with the Soap Lake
Floodplain Preservation Project and meeting preparation and
attendance.
Atchison, Barisone, Condotti, & Kovacevich: ongoing legal services
consisting of contract and grant reviews.
Environmental Science Associates (ESA): Presentation of San Benito
River Erosion Reduction Conceptual Plan.
Moss, Levy & Hartzheim: audit fieldwork, preparation/drafting of the
audited financial statements for the FY 2015-2016 audit.
Santa Clara Valley Open Space Authority (OSA): land acquisition of a
100.6-acre Leung property in the Soap Lake Floodplain.
Expenses for the July 2016 through January 2017 period totaled
$1,961,160.36, which included contractual services, insurance, audit services
and other expenses.
PRWFPA’s Profit and Loss Statement reflects an excess of revenue over
expense of $38,597.84 for the period July 1, 2016 through January 31, 2017.
The following table highlights key Budget to Actual financial data:
Budget to Actual Financial Highlights
For Period July 1, 2016 Through January 31, 2017
Expense
Budget July 2016 - June 2017
ActualJuly 2016 - January 2017 Difference
Professional Services 2,026,225.00$ 1,956,430.37$ 69,794.63$
Insurance 1,600.00$ 1,377.00$ 223.00$
Supplies 2,500.00$ 3,322.87$ (822.87)$
Travel 1,500.00$ 30.12$ 1,469.88$
Total 2,031,825.00$ 1,961,160.36$ 70,664.64$
Revenue
State/Local Revenue 2,031,825.00$ 1,999,758.20$ (32,066.80)$
Page 22 of 38
Professional Services are under budget primarily due to the remaining fiscal
year contractual obligations as follows:
RAPS, Inc. - $15,874.50
Gutierrez Consultants - $41,751.90
Atchison, Barisone, Condotti, & Kovacevich - $15,273.23
ATTACHMENTS:
1. Balance Sheet as of January 31, 2017
2. Profit and Loss Statement: July 1, 2016 through January 31, 2017
3. Accounts Receivable Aging Detail as of January 31, 2017
4. Accounts Payable Aging Detail as of January 31, 2017
5. Check Register: September through October 2016
APPROVED BY:
____________________________________
Maura F. Twomey, Executive Coordinator
Page 23 of 38
Unaudited Pajaro River Watershed Flood Prevention Authority
Balance Sheet As of January 31, 2017
January 31, 2017
ASSETS
Current Assets
Cash and Cash Equivalents
Cash in Bank Checking 459,844.79
LAIF Account 129,241.68
Total Cash and Cash Equivalents 589,086.47$
Accounts Receivable
Accounts Receivable 1,762,814.53
Total Accounts Receivable 1,762,814.53$
Long-Term Assets
Retention Receivable 355,047.85
Total Long-Term Assets 355,047.85$
TOTAL ASSETS 2,706,948.85$
LIABILITIES & FUND BALANCE
Liabilities
Current Liabilities
Accounts Payable 1,741,197.03
Total Current Liabilities 1,741,197.03$
Long-Term Liabilities
Retention Payable 271,208.80
Total Long-Term Liabilities 271,208.80$
2,012,405.83$
Fund Balance
Fund Balance - Beginning of Fiscal Year 655,945.18
Net Income/(Loss) 38,597.84
Total Fund Balance 694,543.02$
TOTAL LIABILITIES & FUND BALANCE 2,706,948.85$
Total Liabilities
Page 24 of 38
Unaudited Pajaro River Watershed Flood Prevention Authority
Profit & Loss July 1, 2016 - January 31, 2017
July 1, 2016 - January 31, 2017
Income
Interest 424.43
California Proposition 50 1,935,333.77
Member Dues 64,000.00
Total Income 1,999,758.20$
Expense
Audit Expense 4,925.00
Gutierrez Consultants 32,048.10
Santa Clara Valley Open Space Authority (OSA) 1,882,500.00
Regional Analysis & Planning Service Inc. (RAPS) 29,125.50
Environmental Science Associates, Inc. (ESA) 3,105.00
Insurance 1,377.00
Legal Services 4,726.77
Other Expense
Web Hosting Costs 174.65
Legislative Conference Supplies 3,148.22
Meetings/Supplies 30.12
Total Other Expense 3,352.99
Total Expense 1,961,160.36$
Net Income/(Loss) 38,597.84$
Page 25 of 38
Unaudited Pajaro River Watershed Flood Prevention Authority
A/R Aging Detail As of January 31, 2017
Date Num Name Due Date Open Balance Paid
06/30/2016 166 PVWMA 09/28/2016 21,014.14 √09/30/2016 175 PVWMA 12/29/2016 22,767.16
12/31/2016 176 PVWMA 03/31/2017 1,719,033.23
TOTAL 1,762,814.53$
√ = Reflects payments received subsequent to January 31, 2017.
Page 26 of 38
Unaudited Pajaro River Watershed Flood Prevention Authority
A/P Aging Detail As of January 31, 2017
Date Num Name Due Date Open Balance
09/30/2016 123981 Environmental Science Associates, Inc 09/30/2016 215.00
10/19/2016 1672756081 AMBAG 12/15/2016 72.35
10/26/2016 1996804923 AMBAG 10/26/2016 100.40
10/26/2016 1997906007 AMBAG 10/26/2016 19.95
10/26/2016 57076 AMBAG 10/26/2016 110.00
10/26/2016 510283 AMBAG 10/26/2016 142.76
10/26/2016 75252 AMBAG 10/26/2016 189.88
10/26/2016 906212 AMBAG 10/26/2016 59.98
10/26/2016 2259534 AMBAG 10/26/2016 31.90
10/26/2016 0076-9434-7 AMBAG 10/26/2016 87.16
10/26/2016 e7QH AMBAG 10/26/2016 35.75
10/26/2016 705622 AMBAG 10/26/2016 131.00
10/26/2016 614210 (A) AMBAG 10/26/2016 97.63
10/31/2016 32487 Atchison, Barisone, Condotti & Kovacevich 11/30/2016 730.00
10/31/2016 1011 Gutierrez Consultants 01/29/2017 8,066.20
10/31/2016 962 Regional Analysis & Planning Services 12/30/2016 9,755.00
11/30/2016 32520 Atchison, Barisone, Condotti & Kovacevich 12/30/2016 586.40
11/30/2016 1013 Gutierrez Consultants 02/28/2017 2,110.00
11/30/2016 963 Regional Analysis & Planning Services 01/31/2017 2,674.50
11/30/2016 113016 Santa Clara County Open Space Authority 12/10/2016 1,694,250.00
12/14/2016 49555065 AMBAG 12/14/2016 24.95
12/31/2016 32545 Atchison, Barisone, Condotti & Kovacevich 01/31/2017 238.97
12/31/2016 1025 Gutierrez Consultants 03/31/2017 2,321.00
12/31/2016 9025 Moss, Levy & Hartzheim 01/30/2017 4,925.00
12/31/2016 964 Regional Analysis & Planning Services 03/01/2017 980.00
01/14/2017 49568533 AMBAG 01/13/2017 24.95
01/31/2017 32575 Atchison, Barisone, Condotti & Kovacevich 02/28/2017 159.00
01/31/2017 1034 Gutierrez Consultants 05/01/2017 5,793.30
01/31/2017 965 Regional Analysis & Planning Services 04/01/2017 7,264.00
TOTAL 1,741,197.03$
Page 27 of 38
Un
aud
ited
Paj
aro
Riv
er W
ater
shed
Flo
od
Pre
ven
tio
n A
uth
ori
ty
Ch
eck
Reg
iste
r S
epte
mb
er t
hro
ug
h O
cto
ber
201
6
Dat
eN
um
Nam
eM
emo
Am
ou
nt
09/0
8/20
1680
9A
MB
AG
Rei
mbu
rse
AM
BA
G fo
r T
rave
l, B
oard
Mee
ting/
Leg
isla
tive
Con
fere
nce
Exp
ense
and
Pre
miu
m W
eb H
ostin
g fr
om 0
7/14
/16
to 1
0/13
/16
1,87
5.10
09/0
8/20
1681
0A
tchi
son
Bar
ison
e C
ondo
tti &
Kov
acev
ich
Lega
l Ser
vice
s P
rovi
ded
from
May
Thr
ough
Jul
y 20
161,
648.
65
09
/08/
2016
811
Env
ironm
enta
l Sci
ence
Ass
ocia
tes,
Inc
San
Ben
ito R
iver
Ero
sion
Red
uctio
n C
once
ptua
l Pla
n1 fr
om 0
2/20
/16
- 03
/25/
1621
2.75
09
/08/
2016
812
Gut
ierr
ez C
onsu
ltant
sLa
ke F
lood
plai
n P
rese
rvat
ion
Pro
ject
Ser
vice
s an
d M
eetin
gs fr
om 0
5/01
/16
- 07
/31/
1611
,644
.14
09
/08/
2016
813
Reg
iona
l Ana
lysi
s &
Pla
nnin
g S
ervi
ces
Age
ncy
Adm
inis
trat
ion
from
May
Thr
ough
Jul
y 20
169,
125.
00
10
/06/
2016
814
Gla
tfelte
r In
sura
nce
Gro
upR
enew
Insu
ranc
e P
olic
y fo
r P
erio
d 09
/17/
16 -
09/
17/1
71,
377.
00
10
/21/
2016
815
AM
BA
GR
eim
burs
e A
MB
AG
for
Tra
vel,
Boa
rd M
eetin
g E
xpen
se a
nd P
rem
ium
Web
Hos
ting
from
07/
14/1
6 to
10/
13/1
613
6.50
10
/21/
2016
816
Atc
hiso
n B
aris
one
Con
dotti
& K
ovac
evic
hLe
gal S
ervi
ces
Pro
vide
d fr
om A
ugus
t Thr
ough
Sep
tem
ber
2016
2,54
8.50
10/2
1/20
1681
7E
nviro
nmen
tal S
cien
ce A
ssoc
iate
s, In
cS
an B
enito
Riv
er E
rosi
on R
educ
tion
Con
cept
ual P
lan1
SB
CW
D P
rese
ntat
ion
in J
uly
201
62,
890.
00
10
/21/
2016
818
Gut
ierr
ez C
onsu
ltant
sLa
ke F
lood
plai
n P
rese
rvat
ion
Pro
ject
Ser
vice
s an
d M
eetin
gs fr
om 0
8/01
/16
- 09
/30/
1611
,244
.70
10
/21/
2016
819
Reg
iona
l Ana
lysi
s &
Pla
nnin
g S
ervi
ces
Age
ncy
Adm
inis
trat
ion
from
Aug
ust T
hrou
gh S
epte
mbe
r 20
167,
680.
00
10
/21/
2016
820
Sw
ing
Tim
e C
afé
Paj
aro
Legi
slat
ive
Con
fere
nce
10/2
6/2
016
Lunc
h40
4.60
TO
TA
L50
,786
.94
$
Page 28 of 38
MEMORANDUM
TO: PRWFPA Board of Directors
FROM: Lidia Gutierrez, Gutierrez Consultants
SUBJECT: Legislative Support for the Pajaro River Flood Risk
Reduction Project
MEETING DATE: March 10, 2017
RECOMMENDATION:
Approve the Budget Amendment in the amount of $6,300 to fund expenses
related to the legislative support for the Pajaro River Flood Risk Reduction
Project.
BACKGROUND:
The Pajaro River Watershed Flood Prevention Authority (Authority) was
established by the California State Legislature in 2000 to “identify, evaluate,
fund and implement flood prevention and control strategies in the Pajaro
River Watershed on an intergovernmental basis.” To accomplish this goal,
the Authority’s Board of Directors has committed to supporting the Pajaro
River Flood Risk Reduction Project, including supporting the effort to secure
the necessary federal funding, staffing and commitment to continue project
planning, engineering and environmental documentation. Staff is
recommending that this support involve a lobbying trip to Washington D.C.
to meet with elected officials, representatives from the Army Corps of
Engineers (Corps), and relevant legislative budget committee representatives.
DISCUSSION:
The Pajaro River Flood Risk Reduction Project is a joint effort between the
Corps and the Local Sponsors (Santa Cruz and Monterey Counties).
Historically, inconsistent and inadequate federal funding and staffing has
P.O. Box 2453, Seaside, CA 93955 Phone: 831.883.3750 FAX: 831.883.3755 www.pajaroriverwatershed.org Member Agencies:
County of Monterey
County of San Benito
County of Santa Clara
County of Santa Cruz
Monterey County Water
Resources Agency
San Benito County
Water District
Santa Clara Valley
Water District
Santa Cruz County Zone
7 Flood Control District
Page 29 of 38
severely delayed the development of a Corps flood protection strategy, leaving the
Pajaro Valley at significant risk of additional flooding, threats to life and safety, and
continued economic damages. However, over the last two years substantial progress
was recorded with respect to its acceptance into the Corps SMART planning process,
an Alternative Formulation Briefing Conference, execution of a new Feasibility Cost
Share Agreement, execution of a contract for the required NEPA and CEQA
documents, and then the receipt of full federal funding through completion of the
study. Most of the pressing time sensitive matters appeared to be resolved.
Unfortunately, additional time sensitive matters have resurfaced.
Since the conversion to the Corps’ SMART planning in August 2014, the project study
schedule has slipped 18 months in what is supposed to be a three-year planning effort.
These delays postpone the study completion date and led to the Army Corps of
Engineers placing the project on inactive status. A projected conclusion is now well
outside the three year planning window and the entire project is in jeopardy, which
requires additional federal attention to restart the project.
The Local Sponsors, Santa Cruz and Monterey Counties along with the City of
Watsonville, are working diligently to get the Federal support needed to get the
project restarted. As recommended by their lobbyist and Congressman Panetta, the
Local Sponsors intend to work with elected representatives and the Corps, both
locally and in Washington DC, to raise the attention on and priority of the Pajaro
River project.
The Local Sponsors will be scheduling meetings with the local offices of elected
representatives and travelling to Washington D.C. to meet with headquarters and
capitol staff, as recommended by the lobbyist. The timing for the visit is unknown at
this time and is dependent on the staffing transitions in Washington DC and the
priorities of the new administration.
Local Sponsors are seeking support from the Authority to join them in a visit to
Washington DC to request priority attention to the Project study. A joint delegation
from the Counties and the Authority would be advantageous and would demonstrate
the unprecedented support of four counties in the state. Although the timing of the
visit is not known yet, it would likely require an expedited response to plan the trip
after a decision is made.
Santa Cruz and Monterey County staff and Supervisors and City staff and council
member will likely be participating in the trip. Staff is recommending that the Santa
Clara or San Benito representatives of the Authority and the Authority consultant,
Page 30 of 38
Lidia Gutierrez, also participate in the trip. The goal of Authority representation is to
express the four county regional support for the project funding and priority.
Meetings with the legislative and Corps representatives will be scheduled by the
Local Sponsors’ lobbyists and will likely occur over two days. Typically, the day
before and day after the meeting days are dedicated to travel, resulting in a four day
itinerary. The estimated travel costs and expenses per person for the trip is $2,100, as
detailed below, and the staff is recommending participation of up to three Authority
representatives. In addition, the Authority would incur costs for the consultant’s
travel and work time during the trip, approximately $6,300. The amount for
consultant costs included in the adopted budget is adequate to cover the consultant’s
fees for the trip to Washington D.C.
Airfare $600
Hotel $1,200
Meals $300
ATTACHMENT:
1. Draft FY 2016-2017 Budget Amendment No. 1
APPROVED BY:
______________________________
Maura Twomey, Executive Coordinator
Page 31 of 38
Paj
aro
Riv
er W
ater
shed
Flo
od P
reve
ntio
n A
uth
orit
yD
raft
FY
201
6-20
17 B
ud
get
Am
end
men
t N
o. 1
FY
201
6-20
17F
Y 2
016-
2017
FY
201
6-20
17A
dopt
edA
ctu
al A
s O
fA
men
dmen
t N
o. 1
06/0
3/16
12/3
1/16
02/0
3/17
RE
VE
NU
E:
^M
embe
r A
genc
ies
Con
trib
utio
ns -
Age
ncy
Adm
in. &
Stu
dy (
8 x
$8k)
64,0
00$
64
,000
$
64,0
00$
P
ropo
sitio
n 50
Fun
ds -
Soa
p L
ake
Pre
serv
atio
n P
roje
ct1,
967,
575
$
1,
935,
334
$
1,
972,
375
$
In
tere
st E
arne
d25
0$
41
6$
25
0$
T
otal
Rev
enu
e 2,
031,
825
$
1,
999,
750
$
2,
036,
625
$
EX
PE
ND
ITU
RE
S:
Age
ncy
Adm
inis
trat
ion
RA
PS
, Inc
.45
,000
$
21,8
62$
45
,000
$
Leg
al F
ees
20,0
00$
4,
568
$
20
,000
$
Aud
it Fe
es4,
925
$
4,
925
$
4,
925
$
L
iabi
lity
Insu
ranc
e1,
600
$
1,
377
$
1,
600
$
T
rave
l1,
500
$
35
$
6,
300
$
M
isc.
Exp
ense
(M
eetin
g E
xpen
ses,
Web
site
Hos
ting,
Sup
plie
s, E
tc.)
2,50
0$
3,35
0$
2,50
0$
Soa
p L
ake
Pre
serv
atio
n P
roje
ctG
utie
rrez
Con
sulta
nts
73,8
00$
26
,255
$
73,8
00$
S
anta
Cla
ra V
alle
y O
pen
Spa
ce A
utho
rity
1,88
2,50
0$
1,88
2,50
0$
1,88
2,50
0$
San
Ben
ito R
iver
Stu
dyE
nvir
onm
enta
l Sci
ence
Ass
ocia
tes
(ESA
)-
$
3,10
5$
-$
T
otal
Exp
endi
ture
s2,
031,
825
$
1,
947,
976
$
2,
036,
625
$
FU
ND
BA
LA
NC
E R
ES
TR
ICT
ED
(C
AR
RY
-OV
ER
):G
ener
al R
eser
ve
603,
959
$
603,
959
$
603,
959
$
Tot
al F
un
d B
alan
ce
603,
959
$
603,
959
$
603,
959
$
NO
TE
S:
(3)
FU
ND
BA
LA
NC
E R
EC
ON
CIL
IAT
ION
:B
egin
ning
Fun
d B
alan
ce60
3,95
9$
60
3,95
9$
P
rior
Per
iod
Adj
ustm
ents
-$
-
$
Exc
ess
of R
even
ues
Ove
r/(U
nder
) E
xpen
ditu
res
51,7
75$
51
,775
$
End
ing
Fund
Bal
ance
655,
734
$
655,
734
$
(4)
The
Fun
d B
alan
ce r
epre
sent
s an
acc
umul
atio
n of
net
inco
me
sinc
e th
e in
cept
ion
of th
e ag
ency
. Ple
ase
note
that
the
Age
ncy
has
rest
rict
ed th
ese
fund
s fo
r le
gal
and
gene
ral b
usin
ess
use.
(2)
A m
ajor
ity o
f th
e co
ntra
ct a
mou
nts
are
deem
ed r
eim
burs
able
exp
ense
s pu
rsua
nt to
Pro
posi
tion
50 f
undi
ng.
(1)
Pro
posi
tion
50 r
even
ue a
nd e
xpen
ditu
res
incl
ude
ease
men
t acq
uisi
tions
and
sub
sequ
ent
reim
burs
emen
t.
Page 32 of 38
Paj
aro
Riv
er W
ater
shed
Flo
od P
reve
ntio
n A
uth
orit
yD
raft
FY
201
6-20
17 B
ud
get
Am
end
men
t N
o. 1
2016
-201
7 C
ON
TR
AC
T S
ER
VIC
E A
MO
UN
TS
:A
tchi
son,
Bar
ison
e, C
ondo
tti &
Kov
acev
ich
20,0
00$
G
utie
rrez
Con
sulta
nts
73,8
00$
M
oss,
Lev
y an
d H
artz
heim
, LL
C4,
925
$
R
egio
nal A
naly
sis
and
Plan
ning
Ser
vice
s, I
nc. (
RA
PS
)45
,000
$
^20
16-2
017
ME
MB
ER
SH
IP C
ON
TR
IBU
TIO
NS
:•
Cou
nty
of M
onte
rey
8,00
0$
• C
ount
y of
San
Ben
ito8,
000
$
•
Cou
nty
of S
anta
Cla
ra8,
000
$
•
Cou
nty
of S
anta
Cru
z8,
000
$
•
Mon
tere
y C
ount
y W
ater
Res
ourc
es A
genc
y8,
000
$
•
San
Ben
ito C
ount
y W
ater
Dis
tric
t8,
000
$
•
San
ta C
lara
Val
ley
Wat
er D
istr
ict
8,00
0$
• S
anta
Cru
z C
ount
y Fl
ood
Con
trol
and
Wat
er C
onse
rvat
ion
Dis
tric
t, 8,
000
$
Z
one
7
Page 33 of 38
THIS PAGE IS
INTENTIONALLY BLANK
Page 34 of 38
2017 PRWFPA Schedule of Meetings
April 7, 2017: San Benito County Board of Supervisors Chambers
481 Fourth Street, Hollister, CA 95023
Meeting Time: 9 am
June 2, 2017: Gilroy City Hall
7351 Rosanna Street, Gilroy, CA 95020
Meeting Time: 9 am
September 8, 2017: Watsonville Council Chambers
275 Main Street, 4th Floor, (6th Flr. Parking),
Watsonville, CA 95077
Meeting Time: 9 am
November 3, 2017: Monterey County Water Resources Agency
Location to be determined
Meeting Time: 9 am
P.O. Box 2453, Seaside, CA 93955 Phone: 831.883.3750 FAX: 831.883.3755 www.pajaroriverwatershed.org Member Agencies: County of Monterey County of San Benito County of Santa Clara County of Santa Cruz Monterey County Water Resources Agency San Benito County Water District Santa Clara Valley Water District Santa Cruz County Zone 7 Flood Control District
Page 35 of 38
THIS PAGE IS
INTENTIONALLY BLANK
Page 36 of 38
PRWFPA Acronym Guide
ABC Law Atchison Barisone Condotti & Kovacevich
AEP Annual Exceedance Probability
AFB Alternate Formulation Briefing
ASA-CW Assistant Secretary of the Army, Civil Works
cfs Cubic feet per second
CEQA California Environmental Quality Act
DWR Department of Water Resources
EIR Environmental Impact Report
EIS Environmental Impact Statement
EPA Environmental Protection Agency
ESA Environmental Science Associates
FCSA Federal Cost Sharing Agreement
FEIS Final Environmental Impact Statement
FRM Flood Risk Management
FRRP Flood Risk Reduction Project
FY Fiscal Year
FFY Federal Fiscal Year
GRR General Reevaluation Report
LPP Locally Preferred Plan
LRP Locally Requested Plan
MCWRA Monterey County Water Resources Agency
NED National Economic Development
NFS Non-Federal Sponsors
NEPA National Environmental Policy Act
OMB Office of Management & Budget
OSA Santa Clara County Open Space Authority
PED Preconstruction Engineering and Design
PDT Project Delivery Team
P.O. Box 2453, Seaside, CA 93955 Phone: 831.883.3750 FAX: 831.883.3755 www.pajaroriverwatershed.org
Page 37 of 38
PRWFPA Pajaro River Watershed Flood Prevention Authority
RAPS, Inc. Regional Analysis Planning Services, Inc.
RWQCB Regional Water Quality Control Board
SBCWD San Benito County Water District
SCVWD Santa Clara Valley Water District
SF San Francisco
SMART Planning Specific, Measurable, Attainable, Risk Informed, Timely Planning
SWG Staff Working Group
SWRCB State Water Resources Control Board
TNC The Nature Conservancy
TSP Tentatively Selected Plan
USACE U.S. Army Corps of Engineers
WRDA Water Resources Development Act
Page 38 of 38