Environmental Monitoring Report
Bi-annual Environmental Monitoring Report January 2013
PAK: Power Distribution Enhancement Investment Program, Tranche 2
Prepared by Hyderabad Electric Supply Company, Sindh for the Asian Development Bank.
NOTES
(i) The fiscal year (FY) of the Government of the Islamic Republic of Pakistan and its agencies ends on 30 June.
(ii) In this report, "$" refers to US dollars.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature.
In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
ADB Bi-Annual Environmental Monitoring Report
Project Number: 2727-PAK-Tranche-II (July-December, 2012)
Islamic Republic of Pakistan: Power Distribution Enhancement Investment Project Financed by the Asian Development Bank
Prepared by: Faiz Mohammad Domki, Dy. Manager (Env & Safeguard)
PMU, HESCO, Hyderabad-Pakistan
For, Hyderabad Electric Supply Company Pakistan Electric Power Company (PEPCO)
This report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents.
Asian Development Bank
Table of Contents
Subject Page No.
Part I: Introduction
1.1 Basic Data 4
1.2 Introduction 5
1.3 Scope & Status of Work 6
Part II: Environmental Monitoring 7
Part III: Environmental Management
3.1 Submission of EIA/IEE reports 8
3.2 Findings/Observations 8
3.3 Corrective Actions 9
3.4 Consultation & Complaints 9
EIA Submission & Follow-up Letters To Sindh EPA Annex- I
Follow-up Letters To Sindh EPA Annex- II
Env. & Social Complaint Register Annex-IV
Environmental Monitoring Check List Annex-V
2
Abbreviations
ADB Asian Development Bank
AH's Affected households
AP's Affected persons
BPI British Power International
CED Chief Engineer Development
E& SS Environmental and Social Safeguard
EIA Environment Impact Assessment
EPA Environmental Protection Agency
HESCO Hyderabad Electric Supply Company
GRC Grievance Redress Committee
GOP Government of Pakistan
IEE Initial Environmental Examination
ITC Increase in transformer capacity=augmentation
Km kilometer
KV kilo-Volt
MOWP Ministry of Water and Power
PEPCO Pakistan Electric Power Company
PIC Project Implementation Consultant
PDE Power Distribution Enhancement
PMU Project Management Unit
PDEMFF Power Distribution Enhancement Multi Tranche Financing Facility
3
Part I: Introduction
1.1 Basic Data of Tranche-II
a. ADB Loan No. 2727-PAK
b. Project Title Power Distribution Enhancement Investment Project Tranche-2
c. Borrower Islamic Republic of Pakistan
d. Executing Agency Pakistan Electric Power Company (PEPCO)
e. Implementing Agency Hyderabad Electric Power Company Ltd.
f. Total Project Cost US$ 35.35 Million
j. Loan Signing Date January 28, 2011
k. Date of Effectiveness October, 5, 2011
m. Date of Physical Completion
March 31, 2015
4
1.2 Introduction
1. Hyderabad Electric Supply Company Ltd. HESCO is a Public Limited Utility
Company, established in 1998 under Companies Ord nance 1984 and is
responsible for distribution of Electric Power within itS erritorial jurisdiction
in entire Sindh except Karachi.
2. HESCO through GoP has undergone a Project Finar4ing agreement with
Asian Development Bank for:
a) Strengthening the capacity of Power Distributio and Transmission
networks
b) To meet the increasing electricity demand in the selected areas more
efficiently
c) To upgrade the existing power infrastructure.
3. Overall the proposed MFF has been designed to address both investment
and institutional aspects in electric power sector. Development Objectives/
Project Purpose will be fully achieved after completion of the proposed
Sub-projects.
4. So far no construction activity has started at any of the subprojects in
Tranche-II.
5. Environment and Safeguard Unit (ESU) HESCO is presently staffed with
Mr. Asif Sheeraz Assistant Manager (Env), Mr. Ali Khan Jamali Assistant
Manager (Admn) and Mr. Faiz Muhammad Domki Additional Deputy Manager
(Electrical Engineer). The later are working as Assistant Manager (Social
Impact) and Deputy Manager (Environment & Social Safeguard) PMU,
HESCO respectively.
6. PD (GSC), Contractor(s) and other related staff has been provided
orientation on Environmental Management & Implementation of ADB
guideline and rules/regulations of Government of Pakistan.
5
1.3 Scope & Status of Project:
Sr.
No. Sub-Project
Length of Transmission
Line (km) Status
1. Construction of New 132 kV Grid station
Jacobabad-II. 0.05
Contract Signed on 29-06-2012
2.
Conversion of 66 kV Larkana Grid Station
into 132 kV Grid Station and allied 132 kV
Transmission Line
2.44
Contract Signed on 29-06-2012
3.
Conversion of 66 kV Sukkur City Grid Station
into 132 kV Grid Station and allied 132 kV
Transmission Line
7.63
Contract Signed on 29-06-2012
4.
Conversion of 66 kV Talhar Grid Station into
132 kV Grid Station and allied 132 kV
Transmission Line
2.00
Contract Signed on 29-06-2012
5 .
Second Circuit Stringing of Sanghar-
132 kV Transmission
Line 64.38 Bidding under
process
6.
Second Circuit Stringing of Shikarpur-
Larkana 132 kV Transmission Line 67.90 Bidding under
process
7. Construction of Larkana-Mehar-Dadu 132
kV SDT Transmission Line (New) 127.72 Bidding under
process
Part II Environmental Monitoring
1. GSC & Contractor(s) have been apprised to m nitor Environmental
aspects during the implementation of Tranci e II subprojects. No
major civil work has been started at subproject ites. Environmental
Management Plan (EMP) has been made part of bidding documents
and contractor(s) are bound to comply with Environmental
Management Plan (EMP) and during execution each project will be
monitored to check the compliance with EMP.
2. Environmental Social Monitor (ESM) will fill checklists / monitoring
proforma which will be duly signed by SDO (GSC)/ ESI on fortnight
basis. The record of above parameters will be kept as specified in
bidding documents.
3. Environmental Monitorng Check list filled during visit in January, 2013
on Talhar Sub-Project (Annex-V).
7
Part -III
3.1
Environmental Management
Submission of EIA /IEE Reports
1. Initial Environmental Examination (IEE) Reports
PEPCO Consultant M/S British Power Internationa
by HESCO through PEPCO in November / Decembe
were prepared by
(BPI) and received
r 2010.
2. These reports were reviewed, converted from I E format to EIA to
comply with the local statutory requirements / Iaw
3. Approval of these EIAs was accorded by worthy CEO, HESCO, and then
uploaded on HESCO's official website (www.hesco.gov.pk).
4. EIAs have also been submitted to EPA Sindh for Environmental
Approval (Annex-I). Though EPA has been approached from time to
time vide letters (Annex-II) but approval is still under process which
will be obtained as soon as possible.
5. The Environmental Monitoring and Management Plan (EMMP) enlisted
in EIA Reports have been made part of the bidding documents of civil
works (Turnkey Project).
3.2 Findings/Observations
Findings/ Observations noted during the site visit. Its detail is as follows:
a) Land for 132 KV Jacobabad-II new grid stations has been purchased
on willing-seller, willing-buyer basis.
b) No potential significant environmental impacts associated with the
subprojects have been recorded as construction work has not been
started.
8
c) There will be some environmental impacts during execution work of
subprojects which will be mitigated by implementing EMP.
d) Suitable control measures will be required in prOj
mitigate environmental impacts, disruption,
ct area to minimize/
contamination of
surroundings arising out due to construction material/ chemicals
handling/ storage and disposal of construction waste.
3.3 Corrective action plans
Since there is no commencement of any civil work at subproject sites,
therefore, no Non-Compliance (NC), Observation neither reported nor
corrective action (CA) taken at project sites, however the works are
expected to be started soon.
3.4 Consultation and Complaints
Environmental Social Complaint Register (Annex-IV) will be placed on each active
subproject site. So far, No affected person/ household has logged any Complaint in
PMU Office.
Implementation Report on EIA/IEE Mitigation Requirements
Reference Requirement Action to date Action
Required / Comment
Compliance of Inclusion of EIA/ EIA/ IEE Reports have DONE EIA/IEE Report IEE Reports in been included/ made during Execution of Project Civil
Bidding documents part of the Bidding Documents
Work
Compliance of Inclusion of EMMP EMMP Documents DONE Environment in Bidding have been included/ Monitoring & documents made part of the Management Plan during execution of Project Civil
Bidding documents
Work
Information Dissemination
EMMP Dissemination on site of work
EMMP Disseminated on active sites of work
DONE
Formats for Monitoring
Formats for Monitoring EMMP
Monitoring Formats are ready
DONE
10
a
5 ;"-' _ 0
.f. i a 6 6
. _ _ ,, f. 2
0 N ,.. a fq 6
- -,7, C Z $)
.>. ).
.., ^ 0 .
* C 7 .2"
2 i'
i 4! /
g
e r2 - : 2
3.
2 tt: i i .2 °
OE ts , it E f
4 l' 8, 8 t-tic c e , . - e a o g2 1, - a at a 3 riBi E i 0 x E g t 2, ut0.5. m z t u 0 a ,e E-, > - :.04 E 7_ ,"6 473171 : i i 2 I " VE m ig VI 1, .fi-tii rl •
t p43>Efi, ' > • IS .9q :ii!,
. g 7.1 >;.gr, li a 2 RM E0 el 1) I .2 „ - .... 1- 4, . s 2 ,i c ix z 0,.0>ec 0 N t uW OT r i
2 E -.. z:013o 0to - U :
n 1!-:f:Ei! '2'8' i 5i 1 t 114 00 40,7,W Y.
12 1 ''' diOtP5 h ? Es 5 9 0 u13 - 11 ,act= -e et f' lz 3 a fiis!:u.itia i il gi
ri P
t 5. a 81a8gAW 14 n ;‘t 6! ilj ..; ,.J ,,i 4 vi vi 4lb .- ..;..
1'7" c 0
C
O • O
C U U
O C tn to
4.1
t c
A-, a) to 0)
.(1) z E t_
f,
2 25 ". c 0
-c > c
I.
sr-
O
0.) to a) 7 01 U1
Feb
ruar
y, 2
013
to c
ondu
ct th
e sa
me.
12- to 0) L. VI .0
whi
ch
Pub
lic
refe
rred
abo
ve, vid
e
on 2
3-06
-20
11, b
ut
due
to s
ome
(7) obi
refe
renc
e to
-5a)
-16 C U U tn M I0 3
O
26 00
70
,Fax N
o. 0
22-3
81
22
99
m
I., -o
LI.) v c) -4 rn 4'4 ..„. 0 0 fs1
F-- '.Q• rsi
iv kCI ...o t .4 -,... 03 Ul 0 0
VI n tn NN .
tu V) t■
tr.) r, WI 73 9 r+, ;.?
1.n
< „, at co m to' •-■ 0 1:3 rg -....,
Dat
ed
;30
/01
/20
13
0 11.1 .-4 in a '0
t o to Z o co to' z ...... ',... I
.-I r.,) 13 V >. C "'XI- C 0 pr. st U •-4 CO *...1 o a, r•I 01 n-r z rt.- oi 0. <
L <
O Z° z° Z3 -3— c ...1
co ,t. L.. < ...... "8 ... ti 01 RD
t t ., 2 el z >.
— 0 01 0) (/) (I) ti1 LIJ s - - - 025 o NJ -s_ L. ,z. 0 I E eu SU 4/
0- 0 't:Z; ai ...... E E E I- — ..H 1.._ o V /3 w < ul 0 0 0 o o
.x x. c .../ —I C. cl. 0 C (/) --= ..0 Ill " IA t0 > 01 ru 0 ,5 > 0 •C •C 0 0 W E •-rc Lr) z U-I >"' 1— 1— Cr: 0 ....4` C ."--,.., V) rn
N s• el, • ■ = ' w 0 ,.:1 rsi ei 8 w 4, c I ••■••■
0 •—• t-- .6 tv o = c > sn . o ii a. C u
‘c o -6 tu 6 Zs a- 6 u..., c cu tu .cZ c AZ to 1_ 1 U
O. scoodo ft) M I" C3- 2 X :13
LU 15
Z P. OE Y Y cL. t/1 cd
0
9 0
1!),
En
vir
on
me
nta
En
vir
on
me
nta
Rem
ark
s
An
y O
t her
Mit
igati
on
M
easu
re T
ak
en
fo
r R
ed
res
sa
l of
Mit
igti
on
Me
as
ure
Imp
lem
enta
tio
n
Sta
tus
of
Mit
igati
on
s
Measu
res
Date
of
Imp
lem
enta
tio
n o
f S
ug
geste
d
Mit
igati
on
M
easu
res
Imp
lem
en
tati
on
R
esp
on
sib
ilit
y
Su
gg
este
d
Mit
igati
on
M
ea
su
res
1
HESCO HYDERABAD ELECTRIC SUPPLY COMPANY
Bungalow N4.A-1 HESCO Power Wins Colony HUssainabad Hyderabad
www.hesco.gov.pk Phone No.022-926 0070,Fax No. 022-381 2299
No.CEO/HESCO/PMU/E&SS/ Dated /01/2013
THE Director Genera!, Sindh Environmental PhDtection Agency (SEPA) Plot No. ST-2/1, Sector 23
Korangi Industrial Area,
Karachi Fax No. 021-3506 5940
Subject: ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF ASIAN
DEVELOPMENT BANK TRANCHE-II SUB-PROJECTS.
Reference: 1.Your office letter No. 2011/01/03/EIA/55/1260/30 dated 30-04-2011
2.This office letter No. 9782-85 dated 20-06-2011
3.This office letter No. 341 dated 18-07-2012
This is with reference to letters referred above, vide which Public
Hearing for the subject project was scheduled on 23-06-2011, but due to some
unavoidable circumstances, it was not conducted (postponed).
In this regard, it is requested to fix any suitable date in the month of
February, 2013 to conduct the same.
CC to: - Master File.
GENERAL—MANAGER (DEV) PMU, HESCO Hyderabad
©0
0
■arsetemexe tvet
HEseo, HYDERABAD ELECTRIC SUPPLY COMPANY Bun al w No A-1 ES in. Colo Hussain bad Hyderabad Power
www.hesco.gov.pk Phone No.022-926 0070, Fax No.022-381 2299
No.CEO/HESCO/PMU/CE(Dev)/E8tSS/ 41 THE DIRECTOR (TECH) Sindh Environmental Protection Agency (SEPA) Plot No. St-2/1, Sector 23 Korangi Industrial Area, Karachi Fax No. 021-3506 5940
Dated://07/2012
Subject: ENVIRONMENTAL IMPACT ASSESSMENT (EIA) OF ASIAN DEVELOPMENT BANK TRANCHE-II SUB-PROJECTS,
Reference: This office letters No. 9782-85 dated 20.062011 and even No. 8870-71. dated 29.03.2012 (copies enclosed).
Please refer to this office letters under reference vide which it was
requested to conduct a meeting in EPA Regional Office Hyderabad or in HESCO if
convenient to you while visiting Hyderabad in order to finalize the subject
report/approval but the same has yet not been carried out.
In this regard, it is again requested to arrange the meeting and
conclude the report as the subject sub-projects are at thq verge of beginning
and the ADB is pressing hard for its EIA's approval.
Matter most urgent please.
DA/As above
CC to:
Manager (P, &C) Project Management Unit
HESCO Hyderabad
Master File,
HYDERABAD ELECTRIC SUPPLY COMPANY 1111E,■,:i00 Bungalow No.A-1, HESCO Power Wing Colony, Hussainabad. Hyderabad
www.hesco.gov.pk Phone No.022-926 0070, Fax No.022-381 2299
No.CE(Dev)/PMWHESCO/E&SS/ g 87_0 Dated: /03/2012
The Director (Tech), Sindh Environmental Protection Agency (SEPA), Plot No. ST-2/1, Sector 23, Korangi Industrial Area, Karachi. Fax No. 021-3506 5940
•
Subject: Environmental Impact Assessment (EIA_L of Sub-orolects under APB Tranche-II,
This is with reference to your office letter
No.EPA/2011/01/03/EIA/55/1260/30 dated 30-04-201/ and HESCO Public Notice
dated 11.05.2011 regarding Public Hearing fixed on 23rd June, 2011 in
Committee Room, HESCO Power Wing Colony Hussaknabad, Hyderabad for which
several schedules were made to finalize the pending discussion for the subject
approval but unfortunately postponed due to one reason or another.
While now due to law and order situation at Karachi and exigency of
official work at HESCO and frequent visits to Lahore and Islamabad, it is not
feasible for the undersigned to attend a meeting at. Karachi at present
It is, therefore, requested that a meeting may be conducted in EPA
Regional Office, Hyderabad or in HESCO if convenient to you while visiting
Hyderabad.
Chief E gineer (Dev), PMU, HESCO, Hyderabad
CC to: / Director General, Sindh Environmental Protection Agency, Karachi.
Master File.
'm— HYDERABAD ELECTRIC SUPPLY COMPANY surtgaki H derabA4
www.hesco.gov.pk Phone No.022-926 0070, Fax No.022-381 2299
No .c.E(Dev)/PMUMESCO/E&SS/ 77 2
The Director General, Sindh Environmental Protection A4ency (SEPA), Piot No. ST-2/1, Sector 23, Korangi Industrial Area, Karachi.
Fax No. 021-3506 5940
Subject: Request for Postponement of Public Hearing of the EIA Report for ADB Tranche-H Projects.
Ref'nce: 1. Telephonic Conversation with Mr. Imran Sabir, Asstt. Director(SEPA) on 18-06-2011, regarding the postponement of Public Hearing. 2. Your office letter No. 2011/01/03/EIA/55/1260/30 dated 30-04-2011.
It is to inform that, due to some unavoidable circumstances, HESCO is
not in position to organize / attend the Public Hearing, .which was schedule on
23rd June, 2011.
It is, therefore requested that, Public Hearing scheduled as above
may kindly be postponed & a new date may be fixed in July, 2011 at the same
venue.
Dated.. 2-n/06/2011
Regards
(Engr. Habibullah Shaikh), Chief Engineer (Dev), PMU,
HESCO, Hyderabad CC to:
1. PSO to Chief Executive Officer, HESCO, Hyderabad. 2. HR & Admn Director, HESCO, Hyderabad. 3. Public Relation Officer (PRO), HESCO, Hyderabad.
- Master File.
MR. T AIR/gm SA8IR IDLREc7DR
r /ix 4° • 021-3506591/0
Hit3.
EM)
- HYDERABAD ELECTRIC SUPPLY COMPANY HESCO Bungalow No.A-1, HESCO Power Wing Colony, Hussainabad, Hyderabad
www.hesco.gov.pk , Phone No.022-926 0070, Fax No.022-381 2299
No.CE(Dev)/PMU/HESCO/ E&SS/ '3 1 Li 3 Dated: )A.1/03/2011
The Director General, Sindh Environmental Protection Agency (SEPA), Plot No. ST-2/1, Sector 23, Korangi Industrial Area, Karachi.
Fax No. 021-5065940
Subject: Public Hearing of the E1A Report,
Reference: Your letter No. 2011/01/03/EIA/55/1 6 dated 16-03-2011.
It is submitted that, All Pakistan Newspapers Society (APNS) has
suspended publishing the advertisements ofi Flyderabad Electric Supply
Company (HESCO) from 16-03-2011 vide letter) No. APNS/2011/67 dated
16-03-2011 (copy enclosed); hence the Public NotiCe - for Public Hearing which
was required to be published on or before 24-03-2011 has not been published.
It is expected that the matter will be resolved in week's time; it is
therefore requested that, new date for Public Hearing may please be fixed in
the 2nd week of May, 2011 at the same venue.
Regards \is
DA/A-s /442"12- (Engr. Habiilfah Shaikh), Chief Engineer (Dev), PMU,
HESCO, Hyderabad CC to:
1. PSO to Chief Executive Officer, HESCO, Hyderabad. 2. Public Relation Officer (PRO), HESCO, Hyderabad, matter be resolved at the
earliest as work is suffering.
- Master File.
EN
VIR
ON
ME
NT
AL
MO
NIT
OR
ING
CH
EC
KL
IST
15-0
1-2
013
CO
NS
TR
UC
TIO
N PH
AS
E OF
TR
AN
CH
E —
II, P
EP
CO
HY
DE
RAB
AD
ELE
CT
RIC
SU
PP
LY
CO
MP
AN
Y (
HE
SC
O)
PO
WE
R D
IST
RIB
UT
ION
EN
HA
NC
EM
ENT
INV
ES
TM
EN
T P
RO
GR
AM
Con
vers
ion
of 66
kV Ta
lhar
Grid
Sta
tion
Fia
z M
uham
mad
Dom
ki
Nam
e o
f D
ISC
O:
Nam
e o
f O
bse
rver
/Insp
ecto
r:
Su
b P
roje
ct T
ype
&L
oca
tio
n:
CO
MM
EN
TS
A.
HY
DR
OLO
GY
AN
D D
RA
INA
GE
AS
PE
CT
S
Not
req
uire
d at
thi
s st
age.
B.
OR
IEN
TA
TIO
N F
OR
CO
NT
RA
CT
OR
, AN
D W
OR
KE
RS
ST
AT
US
I
o Z
0 z Y
es
YE
S
YE
S co w r
co w r w w r I Y
ES
DE
SC
RIP
TIO
N
Are
wea
ther
con
diti
ons
feas
ible
dur
ing
par
ticul
ar c
onst
ruct
ion
act
iviti
es u
nd
erta
ken?
Are
lim
itatio
ns c
onsi
dere
d on
exc
avat
ion
dep
ths
as
per a
rea'
s w
ate
r ta
ble
pro
file?
Is la
ndsc
apin
g p
lan
use
d as
an in
teg
rate
d co
mp
onen
t o
f co
nst
ruct
ion
act
ivity
as
an
ero
sio
n co
ntro
l mea
sure
?
Is the
re a
ny re
mov
al o
f tre
es req
uire
d?
Is res
tora
tion
pro
cess
don
e w
here
con
stru
ctio
n s
ites
ha
ve b
een
cle
ared
the v
eget
atio
n?
Is D
ISC
O Env
ironm
ental
Soc
ial
Cel
l desi
gna
ted t
heir e
nv
ironm
ent
al s
pe
cial
ist to
mon
itor
and
pro
gres
s a
ll en
viro
nmen
tal s
tatu
tory
and
rec
omm
ended
obl
igat
ion
s?
Are
sp
eci
al
brie
fing
s co
nduc
ted fo
r man
ager
s an
d / o
r o
n-s
ite tr
ain
ing for
the
con
trac
tors
and
work
ers
on t
he e
nviro
nme
nta
l req
uire
men
t of
the
pro
ject
?
Is a
gre
emen
t on c
ritic
al a
rea
s to
be
co
ns
ider
ed a
nd n
ece
ssa
ry m
itiga
tion
me
asur
es
a z U) (/)
ol 4 5 — CNI 01
SM
EC
Inte
mat
iona
l Pty
Ltd
(F
acili
ty M
anag
emen
t Con
sulta
nt),
PE
PC
O P
roje
ct
CO
MM
EN
TS
As
the w
ork
has
bee
n re
cently
sta
rted
, he
nce
refr
eshe
r ses
sion
s will b
e fo
llow
ed
in fu
ture
with
lette
r an
d sp
irit.
C.
WA
TE
R Q
UA
LIT
Y
As
the c
onst
ruct
ion
wo
rk is
be
ing
carr
ied
out i
nsid
e th
e exi
stin
g G
rid Sta
tion,
whe
re
the
dra
ina
ge fa
cilit
y a
lread
y ex
ists
.
Not
req
uire
d in
th
is c
ase,
as
wo
rk is
insi
de
the
exi
stin
g G
rid
Sta
tion.
Pla
nned
in n
ea
r fu
ture
.
Not
req
uire
d, a
s no w
ate
r bo
dy (
s) is
very
ne
ar to
pro
ject
site
and
site
is
insi
de
bou
ndar
y w
all
of e
xist
ing
Grid
Sta
tion
.
Not
req
uire
d in
thi
s ca
se.
D.
AIR
QU
ALI
TY
ST
AT
US
o z
0 z
0 z
0 z
0 z 0 z
0 Z
Yes
w >- Y
ES
YE
S
DE
SC
RIP
TIO
N
impl
emen
ted
amon
g a
ll pa
rtie
s w
ho a
re in
volv
ed in
pro
ject
act
iviti
es?
Are
co
ntin
uous
pro
gres
ses
revi
ewed
and
ref
resh
er s
essi
ons
pro
perl
y fo
llow
ed?
Is te
mpo
rary
dra
inag
e m
anag
emen
t p
lan
com
pile
d o
ne
mo
nth be
fore
com
mence
men
t o
f co
nst
ruct
ion
work
s?
Are
the
pro
per in
sta
llatio
n o
f te
mpo
rary
dra
inag
e a
nd e
rosi
on c
ontr
ol d
on
e b
efo
re
cons
truc
tion
work
s w
ithin
50
m o
f wa
ter
bodi
es?
Are
pro
per
ma
inte
nanc
e an
d m
ana
gem
ent c
onst
ruct
ion
of te
mpo
rary
dra
inag
e a
nd e
rosi
on
cont
rol m
easu
res,
inc
ludi
ng tra
inin
g o
f op
erat
ors
and o
the
r work
ers
do
ne to
avo
id p
ollu
tion
of w
ate
r bo
dies
by
the
cons
ider
ate
op
erat
ion
of c
ons
truct
ion
mac
hine
ry a
nd e
qui
pm
ent?
Are
sto
rage
of lu
bric
ant
s,
fue
ls a
nd o
ther
hy
droc
arb
ons in
se
lf-co
nta
ined
dedi
cate
d
enc
losu
res
done
mor
e th
an 5
0 m
aw
ay fro
m w
ate
r bo
dies
?
Is d
isp
osa
l of s
olid
was
te f
rom
co
nst
ruct
ion
act
iviti
es d
isp
osin
g p
rope
rly?
Are
the
con
stru
ctio
n m
ate
rials
and
sp
oil s
tock
pile
s co
vere
d p
rope
rly w
ith a
su
itable
ma
teri
al
to re
duce
mat
erial
loss
into
wa
ter
bod
ies?
Is top
soil
stri
pped
mat
eri
al s
tore
d ne
ar n
atur
al d
rain
age?
Are
bor
row
site
s (i
f req
uire
d) b
eing
clo
se to s
ourc
es o
f dri
nkin
g w
ate
r?
Are
all
heav
y eq
uipm
ent an
d m
ach
iner
y fit
ted
in fu
ll co
mpl
ianc
e w
ith t
he n
atio
nal a
nd lo
cal
ci
cd co
5 '
PO
WE
R D
IST
RIB
UT
ION
EN
HA
NC
EM
EN
T IN
VE
ST
ME
NT
PR
OG
RA
M
CO
NS
TR
UC
TIO
N P
HA
SE
OF
TR
AN
CH
E -
II, P
EP
CO
tN
SM
EC
Inte
mat
ional P
ty L
td (
Fac
ility
Man
agem
ent C
onsu
ltant
), P
EP
CO
Pro
jec
t
CO
MM
EN
TS
No
any o
rcha
rd o
r fru
it fa
rm i
s nea
r th
is
sub-
pro
ject
.
Concr
ete
mix
ers
are
be
ing
use
d a
t si
te
and a
re a
way
fro
m s
en
sitiv
e re
ceiv
ers.
RO
UN
D V
IBR
AT
ION
Not
req
uired
in t
his
case
.
Not
req
uir
ed in
thi
s case
.
ST
AT
US
0 z
0 z 0 z 0 z 0 z
0
YE
S
co W >- Y
ES
YE
S
YE
S
YES
YE
S
DE
SC
RIP
TIO
N
0 (13 S 0)
Are
sto
ckp
iled s
oil
and s
and
slig
htly
wet
ted
bef
ore
lo
adin
g, p
art
icu
larl
y in
win
dy
con
diti
ons?
Are
fu
el-e
ffic
ient
an
d w
ell-
mai
nta
ined
hau
lage
tru
ck
s em
plo
yed to
m
inim
ize
ex
hau
st
emis
sion
s?
Are
ve
hicl
es tra
nsp
ort
ing
soil,
san
d a
nd
oth
er c
on
stru
ctio
n m
ater
ials
co
ver
ed?
Are
spee
d lim
itat
ions
app
lied
to m
ater
ial t
ransp
ort
ing
ve
hicl
es?
Is tra
nsp
ort
thr
ough
den
sely
po
pu
late
d a
reas
avo
ided
?
Is ther
e an
y p
lan
to m
inim
ize
the
dust
with
in t
he
vic
inity
of
orc
hard
s a
nd fr
uit
farm
s ?
Is s
pra
yin
g o
f w
ater
don
e i
n bar
e ar
eas?
Are
co
ncre
te p
lant
s to
be
con
tro
lled
in lin
e w
ith s
tatu
tory
req
uir
emen
ts a
nd a
re n
ot
close
to
se
nsi
tive
rece
pto
rs?
Is E
nvir
onm
ental M
onit
orin
g ex
ecu
ted a
s p
er c
ontr
act p
rovi
sion
?
Are
re
qu
ire
me
nts
fo
r p
ilin
g a
nd
use o
f p
ow
ered
me
ch
an
ical
eq
uip
me
nt r
ev
iew
ed
wit
hin
100m
of
sensi
tive
rece
ivers
(S
Rs)
?
Are
co
ndit
ions
of
build
ings
and
con
duct
pub
lic
consu
ltati
on r
evie
wed
with
sen
sitiv
e re
ceiv
ers
to e
sta
blish
less
se
nsi
tive
tim
e fo
r w
ork
s in
volv
ing
pili
ng a
nd
sch
edu
le w
ork
s ac
cord
ing
ly?
Are
non-p
erc
uss
ive
pili
ng m
etho
ds
to b
e use
d w
her
ever
pra
ctic
able
?
Are
per
cuss
ive p
ilin
g m
eth
ods
cond
uct
ed in
day
light
hours
?
ci ' z
(i)
co ,r 5 (0 r- 8
0) 10
.- CV 4
PO
WE
R D
IST
RIB
UT
ION
EN
HA
NC
EM
EN
T IN
VE
STM
EN
T P
RO
GR
AM
CO
NS
TR
UC
TIO
N P
HA
SE
OF
TR
AN
CH
E -
II,
PE
PC
O
SM
EC
Inte
ma
tion
al P
ty L
td (
Fa
cilit
y M
an
ag
em
ent C
onsu
ltan
t), P
EP
CO
Pro
ject
U)
>-
3 0 0 C co
O co C
_c
3 a) . a 0 c to gj)
E E O U o
C
-o co
• (13
ca
C c cn
'cr) U c al 0 E -o c >
U E. a)
E 0_ _C 5
OT C
CZ • C .0 0
= 4' co (73
cn <
0)
>-
Are
heavy
eq
uip
me
nts o
pe
rate
d o
nly
in d
ay
light h
ours
?
Are
we
ll-m
ain
tain
ed
ha
ula
ge tru
cks
used w
ith
spe
ed
co
ntr
ols
?
0)
0
C
— 8 CoC
C O °
0O .c
N N 0
• E
E (.)0 0 cn _CI
.c,
0.1 CO
• >
E CD t. co 0
" al O - -0 0 CD >,
CO
C.3
▪
t .W
O c7) O C N 0
O 2 0 17,
• C• O
Is n
ois
e m
on
itoring c
arr
ied o
ut?
Cr) co co
exc
ess
ive
no
ise e
ncl
osed
or
fitted
with
Not
re
quired in
th
is c
ase
.
Not
re
quired in th
is c
ase
.
CO
MM
EN
TS
O z 0
ci)
DE
SC
RIP
TIO
N
O z
Is H
am
mer-
type p
erc
uss
ive p
ile d
rivi
ng o
pera
tions a
llow
ed a
t n
ight t
ime?
Is th
ere
any s
uita
ble
op
era
ting
pro
ced
ure
ava
ilab
le to r
ed
uce
gro
und
vib
rati
on?
U) 0 2
LL z c2
O z 0 z
ul (NI
0)
>-
O _c
§
O
N
0
O O -o
E
O
0 C 0
O
8 cn co
O 8 , 0.. 0
N
77, Is c
am
p s
ites lo
cate
d n
ear
sett
lem
ents
or
ne
ar
dri
nkin
g w
ate
r su
pp
ly int
akes?
Are
wa
ter
an
d s
an
itary
facili
ties (
at
least
pit la
trin
es) p
rovid
ed
to
em
plo
yee
s?
Is c
utt
ing o
f tr
ees
and
re
mo
val of
veg
eta
tion p
erm
itted
near
cam
p s
ite?
WO
RK
CA
MP
OP
ER
AT
ION
AN
D LO
CA
TIO
N (
if r
eq
uir
ed
)
Is the lo
cation o
f ca
mp
site
app
rove
d b
y th
e D
ISC
O?
PO
WE
R D
IST
RIB
UTIO
N EN
HA
NC
EM
EN
T I
NV
ES
TM
EN
T P
RO
GR
AM
CO
NS
TR
UC
TIO
N P
HA
SE
OF
TR
AN
CH
E -
II, P
EP
CO
SM
EC
Inte
ma
tiona
l P
ty Ltd
(F
aci
lity
Manag
em
ent C
onsu
ltan
t), P
EP
CO
Pro
jec
t
CO
MM
EN
TS
H. S
AF
ET
Y P
RE
CA
UT
IONS
FO
R TH
E W
OR
KE
RS
Will
be
con
side
red du
ring
tra
nsm
issi
on li
ne
cons
truc
tion
.
I.
TR
AF
FIC
CO
ND
ITIO
N
Con
stru
ctio
n s
ite is
encl
osed
by a
bo
unda
ry w
all
in a
n e
xis
ting G
rid
Sta
tion.
Con
stru
ctio
n s
ite is
encl
ose
d by
a
boun
dary
wa
ll. N
o sc
ho
ol o
r ho
spita
l is
near
the s
ite o
f work
.
J.
SO
CIA
L IM
PA
CT
S
ST
AT
US
0 z
Yes
u) Lu >-
u) Lu >-
co Lu >-
U) Lu >-
U) Lu >-
DE
SC
RIP
TIO
N
Is c
am
psite
pro
perl
y fe
nced
to p
reve
nt tr
esp
assi
ng?
Is in
duct
ion
saf
ety
tra
inin
g p
rovi
ded fo
r a
ll st
aff
adeq
uate
wa
rnin
g s
igns
in h
ea
lth a
nd s
afe
ty
mat
ters
?
1
Are
the
re
qui
red
sa
fety
eq
uipm
ents
pro
vide
d to t
he w
ork
ers
be
fore
co
mm
en
cem
ent
the
wo
rk?
Are
the
re
qui
red P
PE
s (s
kull
guard
or
hard
hat
, sa
fety
be
lts,
hard
to
e s
hoes
, etc
.) p
rovi
ded
to the w
ork
ers
bef
ore
com
men
cem
ent
of w
ork
?
Is s
peci
fic h
eig
ht m
ain
tain
ed to
avo
id c
onta
ct w
ith m
agnet
ic fie
ld o
f hig
h te
nsio
n w
ires?
Are
the
te
mpo
rary
ha
uls
an
d a
cce
ss r
oute
s p
lan
su
bmitt
ed o
ne m
on
th p
rior
to s
tart
of
wor
ks?
Is it c
onsi
dere
d to
avo
id r
oute
s in
vic
inity
of s
choo
ls a
nd ho
spita
ls?
Is it co
nsid
ered
to a
void
pot
ential
for
spre
ad o
f ve
cto
r b
orn
e a
nd c
om
mun
ica
ble
dis
ease
s fr
om la
bour
ca
mps
?
Is t
here
an
y ar
rang
emen
t fo
r th
e w
ork
ers
aw
are
ness
ori
enta
tion
and
app
ropr
iate
san
itatio
n m
aint
ena
nce
?
a z li U)
- N Cl) .4- .-- Cs1 .-- CV
PO
WER
DIS
TR
IBU
TIO
N E
NH
AN
CE
ME
NT
INV
ES
TM
ENT
PR
OG
RA
M
CO
NS
TR
UC
TIO
N P
HA
SE
OF
TR
AN
CH
E -
II,
PE
PC
O
U,
SM
EC
Inte
mat
ional P
ly L
td (
Fac
ility
Man
agem
ent C
onsu
ltant
), P
EP
CO
Pro
ject
CO
MM
EN
TS
K.
INS
TIT
UT
IONA
L S
TR
EN
GT
HE
NIN
G A
ND
CA
PA
CIT
Y B
UIL
DIN
G
..zr
ST
AT
US
O z
Yes w
w >- Y
ES
YE
S
w Lu >-
DE
SC
RIP
TIO
N
Is a
ny c
om
pla
int re
gis
ter m
ain
tain
ed fo
r th
e c
om
pla
ints
of
the p
eople
on c
onst
ruct
ion
nuis
an
ce / d
am
age c
lose
to R
OW
?
Is there
any
manag
em
ent
pla
n fo
r the re
gis
tere
d c
om
pla
ints
?
Is c
ontr
act
or
havi
ng s
om
e a
ltern
ativ
e a
rra
nge
ment
s to
avo
id lo
cal c
om
mun
ity im
pa
cts?
Is t
he
re a
ny p
lan fo
r th
e c
ap
aci
ty
bu
ildin
g o
f E
nv
iro
nm
ent
al,
So
cial a
nd
Grid Sta
tion
Const
ruct
ion (
GS
C) s
taff?
ci z li U)
co 5
PO
WE
R D
IST
RIB
UT
ION
EN
HA
NC
EM
EN
T I
NV
ES
TM
EN
T P
RO
GR
AM
CO
NS
TR
UC
TIO
N PH
AS
E O
F T
RA
NC
HE
- II, P
EP
CO
SM
EC
Inte
ma
tiona
l Pty
Ltd
(F
acili
ty M
anag
emen
t Con
sulta
nt)
, PE
PC
O Pro
ject